Footing construction
Leveling before placing subfloor insulation
Connection to the earth loops
Heat tubes
Preparing earth loops
Setting up the manifold
Digging in the earth loops
Greenhouse construction
Greenhouse heat pumps
SolaWrap Greenhouse
Film
Take down old plastic and remove wiggle wire channel
Caulk ends and seams of connectors
Putting connectors in
place and installing the film
Stretching the film for long runs
Tacking down film using connectors
Finished end wall section (horizontal)
Installing film on wing vents
Tightening film on wing vents
Wing vents and roof
panels to the gutter
Vertical side walls (bending connectors)
Finished (with the exception of trimming and caulking)
Cherry tomatoes and slicing
tomatoes, Oct. 2015
The Log Boiler
Used telehandler and spreader bar to transport 14,000 lb unit
Lesson learned!
In place