Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 29
modules
BOS (balance of system) - inverter, meter - cables, mounting system - mounting
0.5€/Wp
= 330CLP
1€/Wp
= 660CLP source of picture: internet
status of PV 2013: costs for system
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
www.solarlake-konstanz.de
today's prices for turn
key PV- system:
1.4-1.7 €/Wp
>>> 9-14 ct/kWh
60-90 CLP/kWh (in Germany)
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 31
electricity production in 2013 in GER
nuclear brown coal black coal gas wind solar water
19.0% 29.6% 24.1% 9.7% 9.1% 4.8% 3.7%
electricity production in first five months in 2013
renewables: ca. 25%
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
weekly electricity power need and production in Germany
200 GW PV, 100 GW wind power
source: volker-
quaschning.de
100% renewable in Germany?
other
Wind offshore
Wind onshore
PV
need
week
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
4.5 years
3.4 years
2.7 years
2.2 years
1.9 years
1.7 years
1.5 years
1.3 years
1.2 years
4.5 years
3.4 years
2.7 years
2.2 years
1.9 years
1.7 years
1.5 years
1.3 years
1.2 years
3.4 years
2.4 years
1.8 years
1.7 years
1.5 years
1.2 years
1.0 years
0.9 years
0.8 years Source: ECN; Mariska de Wilden
status of PV 2013: energy payback
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
status of PV 2013: energy payback
0.5 years
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 35
summary
GERMANY
- In Germany the total installed PV capacity is 35GWp (world wide ca.
120GWp); that corresponds to 5% electricity from PV
-The “Energy Turn Around” in Germany has to be done collectively with
all the alternative energies (good energy mix, smart-grid, storage)
GENERAL
- PV producers are at the moment in a crisis due to overcapacity; but
new markets are fast created
- c-Si modules costs are around 0.5€/Wp; total turn-key PV systems
for 1.50 €/Wp >>> this gives translated ca. 10ct/kWh
- 30 GW PV-market will move to 100 GW market in 2020
- PV is for countries with plenty of sun the best electricity source to
get independent (Hermann Scheer)
status of PV 2013
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
important research topics
36
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 37
research topics
GERMANY CHILE
- snow - sand
- cold (not at the moment) - hot (not at the moment)
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 38
research topics
CELL MODULE SYSTEM
- material saving
- thinner wafer
- Cu instead of Ag
- colorful cells
- bifacial cells
- rear contact cells
- concentrators
- tandem
- 3rd generation?
- material saving
- thinner glass
- less encapsulant
- no frames
- longer lifetime
- glass/glass
- silcones instead EVA
- bifacial moduels
- desert modules
- hybrides (solar thermal)
- …
- material saving
- less frames
- more stable holders
- stable cables
- stable convertors
- smart-grid
- storage!!! (also e.g.
power to gas)
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 39
research topics
- material saving
- thinner wafer
- Cu instead of Ag
- colorful cells
- bifacial cells
- rear contact cells
- concentrators
- tandem
- 3rd generation?
- material saving
- thinner glass
- less encapsulant
- no frames
- longer lifetime
- glass/glass
- silcones instead EVA
- bifacial moduels
- desert modules
- hybrides (solar thermal)
- …
- material saving
- less frames
- more stable holders
- stable cables
- stable convertors
- smart-grid
- storage (also e.g. power
to gas)
CELL MODULE SYSTEM
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 40
research topics: cells
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 41
research topics: cells
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
30°
white board
Conditions
- module embedded in black frame (1x0.5) m2
- placed on white board
- inclined by 30° and facing to the South
- measured in bifacial and monofacial (rear side
covered) arrangement
10 12 14 16 18
0,0
0,2
0,4
0,6
0,8
1,0
bifacial
monofacial
Pm
pp
[arb
itra
ry u
nits]
time during one day in August [h]
10 12 14 16 1820
30
40
50
60
70
80
average gain in P of 33%
time during one day in August [h]
ga
in in
P [
%]
research topics: bifacial modules
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
research topics: bifacial modules
P
morning t evening
S
W
E
N
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 44
research topics: rear contact modules
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 45
research topics: light, flexible modules
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013 46
research topics: stable desert modules
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
overall summary
If the energy turn around with PV (in combination with other
renewables) works in Germany, it works far better in Latin
America and other southern places. PV electricity generation
in 2013 can be done in Germany for 10ct/kWh.
- higher yearly irradiation
- stable irradiation during the year
- more need for decentralized systems
>> adapted solutions needed (e.g. desert module)
>> effective solutions for storage needed (also micro-grids)
>> good political and economical surroundings has to be
established
Radovan Kopecek, Ceremonia de Lanzamiento Centro FONDAP en Energia Solar , 05. 07. 2013
THANK YOU!
source of picture: Internet