14
Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Embed Size (px)

Citation preview

Page 1: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Status report on MURAY telescope R&D

Pasquale Noli on behalf of Mu-Ray collaboration

Page 2: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Outline

• Motivation• Measurement principles• The MURAY telescope – Fiber optical connector– SiPM hybrid connector– SiPM from IRST-FBK test– Front End electronic and DAQ

• Conclusions

23/09/2010 SIF 2010 Bologna 2

Page 3: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

50 300200

Conduit length = 8000mGas content = 5 wt%

20

1631 eruption

Pompei eruption

100,000 ton/s

100

MotivationVolcano-eruption dynamics mostly depend on• the gas content• the chemical composition of the magma • the lava-conduit dimensions and shape.

Seismic,gravimetric,electromag.methods:Several km

Muon radiography: few hundreds m

Traditional measurement methods :• gravimetric • seismological• electromagneticHave spatial resolutions of the order of several hundredmeters.Muonradiographycan improve resolutions by one order of magnitude.

Simulated Mass eruption rate vs. Conduit Simulated Mass eruption rate vs. Conduit

23/09/2010 SIF 2010 Bologna 3

Page 4: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Muon Radiography

• Muon radiography is based on the measurement of the absorption of cosmic muons inside matter.

“The first application was realized in 1971 by Alvarez and collaborators for the search of unknown burial cavities in the Chephren pyramid.”

• In recent years Tanaka and collaborators, from University of Tokyo, have demonstrated the possibility to use this technique, to study the internal structure of volcanoes.

• The spatial resolution that can be obtained with this method is of the order of 10 m.

23/09/2010 SIF 2010 Bologna 4

Page 5: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Measurement principles (I)(No background hypothesis)

• The observed number of muons is a function of the muon flux crossing the volcano volume seen along the direction (,) the absorption factor A, and the detector efficiency :

• In the limit of neglecting the dependence of cosmic ray flux, the product of the muonflux times detector efficiency can be measured using special runs pointing to “free” sky region

• Then the absorption can be evaluated as:

23/09/2010 SIF 2010 Bologna 5

Page 6: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Measurement principles (II)• Starting from the theoretical muon flux distribution f (Thompson and

Whalley expression) , we compute the expected muon transmission rate through water meter equivalent for each direction.

• For each (θ,) direction we can obtain the mean rock density from the ratio between:– the water meter equivalent length relative to A.– thickness of montain.

. 23/09/2010 SIF 2010 Bologna 6

Page 7: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

The MURAY telescope (I)Two 2x2 m2 X-Y stations

• Triangular shape scintillators (from Fermilab)•Scint. light collected by WLS one-side mirrored fiber (BCF92 fast response fibers from Bicron)• Dedicated 32 fibers optical connector • Dedicated SiPM from FBK-IRST .

They have 1.4 mm diameter and 70x70 m2 cell size, with 292 cells in total

• Dedicated hybrid hosting 32 SiPMs•SiPM temperature control by Peltier Cells• SPIROC 0 ASIC FEE (from Orsay group)• Dedicated read-out and acquisition board

Expected performances:• ≈3 mm space resolution (by measurement of charge sharing between two adjacent strips)• ≈ 1ns time resolution• O(10) W power consumption

23/09/2010 SIF 2010 Bologna 7

Page 8: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

The MURAY telescope (II)

2 m

32 scintillator bars module (0.5 m large), with bars glued together and on a G11 fiberglass support plate

Fibers’ connector

SiPM hybrid connector

0.5 m

23/09/2010 SIF 2010 Bologna 8

Page 9: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

The MURAY telescope prototype (I)A prototype is under construction

• 3 X-Y stations 1x1 m2 area

• SPIROC 1 ASIC FEE

23/09/2010 SIF 2010 Bologna

A special tool designed and built for precision assembly of the 32 bars in a plane

9

Page 10: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Fiber optical connectorA special connector (made of black Plexiglas) has been developed for high-precision positioning of the fibers in front of the SiPMs.32 fibers are glued on the connector that will be fixed to the module chassis. The fiber connector is mechanically coupled with a hybrid circuit hosting the SiPMs.

MAGNIFICATION OF THE GLUE TANKS

SIPM SIDEFIBER SIDE

O RING SEAT

Al PROTOTIPE

Reference hole

Al prototype

23/09/2010 SIF 2010 Bologna 10

Page 11: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

SiPM hybrid connector In order to optimize the cooling by Peltier cells, we decided to group together 32 die SiPM in a single PCB. One side of the Peltier cells is thermally in contact with the back side of the PCB. A rubber O-ring ensures light and air tightness. Two temperature sensors are located on the PCB for the Peltier cells control circuit. The first 5 hybrid PCB have been produced in Florence.

23/09/2010 SIF 2010 Bologna 11

Page 12: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

First test on SiPM

We studied the V break-down of the SiPM of first hybrid connector.

23/09/2010 SIF 2010 Bologna 12

Page 13: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Front End electronic and DAQ (I) Spiroc 1: we have 18 chips, enough for the 1x1 m2 prototype

The FE board (Slave) and the trigger-DAQ board (Master) have been designed. The first prototypes have been realized and are under test.

MASTER

SLAVE

23/09/2010 SIF 2010 Bologna 13

Page 14: Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Conclusions

• We are presently assembling the first MU-RAY prototype module

• The SiPMs produced at IRST-FBK are assembled on hybrid connector and are under test in Naples.

• A special optical connector with SiPMs and Peltiercooling has been designed and built.

• The readout electronics has been designed and is under test.

23/09/2010 SIF 2010 Bologna 14