Page 1: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 2: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 3: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 4: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 5: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 6: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 7: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching
Page 8: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching

From: Lori Otto [mailto:[email protected]] Sent: Tuesday, January 17, 2012 7:27 PM To: LNI RE Prevailing Wage Worker 1 Subject: Confirmation on prevailing wage classification We will be installing stay-in-place metal formwork to pour concrete for a bridge deck. We are requesting confirmation from L&I that WAC 296-127-01310 (Carpenters) applies to this work. In the below e-mail, the project manager has provided information on the stay in place form system as well as included plan sheets and shop drawings for the work. Please let us know if there are any questions or if any additional information is needed to provide the confirmation on which clasification applies to this work.

Thank you, Lori Otto 425-394-4202 From: Tim Gattie Sent: Tuesday, January 17, 2012 3:40 PM To: Lori Otto Subject: RE: Murray Morgan Bridge Stay-In-Place Forms Lori, Attached is a drawing of the stay-in-place form system. To answer some of your questions:

1) The system is installed by attaching haunch angles to the bridge stringers. The form pans are then screwed down to the haunch angles using self-drilling screws.

2) It is non-structural. It is installed to support the weight of the rebar and wet concrete. It serves no purpose after the deck is cured and has no connection to the structure other than through the haunch angles.

3) I am attaching the two plan sheets and the shop drawings for the material for your reference.

Let me know if you need anything else. Thanks, Tim

Page 9: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching

Timothy J. Gattie, P.E. | PCL Construction Services, Inc. Project Manager | Murray Morgan Bridge Rehabilitation 1109 A Street, Suite 110 | Tacoma, WA 98402 P 253.267.7133 | C 425.223.0606 | F 253.238.1709 [email protected] | www.pcl.com

From: Lori Otto Sent: Tuesday, January 17, 2012 2:49 PM To: Tim Gattie Subject: RE: Murray Morgan Bridge Stay-In-Place Forms Tim. I spoke to L&I. They will need additional information to make a clarification on the wage determination for this work. Some of the information they are looking for includes, is it a structural component, how is it installed… They also would like the plan pages for this. When you get a moment please give me a call to review. Thanks, Lori

Page 10: Stay-In-Place Metal Forms/Decking - Murray Morgan … · Attached is a drawing of the stay-in-place form system. To answer some of your questions: 1) The system is installed by attaching

1

Selover, Ann (LNI)

From: Iron Workers Local86 [[email protected]]Sent: Tuesday, January 31, 2012 12:42 PMTo: Selover, Ann (LNI)Subject: Pictures and Letters of AssignmentAttachments: 01311202.PDF; 01311201.PDF

Ann, We are asking for a determination on the Murray Morgan Bridge project in Tacoma being performed by PCL Construction. I have attached pictures of the decking and edgeform that is to be placed on this project. In addition there are letters of assignment from Ironworker contractors that have performed this work using Ironworkers on their projects. We do have more letters from other contractors who have performed this work with Ironworkers if needed. This is not a form system. These materials will be permanently attached to the bridge girders by means of welding and fasteners. We appreciate your time in this matter. Please respond to this email or contact Don Demulling at 206.380.3420. Thank you,

Chris McClain Local 86 Dispatcher 4550 s 134th pl. Suite # 102 Tukwila, WA 98168 Phone # 206.248.4246 Fax # 206.439.1069