    Introduction

    According to the provisional data provided by census 2011, population in India amounts

    to 1.21 billion with around 30% of them living in cities. The latest projections suggest

    that 40% of the Indians will have moved into the cities by 2021. Urban population will

    rise from 360 million to 575 million by 2021. India can achieve four fold growth in its

    per capita income. Currently 70% of the GDP is generated in the cities which will only

    grow in the coming years.

    While urbanization has fueled growth into our economy, it has also created much

    pressure on the present physical infrastructure of the country. To keep the growth

    momentum going, India must develop a internally consistent practices across every

    element of the planned urbanization like funding, planning, governance, sectoral policies

    and shape and pattern of the urbanization. India is still waking up to its urban realities

    and the opportunities its cities can offer for economical and social transformation.

    Providing efficient utility services like water supply, waste management, and

    transportation to such a large and rapidly growing population will be a huge challenge

    and will require very strong financial and technical sources.

    From past experiences and by the analysis of the current situation it is clear that there will

    be huge demand- supply gap of the public utility services and its infrastructure. It would

    result into disappointment if we just expect Central and State Government to bridge the

    gap. The private sector will have to come up with its financial resources, technical

    expertise and managerial skills to complete the task.

    The administrative and political structure in India is not competent enough to attract the

    private investors to fund the public utility services projects. The Urban local bodies must

    improve their efficiency and balance sheet to attract private partners. There is also very

    strong need of development on reforms side, which is politically very sensitive area.

  • 8/6/2019 Study on present scenario of water sector in India

    2/44

    Water supply and sanitation were added to the national agenda during the first five-year

    planning period.(1951- 1956) and a new National Water Policy was adopted in 2002.

    Government of India launched the projects like JNNURM and UIDSSMT in 2005 to

    focus attention on the urban infrastructure. Five year past the launch both projects have

    achieved some success in the areas of project planning and implementation, but still there

    is a scope in the area of reforms which need to be addressed as soon as possible.

    Focus is only on developing the infrastructure facilities, and not much attention is given

    to the maintenance of the existing infrastructure. This has resulted into poor utilization of

    the facility and inefficient service delivery.

    In this report we have tried to analyse the water sector in India on various parameters like

    policies and regulatory framework, present scenario, upcoming trends like PPP and its

    scope and technological advancements in the sector. We have tried to find out the

    opportunities in the sector and the future prospects of the sector.

    Overview of the sector

    Urban India is in the midst of transformation. In this era of economic reform,liberalization and globalization, cities and towns are fast emerging as centers of growth.

    Indias water resources are stressed and depleting day by day, while the demand of all

    sectors like drinking water, Industrial water demand, agriculture water demand are

    growing rapidly because of the urbanization and population increase.

    Water supply is the responsibility of the state government under the Indian Constitution.

    The Ministry of Housing and Urban Poverty Alleviation and Ministry of Rural

    Development are the two ministries at the central level responsible for the water

    supply.At present in India generally the State Government plan, design and execute the

    water supply schemes and pass on the responsibility to Urban Local Bodies (ULB) to

    maintain and operate the facility. Some largest cities have created municipal water and

    sanitation utility boards that are legally and financially separated from the local

  • 8/6/2019 Study on present scenario of water sector in India

    3/44

    government, but still they lack in terms of financial capacity. Due to the highly

    centralized decision making and approvals at the state level most of the projects gets

    delayed. Tariffs are also set by the State Governments which often do not cover even the

    operating expenses. There is a strong need for de-centralization of the authority, and

    ULBs should be given the autonomy to plan and design the projects and schemes for the

    water supply.

    One problem in Indias water supply system which has got very less attention yet is that

    people of India consider water as a free goods and dont view water supply services as

    any other utility services like electricity and gas, while water supply system also has

    same requirements of funds for capacity building, expansion, operation and maintenance.

    This attitude of Indian people has made it difficult to charge realistic tariffs, which has

    led to non recovery of the costs by the ULBs which in turn happened to be the reason for

    inadequate and irregular water supply.

    Investment in the water sector by India is comparatively much lower at $5/ per capita

    than compared to the other developing countries at $14/per capita. The government is

    now encouraging the ULBs to approach the private sector not only for their funding

    requirements but also for their technical expertise to bring operational efficiency in the

    services. The situation in India is slowly beginning to change. National water policy has

    been adopted in 2002 and the launch of JNNURM and UIDSSMT were the main

    contributors in the growth of the sector from past five years. Analysis of the data from

    various sources suggests that around 91% to 93% population in urban India gets their

    drinking water from protected sources. And overall 96% of the urban population has

    access to improved source of water.

    From 1951 to 1997 the rapid expansion of irrigation and drainage infrastructure has been

    one of Indias major achievements However, this achievement has come at the cost of

    groundwater depletion.

  • 8/6/2019 Study on present scenario of water sector in India

    4/44

    Water supply sector consists of infrastructure for the procurement, transmission,

    treatment, storage, and distribution of water for homes, commercial establishments,

    industry, and irrigation, as well as for such public needs as firefighting and street

    flushing.

    Water procurement:- The major source for water procurement in India for local bodies

    is surface water, which consists of water from ponds, lakes, streams and rivers and from

    water reservoirs. As most of the rivers in India are now getting highly polluted, this

    source has becoming less useful day by day.

    The another source of water is ground water. The ground water sources of water are

    based on rainwater that goes deep down into the earth to be stored inside the earth. The

    water, which is so stored inside the earth in the form of ground water reservoirs,

    constitutes the major sources of sub-surface water supply. Underground water is

    generally pure because of natural filtration during the percolation process. Ground water

    makes up about twenty percent of the worlds fresh water supply.

  • 8/6/2019 Study on present scenario of water sector in India

    5/44

    Depleting ground water table and deteriorating ground water quality are threatening the

    sustainability of both urban and rural water supply in many parts of India. The supply of

    cities that depend on surface water is threatened by pollution, increasing water scarcity

    and conflicts among users.

    In India now increasing emphasis is given on water conservation, rainwater harvest and

    ground water recharge.

    Water Transmission:-. In India most of the water supply systems use underground pipes

    for the transmission of water. A very common problem in India is water is often wasted

    through leaking pipes, joints, valves and fittings of the transmission system either due to

    bad quality of materials used, poor workmanship, and corrosion, age of the installations..

    This leads to reduced supply and loss of pressure.

    Water Treatment:- Almost all the water treatment plants in India, use liquid chlorine for

    pre and post chlorination process. Government of India accepts the quality standards by

    WHO but it is unable to meet them.

    Water Distribution:- The most important process of any water supply system is the

    effective and efficient water distribution system. India lacks behind in this area.

    Nearly all the cities and towns in India have piped water system but do not function

    efficiently and there is always problem of low pressures and frequent breakdowns. The

    reason behind this is the in India all the emphasis is being given to the creation of the

    infrastructure facilities but there is very little attention given on the efficient maintenance

    of the facilities developed at huge costs. This results into a very high level of Non-

    revenue water.

    Quality of the water

    Quality of the water provided by the ULBs has always been an issue in the country. 2003

    survey showed that 87% of water reservoirs serving residential buildings and 63% of the

    tap water has high level of faecal contaminations.

  • 8/6/2019 Study on present scenario of water sector in India

    6/44

    India accepts the quality standards for water given by WHO but is not able to met the

    standards.

    Cost Recovery

    According to a 2007 study of 20 cities the average rate of cost recovery for operating and

    maintenance costs of utilities in these cities was 60%. Chennai generated the highest

    relative surplus and the lowest cost recovery ratio was found in Indore which recovered

    less than 20% of its operating and maintenance costs.

    Challenges faced in attempting to increase tariffs.

    Tariffs in India for the water services are much lower than the other Asian countries.Existing evidence shows that low-income household will also afford to pay more for

    water provided the improvement in the quality of water and the regularity in the service,

    because as per the study they are already paying almost 4 to 5 times the amount due to

    irregularities in the water supply system.

    Even if users are willing to pay more for better services, political interests often prevent

    tariffs from being increased even to a small extent because the price hike in the water

    services have immediate impact on the voter sensibility.

    Subsidies in the sector

    The strong emphasis on affordability in the Indian water tariff design, and the poor

    performance in terms of recovery of the cost indicates that subsidies lie at the heart of the

    Indian water sector. As per the last available data India spends around Rs. 5470 Crore per

    year, which accounts for 4% of the all Government subsidies in India. Around 98% of

    this subsidy is provided by the State Government. This figure only covers subsidies given

    for the operating and maintaining cost of the plants. The amount including the investment

    subsidies would be much more higher.

  • 8/6/2019 Study on present scenario of water sector in India

    7/44

    According to World Bank survey, 70% of those benefiting from subsidies for public

    water supply in India are not poor, while 40% of the poor are excluded because they do

    not have access to public water services.

    Financing

    As per the Eleventh Five Year Plan (2007-12), the investment of Rs. 127,025 crore will

    be made for urban water supply and sanitation which also includes urban drainage and

    solid waste management. 55% of the proposed investments foreseen under the 11th Plan

    are to be financed by the central government, 28% by state governments, 8% by

    "institutional financing" such as HUDCO, 8% by external agencies and 1.5% by the

    private sector. Local governments are not expected to contribute to the investments.

    External cooperation

    India receives almost twice as much development assistance for water, sanitation and

    water resources management as any other country, according to data from the

    Organization for Economic Co-operation and Development. India accounts for 13 per

    cent of commitments in global water aid for 2006-07, receiving an annual average of

    about US$830 million, which is more than double the amount provided to China. India's

    biggest water and sanitation donor is Japan, which provided US$635 million, followed by

    the World Bank with US$130 million. The annual average for 2004-06, however, was

    about half as much at US$448 million, of which Japan provided US$293 million and the

    World Bank US$87 million. The Asian Development Bank and Germany are other

    important external partners in water supply and sanitation.

  • 8/6/2019 Study on present scenario of water sector in India

    8/44

    Evolution of Water supply sector in India and its present status.

    Key Devlopments

    Prior to 1990

    Water supply and sanitation were added to the national agenda during the first

    five year planning period (1951-1956). The first national water supply

    programme was launched as part of the governments health plan

    The Ministry of Water Resources drafted a National Water Policy in 1987 to

    guide the planning and development of water resources throughout the

    country.

    The policy included several recommendations, which were subsequently

    adopted by the states. The recommendations focused on the need for

    introducing

    (i) Water resource management and according domestic water supply the

    highest priority.

    (ii) Design standards for groundwater structures to protect groundwater

    sources.

    (iii) Water quality monitoring and mapping, and(iv) Data management and valuation.

    Between 1990 to 2000

    74th Amendment Act was passed in 1992 with an objective to give the

    municipalities an independent status and freedom to take decisions which can

    improve their efficiency to the optimum capacity.

    The important provisions in the Act include greater functional responsibilities and

    financial powers to municipalities, regular and fair conduct of municipal

    elections, and constitution of Wards Committees, District Planning Committees,

    Metropolitan Planning Committees and State Finance Commissions.

  • 8/6/2019 Study on present scenario of water sector in India

    9/44

    The Act provided a basis for the State Legislatures to guide the State

    Governments in the assignment of various responsibilities to municipalities and to

    strengthen municipal governance.

    Through this initiative, an attempt is being made to improve the performance

    ability of municipalities, so that they are able to discharge their duties efficiently.

    After 2000.

    National Water Policy 2002 was an revised edition of National Wate Policy 1987,

    which laid emphasis on

    i. Monitoring and limiting groundwater exploitation.ii. Monitoring and enforcement of water quality.

    iii. Increase awareness on on water conservation.

    iv. The most encouraging thing which the policy included was the approach

    to encourage more and more private sector participation and access to the

    commercial borrowing. resources facilities, may be considered.

    The states have been asked to formulate state water polices based on the policy

    within the next two years.

    9th Five year Plan:- The 9th five year plan highlighted some major policies related

    to

    i. Supply of water to the entire population

    ii. Decentralization of ULBs.

    iii. Enhancing the financial viability of the water bodies through full cost

    recovery.

    10th Five year Plan.:- The 10th five year plan included some areas like

  • 8/6/2019 Study on present scenario of water sector in India

    10/44

    i. Prioritizing the water services to the currently uncovered population.

    ii. Encouragement of private players in planning and implementation of the

    scheme.

    11th Five year Plan :- The eleventh plan identified a total requirement of Rs.

    53,666 Crore in order to provide 100 percent water supply coverage to the urban

    population. There are 16 ongoing Externally Aided Projects funded by World

    Bank, JICA, and ADB.

    JNNURM:- Jawaharlal Nehru National Urban Renewal Mission is a massive

    scheme launched by Government of India with an objective to improve the

    service delivery, encourage reforms, and fast track planned developments in 65

    mission cities with an investment of 1,00,000 crores during the span of seven

    years (2005-12).

    The scheme has two sub missions.

    1. Sub-Mission for Urban Infrastructure and Governance administered by the

    Ministry of Urban Development, with a focus on water supply and sanitation,

    solid waste management, road network, urban transport and redevelopment of

    old city areas.

    2. Sub-Mission for Basic Services to the Urban Poor administered by the

    Ministry of Housing and Urban Poverty Alleviation with a focus on integrated

    development of slums.

    UIDSSMT:- The Urban Infrastructure Development Scheme for Small and

    Medium Towns is one component of JNNURM launched by the government to

    cover those small and medium towns which are not covered by JNNURM. Thescheme covers 5098 cities and towns over a period of seven years (2005-2012).

    JNNURM and UIDSSMT are the two largest initiatives in the sector which provided

    strong support for the change in the sector.

  • 8/6/2019 Study on present scenario of water sector in India

    11/44

    Major Issues / Constraints in the sector

    1. Increasing demand of water and depleting water sources.

    India receives an average annual rainfall of about 4000 billion cubic meters (BCM). The

    total utilizable water resource is assessed as 1123 BCM. The per capita availability of

    water at national level has been reduced from about 5177 cubic meters in 1951 to the

    estimated level of 1,820 cubic meters in 2001. Given the projected increase in population

    by the year 2025, the per capita availability is likely to drop to below 1,000 cubic meters,

    which could be labeled as a situation of water scarcity. Most of the rainfall occurs in the

    monsoon season from June to September. The contribution of different states is

    extremely uneven with 100 mm a year from Rajasthan to more than 9000 mm per year

    from Meghalaya. As 80% of the water from the rainfall is received in the monsoon,

    Indias rivers carry 90% of the water during the period from June to November and only

    10% river water is available during the other six months. While, India is considered rich

    in terms of annual rainfall and total water resources, its uneven geographical distribution

    causes severe regional and temporal shortages.

    Depleting ground water table and deteriorating ground water quality are threatening the

    sustainability of both urban and rural water supply in many parts of India. The supply ofcities that depend on surface water is threatened by pollution, increasing water scarcity

    and conflicts among users.

    Demand for water is growing due to urbanization. The gap between demand and water

    access is increasing continuously. As per the research by McKinsey, demand of water in

    the India will be two times of its supply in the year 2030.

    Water availability from other sources like desalination of sea water and ground water isconsidered negligible because of its high costs.

  • 8/6/2019 Study on present scenario of water sector in India

    12/44

    2. Inadequate storage capacity

    Developed, arid countries (United States, Australia) have built over 5000 cubic meters of

    water storage per capita. Middle-income countries like South Africa, Mexico, Morocco

    and China can store about 1000 cubic meters per capita. Indias dams can store only 200

    cubic meters per person. India can store only about 30 days of rainfall, compared to 900

    days in major river basins in arid areas of developed countries.

    3. Incompetent regulatory framework

    The current administrative and political structure does not give the ULBs the autonomy

    they need to operate at the optimum efficiency. In most of the states of India the decision

    making authority is still the State Government for all the matters related to water supply

    sector. For any changes in the technology or tariff changes they need to ask permission

    from the state government, and because of the slow pace of work in the government

    department, most of the decisions are not taken on the time and get delayed, which makes

    it even more difficult to implement that change. In the democracy like India the reform

    needs political willingness and support, the decisions in the sector is also politically

    sensitive as changes in the tariff and staff layoffs are more visible to public than

    improved efficiency and can have direct impact on the voters sensibilities.

    4. Poor service delivery

    A standard indicator of inefficiency in the water distribution is the percentage of water

    produced that does not reach water board customers. Unaccounted water results both

    from leakages and illegal connections. In addition to the financial costs to the water

    utility, high levels of unaccounted water are also a major reason for intermittency in the

    supply of water, since leaks and illegal connections lower water pressure in the

    distribution system.

    Not any of the Indian city having population of more than one million is able to distribute

    water for more than few hours per day. Even when the water is available in the lines

  • 8/6/2019 Study on present scenario of water sector in India

    13/44

    people struggle to get it because of the inadequate pressure, as a result households where

    the water supply is irregular have made investments for storage tanks and installed

    booster pumps in their connection to get the maximum water when it is provided. These

    practices further reduce the pressure in the main line and compel others to do the same.

    Another indicator of the inefficiency in the water distribution is non revenue water which

    is the water which is produced but which does not generate any revenue to the water

    supplying body.

    Following are reasons for the non-revenue water in India.

    Unbilled authorized consumption

    Apparent losses by water theft and metering inaccuracies

    Real losses from transmission mains, storage facilities, distribution mains or

    service connections.

    5. Poor pricing model

    Tariffs for water in India are much lower than compared to the other Asian countries.

    State Governments in India are responsible for choosing urban tariff structures, and the

    result is wide variety in pricing practices. Average tariffs in India are low relative to

    costs. A cross-region study by the Asian Development Bank found average rates in

    Calcutta and Delhi of 5-8 US cents/kilolitre (KL), 11 cents/KL in Mumbai and 31 US

    cents/KL in Chennai. In comparison, rates were 14 cents/KL in Dhaka and Karachi, 32

    cents/KL in Lahore and 41 cents/KL in Kuala Lumpur. With the exception of Chennai,

    Indian cities therefore tend to have much lower prices than other Asian cities. The major

    issue in increasing the prices for the utility is the lack of political willingness, as it can go

    have adverse impact on the sentiments of the people about the ruling party.

    The current pricing model does not generate sufficient revenue even to cover up

    operating and maintenance costs. According to a 2007 study of 20 cities the average rate

    of cost recovery for operating and maintenance costs of utilities in these cities was 60%.

  • 8/6/2019 Study on present scenario of water sector in India

    14/44

    Metering is the precondition for billing water users on the basis of volume consumed.

    According to a survey of 300 cities about 62% of urban water customers in metropolitan

    areas and 50% in smaller cities are metered (average 55%). However, meters often do not

    work so that many "metered" customers are charged flat rates.

    Problems associated with metering arise in the case of intermittent supply, which is

    common in India. Sudden changes in pressure can damage meters, so that many meters

    in India are not functional. Many types of meters also register air flows, which can lead to

    over registration of consumption, so there is also a resistance for metering in India.

    6. Growing financial crunch

    Currently, Indias water sector is in severe financial distress and the gap between the

    requirement and availability of funds is increasing. There is shortage of funds to deal

    with the needs for the development of water resources infrastructure, maintenance and

    management. Though the Government have come up with the schemes like JNNURM

    and UIDSSMT and allocated huge funds for the sector but still there is need to leverage

    JNNURM funds with private investment through PPP and borrowing from capital

    markets, which is not happening because of the absence of a proper revenue model at the

    ULB level and the outdated systems of Finance, Accounts and MIS used by most of the

    ULBs. As investors look for the repayment module prior to the investment in the sector.

    The current governance and financing structure do not create enough confidence to attract

    the private sector.

    7. Social issues

    It also needs to be considered that the issues and problems of water supply systems go

    beyond considerations of financial self-sufficiency. They include critical issues like

    welfare of the community, the social concerns, responsibilities and obligations of the

    Government as part of its commitment to the development and fulfillment of the needs of

    the urban and rural poor.

  • 8/6/2019 Study on present scenario of water sector in India

    15/44

    One problem in Indias water supply system which has got very less attention yet is that

    people of India consider water as a free goods and dont view water supply services as

    any other utility services like electricity and gas, while water supply system also has

    same requirements of funds for capacity building, expansion, operation and maintenance.

    This attitude of Indian people has made it difficult to charge realistic tariffs, which has

    led to non recovery of the costs by the ULBs which in turn happened to be the reason for

    inadequate and irregular water supply.

    The tariff hike in India has mostly met with protests, Critics viewed the price rises as

    laying the ground for privatization of water, and the ULBs mostly fail to justify their

    price hike due to lack of proper information and transparency norms. The opposition

    party always uses this as a point against the ruling party, sot there is lack of political

    support for tariff hike in the sector.

    8. Poor maintenance of infrastructure

    The crucial aspect in water supply sector which require immediate attention is that

    physical infrastructure facilities which have been developed, are not being used in the

    most efficient manner due to inadequate attention and improper operating and

    maintenance. Not much effort has been made either to manage these assets efficiently or

    to achieve self-sustainability. It is therefore necessary that a link be established between

    asset creation and management, as both are important components for ensuring sustained

    service delivery.

    9. Water quality

    The WHOs primary health requirement is that the water be microbiologically safe. In

    India the primary contaminant of surface and ground waters is human and animal waste.

    The WHO guidelines suggest thatE. coli (the indicator organism for bacterial

    contamination) should not be detectable in a 100-ml sample of water, but with fewer than

    10 coliforms, the water is considered to be of moderately good quality. The

    Government of India accepts these guidelines but has been unable to ensure that they are

  • 8/6/2019 Study on present scenario of water sector in India

    16/44

    met. Water-borne diseases from faecal contamination are one of the biggest public health

    risks in the country -- it has been argued that India loses 90 million days a year due to

    waterborne diseases, costing Rs 6 billion in production losses and treatment.

    10. Inadequate transparency

    The key feature of modern water management in a liberalized economy and democratic

    environment is that of openness and transparency. In most countries now all relevant

    information about performance, planning is available publicly, on the web and in real

    time. Unfortunately, India has been slow in adapting to this changed information

    environment. However, recently there has been some modest progress. This change

    would undoubtedly stimulate a chain reaction of accountability, participation and demand

    for more and better data which would transform the culture of water management in thecountry.

    A lack of transparency over the true costs of under-priced and inefficient

    municipal systems dampens public support for major reforms that may be needed.

    Knowledge gaps also plague the sector. There is not much reliable information about the

    customers and connections available. Database of the most of the ULBs are not updated

    regularly which creates lot of problems and confusions while taking any decisions. And

    published data is not readily available.

    11. Expanding Water Conflicts

    In India the major rivers of the country are mostly inter-State rivers. There has been an

    increasing demand for water in all sectors, sometimes leading to inter-State disputes on

    sharing of water. The lack of clear allocation rules and uncertainty about how much water

    each state has a right to, impose high economic and environmental costs. There is also

    growing conflicts about the allocation of water between users like agriculture, industry,

    domestic supplies. Such growing water conflicts between different users, and States and

  • 8/6/2019 Study on present scenario of water sector in India

    17/44

    inequities in distribution of the available water resources are some of the crucial concerns

    currently faced by the countrys water-sector.

    So, the willingness to charge rather than willingness to pay is the bottleneck in the

    sector. We dont pay enough for water which leads to the poor cost recovery , which

    leads to low investment in the sector and ultimately it leads to poor service delivery, and

    thus our willingness to pay decreases, This vicious circle must be broken and it can

    happen with the support from enlightened political leadership at the city and state levels.

    Scope of Improvement in the sector

    Scope for pricing reform

    In India the price of water is artificially low due to the social issues and political

    interference in the water sector. Since the provision of water for drinking and domestic

    uses is a basic need, the pricing of water for this purpose is subsidized. It has been

    assessed through extensive studies that the rich people are paying less for the quantum of

    water they consume compared to the poor.

    Low tariffs affect the profitability of local water boards and therefore the quality of

    service. Currently most of the water supply bodies are not even able to recover the cost of

    operation and maintenance from its revenue from the charges collected from users. There

    is a strong need to change the attitude and approach about the water sector. Realistic

    prices should be charged so that ULBs can generate sufficient funds for proper

    maintenance and operation of the systems.

    Existing evidence suggests that many low income households in India can afford to pay

    more for water, particularly if the increase in prices is accompanied by better service. At

  • 8/6/2019 Study on present scenario of water sector in India

    18/44

    present, households may pay several times the municipal charges in coping costs arising

    from the irregularity and unreliability of supply.

    Increasing block tariff ( IBT) is widely used in developing countries, in which two or

    more prices are charged for water used, each price applies to a customers use within a

    defined block. Prices rise with each successive block. Generally in IBT the first block

    price is deliberately set below cost, however cost may be defined. In the design of IBTs,

    much attention is given to the size and price of the first block. Of course, some form of

    metering is necessary in order for suppliers to charge in proportion to water used.

    IBT should be used in all the areas in which meters are already installed. And wherever

    no meter supply is effective, a flat rate may be levied based on the average cost of

    production and supply of water.

    The water charges should be based on the incremental cost of production & supply of

    water in a water supply system and not on the basis of average cost of water because as

    the connections of the water increases, to satisfy the more demand the city has to use the

    more expensive sources of water such as getting it from the distant location etc. thus the

    cost of the water will also go up, so the recovery would be more effective if the prices are

    charged based on the incremental cost of production.

    Progressive water rates should be charged upon the consumers so that the water may be

    supplied to the urban poor at a subsidized rate. But instead of giving free supply to them

    minimum charge should be collected from them at a flat rate so that can realize the

    importance of treated water supply. The affluent sections of the society should be charged

    at a higher rate based on metered quantity including free supply, if the consumption is

    more than the prescribed limit.

    Where metering is not possible, flat-water charges could be linked as percentage of

    property tax.

  • 8/6/2019 Study on present scenario of water sector in India

    19/44

    The water bodies should develop an approach to recover all expenditure incurred through

    water charges in order to make them self-supporting. Further, funds for future expansion

    should also be created so as to minimize dependence on outside capital.

    Wastage and extravagant use of water should be discouraged and tariff with multi-tier

    system incorporating incentives for low consumption should be designed.

    A study carried out by Johns Hopkins University, USA suggests replacing the IBT with a

    system of uniform pricing with rebates. Under this method, a volumetric charge is set

    equal to marginal cost and coupled with a negative fixed charge, or rebate. But

    considering Indian situation, it would be difficult to implement the system because giving

    back rebate will make the process more complex and the public in India would never

    support such system.

    In the nutshell, the tariffs for the water supply should be designed in the way that can

    allow the ULBs to recover full cost of operation and maintenance and also provide the

    scope for the funds of further expansion of the facility. The effort to create awareness

    about the cost associated with the procurement, treatment and distribution of water

    should be made, that will lessen the possibilities of protest and strong resistance from the

    user community for the tariff hikes.

    Scope for Financial Reform

    Generally the funding for the water supply sector is provided by soft loans and grants

    from the State or the Center. Credit is also available from institutions like HUDCO and

    LIC, but these are mostly backed by guarantees from the State or the Central

    Government.

    Several ULBs have also attempted to access the credit markets through bond issuance, for

    example Ahmedabad Municipal Corporation (AMC) became the first Indian municipality

  • 8/6/2019 Study on present scenario of water sector in India

    20/44

    to use this mode of raising capital in 1998. AMC first worked to gain the trust of the

    credit markets by lowering its budget deficits, increasing the transparency of its financial

    administration and the capacity of its water sector staff.. AMC managed to get A+ rating

    from the Credit Rating Information Services of India, and with this rating the AMC

    raised over $20 million through municipal bonds sold both to the public and to

    institutions. Many other municipal corporation like Ludhiana municipal corporation,

    Bangalore Mahanagar Palika and many other followed the example and were quite

    successful in raising funds through bond market. But still the municipal bond market in

    India has a long way to go before it transforms into a vibrant investing environment.

    Government should further develop the Municipal Bond market in order to meet the debt

    requirement of the sector which had improved in the past with few ULBs accessing the

    market.

    Private investors would not touch the sector until there is enough transparency in the

    framework and enough confidence about the recovery of the funds.

    To attract the private sector funding it is very necessary that ULBs should shift to a

    regime of more transparent and accountable structure. Adoption of transparent

    accounting policy, improvement of financial health, improvement in technical and

    managerial capacities for project management and getting healthy credit ratings from the

    trustworthy rating agencies would ensure larger flow of funds in the sector from the

    capital market. ULBs should develop their financial plans in a manner which can give a

    fair idea of the risk associated with the project, build relationships with capital markets,

    make investor aware of issuer profiles, and establish familiarity with market

    intermediaries and the regulatory environment.

    Projects should be designed to separate the risk that can be handled by the private sector

    from those that can be handled by government. By doing this way it would be easy to

    secure commercial funding for the projects as all private players need the full clarity

    about the risk associated with the project before investing.

  • 8/6/2019 Study on present scenario of water sector in India

    21/44

    Performance based payments contract can be adopted with private investors where the

    public funding is limited.

    JNNURM funding can be tapped for cities which have above 10 lakh population to meet

    the capital investment.

    Aid can also be sought from multi-lateral aid agencies for meeting the capital cost.

    ULBs should also try to access the different financial products to develop a vibrant

    municipal borrowing market like working capital loans, and multilayered debt structures

    etc.

    Specialized and focused agencies should be encouraged to channel the commercial

    capital into the sector.

    Situation should be that the ULBs should compete with each other for the private funding

    and technical and managerial expertise.

    Scope for regulatory reform

    Local bodies should be made to publish fact sheets containing data on operations

    periodically and subject themselves to public review. This would increase the

    transparency of the existing system, and would allow for benchmarking of local water

    utilities with other cities. Public awareness could be further increased by reporting theresults of water quality tests, along with information on hours of service and pressure.

    This information could be coupled with accessible data on how much water subsidies

    take from the state budget, and price increases could be explicitly linked to targeted

    improvements in key sectors.

    States which do not have implemented the mandatory and optional reforms should not be

    given the aid from the central budget.

    Complete decentralization of power as per the 74th CCA should be implemented and

    ULBs should be given power to take decisions regarding the approval of projects,

    increasing tariffs and issuance of the bonds etc.

  • 8/6/2019 Study on present scenario of water sector in India

    22/44

    An Independent regulator should be appointed and the sector should be given freedom

    from political interventions. Promoting changes in the water sector requires finding a way

    to raise the political benefits of reform efforts, or of increasing the political costs of not

    reforming.

    Grants should have a fixed and variable component. Fixed component to be provided

    only if cities conform to basic reform requirements.

    Variable Grants to be provided only if cities achieve pre-determined milestones.

    The efficient water audit systems and should be developed and implemented.

    Scope for operational reform

    The serious effort should be made to transform the water sector into a commercial

    operation and the emphasis should be on full cost recovery and generation of surplus

    funds for further expansion. Basic approach about water supply as social responsibility

    should be converted into a commodity to be bought and sold.

    Realistic tariffs should be charged from all the users of the water and water should not be

    provided free of cost to anyone.

    The process of water storage, transmission and distribution should be made separate to

    achieve better efficiency.

    Subsidies should be eliminated from the sector to compel the ULBs to achieve self

    sustainability and recovery of the entire cost of water procurement and supply.

    Households not paying water charges should be disconnected from the water supply and

    it should not be reconnected just by collecting the earlier dues, but a heavy penalty and

  • 8/6/2019 Study on present scenario of water sector in India

    23/44

    the new water connection charge should be collected from them to ensure the prompt

    payment of water charges.

    Special operations should be carried out to identify illegal connections and the owners of

    such connections should be penalized and then should be given chance to make their

    connection legal.

    Old pipelines should be renovated since major portion of the leakage is found in the

    distribution systems of old pipelines.

    Meters should be installed wherever feasible and the frequent checks should be

    conducted about the working condition of the meters and meter repair workshop should

    be established to repair defective meters.

    Other scopes for improvement.

    India needs to shift its focus from water resources development to water resources

    management by restructuring and strengthening existing institutions for better service

    delivery and resource sustainability. So far the focus has been on the development of

    water resources and very less attention has been given to the proper management and

    utilization of the existing water resources.

    Tanks Rejuvenation:- India has some 580,000 tanks of various sizes spread over across

    the country. Most of them were managed by local communities for several years. With

    growing water scarcity, tank rejuvenation is an important way in which water can be

    conserved and distributed at the time of need. With limited water resources, uncertainty

    of monsoon and looming water scarcity in many parts of India, water conservation and

    use by medium and micro water retaining structures have assumed greater significance.

  • 8/6/2019 Study on present scenario of water sector in India

    24/44

    Overview of JNNURM and UIDSSMT and its impact.

    Jawaharlal Nehru National Urban Renewal Mission (JNNURM):

    JNNURM is an INR 100,000 Crore Government of Indiainitiative launched in December

    2005. Administered by the Ministryof Urban Development and Ministryof Poverty

    Alleviation, the Missionis designed to support state and localinvestment in urban

    development. The central government spends amounts to INR 50,000 crore with

    matching contribution from cities/ states. The overall objective of the Mission is to

    create economically productive, efficient, equitable and responsive cities. The aim is to

    encourage reform and fast track planned development of identified cities. The focus of

    JNNURM is on efficiency and inclusiveness in development of urban infrastructure and

    service delivery mechanisms, community participation and accountability of ULBs

    towards citizens. The duration of the mission is for 7 years and covers 65 cities across the

    nation.

    To qualify for JNNURM funding, city administrations must submit a three tiered

    application with the following information:

    1. City Development Plan (CDP) defining the vision for the city over the next 20-25

    years;

    2. Detailed project report, enumerating the financial requirements;

    3. Timeline for implementation of the proposed initiatives.

    The States and urban local governments (ULBs) accessing the JNNURM must

    complete a total of 22 mandatory and optional reforms, during the seven-year period

    (2005-12). Many of these reforms will help to empower ULBs.

    Some of the mandatory reforms are

    - Aggressive decentralization of urban services to ULBs under 74th CAA.

    - Constitution of district planning and metropolitan planning committees

    - Public disclosure

    - Double entry accounting system , e governance , reasonable user charges.

  • 8/6/2019 Study on present scenario of water sector in India

    25/44

    - Recovery of full O&M cost and internal earmarking of funds for the basic

    services for the urban poor.

    -

    JNNURN AT Glance (Till 25th Feb. 2011)

    Number of cities covered under JNNURM - 65

    Number of City Development Plans (CDPs) appraised - 64

    Number of Memorandum of Agreements (MoAs) signed - 65

    Number of projects approved - 530

    Number of water supply projects approved. - 151

    Total approved project cost For 530 projects 60,212.20 Crores.

    Number of States for which projects approved (Out of 31 States/UTs) 30

    Number of Cities for which projects approved (Out of 65 cities) - 62

    Total Additional Central Assistance (ACA) committed for 530 projects

    27,940.86 Crores.

    Central Share (ACA) released for Projects 12,265.54 Crores.

    Number of completed projects - 100

    Number of completed water supply projects.-32

    JNNURM is a landmark in Indias urbanization policy and has infused a sense of urgency

    amongst various stakeholders to ensure timely results.

    Urban Infrastructure development scheme for small and medium towns

    (UIDSSMT):- UIDSSMTcover those small and medium towns which are not covered by

    JNNURM. The scheme covers 5098 cities and towns. The duration of the Scheme will

    be for seven years beginning from 2005-06.

    The objectives of the scheme are to:

  • 8/6/2019 Study on present scenario of water sector in India

    26/44

    1. Improve infrastructural facilities and help create durable public assets and quality

    oriented services in cities & towns

    2. Enhance public-private-partnership in infrastructural development and

    3. Promote planned integrated development of towns and cities.

    Financing pattern:- The sharing of funds would be in the ratio of 80:10 between

    Central Government & State Government and the balance 10% could be raised by the

    nodal/implementing agencies from the financial institutions.

    The State Government may designate any existing institution as nodal agency for

    implementation of the scheme.

    The nodal agency will be responsible for the following:-

    1. Inviting project proposals from ULBs//Implementing agencies.

    2. Techno-economic appraisal of the projects either through in-house expertise

    or by outside agencies through outsourcing.

    3. Management of funds received from Central and State Governments.

    4. Disbursement of the funds as per the financing pattern given in the

    guidelines.

    5. Furnishing of utilization certificates within 12 months of the closure of the

    financial year and quarterly physical & financial progress reports to the

    Ministry of Urban Development.

    6. Maintenance of audited accounts of funds released to ULBs and implementing

    agencies.

    7. Monitoring of implementation of reforms and infrastructure projects.

  • 8/6/2019 Study on present scenario of water sector in India

    27/44

    UIDSSMT at Glance (Till 31st December 2010)

    Total number of towns covered 640

    Total number of approved projects - 1058

    Total cost of approved projects - 19,936 Crores

    Central Governments contribution committed for projects - 12920.50 Crores

    Funds released from Central Government for projects- 6974.63. Crores

    Total number of water supply projects approved 565

    Total cost of approved water supply projects 10,478.33 Crores

    Central Governments contribution committed for water supply projects -

    7867.11 Crores

    Funds released from Central Government for water supply projects - 4,528.20

    Crores

    UIDSSMT: COMPONENT WISE ACA RELEASED

    AS ON August, 2010

  • 8/6/2019 Study on present scenario of water sector in India

    28/44

    Impact of JNNURM and UIDSSMT on the water supply sector.

    JNNURM has provided a strong platform for investments in the sector and incentivized

    cities to develop sustainable investment framework through service delivery reform and

    cost recovery of services provided.

    Cities have captured the opportunity to finance their urban infrastructure but the reform

    side of the scheme is going at a very slow pace.

    JNNURM has jump started investments in the sector but the service levels in most of the

    JNNURM cities continue to be poor.

    Before JNNURM the financial capacity of the city was considered as a major constraint

    in urban water supply sector, but now the ability of ULBs to execute the project is also

    proving to be equally serious constraint as most of the projects face the time-over runs

    and increase in the project cost due to delay.

    JNNURM increased the use of PPP model for the project implementation. Out of the 500

    billion of projects approved by JNNURM, Rs. 70 Billion worth are being developed on

    the PPP model.

    JNNURM has made a quantum change in size of investments and breadth of coverage

    across cities and sectors.

    Progress of JNNURM and UIDSSMT so far.

    Until March 2011, total 530 projects were approved under JNNURM, out of them

    151 were of water supply projects.

    Out of 151 projects approved, 31 water supply projects completed under

    JNNURM by March 2011.

  • 8/6/2019 Study on present scenario of water sector in India

    29/44

    The UIDSSMT also gives highest priority to the water supply sector. Out of the

    1058 projects approved as on December 2010, 565 were of water supply. And, out

    of the 139 projects completed as on March 2011, 69 of them were of water supply

    sector.

    Regarding State level reforms, so far

    11 States have implemented 74th CAA (Transfer of 12 Sch. functions)

    20 States have implemented 74th CAA (Constitution of DPC)

    6 States have implemented 74th CAA (Constitution of MPC)

    13 States have transferred the City planning functions to ULBs

    17 States have transferred the Water supply and sanitation to ULBs

    19 States have implemented reforms in Rent control

    11 States have rationalized the stamp duty to 5%

    12 States have made enactment of community participation law.

    19 States have made enactment of Public disclosure law.

    Reforms at the ULBs are bit more impressive,

    22 ULBs have set up E-Governance platform.

    37 ULBs have adopted the modern accrual based double entry accounting system.

    21 ULBs have been successful to cover 85% of the total property in the tax

    records.

    15 ULBs have been successful in collecting 90% of the total tax receivable.

    7 ULBs have beens successful in recovering 100% O&M cost from the revenue

    from water charges.

    6 ULBs have beens successful in recovering 100% O&M cost of service of Solid

    waste management.

    47 ULBs have taken initiatives for encouraging public private partnership.

  • 8/6/2019 Study on present scenario of water sector in India

    30/44

    41 ULBs have computerized the process of registration of land and property.

    50 ULBs have started to allocate funds for the Services to the Urban Poor in their

    balance sheets.

    Overall, the total reforms implemented was 61% at the ULB level and 59% at the

    State level. In addition, 76% of optional reforms had been achieved by till

    December 2011.

    The Central Government has launched credit rating scheme of ULBs to facilitate

    access to the market funds. Of the 64 ULBs credit rated so far 38 of them have

    been rated as an investment grade of BBB and above.

  • 8/6/2019 Study on present scenario of water sector in India

    31/44

    Policies, Institutions and Regulatory

    framework

    Overview of the regulatory framework

    Water supply is a State responsibility under the Constitution of India and following the

    73rd and 74th Constitutional Amendments, the States may give the responsibility and

    powers to the Panchayati Raj institutions (PRIs) and Urban Local Bodies(ULBs).

    At present in India, States generally plan, design and execute water supply schemes and

    often continue to operate through their State Public Health Engineering Departments and

    Water Boards. However, the Centre has seen the need over many years for coordination

    and harmonisation of standards. It has also been responsible, through the Five Year Plans,

    for guiding much of the investment in the sector as well as establishing other

    organisations to lend to the States.

    Role of Central Government.

    Planning Commission

    Planning commission is responsible for the planning and allocation of Central

    Government funds to the sector through its five year plans. The central government is

    giving more and more importance to the water supply sector in every next five year plans.Considerable guidelines and suggestions have been given to the sector in the 9th, 10th and

    11th five year plans.

    Ministry of Water Resources.

  • 8/6/2019 Study on present scenario of water sector in India

    32/44

    At the central level the Ministry of Water Resources is responsible for development,

    conservation and management of water as a national resource, like the general policy on

    water resources development and for technical assistance to the states on irrigation,

    multipurpose projects, ground water exploration and exploitation, command area

    development, drainage, flood control, water logging, sea erosion problems, dam safety

    and hydraulic structures for navigation and hydropower. It also oversees the regulation

    and development of inter-State rivers.

    These functions are carried out through various Central Organizations.

    Urban water supply and sewage disposal is handled by the Ministry of UrbanDevelopment while Rural Water Suppy comes in the purview of Department of Drinking

    Water under Ministry of Rural Development. The subject of Hydro-electric power and

    thermal power is the responsibility of the Ministry of Power. Pollution and environment

    control comes under the purview of the Ministry of Environment and Forests. The

    Ministry is responsible for laying down policy guidelines and programmes for the

    development and regulation of country's water resources.

    Following are the main functions of the Ministry.

    Overall planning, policy formulation, coordination and guidance in the water

    resources sector along with technical guidance and clearance of the projects.

    Providing special Central financial assistance for specific projects and assistance

    in obtaining external finance from World Bank and other agencies.

    Overall planning for the development of water resources, establishment of

    utilizable resources and formulation of policies of exploitation, overseeing of and

    support to State level activities in ground water development.

    Disputes resolution relating to inter-state rivers and in some instances, the

    overseeing of the implementation of inter-state projects.

  • 8/6/2019 Study on present scenario of water sector in India

    33/44

    Talks and negotiations with neighbor countries, in regard to river waters, water

    resources development projects and the operation of the Indus Water Treaty.

    The Ministry of Urban Development

    Ministry of Urban Development is responsible for formulating policies, supporting

    programs, monitoring programs and coordinate the activities of various Central

    Ministries, State Governments and other nodal authorities. Ministry of Urban

    Development plays an important role in setting standards of the service in the sector by

    inter state co-ordination and the co-ordination between Center and States. The

    supervision, control and overall responsibility of the schemes like JNNURM and

    UIDSSMT also of Ministry of Urban Development.

    Ministry of Finance

    Department of Economic Affairs, Ministry of Finance plays an important role in the

    sector through its Infrastructure and Investment divisons PPP cell.

    The Public Private Partnership (PPP) Cell is responsible for matters concerning Public

    Private Partnerships, including policy, schemes, programmes and capacity building and

    all other matters relating to mainstreaming PPPs.

    Functions of PPP Cell include.

    1. Examination and approval of all Central Sector PPP projects costing more than

    100 Crores and less than 250 Crores.

    2. Examination and approval of proposals relating to the Scheme for Financial

    Support to Public Private Partnerships in Infrastructure- Viability Gap Funding

    (VGF) Scheme.

    3. Developing innovative interventions and support mechanisms for facilitating

    PPPs in the country, including Technical Assistance programmes from bilateral

    and multilateral agencies on mainstreaming PPPs and support to State and local

    governments.

  • 8/6/2019 Study on present scenario of water sector in India

    34/44

    4. Managing training programmes, strategies, exposures for capacity building for

    PPPs.

    Other organizations related to water supply sector.

    1. Central Water Commission

    Central Water Commission is a premier Technical Organization of India in the field of

    Water Resources and is presently functioning as an attached office of the Ministry of

    Water Resources, Government of India. The Commission is entrusted with the general

    responsibilities of initiating, coordinating and furthering in consultation of the State

    Governments concerned, schemes for control, conservation and utilization of water

    resources throughout the country, for purpose of Flood Control, Irrigation, Navigation,

    Drinking Water Supply and Water Power Development. The commission also undertakes

    the investigations, construction and execution of any such schemes as required.

    2. Central Ground Water Board

    Central Ground Water Board (CGWB), a subordinate office of the Ministry of Water

    Resources. It is responsible for providing scientific inputs for management, exploration,

    monitoring, assessment, augmentation and regulation of ground water resources of the

    country. The Authority is engaged in various activities related to regulation of ground

    water development to ensure its long-term sustainability.

    3. Central Water and Power Research Station

    The Central Water and Power Research Station (CWPRS), began in 1916 as a Special

    Irrigation Division of the then Bombay Presidency is now part of the Union Ministry of

    Water Resources. CWPRS is the principal central agency to cater to the R&D needs of

    projects in the fields of water and energy resources development. CWPRS is a part of is

    one of the foremost organizations in the world in the field of hydraulics and allied

    research. CWPRS provides specialized services through physical and mathematical

    model studies

  • 8/6/2019 Study on present scenario of water sector in India

    35/44

    4. National Water Development Agency

    National Water Development Agency was established as a autonomous society under the

    societies registration Act, 1860. Now it is a society under Ministry of Water Resources.

    In 1990, NWDA was entrusted with the task of Himalayan Rivers Development

    Component of National Perspectives. Recently, the functions of NWDA have been

    further modified and the work of preparation of detailed Project Reports (DPR) of

    various link proposals and Pre-feasibility Reports and feasibility reports of intra-State

    links as proposed by the States.

    Other Ministries and institutions associated with the water supply sector are

    1. Ministry of Environment and Forests.

    2. Central Pollution Control Board

    3. Water and Power Consultancy Services Ltd

    4. National Projects Construction Corporation Limited

    5. National Institute of Hydrology

    Role of State Government:-

    According to constitution of India it is the State Governments responsibility to provide

    water to the citizens.

    But recently, after the 73rd, 74th Amendments and schemes like JNNURM which

    mandates that responsibility for drinking water and sanitation services should be with

    local Governments, Various States in India are at different stages of giving effect to this

    Constitutional mandate. In some states such as Gujarat, Kerala, Maharashtra and Tamil

    Nadu the WSS Boards have been constituted to handle urban and rural water supply.

    Though there are some complexities involved, but the overall national trend is to

    decentralize the operation and maintenance and the investment responsibilities to ULBs

    in the urban areas. .

  • 8/6/2019 Study on present scenario of water sector in India

    36/44

    Currently the State Governments use mix of functional agencies like

    State Water Supply and Sewerage Boards

    Metro Water Authorities/Boards

    Municipal Corporations through their Water Supply and Sewerage Divisions

    State public health engineering departments,

    District engineering agencies

    Urban Local Bodies (ULBs)

    Apart from this State Governments also set up the Water Quality Review Committee

    (WQRC) to review of water quality, and generation of reliable water quality data,

    analysis and interpretation of the data to identify problem areas and developing action

    plans for improving quality on a sustainable basis.

    All State Governments have also constituted State Pollution Control Board for

    prevention and control of water pollution. These Boards have been entrusted with the

    responsibility of enforcing various acts and rules related to prevention, control and

    abatement of water pollution. The State Pollution Control Boards maintain laboratories in

    their respective region for testing water and waste water samples. These boards are

    collaborating with the Central Pollution control Board in monitoring the water quality in

    the country.

    At the central level the Union Ministry of Water Resources is responsible for

    development, conservation and management of water as a national resource, i.e., for the

    general policy on water resources development and for technical assistance to the states

    on irrigation, multipurpose projects, ground water exploration and exploitation, command

    area development, drainage, flood control, water logging, sea erosion problems, dam

    safety and hydraulic structures for navigation and hydropower. It also oversees the

    regulation and development of inter-State rivers. These functions are carried out through

    various Central Organisations. Urban water supply and sewage disposal is handled by the

    Ministry of Urban Development while Rural Water Suppy comes in the purview of

  • 8/6/2019 Study on present scenario of water sector in India

    37/44

    Department of Drinking Water under Ministry of Rural Development. The subject of

    Hydro-electric power and thermal power is the responsibility of the Ministry of Power.

    Pollution and environment control comes under the purview of the Ministry of

    Environment and Forests.

    Water being a State subject, the State Governments have primary responsibility for use

    and control of this resource. The administrative control and responsibility for

    development of water rests with the various State Departments and Corporations. Major

    and medium irrigation is handled by the irrigation/water resources departments. Minor

    irrigation is looked after partly by water resources departments, minor irrigation

    corporations, Zilla Parishads/Panchayats and by the other departments such as

    agriculture. Urban water supply is generally the responsibility of public health

    departments and panchayats take care of rural water supply. Government tubewells are

    constructed and managed by the irrigation/water resources department or by tube well

    corporations set up for the purpose. Hydro-power is the responsibility of the State

    Electricity Boards.

    Generally, Big cities have City Corporations., Medium size cities have City Municipal

    Committees and towns have Town Municipal Committees. All these are elected bodies.

    Administration is carried out by an appointed Chief Executive who is answerable to the

    elected bodies.

    Nodal agencies and agencies outside the government

    NGOs (both national and international) have played a significant role in the sector in

    India over the past three decades. They have exhibited comparative advantages that other

    organisations lack. These include the capacity to reach the rural poor and remote areas,

    promote local participation, operate at low costs, and adapt and be innovative when

    needed.

  • 8/6/2019 Study on present scenario of water sector in India

    38/44

    Policy interventions in the sector

    The water supply sector has witnessed the considerable policy interventions not only by

    the Central and the State Governments but also by the municipal agencies and urban localbodies which is definitely a positive sign for the water sector in India.

    Water supply and sanitation were added to the national agenda during the first

    five-year planning period.(1951- 1956)

    National Water Policy was adopted in September, 1987. Since then, a number of

    issues and challenges have emerged in the development and management of the

    water resources. Therefore, the National Water Policy (1987) has been reviewed

    and updated with the issue of National Water Policy 2002

    The Key salient features of the NWP 2002 are

    1. The NWP defines water as a prime natural resource, water as a crucial

    element in developmental planning, to be managed in a sustainable

    manner and guided by the national perspective.

    2. Private Sector Participation: It encourages participation of private sector in

    planning, development and management of water resources projects with a

    view to introduce innovative ideas, generate financial resources, and bring

    in better management practices. All models of private sector participation,

    viz. build, own, operate and transfer, are acceptable.

    3. Emphasis on Asset Utilization: It stipulates that there is an urgent need for

    paradigm shift from creation of new projects to improvement of the

    performance of existing projects.

    4. The policy encourages those projects development and proposals, which

    account for the sustainable use of surface and groundwater, incorporating

    quantity and quality as well as environmental considerations.

    5. Water Charges will reflect the full recovery of the cost of administration,

    and O&M of water resources projects.

  • 8/6/2019 Study on present scenario of water sector in India

    39/44

    6. Adequate emphasis on physical and financial sustainability.

    7. Participatory approach to management of the water resources.

    8. Private sector participation to be encouraged wherever feasible.

    9. Establishment of well developed information system for water related

    data.

    10. Emphasis on demand management in planning

    11. In allocation, water for life-support first priority, livelihoods next,

    followed by environment and ecology, everything else afterwards.

    12. Thorough examination of all alternatives in Project planning and

    implementation

    13. Ensure physical sustainability of water resources, particularly the

    groundwater resources.

    And based on the national water policy, all the states were told to form their state water

    policy.

    The 2002-2003 Budget called for setting up an Urban Reforms Incentive Fund

    with an initial outlay of Rs. 5 billion to provide reform-linked assistance to states.

    The Government of India approved the proposal on 28th June 2003. In the first

    phase, the URIF will provide incentives to state governments to carry out reforms

    in the sectors which also include water sector.

    The URIF encourages urban bodies to reform, increase operational efficiency and

    reduce subsidies. The plan mandates providing water access to the urban poor,

    setting tariffs to discourage overuse, introducing water efficient flushes etc,

    providing drinking water to all, increasing community participation and NGO

    participation and so on. In return, funding and financial incentives are given to

    urban bodies

    AUWSP (Accelerated Urban Water Supply Program)

  • 8/6/2019 Study on present scenario of water sector in India

    40/44

    This program is promoted by the Ministry of Urban Development (MoUD) and

    provides funds for providing water connections to smaller urban cities. Launched

    in 1993-94, Rs.2000 crore was spent by 2001.

    The Government of India sanctioned a Pilot Scheme for National Project for

    Repair, Renovation & Restoration (RRR) of Water Bodies directly linked to Agriculture

    in January, 2005 with an estimated cost of Rs.300 crore to be shared by Centre and State

    in the ratio of 3:1

    9th five year plan some major policies highlighted included extending the watter

    services to the entire population, decentralization of the resposibilities to the

    ULBs , enhancing financial viability through full cost recovery.

    10th five year plan included, prioritizing the water services to the currently

    uncovered populations, emphasizing the participation of all the stake holders.

    11th five year plan focused on project approval, design and implementation by

    professionals, improved water efficiency, groundwater development, stake holder

    participatin and deployment of multi disciplinary professionals.

    The Central Government has set up a PFDF (Pooled Finance Development Fund)

    to provide credit enhancement to the ULBs and help them to access the capital

    and financial markets based on their creditworthiness.

    74th Constitution Amendment is a path breaking development in strengthening

    the urban local bodies in India. It was passed by the Parliament in December,

    1992 and received presidential assent on April 20, 1993. The main characteristic

    of 74th Constitution Amendment Act, 1992 is that it provides constitution a

    recognition to the constitution, powers and functions of the urban local bodies for

    the first time in the history of India.

    The MoWR is now planning to revise the national water policy,

  • 8/6/2019 Study on present scenario of water sector in India

    41/44

    MoWR is also planning to establish a regulator in the water supply sector.

    Water efficeincey label on electronic machines and buildings , exemption from

    property tax for those buildings who are water efficient are in the planning

    process by Ministry of Water Resources..

    State Governments of West Bengal, Andhra Pradesh, Karnataka, Orissa and Delhi

    have already formulated the laws to control the groundwater usage.

    Punjab govt has approved the accelerated and integrated urban development plan

    to develop water supply.

    Hariyana government is planning to launch a state wide urban infrastructure

    development programme called, Rajiv Gandhi Urban Development mission on

    the lines of JNNURM and has budget of 25 billion for that.

    Karnataka government has decided to launch a 15 point agenda and action plan

    for ULBs,

    Banglore warter supply board has offered a rebate of 5 percent in property tax to

    the citizens who install rainwater harvesting system.

    MCA in the water is not ready yet, Ministry of Urban development has requested

    the WSP- SA to formulate the Model Concession Agreement for the water sector.

    Viability Gap Funding (VGF)

    There are many projects with high economic returns, but the financial returns may not be

    adequate for a profit-seeking investor. For instance, a rural road connecting several

    villages to the nearby town. This would yield huge economic benefits by integrating these

    villages with the market economy, but because of low incomes it may not be possible to

    charge user fee. In such a situation, the project is unlikely to get private investment. In

    such cases, the government can pitch in and meet a portion of the cost, making the projectviable. This method is known as viability gap funding.

    Cabinet Committee on Economic Affairs in its meeting of 25th July, 2005 approved the

    Viability Gap Funding Scheme for support to Public Private Partnerships in

    Infrastructure.

  • 8/6/2019 Study on present scenario of water sector in India

    42/44

    VGF is typically provided in competitively bid projects. Under VGF, the central

    government meets up to 20% of capital cost of a project being implemented in public

    private partnership (PPP) mode by a central ministry, state government, statutory entity

    or a local body. The state government, sponsoring ministry or the project authority can

    pitch in with another 20% of the project cost to make the projects even more attractive for

    the investors. Potential investors bid for these projects on the basis of VGF needed. Those

    needing the least VGF support will be awarded the project. The scheme is administered

    by the Ministry of Finance.

    For the approval of the projects there are different slabs based on the projects cost.

    Viability Gap Funding up to Rs. 100 crore for each project will be sanctioned by

    the Empowered Institution.

    Proposals up to Rs. 200 crore will be sanctioned by the Empowered Committee,

    and

    Amounts exceeding Rs. 200 crore will be sanctioned by the Empowered

    Committee with the approval of Finance Minister

    The Ministry of Finance is now considering to revise the limits upwards.

    The Viability Gap Funding (VGF) Scheme to address the following concerns:

    Address the issue of affordability of user fee.

    Leverage government grant to improve commercial viability of projects

    Promote user pay principle.

    Ensure market based selection of promoter

    Promote concept of developer (in place of contractor) and address project

    life cycle costs.

    Through VGF the Government normally provide funds as capital grant during

    construction.

  • 8/6/2019 Study on present scenario of water sector in India

    43/44

    In January 5, 2006, under the Companies Act 1956, IIFCL was incorporated on as a

    wholly Government owned Company with an authorized capital of Rs. 2000 crore and

    paid-up capital of Rs. 1800 crore.

    The main objective of the establishment of India Infrastructure Finance Corporation

    limited was to provide long term financial assistance to various viable infrastructure

    projects in the country.

    There are various criteria to be eligible for funding by IIFCL which are as follows.

    1. Project must be commercially viable, It was pre-decided that IIFCL will provide

    the finance only to those projects which are commercially viable.

    2. The project must be implemented by public sector company or a private sector

    company under a PPP initiative.

    3. If the project is implemented by private sector company then the private companymust have undertaken some projects at the place where the proposed project is

    supposed to be implemented. OR

    4. The project is being set up under an MoU arrangement with the Central, any State

    government or a Public Sector Undertaking.

    5. Total lending for such private projects shall not exceed 20% of the lending

    programme of the company in any accounting year

    6. The tenor of IIFCL lending should be larger than that of the longest tenor

    commercial debt by at least two years.

    The IIFCL would be helpful in funding commercially viable projects that face problem in

    raising long term debt

    Government of India guarantees to IIFC to raise funds in the market.

    In order to make maximum utilization of this assistance window, Department of

    Economic Affairs has suggested that the Ministries which do not have a Model

    Concession Agreement ( MCA) may initiate steps to formulate such a Model Concession

    Agreement. This Ministry has requested WSP-SA to prepare MCA for water supply &

    sanitation sector.