© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 1
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Stroma Certification
DEA Audit Masterclass Presented by Andy Parkin
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 2
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Welcome
RHI
Welcome to Stroma’s CPD session providing a DEA Audit Masterclass
During this presentation we will cover:
1. The importance of audits
2. The importance of evidence
3. How does the audit process work?
4. Evidence requirements
5. Common audit failure points
6. How to prevent a fail (not avoid a fail)
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 3
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Stroma DEA Certification…
RHI
We are the industry leader for DEA certification with more than 50% of
all lodgements done using Stroma Certification software.
We achieve this by demanding the highest standards from our
members who are regularly audited.
We provide industry approved
RSAP+ software to help lodgements.
Competitive lodgement fees for all members.
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 4
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
The importance of audits
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 5
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Helps to drive standards
Identifies common mistakes across the scheme
Identifies errors on the EPC so that they can be corrected on the
register
Acts as a learning tool for DEAs to prevent repeat mistakes or
misconceptions
Why are audits important?
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 6
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
The importance of evidence
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 7
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
The importance of good evidence
Site notes, floor plans, photos…
Supports the findings of the EPC
Supports the DEA at audit
Supports the DEA if a complaint is received
Useful for historical reference
When returning to the property
Or similar property on the same site
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 8
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Consequences of poor or missing evidence
FAILED AUDIT
Resulting in further audits
Disciplinary action (over a time period)
Not possible to resolve a complaint
Could have financial implications
Could have time or resource implications
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 9
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
All evidence must be kept for 15 years
All evidence must be retrievable during this time
All evidence must be backed up
To allow retrieval in the event of fire, theft or flood
Lost evidence is a common reason for audit failure
Not an acceptable reason!
Key points
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 10
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
How does the audit process work?
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 11
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
What is an audit?
When are they requested?
What is required from each scheme member following an audit
request?
Audit process
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 12
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
An audit is a quality assurance assessment (QAA) check of an assessor’s EPC result
(i.e. the EPC that they have produced). These are requested at certain times of a
year and under certain conditions on a certain percentage of all EPCs lodged.
An audit is wrongly considered to be a way for the scheme operator to ‘catch out’ the
assessor.
Stroma have always considered the audit process to be a fantastic learning tool,
which can help each member understand where they are making mistakes and how
to avoid making those mistakes in the future. Evidence provided by an Energy
Assessor shall be such that an independent assessor can be reasonably certain it
relates to a particular EPC.
It is very important to note, however, that failure to supply evidence for an EPC
survey could result in suspension until such evidence is provided. It is therefore very important that you always respond to an
audit request within the timescales set.
What is an audit and what is their purpose?
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 13
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
1. Random Audits
2. Targeted Audits
Two types of audit
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 14
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Audits can be called for a number of reasons, as
displayed in the table (next slide) for our Scheme
Operating Requirements.
As part of an ongoing quality assurance process Stroma
Certification is required to carry out desk based audits
for a minimum of 2% of all lodged EPCs.
Random Audits
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 15
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Assessor Group Minimum Audits Required % of Member’s
Lodged EPCs
New members (< 6 months)
Either new to the scheme, new to the
qualification or rejoining the scheme after
a break in membership
Note that members who are inactive for a
period of 2 years will automatically revert
to this status
1 audit in the first 30 days of membership or,
First available certificate lodged.
Minimum of 1 audit per quarter*
5%
Existing members (> 6 months)
Have been with the scheme for more than
6 months
Minimum of 1 audit per quarter
1%
Members returning from suspension (for 6
months following return from suspension)
5 audits in a 6 month period
10%
Audit levels
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 16
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Audits requests must be satisfied within 15 working days.
Audits will be completed within 15 working days of receipt.
If the audit fails, the DEA has 10 working days to appeal or replace
the certificate.
Timescales
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 17
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Clarification of the calendar year (3 and 6 month periods)
For the purposes of the QAA Policy:
The calendar year is 1st January to December 31st
Quarter (4 periods in a calendar year) 1st January to 31st March, 1st
April to June 30th, 1st July to September 30th and 1st October to 31st
December
Timescales
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 18
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
If a scheme member is found to have produced an EPC that is outside
the acceptable tolerances, the following steps will be taken:
The audited EPC must be cancelled from the Landmark register and
an amended certificate must be created by the assessor.
This must be provided to Stroma Certification for re-audit. It must be
re-issued to the client and lodged on the register by the energy
assessor within 10 days of the audit fail notification.
Stroma Certification will carry out additional audits
of 2 further EPCs lodged by the
scheme member.
Targeted Audits
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 19
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Evidence requirements
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 20
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Evidence requirements are set out in Appendix 5, Table 1 of the
Scheme Operating Requirements.
The purpose of evidence is to allow the auditor to replicate the EPC
result.
If the result is outside of the tolerances allowed, then the audit fails.
Evidence requirements
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 21
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Minimum Photographic Requirements:
Front Elevation
Rear Elevation
Side Elevation (if property is detached/semi-detached)
Cavity Wall Insulation – evidence
Roof construction
Openings – windows/chimneys (if these aren’t clear on previous photographs)
Primary Heating System (showing key features also)
Secondary Heating System
Loft insulation – showing depth of insulation
Evidence of wall thickness
Conservatory – photographic evidence of separation
Evidence requirements - Photos
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 22
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Where relevant:
Heating System controls
Hot water cylinder and stat
Electricity and gas meters
LPG Cylinder
Fixed low energy light fittings
Any other feature of the building or limitation whose presence or
absence may be reasonably considered likely to affect the SAP rating
Any other feature which supports a claim in the report that could be
queried or be the subject of a complaint
Other evidence requirements
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 23
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
All photographic evidence should be dated within the image, to
prove that they relate to the property being assessed, on the date of
assessment.
If this is not possible, electronic files (e.g. .jpg) are acceptable as
long as we can securely ascertain the dates from the file.
Photographs embedded in files (e.g. WORD, PDF) should be dated
within the image, with the master images being retained by the DEA.
Key point – Date Stamps
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 24
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Documentary evidence is defined in convention 9.02:
It is required to overwrite any U-values and to enter loft insulation/wall
insulation/floor insulation if these cannot be visually inspected. If
documentary evidence does not meet the above requirements, then it
cannot be accepted.
Documentary evidence
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 25
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Initial Audit findings from RdSAP 9.92 EPC Audits
In light of the recent launch of RdSAP 9.92 methodology
and software, the audit process has moved on to cover
the new data points and evidence requirements.
We will now examine the new evidence requirements for
RdSAP 9.92 data entry. These have been ordered to
reflect the potential to result in a failed EPC at audit.
Evidence requirements – RdSAP 9.92 additions
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 26
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
New Data Point Evidence Requirement Fail Area - with Reason
MCS Installed Heating
System
Heat pump MCS install - should be proven by a photograph of the
MCS certificate
Highly likely to result in a failed audit as this has a
large impact on the efficiency of the heating system.
Care should therefore be taken when dealing with
ASHPs and GSHP etc. MCS should be obtained
wherever possible.
Use of Additional
Database for Heating
Selection (Community,
HHR Storage Heaters,
TTZC TRVs, Weather
Compensators etc.)
Selections from heating database - must be proven by suitable
documentary or photographic evidence and be covered in site
notes. This is similar to evidence required when selecting a boiler
or other heating system present in the PCDF.
Highly likely to result in a failed audit. If evidence
isn’t provided to prove the presence of database
choice then the non-database method will be
chosen by the auditor. This will most likely result in
statement inaccuracies and SAP point variances.
PV Connected to Mains
Meter
This section should be adequately shown on site notes and via
photo of electric meter or via a schematic of PV wiring (normally
located by consumer unit, meter or inverter after PV installed).
Highly likely to result in failure. Whilst it is safe to
assume that most PV systems are connect to the
mains electric via the meter (in order to obtain the
FIT), you will need to show that the system is
connected, the SAP rating will be highly affected
resulting in a fail of the EPC.
RdSAP 9.92 considerations (High Risk)
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 27
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
New Data Point Evidence Requirement Fail Area - with Reason
Party Wall Length On floor plan and in calculations
Potentially. Incorrect length could result in SAP
rating change in some properties (mid-terrace
will be particularly affected if party wall isn’t
solid). This doesn’t affect the statements or
recommendations on the EPC.
Party Wall Construction
Party Wall identification should be covered. This needs to be
present in site notes and suitable photographic evidence to
support identification of construction type or supporting the
use of 'unable to identify'.
Potentially. Incorrect identification could result in
SAP rating change in some properties (mid-
terrace will be particularly affected if party wall
isn’t solid). This doesn’t affect the statements or
recommendations on the EPC.
Glazing Gap
Existing photo used from proof of multiple glazing can be
used, as long as the photo shows the extent of the glazing
gap. Documentary evidence may exist to prove actual gap.
No requirement to buy and use specific measuring device.
Extent of glazing, including type and percentage of multiple
glazing should be covered in site notes or on Floor Plan.
Could result in a fail for recommendation and
statement variance on the EPC. If the data
entered should be DG, Pre-2002 (2003
Scot/2006 NI) or unknown date and 12mm gap,
then this will promote a glazing upgrade
recommendation.
RdSAP 9.92 considerations (Medium Risk)
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 28
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
New Data Point Evidence Requirement Fail Area - with Reason
Heating System
Pump Age
Heat pump age - needs to be supported by suitable
photographic evidence showing EIR label. Unknown
should be used if the pump cannot be located (located
in the boiler).
Unlikely to cause a fail on its own, but could
contribute to a fail if identified incorrectly,
but will have some impact on the rating due
to efficiency gains or losses in the heating
system.
Heating System Flow
Temperature
Flow temperature - needs to be supported with suitable
documentary evidence. A MCS certificate or heating
system design spec would be adequate. Unknown
should be used in the absence of documentary
evidence.
Unlikely to cause a fail on its own, but could
contribute to a fail if identified incorrectly,
but will have some impact on the rating due
to efficiency gains or losses in the heating
system.
RdSAP 9.92 considerations (Low Risk)
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 29
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Common audit failures – Why do audits fail?
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 30
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Heating Systems: Secondary Heating Type
Photos : Date Stamps
Age & Dimensions: Calculation
Heating Systems: Boiler Identification
Roof Construction: Insulation Thickness
Roof Construction: Insulation
Photos: Missing
Wall Construction: Insulation
Wall Construction: Wall Thickness
Heating Systems: Heating Controls
Common audit failure reasons
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 31
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Another common audit failure reason is non-submission of evidence.
This is broken down as:
No evidence submitted at all within the timescales
Insufficient evidence submitted:
As per the minimum evidence in the SOR
EPC audit could be started
i.e. no floor plan, no heating system photos
Evidence non-submission
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 32
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
How to prevent a fail (not avoid a fail)
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 33
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Spend enough time on site to gather relevant evidence
Use of an appropriate camera (time and date stamps)
Develop a routine
Ensure all data, notes, photos, plans are stored and backed up
straightaway
Use of software to assist?
Techniques for passing audit
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 34
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Stroma’s iPad software performs all of these functions and more.
Stroma’s iPad and desktop
applications are linked.
Stroma’s iPad software links to Tracker software which integrates
into client applications:
Transfer of docs, site notes etc
Appointments can be sent from client to iPad user
Introducing RSAP+ iPad software
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 35
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
RSAP+ software demonstration
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 36
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
You can view the following documents on
the members area: CPD on audit failure points
Latest technical bulletin (Feb 2015)
Conclusions…
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 37
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
Please send your questions to [email protected]
© Stroma Certification 2015 | Version 1.0 © Stroma Certification 2015 | Version 1.0 | Page 38
Part of our 3 day Ecobuild CPD Programme Stroma Certification: Renewable Heat Incentive RHI
0845 621 11 11 [email protected]
www.stroma.com
Thank you for your time