Upload
doanh
View
218
Download
3
Embed Size (px)
Citation preview
B4
B2B1 B3
B4
B2B1 B3
B4
B2B1 B3
STEP 1Lay out the base stabilizers like this.
STEP 4Place the field bricks on top so they overlap the connectors like this.
STEP 2Place connectors on the locations indicated.
STEP 3Lay out the remaining bricks so the field looks like this.
CM-ISU-MLBGENGS1-G4
©2015 OYO Sports, Inc. All rights reserved.• 20 Main St. Acton MA, 01720t 978.264.2000 • f 978.264.2024
www.oyosports.com
TEAM LOGO
Logo Logo