B4 B2 B1 B3 B4 B2 B1 B3 B2 STEP 1 Lay out the base stabilizers like this. STEP 4 Place the field bricks on top so they overlap the connectors like this. STEP 2 Place connectors on the locations indicated. STEP 3 Lay out the remaining bricks so the field looks like this. CM-ISU-MLBGENGS1-G4 ©2015 OYO Sports, Inc. All rights reserved. 20 Main St. Acton MA, 01720 t 978.264.2000 f 978.264.2024 www.oyosports.com TEAM LOGO Logo Logo

STEP 1 STEP 2 - · PDF fileSTEP 1 Lay out the base stabilizers like this. STEP 4 Place the field bricks on top so they overlap the connectors like this. STEP 2 Place connectors on

  • Upload
    doanh

  • View
    218

  • Download
    3

Embed Size (px)

Citation preview

Page 1: STEP 1 STEP 2 - · PDF fileSTEP 1 Lay out the base stabilizers like this. STEP 4 Place the field bricks on top so they overlap the connectors like this. STEP 2 Place connectors on

B4

B2B1 B3

B4

B2B1 B3

B4

B2B1 B3

STEP 1Lay out the base stabilizers like this.

STEP 4Place the field bricks on top so they overlap the connectors like this.

STEP 2Place connectors on the locations indicated.

STEP 3Lay out the remaining bricks so the field looks like this.

CM-ISU-MLBGENGS1-G4

©2015 OYO Sports, Inc. All rights reserved.• 20 Main St. Acton MA, 01720t 978.264.2000 • f 978.264.2024