Click here to load reader
Upload
dime-ceselkoski
View
24
Download
3
Embed Size (px)
DESCRIPTION
Study Material_2011 PE Civil Trans SQS Errata
Citation preview
ERRATA for PE Civil Transportation Sample Questions and Solutions
ISBN 978-1-932613-64-3 Copyright 2011
Errata posted 10-22-2012
Page 1 of 1
Transportation Module Question 522, p. 75:
The ninth line should read as follows:
250.04R ($6,987,500)
1 (1 0.04)
THE CORRECT ANSWER IS: (D)