12
STEEL WINDOWS Montage Hotel & Resort Beverly Hills, CA HKS Hill Glazier Studio STEEL WINDOW INSTITUTE A STANDARD OF EXCELLENCE

STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

STEEL WINDOWS

Montage Hotel & Resort Beverly Hills, CA HKS Hill Glazier Studio

STEELWINDOWINSTITUTE

A STANDARD OFEXCELLENCE

Page 2: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

OUTS

IDE

INSI

DE

1

HR-589

#6 X 1" PL-FH-SMS410 TEK/2

HR-601

HR-595R

2

HR-595R

3

HR-601

#6 X 1" PL-FH-SMS410 TEK/2

OUTS

IDE

INSI

DE

HR-589

4

HR-5

95R

HR-5

95R

#6 X 1" PL-FH-SMS410 TEK/2

5 6

HR-6

01

HR-6

01

HR-6

01

HR-5

98

7

HR-6

01

HR-5

98

HR-6

01

HR-5

988

HR-5

89

OUTSIDE

INSIDE

MUTIN

W-0014

Optional Glazing Bead

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\02 STL212HR\SERIES\WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Integra SeriesSTL212HR Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 3: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

Product Standards and Guide Specifications

1

INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed

1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows

PART 1 - GENERAL

1. DESCRIPTION A. Work included:

1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California

B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section

08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.

2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:

1. Air infiltration test a. Products must be independently lab tested

and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with

differential pressure across window unit of 1.57 / 6.24 PSF

2. Water penetration test a. Products must be independently lab tested

and meet or exceed ASTM E331. b. No water penetration for 15 minutes when

window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF

3. Field Testing a. Field testing criteria (when applicable) shall be

in accordance with AAMA 502-08. 4. Structural test

a. Meets or exceeds ASTM E330 5. Forced entry test

a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds

6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in

Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test

3. SUBMITTALS A. Shop drawings

1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

2. Dimensioned elevations showing window opening and window sizes.

4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the

protection and storage of the windows after delivery to the site.

5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.

PART 2 - PRODUCT AND FABRICATION 1. MATERIALS

A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections

shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.

B. Operable Hardware: 1. Awning, Hopper:

a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty

stainless steel four bar hinges with brass friction shoes.

2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless

steel pin. c. Friction and limit device: Stainless steel with

sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,

trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

2. FABRICATION A. Fabricate steel windows in accordance with approved

shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be

cleaned by shot blasting. C. Glazing

1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to

suit the glass as specified. D. Weatherstrip

1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.

3. FACTORY FINISHING A. Pretreatment

1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.

B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and

accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.

PART 3 - EXECUTION 1. INSPECTION

A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

2. INSTALLATION A. Install windows in openings in strict accordance with

approved shop drawings. 3. CLEANING

A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

END OF SECTION 6.

OUTS

IDE

INSI

DE

1

HR-589

#6 X 1" PL-FH-SMS410 TEK/2

HR-601

HR-595R

2

HR-595R

3

HR-601

#6 X 1" PL-FH-SMS410 TEK/2

OUTS

IDE

INSI

DE

HR-589

4

HR-5

95R

HR-5

95R

#6 X 1" PL-FH-SMS410 TEK/2

5 6

HR-6

01

HR-6

01

HR-6

01

HR-5

98

7

HR-6

01

HR-5

98

HR-6

01

HR-5

988

HR-5

89

OUTSIDE

INSIDE

MUTIN

W-0014

Optional Glazing Bead

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\02 STL212HR\SERIES\WINDOW-STEEL-STL212HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Integra SeriesSTL212HR Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 4: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

OUTSIDE

INSIDE

HR-601

HR-601

HR-002

HR-002

HR-001

HR-001

HR-6

01

HR-0

02

HR-001

HR-6

01

HR-0

02

HR-6

01

HR-0

02HR

-601

HR-0

02

HR-6

01

HR-0

02

1

2

3

4

5 6

7

8

OUTSIDE

INSIDE

Optional Glazing Bead

W-0014

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\03 STL212HRV\SERIES\WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Victoria SeriesSTL212HRV Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 5: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

Product Standards and Guide Specifications

1

VICTORIA Series STL212HRV Awning, Hopper, Casement, Fixed

1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows

PART 1 - GENERAL

1. DESCRIPTION A. Work included:

1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California

B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section

08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.

2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:

1. Air infiltration test a. Products must be independently lab tested

and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with

differential pressure across window unit of 1.57 / 6.24 PSF

2. Water penetration test a. Products must be independently lab tested

and meet or exceed ASTM E331. b. No water penetration for 15 minutes when

window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF

3. Field Testing a. Field testing criteria (when applicable) shall be

in accordance with AAMA 502-08. 4. Structural test

a. Meets or exceeds ASTM E330 5. Forced entry test

a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds

6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in

Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test

3. SUBMITTALS A. Shop drawings

1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

2. Dimensioned elevations showing window opening and window sizes.

4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the

protection and storage of the windows after delivery to the site.

5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.

PART 2 - PRODUCT AND FABRICATION 1. MATERIALS

A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes

1. Combined weight of frame and ventilator sections shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.

B. Operable Hardware: 1. Awning, Hopper:

a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty

stainless steel four bar hinges with brass friction shoes.

2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless

steel pin. c. Friction and limit device: Stainless steel with

sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,

trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

2. FABRICATION A. Fabricate steel windows in accordance with approved

shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be

cleaned by shot blasting. C. Glazing

1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to

suit the glass as specified. D. Weatherstrip

1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.

3. FACTORY FINISHING A. Pretreatment

1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.

B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and

accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.

PART 3 - EXECUTION 1. INSPECTION

A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

2. INSTALLATION A. Install windows in openings in strict accordance with

approved shop drawings. 3. CLEANING

A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

END OF SECTION 6.

OUTSIDE

INSIDE

HR-601

HR-601

HR-002

HR-002

HR-001

HR-001

HR-6

01

HR-0

02

HR-001

HR-6

01

HR-0

02

HR-6

01

HR-0

02HR

-601

HR-0

02

HR-6

01

HR-0

02

1

2

3

4

5 6

7

8

OUTSIDE

INSIDE

Optional Glazing Bead

W-0014

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\03 STL212HRV\SERIES\WINDOW-STEEL-STL212HRV-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Victoria SeriesSTL212HRV Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 6: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

W8-630

WH6-629

W8-630

WH6-629

W7-640

W7-640

W7-640

W8-630

WH5-628

W8-

630

WH6

-629

W8-

630

WH6

-629

W8-630

WH5-628

W8-630

WH5-628

WT2-644

1

2

3

4

5 6

7

8

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\01 STL175HR\SERIES\WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Venetian SeriesSTL175HR Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 7: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

Product Standards and Guide Specifications

1

VENETIAN Series STL175HR Awning, Hopper, Casement, Fixed

1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows

PART 1 - GENERAL

1. DESCRIPTION A. Work included:

1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California

B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section

08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.

2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:

1. Air infiltration test a. Products must be independently lab tested

and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with

differential pressure across window unit of 1.57 / 6.24 PSF

2. Water penetration test a. Products must be independently lab tested

and meet or exceed ASTM E331. b. No water penetration for 15 minutes when

window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF

3. Field Testing a. Field testing criteria (when applicable) shall be

in accordance with AAMA 502-08. 4. Structural test

a. Meets or exceeds ASTM E330 5. Forced entry test

a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds

6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in

Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test

3. SUBMITTALS A. Shop drawings

1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

2. Dimensioned elevations showing window opening and window sizes.

4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the

protection and storage of the windows after delivery to the site.

5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.

PART 2 - PRODUCT AND FABRICATION

1. MATERIALS A. Heavy custom windows shall be manufactured from

solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections

shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.

B. Operable Hardware: 1. Awning, Hopper:

a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty

stainless steel four bar hinges with brass friction shoes.

2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless

steel pin. c. Friction and limit device: Stainless steel with

sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,

trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

2. FABRICATION A. Fabricate steel windows in accordance with approved

shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be

cleaned by shot blasting. C. Glazing

1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to

suit the glass as specified. D. Weatherstrip

1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.

3. FACTORY FINISHING A. Pretreatment

1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.

B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and

accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.

PART 3 - EXECUTION 1. INSPECTION

A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

2. INSTALLATION A. Install windows in openings in strict accordance with

approved shop drawings. 3. CLEANING

A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

END OF SECTION

W8-630

WH6-629

W8-630

WH6-629

W7-640

W7-640

W7-640

W8-630

WH5-628

W8-

630

WH6

-629

W8-

630

WH6

-629

W8-630

WH5-628

W8-630

WH5-628

WT2-644

1

2

3

4

5 6

7

8

6

7

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

As of: 05/21/13WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\01 STL175HR\SERIES\WINDOW-STEEL-STL175HR-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Venetian SeriesSTL175HR Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 8: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

67

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

58"

58" WEEP

138"

138"

2

2

WEEP

212"

134" 4

#45 DRIP

134"

212"

3

OUTS

IDE

INSI

DE

134"

212"

16

134"

212"

16

134"

212"

16

134"

212"

16

516"

218"

516"

15

As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Milano SeriesSTL1375M Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

67

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

58"

58" WEEP

138"

138"

2

2

WEEP

212"

134" 4

#45 DRIP

134"

212"

3

OUTS

IDE

INSI

DE

134"

212"

16

134"

212"

16

134"

212"

16

134"

212"

16

516"

218"

516"

15

As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Milano SeriesSTL1375M Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

#S515 ALUMINUM SNAP-ONGLAZING BEAD

1/2" GLASS POCKET1/4" THICK GLASS SHOWN

(ALSO FOR 1/8" & 3/16")

114"

34"

#S501 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)

#S505 ALUMINUM SNAP-ONGLAZING BEAD1" GLASS POCKET

3/4" THICK GLASS SHOWN(ALSO FOR 5/8" GLASS)

1"

#S506 ALUMINUM SNAP-ONGLAZING BEAD

1 1/4" GLASS POCKET1" THICK GLASS SHOWN(ALSO FOR 7/8" & 15/16")

#S508 ALUMINUM SCREW-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)

#S503 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 5/8")

12"

34" 1"

12"

14"

34"

12"

SHEET G1SCALE: 1/2 FULL

34"

12"

12"

14"

#S516 ALUMINUM SNAP-ONGLAZING BEAD

1/2" GLASS POCKET1/4" THICK GLASS SHOWN

(ALSO FOR 1/8" & 3/16")

As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Milano SeriesSTL1375M Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 9: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

#S515 ALUMINUM SNAP-ONGLAZING BEAD

1/2" GLASS POCKET1/4" THICK GLASS SHOWN

(ALSO FOR 1/8" & 3/16")

114"

34"

#S501 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)

#S505 ALUMINUM SNAP-ONGLAZING BEAD1" GLASS POCKET

3/4" THICK GLASS SHOWN(ALSO FOR 5/8" GLASS)

1"

#S506 ALUMINUM SNAP-ONGLAZING BEAD

1 1/4" GLASS POCKET1" THICK GLASS SHOWN(ALSO FOR 7/8" & 15/16")

#S508 ALUMINUM SCREW-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 3/8" GLASS)

#S503 ALUMINUM SNAP-ONGLAZING BEAD3/4" GLASS POCKET

1/2" THICK GLASS SHOWN(ALSO FOR 5/8")

12"

34" 1"

12"

14"

34"

12"

SHEET G1SCALE: 1/2 FULL

34"

12"

12"

14"

#S516 ALUMINUM SNAP-ONGLAZING BEAD

1/2" GLASS POCKET1/4" THICK GLASS SHOWN

(ALSO FOR 1/8" & 3/16")

As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Milano SeriesSTL1375M Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1

Page 10: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

67

1 1

2

65

4

8

1

4

6

3

2

3

2

3

2

3

58"

58" WEEP

138"

138"

2

2

WEEP

212"

134" 4

#45 DRIP

134"

212"

3

OUTS

IDE

INSI

DE

134"

212"

16

134"

212"

16

134"

212"

16

134"

212"

16

516"

218"

516"

15

As of: 05/21/13WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.pdf

Scale:

Function:Description:

Detail:OFSHEET

Z:\01 UPDATED FILES\01 CAD\03 WINDOWS\STEEL\05 STL1375M\WINDOW-STEEL-STL1375M-AWNING-HOPPER-CASEMENT-FIXED-ALL-SERIES.DWGDbehner

Milano SeriesSTL1375M Hot Rolled Window

Awning, Hopper, Casement, FixedALL1'-0" = 1'-0" (Full) 1 1Product Standards and Guide Specifications

1

Milano Series STL1375M Awning, Hopper, Casement, Fixed

1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows

PART 1 - GENERAL

1. DESCRIPTION A. Work included:

1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California

B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section

08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.

2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:

1. Air infiltration test a. Products must be independently lab tested

and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with

differential pressure across window unit of 1.57 / 6.24 PSF

2. Water penetration test a. Products must be independently lab tested

and meet or exceed ASTM E331. b. No water penetration for 15 minutes when

window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF

3. Field Testing a. Field testing criteria (when applicable) shall be

in accordance with AAMA 502-08. 4. Structural test

a. Meets or exceeds ASTM E330 5. Forced entry test

a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds

6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in

Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test

3. SUBMITTALS A. Shop drawings

1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

2. Dimensioned elevations showing window opening and window sizes.

4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the

protection and storage of the windows after delivery to the site.

5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.

PART 2 - PRODUCT AND FABRICATION 1. MATERIALS

A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes 1. Combined weight of frame and ventilator sections

shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.

B. Operable Hardware: 1. Awning, Hopper:

a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty

stainless steel four bar hinges with brass friction shoes.

2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless

steel pin. c. Friction and limit device: Stainless steel with

sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,

trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

2. FABRICATION A. Fabricate steel windows in accordance with approved

shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be

cleaned by shot blasting. C. Glazing

1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to

suit the glass as specified. D. Weatherstrip

1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.

3. FACTORY FINISHING A. Pretreatment

1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.

B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and

accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.

PART 3 - EXECUTION 1. INSPECTION

A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

2. INSTALLATION A. Install windows in openings in strict accordance with

approved shop drawings. 3. CLEANING

A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

END OF SECTION

Product Standards and Guide Specifications

1

VICTORIA Series STL212HRV Awning, Hopper, Casement, Fixed

1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23 Steel Windows

PART 1 - GENERAL

1. DESCRIPTION A. Work included:

1. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be fabricated by Arcadia Inc. Vernon, California

B. Related work specified elsewhere: 1. Glass, glazing and glazing materials, Section

08810. 2. Perimeter caulking, Section 07915. 3. Miscellaneous structural items, Section 05100.

2. QUALITY ASSURANCE A. Allowable tolerances: Size dimensions + 1/16 inch. B. Source quality control:

1. Air infiltration test a. Products must be independently lab tested

and meet or exceed ASTM E-283. b. Maximum air infiltration 0.30 CFM/ SQFT with

differential pressure across window unit of 1.57 / 6.24 PSF

2. Water penetration test a. Products must be independently lab tested

and meet or exceed ASTM E331. b. No water penetration for 15 minutes when

window is subjected to a rate of flow of 5 gal./hr/sq.ft with differential pressure across window unit of 6.00 PSF

3. Field Testing a. Field testing criteria (when applicable) shall be

in accordance with AAMA 502-08. 4. Structural test

a. Meets or exceeds ASTM E330 5. Forced entry test

a. Meets or exceeds ASTM F588 b. Grade 40 @ 300 pounds

6. Quality of top coat combination shall meet or exceed the following ASTM designations: a. ASTM D4585 Humidity Test b. ASTM D714 Paint Blistering Test c. ASTM B117–03 Salt Spray (Fog) Test d. ASTM D1654–05 Painted Products in

Corrosive Environments e. ASTM G85 Cyclic Fog/Dry Test (Prohesion) f. ASTM D5894–96 Salt Fog/UV Painted Metal g. ASTM D4541 Pull off Strength of Coating Test

3. SUBMITTALS A. Shop drawings

1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

2. Dimensioned elevations showing window opening and window sizes.

4. PRODUCT, STORAGE AND HANDLING A. The General Contractor shall be responsible for the

protection and storage of the windows after delivery to the site.

5. WARRANTY A. Provide Arcadia’s standard 10 year Limited Warranty.

PART 2 - PRODUCT AND FABRICATION 1. MATERIALS

A. Heavy custom windows shall be manufactured from solid hot rolled steel shapes

1. Combined weight of frame and ventilator sections shall be a minimum of 4.20 pounds per lineal foot. Frame section alone shall not weigh less than 1.80 pounds per lineal foot.

B. Operable Hardware: 1. Awning, Hopper:

a. Fastener: Brass or Bronze cam fastener. b. Ventilators shall be hung on heavy-duty

stainless steel four bar hinges with brass friction shoes.

2. Casement: a. Fastener: Brass or Bronze cam fastener b. Pivots: Aluminum-bronze pivot with stainless

steel pin. c. Friction and limit device: Stainless steel with

sliding brass shoe and screw adjusted friction. C. All screws that are furnished by Arcadia for hardware,

trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

2. FABRICATION A. Fabricate steel windows in accordance with approved

shop drawings. B. Prior to fabrication, all hot rolled steel sections shall be

cleaned by shot blasting. C. Glazing

1. All windows shall be designed for outside glazing. 2. Provide replaceable continuous glazing beads to

suit the glass as specified. D. Weatherstrip

1. All ventilators shall receive continuous EPDM weatherstripping that shall be applied to the interior and exterior contact surfaces of the frame and ventilator sections.

3. FACTORY FINISHING A. Pretreatment

1. Pretreatment process to thoroughly clean and prepare the substrates for zinc coating.

B. Paint Finish Top coat 1. Following the zinc primer coat(s), all windows and

accessories are given a spray coat of acrylic polyurethane and oven baked at 225°F for 15 minutes to dry film thickness of 1.5-2.0 mils.

PART 3 - EXECUTION 1. INSPECTION

A. Window openings shall conform to details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

2. INSTALLATION A. Install windows in openings in strict accordance with

approved shop drawings. 3. CLEANING

A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

END OF SECTION 6.

Page 11: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

Montage Hotel & Resort Beverly Hills, CA HKS Hill Glazier Studio

Page 12: STEEL WINDOWS...Product Standards and Guide Specifications 1 INTEGRA Series STL212HR Awning, Hopper, Casement, Fixed 1995 CSI SECTION 08510 Steel Windows 2004 CSI SECTION 08 51 23

arcadiainc.com

Corporate Location

2301 East Vernon Avenue Vernon, CA 90058

Ph 323.269.7300 Fx 323-269-7390

[email protected]

Washington Location

7830 S. 196th Street Kent, Washington 98032

Ph 425-869-7300 Fx 253-395-4234

Arizona Location

2510 West Geneva DriveTempe, AZ 85282

Ph 602-437-2514 Fx 602-437-2515

New Mexico Location

4705 Mcleod Road N.E.Albuquerque, NM 87109

Ph 505-341-4222 Fx 505-341-4225

Nevada Location

1850 East Maule AvenueLas Vegas, NV 89119

Ph 702-798-7300 Fx 702-798-7305

Connecticut Location

60 Bonner StreetStamford, CT 06902

Ph 203-316-8000 Fx 203-316-8200

Hawaii Location

94-410 Uke’e Street, Bldg #AWaipahu, HI 96797

Ph 808-678-9700 Fx 808-676-8663

Northern California Location

2187 Alpine WayHayward, CA 94545

Ph 510-783-4990 Fx 510-783-1149

Sacramento Location

2324 Del Monte StreetSacramento, CA 95691

Ph 916-375-1478 Fx 916-375-1523