Upload
dangcong
View
216
Download
1
Embed Size (px)
Citation preview
SUBSEA: Global Opportunities
BRAZIL
Petrobras Perspective
José FormigliE&P
Production EngineeringSeptember 2005
2
2005 Production
13.02 billion boe
Offshore (0-300m)Offshore (0-300m)OnshoreOnshore Offshore (300-1500m)Offshore (300-1500m) Offshore (> 1500m)Offshore (> 1500m)
2004 Proven Reserves (SPE)
1,91 thousand boed
10% 11%
56%
23%
8% 19%
37%
36%Current Exploratory Area
149.5 thousand km2
Petrobras Production and Reserves X Water DepthPetrobras Production and Reserves X Water Depth
5
62
1518
3
Expansion of Exploration Frontiers and New Oil Producing Basins
Expansion of Exploration Frontiers and New Oil Producing Basins
Fields discovered until 1984
Fiels discovered between 1984 and 2001
Fields discovered in 2002/2003
Oil and gas discoveries under evaluation
BS-500BS-500
BC-20BC-20Gas and light oilGGaas s andand light oillight oil
ESS-130 (Light oil)ESSESS--130 130 (L(Light oilight oil))
(Light oil)(L(Light oilight oil))
GasGGaass
(Heavy oil)((Heavy oilHeavy oil))
(Heavy oil)((Heavy oilHeavy oil))
4
2,200
2,100
2,000
1,910
1,700
2,300
1,400
1,600
1,800
2,000
2,200
2,400
2005 2006 2007 2008 2009 2010
Albacora LesteP-50
180,000 bpd2005
WI 90% BR
Albacora LesteP-50
180,000 bpd2005
WI 90% BR
BarracudaP-43
150,000 bpdCaratinga
P-48150,000 bpd
2005
BarracudaP-43
150,000 bpdCaratinga
P-48150,000 bpd
2005
JubartePhase 1
P-3460,000 bpd
2006
JubartePhase 1
P-3460,000 bpd
2006
Marlim LesteP-53
180,000 bpd2008
Marlim LesteP-53
180,000 bpd2008
Golfinho Mod. 1
100,000 bpd2006
Golfinho Mod. 1
100,000 bpd2006
RJS-409Espadarte
100,000 bpd2007
RJS-409Espadarte
100,000 bpd2007
Frade2009
WI 30% BR
Frade2009
WI 30% BR
RoncadorP-52
180,000 bpd2007
RoncadorP-52
180,000 bpd2007
RoncadorP-54
180,000 bpd2007
RoncadorP-54
180,000 bpd2007
Marlim SulModule 2
P-51180,000 bpd
2008
Marlim SulModule 2
P-51180,000 bpd
2008
Piranema20,000 bpd
2006
Piranema20,000 bpd
2006
GolfinhoMod. 2
100,000 bpd2007
GolfinhoMod. 2
100,000 bpd2007
Albacora Extension
100,000 bpd2010
Albacora Extension
100,000 bpd2010
RoncadorP-55
180,0002010
RoncadorP-55
180,0002010
GolfinhoFPSO Mod. 3100,000 bpd
2010
GolfinhoFPSO Mod. 3100,000 bpd
2010
JubartePhase 2
P-57180,000 bpd
2010WI 85% BR
JubartePhase 2
P-57180,000 bpd
2010WI 85% BR
Domestic PETROBRAS Oil Production X New ProjectsDomestic PETROBRAS Oil Production X New Projects
5
1000 m
2500 m
1500 m
Module 42013
Module 1In Operation
Module 22008 2012
Módulo 3
FPSO Marlim SulP-40
P-38
P-51
Oil PipelineGas Pipeline
P-40 / P-38 Complement
Production Wells 16 5 14
Injection Wells 10 4 10
Capacity (bpd) 155.000 100,000 180,000
First Oil 2001 2004 2008Production System
P-40 (SS) P-38 (FSO)
FPSO-MLS P-51(SS)
API 23-27 25 22
feasibility
under
study
Modules 3 & 4
Module 1Highlights Module 2
Module 1Complement
2004
Fields in Development �Marlim SulFields in Development �Marlim Sul
Water depth:850 - 2,400 m
6
Fields in Development � RoncadorFields in Development � Roncador
HighlightsModule 1A
Phase IModule 1A
Phase IIModule 2 Module 3 Module 4
Production wells 8 20 10
Injection wells 3 10 6
Capacity (bpd) 90,000 180,000 180,000
First oil 2002 2007 2007
Production system FPSO Brasil SS P-52 FPSO P-54
API 27 to 31 27 to 31 18
underfeasibility
study
underfeasibility
study
P-52 (2007)
MODULE
1A
MODULE
3
MODULE
4MODULE
2P-54 (2007)
FPSO BrasilOperating
1,500 m
1,900 m
Water depth: 1,500 � 1,900 mWater depth:
1,500 � 1,900 m
P-55 (2010)
7
Fields in Development � JubarteFields in Development � Jubarte
Highligths Pilot Phase 1 Phase 2
Production wells 1 4 21
Injection wells 6
Capacity (bpd) 20.000 60.000 150.000
First Oil 2002 2005 2009
Production System Seillean FPSO P-34 FPSOoAPI 17 17 17
Water Depth: 1,240�1,350 mWater Depth:
1,240�1,350 m
P-57 P-57
8
Fields in Development � GolfinhoFields in Development � Golfinho
Highligths Pilot Phase 1 Phase 2
Production wells 1 6 4
Injection wells 2 3
Capacity (bpd) 25,000 100,000 100,000
Production System SeilleanFPSO
CapixabaFPSO
oAPI 28 28-41 28
Water Depth: 1,300�1,450 mWater Depth:
1,300�1,450 m
9
PETROBRAS OptionPETROBRAS Option
Subsea Equipment and Floating Production Units:Subsea Equipment and Floating Production Units:
� Reservoir Characteristics
� Favorable Sea Environmental Conditions
� Early Production Unit as a Field-scale Lab for Definitive Systems
� Extended Well Testing & Phased Development
� Lower Capital Exposure & Early Cash Flow
� Anticipation of First Oil & High Level of Flexibility
� Field-proven & Reliable Technology
� Partnerships with the Main Suppliers
� Reservoir Characteristics
� Favorable Sea Environmental Conditions
� Early Production Unit as a Field-scale Lab for Definitive Systems
� Extended Well Testing & Phased Development
� Lower Capital Exposure & Early Cash Flow
� Anticipation of First Oil & High Level of Flexibility
� Field-proven & Reliable Technology
� Partnerships with the Main Suppliers
10
PETROBRAS ExperiencePETROBRAS Experience
Campos Basin
Santos Basin
Espirito Santo Basin
85% of the Domestic Reserves & Production
Campos, Espírito Santo and Santos Basins Main Data (June 2005)
4,498 Km Pipeline Network33Production Fields13Fixed Plataforms
23Floating ProductionUnits
50 � 3,400 mWater Depths
11
PETROBRAS Subsea ExperiencePETROBRAS Subsea Experience
Petrobras Offshore FacilitiesPetrobras Offshore FacilitiesSubseaSubsea Completion RecordsCompletion Records
1693,443Rigid Pipelines(Km)
2161,486 Umbilicals (Km)
3502,477Subsea FlexibleFlowlines (Km)
0258SubseaManifolds
47548Subsea Trees
Planned2005
InstalledDec/2004
Equipment
12
Floating Production SystemsFloating Production Systems
Overall Efficiency =Overall Efficiency =Actual ProductionActual Production
Potential ProductionPotential Production
* Potential Production - Sum of maximumwell production capacities which produceto a Production Unit.
* Potential Production - Sum of maximumwell production capacities which produceto a Production Unit.
Deepwater Fields Range:Overall Efficiency = up to 98%
Deepwater Fields Range:Overall Efficiency = up to 98%
Period: 2001-2003Period: 2001-2003
13
PROCAP-3000PROCAP-3000
Application Scenarios :
Roncador (1.500 � 2.000m), Mód 2,
Mód 3, Mod 4
Marlim Sul Mod 2 (1.100 � 1.500m)
Marlim Leste (1.100 � 1.700m)
Albacora Leste (800 � 2.100m)
Jubarte I, II (1.300-1.500m)
Golfinho I, II (1.300-1.500m)
Prospects at 3,000m WD
West Africa & GoM
Application Scenarios :
Roncador (1.500 � 2.000m), Mód 2,
Mód 3, Mod 4
Marlim Sul Mod 2 (1.100 � 1.500m)
Marlim Leste (1.100 � 1.700m)
Albacora Leste (800 � 2.100m)
Jubarte I, II (1.300-1.500m)
Golfinho I, II (1.300-1.500m)
Prospects at 3,000m WD
West Africa & GoM
Petrobras current strategic in-house corporate program dedicated to ultra-deepwater exploitation systems.Petrobras current strategic in-house corporate program dedicated to ultra-deepwater exploitation systems.
14
PROCAP-3000 Main GoalsPROCAP-3000 Main Goals
To provide technological solutions to:
Produce and support next phases of Marlim Sul, Roncador, Marlim Leste, Jubarte, Albacora Leste and Espirito Santo Basin light oil recent discoveries;
Make feasible the production from new discoveries in water depths up to 3,000 meters;
Reduce the Capital Expenditures in production developments in water depths beyond 1,000 meters;
Reduce Lifting Cost in currently producing fields in water depths beyond 1,000 meters.
To provide technological solutions to:
Produce and support next phases of Marlim Sul, Roncador, Marlim Leste, Jubarte, Albacora Leste and Espirito Santo Basin light oil recent discoveries;
Make feasible the production from new discoveries in water depths up to 3,000 meters;
Reduce the Capital Expenditures in production developments in water depths beyond 1,000 meters;
Reduce Lifting Cost in currently producing fields in water depths beyond 1,000 meters.
15
PROCAP-3000 Projects PortfolioPROCAP-3000 Projects Portfolio
Floating Production Units & Mooring
Drilling and Completion
Artificial Lift & Boosting
Flow Assurance
Subsea Equipment
Flowlines and Riser Systems
Floating Production Units & Mooring
Drilling and Completion
Artificial Lift & Boosting
Flow Assurance
Subsea Equipment
Flowlines and Riser Systems
16
PROCAP-3000 Project Portfolio
Floating Production Units & Mooring
PROCAP-3000 Project Portfolio
Floating Production Units & Mooring
Fit for Purpose Hull for Ultra-Deepwaters > MonoBR > FPSO BR
Mooring > Torpedo Anchors > Polyester Ropes > Spread Mooring
Fit for Purpose Hull for Ultra-Deepwaters > MonoBR > FPSO BR
Mooring > Torpedo Anchors > Polyester Ropes > Spread Mooring
17
PROCAP-3000 Project Portfolio
Drilling and Completion
PROCAP-3000 Project Portfolio
Drilling and Completion
Deepwater Drilling Equipments > Torpedo Subsea Well Base
> Slender Wellhead
> Casing Drilling
> Surface BOP Drilling
Deep Horizon Drilling > HPHT Well Drilling and Completion > Hard Rock Drilling Optimization
18
PROCAP-3000 Project Portfolio
Artificial Lift & Boosting
PROCAP-3000 Project Portfolio
Artificial Lift & Boosting
Boosting systems for ultra-deepwater
> Subsea electrical submersible pump
> Subsea multiphase pumping system
> Subsea Separation System
Gas-lift for deepwater satellite well
19
PROCAP-3000 Project Portfolio
Subsea Equipment
PROCAP-3000 Project Portfolio
Subsea EquipmentSubsea equipment for 3,000m water depth
> Guide lined installation procedures for 3,000m water depth
> Completion riser for 3,000m water depth
> Subsea test tree with ESP connection
> Guide lined installed subsea injection tree
Unconventional subsea production systems
> Subsea boosting and heating system
> Water Separation Subsea System
> Raw Sea Water Injection
Participation in DeepStar Phase V
Subsea system for 3,000m water depth long term test
Subsea equipment for 3,000m water depth
> Guide lined installation procedures for 3,000m water depth
> Completion riser for 3,000m water depth
> Subsea test tree with ESP connection
> Guide lined installed subsea injection tree
Unconventional subsea production systems
> Subsea boosting and heating system
> Water Separation Subsea System
> Raw Sea Water Injection
Participation in DeepStar Phase V
Subsea system for 3,000m water depth long term test
20
PROCAP-3000 Project Portfolio
Flowlines & Riser Systems
PROCAP-3000 Project Portfolio
Flowlines & Riser SystemsSteel catenary riser systems for ultra-deepwater > Steel catenary riser systems for FPSOs > Steel catenary riser systems for Semi-Submersibles > Installation methods for SCRs > Lazy-wave steel catenary risers
Flexible riser systems for ultra-deepwater > Steep-wave flexible risers for FPSOs and SS > Thermal insulation
Subsea risers and pipelines (gathering, exportation and control) for 3,000m water depth
Alternative riser systems for ultra-deepwater > Tethered riser buoy (TRB) > Hybrid catenary riser (HCR) > Self-standing riser (Tower) > Single line offset riser (SLOR) > Concentric offset riser (COR)
Steel catenary riser systems for ultra-deepwater > Steel catenary riser systems for FPSOs > Steel catenary riser systems for Semi-Submersibles > Installation methods for SCRs > Lazy-wave steel catenary risers
Flexible riser systems for ultra-deepwater > Steep-wave flexible risers for FPSOs and SS > Thermal insulation
Subsea risers and pipelines (gathering, exportation and control) for 3,000m water depth
Alternative riser systems for ultra-deepwater > Tethered riser buoy (TRB) > Hybrid catenary riser (HCR) > Self-standing riser (Tower) > Single line offset riser (SLOR) > Concentric offset riser (COR)
21
ConclusionsConclusions
� Deep and Ultra-deepwaters are �mandatory� for Petrobras domestic production increment;
� Petrobras operational experience leads to �one most probable option� : FPS + Subsea Completions;
� Petrobras operational record proves competitiveness of subsea production systems
� Technology is available for 2000m production developments;
� Continuous Investment in R&D to turn feasible production of new discoveries in water depths up to 3,000 meters;
� Deep and Ultra-deepwaters are �mandatory� for Petrobras domestic production increment;
� Petrobras operational experience leads to �one most probable option� : FPS + Subsea Completions;
� Petrobras operational record proves competitiveness of subsea production systems
� Technology is available for 2000m production developments;
� Continuous Investment in R&D to turn feasible production of new discoveries in water depths up to 3,000 meters;