Upload
peers
View
49
Download
0
Embed Size (px)
DESCRIPTION
ENFORCEMENT REPORT. Status Update on ENFORCEMENT ACTIVITY michael C. wright chief, enforcement Section AUGUST 9, 2013. ENFORCEMENT REPORT. Enforcement Activity –June 14 thru August 5: 3 Letters of Authorization issued 5 Enforcement Cases have been resolved 3 NOV’s issued - PowerPoint PPT Presentation
Citation preview
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X
STATUS UPDATE ON ENFORCEMENT ACTIVITY
MICHAEL C. WRIGHTCHIEF, ENFORCEMENT SECTION
AUGUST 9, 2013
1
ENFORCEMENT REPORT
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 2
ENFORCEMENT REPORT
Enforcement Activity –June 14 thru August 5: 3 Letters of Authorization issued 5 Enforcement Cases have been resolved 3 NOV’s issued Encroachment Database – August 5: 90 Active Enforcements 347 Encroachments Under Investigation 360 Encroachment cases have been resolved and closed
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 3
ENFORCEMENT REPORT
6/3/2013 6/10/2013 7/8/2013 8/5/20130
100
200
300
400
500
600
700
800
900
228301 330 360
381373 365 347
176111 92 90
CVFPB - Enforcement Encroachment Tracker
Encroachment Closed Investigate Active Enforcement
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 4
USACE’S RIP LEVEE STATUS
3/22/1
3
4/5/13
4/26/1
3
5/10/13
5/24/13
6/14/13
6/28/1
3
7/23/13
7/26/1
30
20
40
60
80
100
6764 63 60 59 54 54 55 54
0 0 0 0
43 49 50 53 54 60 60 59 60
0 0 0 0
8 3 3 3 3 2 2 2 2
0 0 0 0
Levee System Status - Rehabilitation and Inspection Program (RIP)
Active Inactive Partially Inactive
3/22/1
3
4/5/13
4/26/1
3
5/10/13
5/24/13
6/14/13
6/28/1
3
7/23/13
7/26/1
3
57%55% 54% 52% 51% 47% 47% 47% 47%
0% 0% 0% 0%
36%42% 43% 46% 47% 52% 52% 51% 52%
0% 0% 0% 0%
3% 2% 2% 2% 2%
0% 0% 0% 0%
Levee System Status - Rehabilitation and Inspection Program (RIP)
Active Inactive Partially Inactive
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 5
ENFORCEMENT REPORT
Letter of Intent (LOI) for System Wide Improvement Framework (SWIF) Update:
Reclamation District 108 Submitted a LOI July 23, 2013 for the Sacramento River West Bank Levee System (LD 1, LD 2, RD 108, RD 787 & DWR)
SBFCA’s and RD 1001’s LOI’s are currently being reviewed by USACE Reclamation District 1000’s LOI was approved May 16, 2013. RD 1000 is
currently preparing a SWIF
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 6
ENFORCEMENT REPORT
Questions?
BUILDING STRONG®
Sacramento River West Bank Levee System 8 Segments - 120 miles
LD 1 – Glenn County (12.25 miles)LD 2 – Glenn County (4.91 miles)Maint Area 01 (16.78 miles)Sac River West Side (23 miles)Sac River West Side (26.63 miles)RD 0787 Fair (4.45 miles)RD 0108 (20.65 miles)Maint Area 12 (11.06 miles)
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 8
ENFORCEMENT REPORT
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 9
Enforcement Action No. 2013-146 (BEFORE):
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 10
Enforcement Action No. 2013-146 (AFTER):
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 11
Enforcement Action No. 2013-152 (BEFORE):
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 12
Enforcement Action No. 2013-152 (BEFORE):
Central Valley Flood Protection Board Meeting – Enforcement Report
Exec. Report X 13
Enforcement Action No. 2013-152 (AFTER):