Northern Powergrid (Yorkshire) plc, Registered Office: Lloyds Court, 78 Grey Street, Newcastle Upon Tyne NE1 6SF
Registered In England And Wales No. 4112320
Statement of Use of System Charging
Northern Powergrid (Yorkshire) plc
Final Notice
Effective from 1st April 2014
Version 1.0
Version Control
Version Date Description of version and any changes made
1.0 1 April 2014 This statement is based on version 7.8 of the common template developed during 2013.
A change-marked version of this statement can be provided upon request.
PAGE 3 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Contents
1. Introduction 4
2. Charge Application and Definitions 6
Supercustomer Billing and Payment 6 Supercustomer Charges 6 Site-Specific Billing and Payment 7 Site-Specific Billed Charges 7 Time periods for half-hourly metered properties 8 Time periods for half-hourly unmetered properties 9 Application of Capacity Charges 9 Chargeable Capacity 9 Exceeded capacity 9 Demand exceeded capacity 9 Generation exceeded capacity 10 Standby Capacity for Additional Security on Site 10 Minimum Capacity Levels 10 Application of charges for excess reactive power 10 Demand chargeable reactive power 11 Generation chargeable reactive power 11 Generation charges for pre-2005 Designated EHV Properties 12 Provision of billing data 12 Use of System Charges Out of Area 13 Licensed Distributor Network Operator (LDNO) charges 13 Third party access from exempt distribution networks 13
3. Schedule of Charges for use of the Distribution System 15
4. Schedule of Line Loss Factors 16
Role of Line Loss Factors in the Supply of Electricity 16 Calculation of Line Loss Factors 16 Line Loss Factor time periods 16 Line Loss Factor tables 16
5. Notes for Designated EHV Properties 18
EDCM nodal costs 18 Charges for New Designated EHV Properties 18 Charges for amended Designated EHV Properties 18 Demand Side Management 18
6. Electricity Distribution Rebates 19
7. Accounting and Administration Services 20
Administration Charge 20
8. Charges for electrical plant provided ancillary to the grant of Use of System 20
9. Glossary of Terms 21
Annex 1 - Schedule of charges for use of the distribution system by LV and HV Designated Properties 26 Annex 2 - Schedule of charges for use of the distribution system by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users) 27 Annex 3 - Schedule of charges for use of the distribution system by preserved/additional LLF classes 41 Annex 4 - Charges applied to LDNOs with LV and HV end-users 42 Annex 5 - Schedule of line loss factors 45 Annex 6 - Addendum to charging statement detailing charges for new Designated EHV Properties 48
PAGE 4 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
1. Introduction
1.1. This statement has been prepared in order to discharge Northern Powergrid’s
obligation under Standard Licence Condition 14 of our Electricity Distribution Licence.
It contains information on our charges1 and charging principles for use of our
Distribution System. It also contains information on our Line Loss Factors.
1.2. The charges in this statement are calculated using the Common Distribution Charging
Methodology (CDCM) for Low-Voltage and High-Voltage (LV and HV) Designated
Properties and the Extra-High Voltage Distribution Charging Methodology (EDCM) for
Designated Extra-High Voltage (EHV) Properties (for Metering Point Administration
Numbers/Metering System Identifiers (MPANs/MSIDs) connected to our designated
distribution services area). The application of charges to a premise can usually be
referenced using the Line Loss Factor Class (LLFC) contained in the charge tables.
1.3. All charges in this statement are shown exclusive of VAT.
1.4. The annexes that form part of this statement are also provided for additional
convenience in spreadsheet format. This spreadsheet also contains supplementary
information used for charging purposes but which is not required to be provided in
accordance with Standard Licence Condition 14. This spreadsheet can be downloaded
from:
http://www.northernpowergrid.com/downloads/system.cfm
1.5. If you have any questions about this statement please contact us at the address
shown below:
Charges Manager
Northern Powergrid
98 Aketon Road
Castleford
WF10 5DS
e-mail:- [email protected]
1 Charges can be positive or negative.
PAGE 5 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
1.6. All enquiries regarding connection agreements and changes to maximum capacities
should be addressed to:
Connection Record Maintenance
Northern Powergrid
Manor House
Station Road
New Penshaw
Houghton-le-Spring
DH4 7LA
e-mail:- [email protected]
PAGE 6 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
2. Charge Application and Definitions
Supercustomer Billing and Payment
2.1. Supercustomer billing and payment applies to Metering Points registered as Non-Half
Hourly (NHH) metered or NHH unmetered. The Supercustomer approach makes use of
aggregated data obtained from the ‘Supercustomer Distribution Use of System (DUoS)
Report’.
2.2. Invoices are calculated on a periodic basis and sent to each user, for whom Northern
Powergrid is transporting electricity through its distribution system. Invoices are
reconciled, over a period of approximately 14 months, to ensure the cash positions of
users and Northern Powergrid are adjusted to reflect later and more accurate
consumption figures.
2.3. The charges are applied on the basis of the LLFC assigned to the Metering Point
Administration Number (MPAN), and the units consumed within the time periods
specified in this statement. All LLFCs are assigned at the sole discretion of Northern
Powergrid. Invoices take account of previous settlement runs and include VAT.
Supercustomer Charges
2.4. Supercustomer charges are generally billed through the following components:
a fixed charge - pence/MPAN/day, there will only be one fixed charge applied to
each MPAN; and
unit charges - pence/kilowatt-hour (kWh), more than one kWh charge may be
applied.
2.5. Users who wish to supply electricity to customers whose metering system is
measurement class A and settled on profile classes (PC) 1 through to 8 will be
allocated the relevant charge structure set out in Annex 1.
2.6. Measurement class A charges apply to exit/entry points where NHH metering is used
for settlement.
2.7. Measurement class B charges apply to exit points deemed to be suitable as unmetered
supplies as permitted in the Electricity (Unmetered Supply) Regulations 20012 and
where operated in accordance with BSCP5203.
2.8. Identification of the appropriate charge can be made by cross reference to the LLFC.
2 The Electricity (Unmetered Supply) Regulations 2001 available from
http://www.legislation.gov.uk/uksi/2001/3263/made 3 Balancing and Settlement Code Procedures on unmetered supplies are available from
http://www.elexon.co.uk/pages/bscps.aspx
PAGE 7 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
2.9. Valid settlement profile class/standard settlement configuration/meter timeswitch
code (PC/SSC/MTC) combinations for these LLFCs are detailed in Market Domain Data
(MDD).
2.10. Where an MPAN has an invalid settlement combination, the ‘Domestic Unrestricted’
fixed and unit charge will be applied as default until the invalid combination is
corrected. Where there are multiple SSC - time pattern regime (TPR) combinations,
the default ‘Domestic Unrestricted’ fixed and unit charge will be applied for each
invalid TPR combination.
2.11. The time periods for the charge rates are as specified by the SSC. To determine the
appropriate charge rate for each SSC/TPR a look-up table is provided in the ENA
spreadsheet that accompanies this statement4.
2.12. The ‘Domestic Off-Peak’ and ‘Small Non-Domestic Off-Peak’ charges are
supplementary to either an unrestricted or a two-rate charge.
Site-Specific Billing and Payment
2.13. Site-specific billing and payment applies to metering points settled as Half Hourly
(HH) metered. The site-specific billing and payment approach to Use of System (UoS)
billing makes use of HH metering data received through settlement.
2.14. Invoices are calculated on a periodic basis and sent to each user, for whom Northern
Powergrid is transporting electricity through its distribution system. Where an
account is based on estimated data, the account shall be subject to any adjustment
which may be necessary following the receipt of actual data from the user.
2.15. The charges are applied on the basis of the LLFC assigned to the MPAN (or the MSID
for Central Volume Allocation (CVA) sites), and the units consumed within the time
periods specified in this statement.
2.16. All LLFCs are assigned at the sole discretion of Northern Powergrid. Where an
incorrectly applied LLFC is identified, Northern Powergrid, may at its sole discretion
apply the correct LLFC and/or charges. Where MPANs have not been associated, for
example when multiple connections are fed from different sources, the relevant
number of fixed charges will be applied.
Site-Specific Billed Charges
2.17. Site-specific billed charges may include the following components:
a fixed charge pence/MPAN/day or pence/MSID/day;
4 Northern Powergrid Yorkshire - Schedule of charges and other tables – Version 10.7.xlsx
PAGE 8 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
a capacity charge, pence/kVA/day, for Maximum Import Capacity (MIC) and/or Maximum Export Capacity (MEC);
an excess capacity charge, pence/kVA/day, if a site exceeds its MIC and/or MEC;
unit charges, pence/kWh, more than one unit charge may be applied; and
an excess reactive power charge, pence/kVArh, for each unit in excess of the reactive charge threshold.
2.18. Users who wish to supply electricity to customers whose metering system is
measurement class C, D or E or CVA will be allocated the relevant charge structure
dependent upon the voltage and location of the metering point.
2.19. Measurement class C, E or CVA charges apply to exit/entry points where HH metering,
or an equivalent meter, is used for settlement purposes.
2.20. Measurement class D charges apply to exit points deemed to be suitable as
unmetered supplies as permitted in the Electricity (Unmetered Supply) Regulations
2001 and where operated in accordance with BSCP520.
2.21. Fixed charges are generally levied on a pence per MPAN basis. Where two or more HH
MPANs are located at the same point of connection (as identified in the connection
agreement), with the same LLFC, and registered to the same supplier, only one daily
fixed charge will be applied.
2.22. LV & HV Designated Properties will be charged in accordance with the CDCM and
allocated the relevant charge structure set out in Annex 1.
2.23. Designated EHV Properties will be charged in accordance with the EDCM and allocated
the relevant charge structure set out in Annex 2.
2.24. Where LV and HV Designated Properties or Designated EHV Properties have more than
one point of connection (as identified in the connection agreement) then separate
charges will be applied to each point of connection.
Time periods for half-hourly metered properties
2.25. The time periods for the application of unit charges to LV and HV Designated
Properties that are HH metered are detailed in Annex 1. Northern Powergrid has not
issued a notice to change the time bands.
2.26. The time periods for the application of unit charges to Designated EHV Properties are
detailed in Annex 2. Northern Powergrid has not issued a notice to change the time
bands.
PAGE 9 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Time periods for half-hourly unmetered properties
2.27. The time periods for the application of unit charges to connections that are pseudo
HH metered are detailed in Annex 1. Northern Powergrid has not issued a notice to
change the time bands.
Application of Capacity Charges
2.28. The following sections explain the application of capacity charges and exceeded
capacity charges.
Chargeable Capacity
2.29. The chargeable capacity is, for each billing period, the MIC/MEC, as detailed below.
2.30. The MIC/MEC will be agreed with Northern Powergrid at the time of connection or
pursuant to a later change in requirements. Following such an agreement (be it at
the time of connection or later) no reduction in MIC/MEC will be allowed for a period
of one year. In the absence of an agreement the chargeable capacity, save for error
or omission, will be based on the last MIC and/or MEC previously agreed by the
distributor for the relevant premises’ connection. A customer can seek to agree or
vary the MIC and/or MEC by contacting Northern Powergrid using the contact details
in paragraph 1.6.
2.31. Reductions to the MIC/MEC may only be permitted once in a 12 month period and no
retrospective changes will be allowed. Where MIC/MEC is reduced the new lower
level will be agreed with reference to the level of the customer’s maximum demand.
It should be noted that, where a new lower level is agreed, the original capacity may
not be available in the future without the need for network reinforcement and
associated charges.
Exceeded capacity
2.32. Where a customer takes additional unauthorised capacity over and above the
MIC/MEC, the excess will be classed as exceeded capacity. The exceeded portion of
the capacity will be charged at the excess capacity charge p/kVA/day rate, based on
the difference between the MIC/MEC and the actual capacity used. This will be
charged for the full duration of the month in which the breach occurs.
Demand exceeded capacity
),),max(max(2 capacity exceeded Demand 2 02 MICRERIAI
Where:
AI = Active Import (kWh)
RI = Reactive import (kVArh)
PAGE 10 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
RE = Reactive export (kVArh)
MIC = Maximum import capacity (kVA)
2.33. Only RI and RE values occurring at times of AI are used in the calculation. Where data
for two or more MPANs is aggregated for billing purposes the HH consumption values
are summated prior to the calculation above.
2.34. This calculation is completed for every half hour and the maximum value from the
billing period is applied.
Generation exceeded capacity
),),max(max(2 capacity exceeded Generation 02 MECRERIAE 2
Where:
AE = Active Export (kWh)
RI = Reactive import (kVArh)
RE = Reactive export (kVArh)
MEC = Maximum export capacity (kVA)
2.35. Only RI and RE values occurring at times of AE are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values occurring at times of kWh export are summated prior to the calculation
above.
2.36. This calculation is completed for every half hour and the maximum value from the
billing period is applied.
Standby Capacity for Additional Security on Site
2.37. Where standby capacity charges are applied, the charge will be set at the same rate
as that applied to normal MIC.
Minimum Capacity Levels
2.38. There is no minimum capacity threshold.
Application of charges for excess reactive power
2.39. When an individual HH metered MPAN’s reactive power (measured in kVArh) at LV and
HV Designated Properties exceeds 33% of total active power (measured in kWh),
excess reactive power charges will apply. This threshold is equivalent to an average
power factor of 0.95 during the period. Any reactive units in excess of the 33%
threshold are charged at the rate appropriate to the particular charge.
2.40. Power Factor is calculated as follows:
PAGE 11 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Cos θ = Power Factor
2.41. The chargeable reactive power is calculated as follows:
Demand chargeable reactive power
Where:
AI = Active Import in (kWh)
RI = Reactive Import in (kVArh)
RE = Reactive Export in (kVArh)
2.42. Only RI and RE values occurring at times of AI are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values are summated prior to the calculation above.
2.43. The square root calculation will be to two decimal places.
2.44. This calculation is completed for every half hour and the values summated over the
billing period.
Generation chargeable reactive power
Where:
AE = Active Export in (kWh)
RI = Reactive Import in (kVArh)
RE = Reactive Export in (kVArh)
kWh
kVArh
θ
0,1
95.0
1RERI,maxmax kVArh Chargeable Demand
2AI
0,AE1
95.0
1RERI,maxmax kVArh Chargeable Generation
2
PAGE 12 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
2.45. Only RI and RE values occurring at times of AE are used in the calculation. Where
data for two or more MPANs is aggregated for billing purposes the HH consumption
values are summated prior to the calculation above.
2.46. The square root calculation will be to two decimal places.
2.47. This calculation is completed for every half hour and the values summated over the
billing period.
Generation charges for pre-2005 Designated EHV Properties
2.48. Designated EHV Properties that were connected to the distribution system under a
pre-2005 connection charging policy are eligible for exemption from generation UoS
charges unless one of the following criteria has been met:
25 years have passed since their first energisation/connection date (i.e.
Designated EHV Properties with energisation/connection agreements dated prior
to 1st April 2005, and for which 25 years has passed since their first
energisation/connection date will receive generation UoS charges from the next
charging year following the expiry of their 25 years exemption, (starting 1st
April), or
the person responsible for the Designated EHV Property has provided notice to
Northern Powergrid that they wish to opt in to generation UoS charges.
If a notice to opt in has been provided there will be no further opportunity to opt out.
2.49. Furthermore, if an exempt customer makes an alteration to its export requirement
then the customer may be eligible to be charged for the additional capacity required
or energy imported or exported. For example, where a generator increases its export
capacity the incremental increase in export capacity will attract UoS charges as other
non-exempt generators.
Provision of billing data
2.50. Where HH metering data is required for UoS charging and this is not provided through
settlement processes, such metering data shall be provided by the user of the system
to Northern Powergrid in respect of each calendar month within 5 working days of the
end of that calendar month. The metering data shall identify the amount consumed
and/or produced in each half hour of each day and shall separately identify active
and reactive import and export. Metering data provided to Northern Powergrid shall
be consistent with that received through the metering equipment installed. Metering
data shall be provided in an electronic format specified by Northern Powergrid from
time to time, and in the absence of such specification, metering data shall be
PAGE 13 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
provided in a comma-separated text file in the format of D0275 MRA data flow (as
agreed with Northern Powergrid). The data shall be e-mailed to:
2.51. Northern Powergrid requires details of reactive power imported or exported to be
provided for all measurement class C (mandatory HH metered) sites and for
measurement class E (elective HH metered sites). It is also required for CVA sites and
exempt distribution network boundaries with difference metering. Northern
Powergrid reserves the right to levy a charge on users who fail to provide such
reactive data.
Use of System Charges Out of Area
2.52. Northern Powergrid does not operate networks outside its distribution service area.
Licensed Distributor Network Operator (LDNO) charges
2.53. Licenced distribution network operator (LDNO) charges are applied to LDNOs who
operate embedded networks within Northern Powergrid’s distribution services area.
2.54. The charge structure for LV and HV Designated Properties embedded in networks
operated by LDNOs will mirror the structure of the ‘all-the-way’ charge and is
dependent upon the voltage of connection of each embedded network to the host
DNO’s network. The same charge elements will apply as those that match the LDNO’s
end customer charges. The relevant charge structures are set out in Annex 4.
2.55. Where an MPAN has an invalid settlement combination, the ‘LDNO HV: Domestic
Unrestricted’ fixed and unit charge will be applied as default until the invalid
combination is corrected. Where there are multiple SSC-TPR combinations, the
default ‘LDNO HV: Domestic Unrestricted’ fixed and unit charge will be applied for
each invalid TPR combination.
2.56. The charge structure for Designated EHV Properties embedded in networks operated
by LDNOs will be calculated individually using the EDCM. The relevant charge
structures are set out in Annex 2.
2.57. For nested networks the relevant charging principles set out in DCUSA Schedule 21
will apply.
Third party access from exempt distribution networks
2.58. Where one of our MPANs (prefix 23) is embedded within an exempt distribution
network connected to one of Northern Powergrid’s distribution systems, and a
dispensation for difference metering is in place for settlement purposes, we will
continue to charge the supplier of the boundary MPAN of the connection, based on
PAGE 14 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
gross measurement for UoS. No charges will be levied directly to the customer or
supplier of the embedded MPAN(s) connected within the exempt distribution network.
2.59. Northern Powergrid requires that gross metered data for the boundary of the
connection is provided to them. Until a new flow is introduced for the sending of
such gross data, gross metered data shall:
be sent using the D0036 or D0275 MRA data flow; and
the D0036 or D0275 shall contain the metering reference specified by Northern Powergrid in place of the boundary settlements MPAN.
2.60. For the avoidance of doubt the reduced difference metered measurement data for
the boundary connection that is to enter settlements should continue to be sent using
the settlements MPAN.
2.61. Where the data collector is unable to send the D0036 or D0275 MRA data flow due to
system constraints, gross metered data shall;
be provided in a text file in the format of the D0036 or D0275 MRA data flow;
the text file shall contain the metering reference specified by Northern Powergrid in place of the settlements MPAN;
the text file shall be emailed to [email protected];
the text filename shall be formed of the metering reference specified by Northern Powergrid followed by a hyphen and followed by a timestamp in the format YYYYMMDDHHMMSS and followed by “.txt”;
and the title of the email should contain the phrase “gross data for difference metered private network”.
PAGE 15 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
3. Schedule of Charges for use of the Distribution System
3.1. Tables listing the charges for the distribution of electricity for UoS are published in
annexes to this document.
3.2. These charges are also listed in a spreadsheet which is published with this statement
and can be downloaded from:
http://www.northernpowergrid.com/downloads/system.cfm
3.3. Annex 1 contains charges to LV and HV Designated Properties.
3.4. Annex 2 contains the charges to Designated EHV Properties and charges applied to
LDNOs with Designated EHV Properties/end-users embedded in networks within
Northern Powergrid’s area.
3.5. Annex 3 contains details of any preserved and additional charges that are valid at this
time. Preserved charges are mapped to an appropriate charge and are closed to new
customers.
3.6. Annex 4 contains the charges applied to LDNOs with LV and HV Designated Properties
embedded in networks within Northern Powergrid’s distribution services area.
PAGE 16 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
4. Schedule of Line Loss Factors
Role of Line Loss Factors in the Supply of Electricity
4.1. Electricity entering or exiting the DNOs’ networks is adjusted to take account of
energy that is lost5 as it is distributed through the network.
4.2. This adjustment is made to ensure that energy bought or sold by a user, from/to a
customer, accounts for energy lost as part of distributing energy to and from the
customer’s premises.
4.3. DNOs are responsible for calculating the Line Loss Factors (LLFs) and providing these
factors to Elexon. Elexon manage the Balancing and Settlement Code (BSC). The code
covers the governance and rules for the balancing and settlement arrangements.
4.4. Annex 5 provides the LLFs which must be used to adjust the metering system volumes
to take account of losses on the distribution network.
Calculation of Line Loss Factors
4.5. LLFs are calculated in accordance with BSC Procedure (BSCP) 128, which determines
the principles that DNOs must comply with when calculating LLFs.
4.6. LLFs are either calculated using a generic method or a site-specific method. The
generic method is used for sites connected at LV or HV and the site-specific method is
used for sites connected at EHV or where a request for site-specific LLFs has been
agreed. Generic LLFs will be applied to all new EHV sites until sufficient data is
available for a site-specific calculation.
4.7. The Elexon website:
(http://www.elexon.co.uk/reference/technicaloperations/losses/) contains more
information on LLFs. This page also has links to BSC Procedure (BSCP) 128 and to our
LLF methodology.
Line Loss Factor time periods
4.8. LLFs are calculated for a set number of time periods during the year and are detailed
in Annex 5.
Line Loss Factor tables
4.9. When using the LLF tables in Annex 5 reference should be made to the LLFC allocated
to the MPAN to find the appropriate LLF.
5Energy can be lost for technical and non-technical reasons and losses normally occur by heat dissipation through power
flowing in conductors and transformers. Losses can also reduce if a customer’s action reduces power flowing in the
distribution network. This might happen when a customer generates electricity and the produced energy is consumed
locally.
PAGE 17 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
4.10. The Elexon portal website, https://www.elexonportal.co.uk, contains the LLFs in
standard industry data format (D0265). A user guide with details on registering and
using the portal can be downloaded from: www.elexonportal.co.uk/userguide
PAGE 18 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
5. Notes for Designated EHV Properties
EDCM nodal costs
5.1. A table is provided in the accompanying spreadsheet which shows the unscaled LRIC
nodal costs used to calculate the current EDCM charges. This spreadsheet Northern
Powergrid Yorkshire - Schedule of charges and other tables – Version10.7.xlsx is
available to download from Northern Powergrid’s website.
5.2. These are illustrative of the modelled costs at the time that this statement was
published. A new connection will result in changes to current network utilisations
which will then form the basis of future prices, the charge determined in this
statement will not necessarily be the charge in subsequent years because of the
interaction between new and existing network connections and any other changes
made to Northern Powergrid’s distribution system which may affect charges.
Charges for New Designated EHV Properties
5.3. Charges for any new Designated EHV Properties calculated after publication of the
current statement will be published in an addendum to that statement as and when
necessary.
5.4. The form of the addendum is detailed in Annex 6 of this statement.
5.5. The addendum will be sent to relevant DCUSA parties and published as a revised
“Schedule of Charges and other tables” spreadsheet on our website. The addendum
will include charge information that under enduring circumstances would be found in
Annex 2 and line loss factors that would normally be found in Annex 5.
5.6. The new Designated EHV Properties charges will be added to Annex 2 in the next full
statement released.
Charges for amended Designated EHV Properties
5.7. Where an existing Designated EHV Property is modified and energised in the charging
year, Northern Powergrid may revise its EDCM charges for the modified Designated
EHV Property. If revised charges are appropriate, an addendum will be sent to
relevant DCUSA parties and published as a revised 'Schedule of charges and other
table' spreadsheet on http://www.northernpowergrid.com/downloads/system.cfm.
The modified Designated EHV property charges will be added to Annex 2 in the next
full statement released.
Demand Side Management
5.8. For those premises where use of system is charged under the EDCM, some customers
may be able to benefit from entering into a Demand Side Management (DSM)
agreement with Northern Powergrid.
PAGE 19 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
5.9. DSM arrangements are based on a formal commitment by the customer to materially
reduce their MIC in certain time periods, as determined by Northern Powergrid, for
active network management purposes other than normal planned or unplanned
outages.
5.10. For new connections the customer must make an express statement in their
application that they have an interest in some, or all, of the import capacity for their
intended connection or modified connection being interruptible for active network
management purposes.
5.11. Where the customer enters into a DSM agreement by agreeing to reduce their MIC to
meet the defined parameters in the agreement, reduced use of system charges will
apply. The chargeable capacity will be equal to the MIC minus the capacity that is
subject to restrictions under the DSM agreement. The scale of the reduction will vary
by site and is linked to the LRIC element of the charge in line with the approved
charging methodology.
5.12. Any reduction in use of system charges applicable to the customer will be assessed on
a site-specific basis by Northern Powergrid. Any customers who wish to enquire
whether they can take advantage of DSM should in the first instance contact:
Connection Record Maintenance
Manor House
Station Road
New Penshaw
Houghton-le-Spring
DH4 7LA
e-mail:- [email protected]
6. Electricity Distribution Rebates
6.1. Northern Powergrid (Yorkshire) plc issued a use of system rebate to energy suppliers
in December 2013. Its intention was to facilitate the Department for Energy and
Climate Change’s announcement early that month that network operators were
willing to take voluntary action to reduce network costs. The rebates amounted to
£6.10 per domestic unrestricted customer and £8.67 per domestic restricted
customer and were based on the number of traded MPANs (excluding related MTCs).
6.2. Northern Powergrid (Yorkshire) plc is not proposing to make further rebates in the
2014/15 charging year.
PAGE 20 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
6.3. The tariffs within this statement do not attempt to recover any of the revenue
associated with the rebate and are identical to those tariffs that would have been
published had the rebate not been issued.
7. Accounting and Administration Services
Administration Charge
7.1. Where a user has failed to settle a DUoS invoice or notify Northern Powergrid of a
bona fide dispute, in accordance with the Use of System agreement an account
review charge of £75.00 may be made to cover the associated credit control,
administration, invoicing and collection costs. This is in addition to the interest
charge that will be made in accordance with clause 23.3 of the Distribution
Connection and Use of System Agreement (DCUSA).
8. Charges for electrical plant provided ancillary to the grant of Use of System
8.1. Northern Powergrid has no charges applicable to this section.
PAGE 21 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
9. Glossary of Terms
9.1. The following definitions, which can extend to grammatical variations and cognate
expressions, are included to aid understanding:
Term Definition
All-the-way charge A tariff applicable to an end user rather than an LDNO.
Balancing and Settlement Code (BSC)
The BSC contains the governance arrangements for electricity balancing and settlement in Great Britain. An overview document is available from
www.elexon.co.uk/ELEXON Documents/trading_arrangements.pdf.
CDCM
The common distribution charging methodology used for calculating charges to Designated Properties as required by standard licence condition 13A of the electricity distribution licence.
Central volume allocation (CVA) As defined in the BSC.
Customer
A person to whom a user proposers to supply, or for the time being supplies, electricity through an exit point, or from who, a user or any relevant exempt supplier, is entitled to recover charges, compensation or an account of profits in respect of electricity supplied though an exit point;
Or A person from whom a user purchases, or proposes to purchase, electricity, at an entry point (who may from time to time be supplied with electricity as a customer of that user (or another electricity supplier) through an exit point).
Designated Properties As defined in standard condition 13A of the electricity distribution licence.
Distributed generator A generator directly connected or embedded within the distribution system.
Distribution Connection and Use of System Agreement (DCUSA)
The DCUSA is a multi-party contract between the licensed electricity distributors, suppliers, generators and Offshore Transmission Owners (OFTOs) of Great Britain.
It is a requirement that all licensed electricity distributors and suppliers become parties to the DCUSA.
Distribution network operator (DNO)
An electricity distributor who operates one of the 14 distribution services areas and in whose electricity distribution licence the requirements of Section B of the standard conditions of that licence have effect.
PAGE 22 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Term Definition
Distribution services area The area specified by the authority within which each DNO must provide specified distribution services.
Distribution system
The system consisting (wholly or mainly) of:
electric lines owned or operated by an authorised distributor that is used for the distribution of electricity from grid supply points or generation sets or other entry points to the points of delivery to customers or users; or
any transmission licensee in its capacity as operator of that licensee’s transmission system or the Great Britain (GB) transmission system
and includes any remote transmission assets (owned by a transmission licensee within England and Wales) that are operated by that authorised distributor and any electrical plant, electricity meters, and metering equipment owned or operated by it in connection with the distribution of electricity, but does not include any part of the GB transmission system.
Designated EHV Properties As defined in standard condition 13B of the electricity distribution licence.
EDCM
The EHV distribution charging methodology used for calculating charges to Designated EHV Properties as required by standard licence condition 13B of the electricity distribution licence.
Electricity distribution licence The electricity distribution licence granted or treated as granted pursuant to section 6(1) of the Electricity Act 1989.
Electricity distributor Any person who is authorised by an electricity distribution licence to distribute electricity.
Embedded LDNO This refers to an LDNO operating a distribution network which is embedded within another distribution network.
Embedded network An electricity distribution system operated by an LDNO and embedded within another distribution network.
Entry point
A boundary point at which electricity is exported onto a distribution system from a connected installation or from another distribution system, not forming part of the total system (boundary point and total system having the meaning given to those terms in the BSC).
Exit point
A point of connection at which a supply of electricity may flow from the distribution system to the customer’s installation or user’s installation or the distribution system of another person.
Extra-high voltage (EHV) Nominal voltages of 22kV and above.
PAGE 23 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Term Definition
Gas and Electricity Markets Authority (GEMA) (the Authority)
As established by the Utilities Act 2000.
Grid supply point (GSP)
A metered connection between the National Grid Electricity Transmission (NGET) system and the licensee’s distribution system at which electricity flows to or from the distribution system.
GSP group A distinct electrical system that is supplied from one or more GSPs for which total supply into the GSP group can be determined for each half hour.
High voltage (HV) Nominal voltages of at least 1kV and less than 22kV.
Host DNO A distribution network operator that is responsible for a distribution services area as defined in standard conditions of the electricity distribution licence.
Intermediate LDNO An embedded licenced distribution network operator that is responsible for a distribution system between a host DNO and another embedded distribution system.
Invalid settlement combination A settlement combination that is not recognised as a valid combination in market domain data - see https://www.elexonportal.co.uk/MDDVIEWER.
kVA Kilovolt amperes.
kVArh Kilovolt ampere reactive hour.
kW Kilowatt.
kWh Kilowatt hour (equivalent to one “unit” of electricity).
Licensed distribution network operator (LDNO)
The holder of a licence in respect of distribution activities in Great Britain.
Line loss factor (LLF) The factor that is used in settlement to adjust the metering system volumes to take account of losses on the distribution system.
Line loss factor class (LLFC) An identifier assigned to an SVA metering system which is used to assign the LLF and use of system charges.
Low voltage (LV) Nominal voltages below 1kV.
Market domain data (MDD) Market domain data is a central repository of reference data used by all users involved in settlement. It is essential to the operation of SVA trading arrangements.
PAGE 24 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Term Definition
Maximum export capacity (MEC)
The maximum export capacity of apparent power expressed in kVA that has been agreed can flow through the entry point to the distribution system from the customer’s installation as specified in the connection agreement.
Maximum import capacity (MIC)
The maximum import capacity of apparent power expressed in kVA that has been agreed can flow through the exit point from the distribution system to the customer’s installation as specified in the connection agreement.
Measurement class
A classification of metering systems which indicates how consumption is measured, i.e.:
non-half-hourly metering equipment (equivalent to measurement class A);
non-half-hourly unmetered supplies (equivalent to measurement class B);
half-hourly metering equipment at or above 100kW premises (equivalent to measurement class C);
half-hourly unmetered supplies (equivalent to measurement class D); and
half-hourly metering equipment below 100kw premises (equivalent to measurement class E).
Metering point
The point at which electricity that is exported to or imported from the licensee’s distribution system is measured, is deemed to be measured, or is intended to be measured and which is registered pursuant to the provisions of the MRA. For the purposes of this statement, GSPs are not ‘metering points’.
Metering system Particular commissioned metering equipment installed for the purposes of measuring the quantities of exports and/or imports at the exit point or entry point.
Metering point administration number (MPAN)
A number relating to a metering point under the MRA.
MRA The Master Registration Agreement.
Meter timeswitch code (MTC)
MTCs are three digit codes allowing suppliers to identify the metering installed in customers’ premises. They indicate whether the meter is single or multi-rate, pre-payment or credit, or whether it is ‘related’ to another meter.
Nested LDNO A distribution system operator that is responsible for a nested network.
PAGE 25 OF 48
NORTHERN POWERGRID (YORKSHIRE) PLC FEBRUARY 2014 – V1.0
Term Definition
Nested networks
This refers to a situation where there is more than one level of embedded network and therefore nested distribution systems between LDNOs (e.g. host DNOintermediate LDNOnested LDNOcustomer).
Ofgem Office of Gas and Electricity Markets – Ofgem is governed by GEMA and is responsible for the regulation of the distribution companies.
Profile class (PC)
A categorisation applied to NHH MPANs and used in settlement to group customers with similar consumption patterns to enable the calculation of consumption profiles.
Settlement The determination and settlement of amounts payable in respect of charges (including reconciling charges) in accordance with the BSC.
Settlement class (SC)
The combination of profile class, line loss factor class, time pattern regime and standard settlement configuration, by supplier within a GSP group and used for settlement.
Standard settlement configuration (SSC)
A standard metering configuration relating to a specific combination of TPRs.
Supercustomer The method of billing users for use of system on an aggregated basis, grouping together consumption and standing charges for all similar NHH metered customers.
Supercustomer DUoS Report A report of profiled data by settlement class providing counts of MPANs and units consumed.
Supplier An organisation with a supply license which can register itself as being responsible for electricity supplied to and/or exported from a metering point.
Supplier volume allocation (SVA) As defined in the BSC.
Time pattern regime (TPR) The pattern of switching behaviour through time that one or more meter registers follow.
Use of system charges Charges applicable to demand and generation connections which are connected to and utilise the distribution network.
User Someone that has a use of system agreement with the DNO e.g. a supplier, generator or other DNO.
Unmetered Supplies
Exit points deemed to be suitable as unmetered supplies as permitted in the Electricity (Unmetered Supply) Regulations 2001 and where operated in accordance with BSCP520.
Annex 1 - Schedule of Charges for use of the Distribution System by LV and HV Designated Properties
Time periodsRed Time
BandGreen Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16:00 to 19:3000:00 to 08:00
22:00 to 24:0016:00 to 19:30
08:00 to 16:00
19:30 to 22:00
00:00 to 08:00
22:00 to 24:00
Saturday and Sunday
All Year00:00 to 24:00 08:00 to 22:00
00:00 to 08:00
22:00 to 24:00
Notes 00:00 to 24:00
DNOs paste value cells A15:I42 from CDCM 3701 into cells
A14:J41Open LLFCs PCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA/day
Closed LLFCs
Domestic Unrestricted 100 1 2.263 4.71 101, 400, 401, 999
Domestic Two Rate 120 2 2.829 0.101 4.71 121, 123, 402, 403, 413
Domestic Off Peak (related MPAN) 111 2 0.390 130, 131, 414, 415, 416
Small Non Domestic Unrestricted 240 3 2.254 4.32 241, 404, 405
Small Non Domestic Two Rate 246 4 2.946 0.185 4.32 249, 250, 275, 406, 407, 417, 418
Small Non Domestic Off Peak (related MPAN) 214 4 0.503 268, 419, 420
LV Medium Non-Domestic 290 5-8 2.236 0.063 30.40 280, 287, 408, 409, 421
LV Sub Medium Non-Domestic - 5-8 1.504 0.041 43.66 -
HV Medium Non-Domestic 580 5-8 1.764 0.036 210.59 410
LV HH Metered 281 0 9.377 0.963 0.051 13.06 1.46 0.329 1.46 244, 248, 257, 291, 297
LV Sub HH Metered 471 0 8.256 0.786 0.040 43.66 1.93 0.269 1.93 472
HV HH Metered 581 0 6.522 0.573 0.027 111.03 1.81 0.198 1.81 500, 501, 502, 741, 742, 743, 744
HV Sub HH Metered
NHH UMS category A 814 8 1.107 -
NHH UMS category B 815 1 1.498 -
NHH UMS category C 816 1 2.806 -
NHH UMS category D 817 1 0.855 -
LV UMS (Pseudo HH Metered) 813 & 913 0 21.989 0.847 0.046 -
LV Generation NHH 20 8 ( 0.574) 17, 18, 21, 411, 412
LV Sub Generation NHH 30 8 ( 0.504) -
LV Generation Intermittent 22 0 ( 0.574) 0.134 12, 40
LV Generation Non-Intermittent 24 0 ( 3.423) ( 0.621) ( 0.039) 0.134 -
LV Sub Generation Intermittent 23 0 ( 0.504) 0.128 14
LV Sub Generation Non-Intermittent 25 0 ( 3.007) ( 0.545) ( 0.034) 0.128 -
HV Generation Intermittent 26 0 ( 0.357) 117.36 0.098 15, 41
HV Generation Non-Intermittent 28 0 ( 2.139) ( 0.384) ( 0.024) 117.36 0.098 -
HV Sub Generation Intermittent
HV Sub Generation Non-Intermittent
08:00 to 16:00
19:30 to 22:00
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final LV and HV charges
Time Bands for Half Hourly Metered Properties Time Bands for Half Hourly Unmetered Properties
Amber Time Band Time periods
All the above times are in UK Clock time
Monday to Friday
(Including Bank Holidays)
April to October and March
Inclusive
All the above times are in UK Clock time Saturday and Sunday
All other times
NORTHERN POWERGRID (YORKSHIRE) PLC 26 of 48 FEBRUARY 2014 - V1.0
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
3 4 5 6 6 7 8 9
Import
Unique
Identifier
LLFCImport
MPANs/MSIDs
Export Unique
IdentifierLLFC
Export
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded capacity rate
(p/kVA/day)
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded capacity rate
(p/kVA/day)
7502300000599657
2336541294017EHV Site Specific 0.498 9.43 9.43
751
2300000702517
2300000702526
2300000702535
2376555002010
2376555002029
2376555002038
EHV Site Specific 0.074 5,812.23 1.83 1.83
753 2356555555010 90 2394000039650 EHV Site Specific 0.781 6,271.33 2.28 2.28 104.52 0.13 0.13
754 2356555554017 82 2394000039660 EHV Site Specific 0.487 9,377.56 1.48 1.48 468.88 0.13 0.13
755 2316521850010 76 2394000039641 EHV Site Specific 0.058 4,347.17 2.31 2.31 434.72 0.13 0.13
756 2346540436013 75 2394000039679 EHV Site Specific 0.017 5,931.03 1.49 1.49 444.83 0.13 0.13
757 2336566756217 95 2394000060226 EHV Site Specific 796.98 2.44 2.44 ( 0.146) 796.98 0.13 0.13
758 2366591411116 EHV Site Specific 0.104 7,952.88 0.84 0.84
759 MSID 0645 EHV Site Specific 16,521.44 2.59 2.59
7602300000880966
237650900101360
2300000233736
2300000880975EHV Site Specific - Generation Exempt 1,810.30 1.24 1.24
7612300000526686
2336518071011EHV Site Specific 0.002 552.57 0.87 0.87
762 2300000457400 62 2300000457410 EHV Site Specific - Generation Exempt 0.062 120.35 1.34 1.34
7632300000775853
237650900001080
2300000948904
2300000948913EHV Site Specific - Generation Exempt 0.015 829.91 0.76 0.76
764
2300000233959
2300000233968
2300000233977
EHV Site Specific 0.017 4,837.36 0.66 0.66
765
2300000457084
2390000010840
2390000010859
EHV Site Specific 0.544 3,350.71 2.07 2.07
7662376508030013
237650803002266
2300000233912
2300000996990EHV Site Specific - Generation Exempt 215.85 1.18 1.18
767MSID 7020
MSID 702167
MSID 7020
MSID 7021EHV Site Specific - Generation Exempt 170.52 1.39 1.39
769 2346526241119 EHV Site Specific 0.083 7,952.88 1.99 1.99
770 2366591365115 EHV Site Specific 0.115 7,952.88 1.90 1.90
771 2366591376117 92 2394000019176 EHV Site Specific 0.043 1,988.22 0.84 0.84 ( 0.043) 5,964.66 0.13 0.13
772 2366591373116 EHV Site Specific 0.058 7,952.88 1.98 1.98
773 2366591486111 EHV Site Specific 0.136 7,952.88 2.05 2.05
7742326522910011
232652291002074
2394000002925
2394100008408EHV Site Specific - Generation Exempt 2.636 230.24 1.21 1.21
775 2380000531989 87 2394000024440 EHV Site Specific 0.051 352.88 0.88 0.88 ( 0.223) 1,347.35 0.13 0.13
777 2300000233596 77 2300000233610 EHV Site Specific - Generation Exempt 0.612 9.21 1.04 1.04
778 2300000443816 78 2300000443825 EHV Site Specific - Generation Part Exempt 6.38 2.30 2.30 414.54 0.13 0.13
780 2380000825051 EHV Site Specific 0.011 1,062.64 0.55 0.55
781 2300000790540 81 2300000790550 EHV Site Specific - Generation Exempt 147.48 1.05 1.05
7822300001016288
2300001016297EHV Site Specific 0.139 552.57 1.91 1.91
783 2300000974268 83 2300000974408 EHV Site Specific - Generation Exempt 0.137 10.23 1.77 1.77
784 2300001007247 84 2300001007256 EHV Site Specific - Generation Exempt 0.028 1.37 2.21 2.21
785 2380000151720 85 2394000011646 EHV Site Specific - Generation Exempt 0.068 4.08 0.80 0.80
786 2380000148115 862391100013704
2394000011502EHV Site Specific - Generation Exempt 2.74 0.76 0.76
7872380000123421
2380000123430EHV Site Specific 637.59 2.23 2.23
788 2380000654644 88 2394000027673 EHV Site Specific 0.094 0.71 1.47 1.47 ( 0.313) 1,593.26 0.13 0.13
789 2380001118812 89 2394000043364 EHV Site Specific 38.88 1.35 1.35 ( 0.103) 1,555.09 0.13 0.13
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
16:00 to 19:30
Notes All the above times are in UK Clock time
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM charges
Time Periods for Designated EHV Properties
Time periods Super Red Time Band
NORTHERN POWERGRID (YORKSHIRE) PLC 27 of 48 FEBRUARY 2014 - V1.0
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDs
Export Unique
IdentifierLLFC
Export
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded capacity rate
(p/kVA/day)
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded capacity rate
(p/kVA/day)
790 2380001476585 94 2394000056790 EHV Site Specific 0.067 12.15 1.28 1.28 816.71 0.13 0.13
791 2380001494334 93 2394000058333 EHV Site Specific 0.148 5.38 1.33 1.33 ( 0.338) 270.91 0.13 0.13
793
2380001252829
2380001252838
2380001767827
91
2394000047581
2394000047590
2394000047606
EHV Site Specific 0.323 73.36 1.24 1.24 1,796.90 0.13 0.13
794 2380001458911 97 2394000055174 EHV Site Specific 1.519 324.14 1.51 1.51 9,724.21 0.13 0.13
7952380001532167
2380001532176EHV Site Specific 0.079 1,908.51 1.01 1.01
796 2380001635401 98 2394000072198 EHV Site Specific 52.96 0.51 0.51 5,211.58 0.13 0.13
8312316530305110
2316530305129EHV Site Specific 3.726 191.28 5.54 5.54
832 2316541311014 73 2300000233587 EHV Site Specific 1.888 84.32 2.78 2.78 ( 1.864) 11.32 0.13 0.13
8332326511015014
2326511015023EHV Site Specific 5.522 191.28 4.24 4.24
834
2300000456903
2300000516605
2326531140128
EHV Site Specific 1.623 286.91 3.91 3.91
8352300000473625
2336505790019EHV Site Specific 0.837 191.28 5.93 5.93
8362300000473616
2336506255013EHV Site Specific 0.748 191.28 6.65 6.65
8372300000473634
2336526022010EHV Site Specific 0.238 191.28 3.97 3.97
8382300000584925
2336559992019EHV Site Specific 0.317 191.28 1.52 1.52
8392300000233833
233656635621168 2300000233898 EHV Site Specific 0.168 151.01 2.23 2.23 ( 0.168) 40.27 0.13 0.13
840 2336566566018 EHV Site Specific 0.878 95.64 2.86 2.86
841
2300000539365
2300000539374
2336590660028
2336590660037
EHV Site Specific 0.244 382.55 4.95 4.95
8422300000539356
2336593810110EHV Site Specific 0.112 191.28 3.82 3.82
8432300000541434
2336593980114EHV Site Specific 0.796 95.64 1.84 1.84
8442356530330014
2356530330023EHV Site Specific 0.715 191.28 5.07 5.07
845 2356562495011 EHV Site Specific 1.194 95.64 4.33 4.33
846
2300000444962
2300000601321
2366531830013
EHV Site Specific 1.622 286.91 3.93 3.93
847 2366560261014 EHV Site Specific 0.963 95.64 1.07 1.07
8482300000457377
2366560264112EHV Site Specific 0.963 191.28 8.88 8.88
8492300000652292
2376503256010EHV Site Specific 0.008 191.28 2.92 2.92
850
2300000647051
2300000647060
2376552920013
2376552920022
EHV Site Specific 2.046 382.55 3.12 3.12
851
2376550825013
2380000000543
2380000004097
EHV Site Specific 0.686 286.91 4.73 4.73
852 2380000257932 71 2394000016040 EHV Site Specific - Generation Exempt 0.208 5.63 1.18 1.18
8532380000428837
2380000428846EHV Site Specific 0.007 191.28 4.14 4.14
854 2380000476088 72 2394000022132 EHV Site Specific - Generation Exempt 0.208 2.33 1.18 1.18
855
2380000724195
2380001078977
2380001078986
2380001078995
2380001079001
2380001079321
EHV Site Specific 573.83 1.41 1.41
856
2380001519750
2380001519760
2380001519779
2380001519788
EHV Site Specific 0.299 382.55 1.08 1.08
857 2300000526046 EHV Site Specific 2.239 95.64 3.81 3.81
858
2300000839364
2326526290016
2326526290025
EHV Site Specific 2.105 286.91 3.65 3.65
NORTHERN POWERGRID (YORKSHIRE) PLC 28 of 48 FEBRUARY 2014 - V1.0
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDs
Export Unique
IdentifierLLFC
Export
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded capacity rate
(p/kVA/day)
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded capacity rate
(p/kVA/day)
8592336525711011
2336525711020EHV Site Specific 0.030 191.28 2.08 2.08
860
2336526332017
2336526332026
2300000457057
EHV Site Specific 0.241 382.55 3.30 3.30
861
2300000493180
2300000552125
2336552115017
2336552115026
EHV Site Specific 0.113 382.55 3.31 3.31
862
2300000234163
2300000234172
2336590770013
2336590770022
EHV Site Specific 1.125 382.55 3.25 3.25
863
2300000234066
2300000234075
2300000234084
2336590810010
EHV Site Specific 0.603 382.55 4.56 4.56
864 2300000478970 EHV Site Specific 0.216 95.64 1.62 1.62
8652346530035017
2346530035026EHV Site Specific 0.767 191.28 2.21 2.21
8672346534433019
2346534433028EHV Site Specific 0.239 191.28 3.84 3.84
8682356530030015
2356530030024EHV Site Specific 0.019 191.28 2.55 2.55
8692356530321010
2356530321029EHV Site Specific 0.715 191.28 5.03 5.03
8702356530620210
2356530620229EHV Site Specific 1.431 191.28 3.13 3.13
8712366540061017
2366540061026EHV Site Specific 1.501 191.28 4.01 4.01
872
2300000674055
2300000674064
2300000674073
2366540100010
EHV Site Specific 0.250 191.28 3.64 3.64
8732300000777530
2366540110116EHV Site Specific 0.181 191.28 1.59 1.59
874 2300000542828 EHV Site Specific 95.64 2.67 2.67
875 2366560263119 EHV Site Specific 0.963 191.28 2.77 2.77
8762300000699565
2366591250015EHV Site Specific 0.318 191.28 4.17 4.17
877 2366591617013 EHV Site Specific 3.220 191.28 6.65 6.65
878 2376501360010 EHV Site Specific 0.495 191.28 3.49 3.49
8792376502195011
2390000003986EHV Site Specific 0.017 191.28 2.16 2.16
880 2300000792050 EHV Site Specific 0.276 191.28 2.05 2.05
8812300000634415
2376552766015EHV Site Specific 0.276 191.28 2.82 2.82
882 2300000826383 69 2300000930377 EHV Site Specific 5.359 11.27 0.74 0.74 ( 5.359) 84.37 0.13 0.13
883
2376503230011
2376508010017
2390000002440
2390000002459
EHV Site Specific 0.275 191.28 2.64 2.64
884 2300000233754 EHV Site Specific 0.016 95.64 2.28 2.28
886 2380001187667 EHV Site Specific 0.317 95.64 1.91 1.91
887 2380001432843 EHV Site Specific 0.259 95.64 2.19 2.19
888
2380001448611
2380001448620
2380001448630
2380001448649
2380001448658
EHV Site Specific 0.110 478.19 1.73 1.73
889 2380001564275 70 2394000039590 EHV Site Specific 0.165 2.42 1.59 1.59 ( 0.165) 93.22 0.13 0.13
797 2390000079381 99 2394000079398 EHV Site Specific - Generation Exempt 0.470 2.20 1.78 1.78
798 2380001746400 61 2394000083311 EHV Site Specific 33.67 1.21 1.21 2,721.33 0.13 0.13
799 2380001812550 51 2394000089457 EHV Site Specific 0.282 32.81 1.18 1.18 ( 0.282) 3,281.15 0.13 0.13
821 2380001851381 52 2394000093027 EHV Site Specific 0.286 4.08 3.60 3.60 272.20 0.13 0.13
8222380001883036
238000188304553
2394000095831
2394000095840EHV Site Specific 0.286 10.27 3.60 3.60 266.02 0.13 0.13
823 2380001877557 54 2394000097068 EHV Site Specific 0.122 17.40 5.41 5.41 3,754.98 0.13 0.13
824 MSID 7275 55 MSID 7275 EHV Site Specific 15.61 2.16 2.16 538.45 0.13 0.13
826 2380001874087 57 2394000094590 EHV Site Specific 0.268 28.63 3.79 3.79 3,435.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 29 of 48 FEBRUARY 2014 - V1.0
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDs
Export Unique
IdentifierLLFC
Export
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded capacity rate
(p/kVA/day)
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded capacity rate
(p/kVA/day)
8662346534400013
2346534400022EHV Site Specific 0.801 95.64 2.03 2.03
827 2380001838371 58 2394000091952 EHV Site Specific 0.002 2.28 1.19 1.19 ( 0.074) 274.00 0.13 0.13
768 2380001882798 59 2394000095804 EHV Site Specific 0.016 4.26 2.95 2.95 272.03 0.13 0.13
801 2380001905070 105 2394000098805 EHV Site Specific 1.188 2.50 3.21 3.21 316.29 0.13 0.13
792 2380001951360 96 2394000102693 EHV Site Specific 19.18 1.26 1.26 1,574.78 0.13 0.13
806 TBC 109 TBC EHV Site Specific 0.073 45.72 2.52 2.52 1,973.30 0.13 0.13
803 2380001909066 107 2394000099074 EHV Site Specific 14.15 2.08 2.08 1,771.09 0.13 0.13
805 TBC 108 TBC EHV Site Specific 0.189 32.93 3.87 3.87 4,621.45 0.13 0.13
825 2380002022460 56 2394000110630 EHV Site Specific 0.087 4.10 2.58 2.58 393.12 0.13 0.13
8022380001909075
2380001909084106
2394000099056
2394000099065EHV Site Specific 0.162 263.74 1.81 1.81 ( 0.187) 1,776.54 0.13 0.13
807 2380002032360 63 2394000111660 EHV Site Specific 195.18 1.94 1.94 1,717.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 30 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Super Red Time Band
16:00 to 19:30
All the above times are in UK Clock time
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
7502300000599657
2336541294017EHV Site Specific 0.498 9.43 9.43
751
2300000702517
2300000702526
2300000702535
2376555002010
2376555002029
2376555002038
EHV Site Specific 0.074 5,812.23 1.83 1.83
753 2356555555010 EHV Site Specific 0.781 6,271.33 2.28 2.28
754 2356555554017 EHV Site Specific 0.487 9,377.56 1.48 1.48
755 2316521850010 EHV Site Specific 0.058 4,347.17 2.31 2.31
756 2346540436013 EHV Site Specific 0.017 5,931.03 1.49 1.49
757 2336566756217 EHV Site Specific 796.98 2.44 2.44
758 2366591411116 EHV Site Specific 0.104 7,952.88 0.84 0.84
759 MSID 0645 EHV Site Specific 16,521.44 2.59 2.59
7602300000880966
2376509001013EHV Site Specific - Generation Exempt 1,810.30 1.24 1.24
7612300000526686
2336518071011EHV Site Specific 0.002 552.57 0.87 0.87
762 2300000457400 EHV Site Specific - Generation Exempt 0.062 120.35 1.34 1.34
7632300000775853
2376509000010EHV Site Specific - Generation Exempt 0.015 829.91 0.76 0.76
Notes
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM import charges
Time Periods for Designated EHV Properties
Time periods
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
NORTHERN POWERGRID (YORKSHIRE) PLC 31 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
764
2300000233959
2300000233968
2300000233977
EHV Site Specific 0.017 4,837.36 0.66 0.66
765
2300000457084
2390000010840
2390000010859
EHV Site Specific 0.544 3,350.71 2.07 2.07
7662376508030013
2376508030022EHV Site Specific - Generation Exempt 215.85 1.18 1.18
767MSID 7020
MSID 7021EHV Site Specific - Generation Exempt 170.52 1.39 1.39
769 2346526241119 EHV Site Specific 0.083 7,952.88 1.99 1.99
770 2366591365115 EHV Site Specific 0.115 7,952.88 1.90 1.90
771 2366591376117 EHV Site Specific 0.043 1,988.22 0.84 0.84
772 2366591373116 EHV Site Specific 0.058 7,952.88 1.98 1.98
773 2366591486111 EHV Site Specific 0.136 7,952.88 2.05 2.05
7742326522910011
2326522910020EHV Site Specific - Generation Exempt 2.636 230.24 1.21 1.21
775 2380000531989 EHV Site Specific 0.051 352.88 0.88 0.88
777 2300000233596 EHV Site Specific - Generation Exempt 0.612 9.21 1.04 1.04
778 2300000443816 EHV Site Specific - Generation Part Exempt 6.38 2.30 2.30
780 2380000825051 EHV Site Specific 0.011 1,062.64 0.55 0.55
781 2300000790540 EHV Site Specific - Generation Exempt 147.48 1.05 1.05
7822300001016288
2300001016297EHV Site Specific 0.139 552.57 1.91 1.91
783 2300000974268 EHV Site Specific - Generation Exempt 0.137 10.23 1.77 1.77
784 2300001007247 EHV Site Specific - Generation Exempt 0.028 1.37 2.21 2.21
785 2380000151720 EHV Site Specific - Generation Exempt 0.068 4.08 0.80 0.80
786 2380000148115 EHV Site Specific - Generation Exempt 2.74 0.76 0.76
7872380000123421
2380000123430EHV Site Specific 637.59 2.23 2.23
788 2380000654644 EHV Site Specific 0.094 0.71 1.47 1.47
789 2380001118812 EHV Site Specific 38.88 1.35 1.35
790 2380001476585 EHV Site Specific 0.067 12.15 1.28 1.28
791 2380001494334 EHV Site Specific 0.148 5.38 1.33 1.33
NORTHERN POWERGRID (YORKSHIRE) PLC 32 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
793
2380001252829
2380001252838
2380001767827
EHV Site Specific 0.323 73.36 1.24 1.24
794 2380001458911 EHV Site Specific 1.519 324.14 1.51 1.51
7952380001532167
2380001532176EHV Site Specific 0.079 1,908.51 1.01 1.01
796 2380001635401 EHV Site Specific 52.96 0.51 0.51
8312316530305110
2316530305129EHV Site Specific 3.726 191.28 5.54 5.54
832 2316541311014 EHV Site Specific 1.888 84.32 2.78 2.78
8332326511015014
2326511015023EHV Site Specific 5.522 191.28 4.24 4.24
834
2300000456903
2300000516605
2326531140128
EHV Site Specific 1.623 286.91 3.91 3.91
8352300000473625
2336505790019EHV Site Specific 0.837 191.28 5.93 5.93
8362300000473616
2336506255013EHV Site Specific 0.748 191.28 6.65 6.65
8372300000473634
2336526022010EHV Site Specific 0.238 191.28 3.97 3.97
8382300000584925
2336559992019EHV Site Specific 0.317 191.28 1.52 1.52
8392300000233833
2336566356211EHV Site Specific 0.168 151.01 2.23 2.23
840 2336566566018 EHV Site Specific 0.878 95.64 2.86 2.86
841
2300000539365
2300000539374
2336590660028
2336590660037
EHV Site Specific 0.244 382.55 4.95 4.95
8422300000539356
2336593810110EHV Site Specific 0.112 191.28 3.82 3.82
8432300000541434
2336593980114EHV Site Specific 0.796 95.64 1.84 1.84
8442356530330014
2356530330023EHV Site Specific 0.715 191.28 5.07 5.07
845 2356562495011 EHV Site Specific 1.194 95.64 4.33 4.33
NORTHERN POWERGRID (YORKSHIRE) PLC 33 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
846
2300000444962
2300000601321
2366531830013
EHV Site Specific 1.622 286.91 3.93 3.93
847 2366560261014 EHV Site Specific 0.963 95.64 1.07 1.07
8482300000457377
2366560264112EHV Site Specific 0.963 191.28 8.88 8.88
8492300000652292
2376503256010EHV Site Specific 0.008 191.28 2.92 2.92
850
2300000647051
2300000647060
2376552920013
2376552920022
EHV Site Specific 2.046 382.55 3.12 3.12
851
2376550825013
2380000000543
2380000004097
EHV Site Specific 0.686 286.91 4.73 4.73
852 2380000257932 EHV Site Specific - Generation Exempt 0.208 5.63 1.18 1.18
8532380000428837
2380000428846EHV Site Specific 0.007 191.28 4.14 4.14
854 2380000476088 EHV Site Specific - Generation Exempt 0.208 2.33 1.18 1.18
855
2380000724195
2380001078977
2380001078986
2380001078995
2380001079001
2380001079321
EHV Site Specific 573.83 1.41 1.41
856
2380001519750
2380001519760
2380001519779
2380001519788
EHV Site Specific 0.299 382.55 1.08 1.08
857 2300000526046 EHV Site Specific 2.239 95.64 3.81 3.81
858
2300000839364
2326526290016
2326526290025
EHV Site Specific 2.105 286.91 3.65 3.65
8592336525711011
2336525711020EHV Site Specific 0.030 191.28 2.08 2.08
860
2336526332017
2336526332026
2300000457057
EHV Site Specific 0.241 382.55 3.30 3.30
NORTHERN POWERGRID (YORKSHIRE) PLC 34 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
861
2300000493180
2300000552125
2336552115017
2336552115026
EHV Site Specific 0.113 382.55 3.31 3.31
862
2300000234163
2300000234172
2336590770013
2336590770022
EHV Site Specific 1.125 382.55 3.25 3.25
863
2300000234066
2300000234075
2300000234084
2336590810010
EHV Site Specific 0.603 382.55 4.56 4.56
864 2300000478970 EHV Site Specific 0.216 95.64 1.62 1.62
8652346530035017
2346530035026EHV Site Specific 0.767 191.28 2.21 2.21
8672346534433019
2346534433028EHV Site Specific 0.239 191.28 3.84 3.84
8682356530030015
2356530030024EHV Site Specific 0.019 191.28 2.55 2.55
8692356530321010
2356530321029EHV Site Specific 0.715 191.28 5.03 5.03
8702356530620210
2356530620229EHV Site Specific 1.431 191.28 3.13 3.13
8712366540061017
2366540061026EHV Site Specific 1.501 191.28 4.01 4.01
872
2300000674055
2300000674064
2300000674073
2366540100010
EHV Site Specific 0.250 191.28 3.64 3.64
8732300000777530
2366540110116EHV Site Specific 0.181 191.28 1.59 1.59
874 2300000542828 EHV Site Specific 95.64 2.67 2.67
875 2366560263119 EHV Site Specific 0.963 191.28 2.77 2.77
8762300000699565
2366591250015EHV Site Specific 0.318 191.28 4.17 4.17
877 2366591617013 EHV Site Specific 3.220 191.28 6.65 6.65
878 2376501360010 EHV Site Specific 0.495 191.28 3.49 3.49
NORTHERN POWERGRID (YORKSHIRE) PLC 35 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
8792376502195011
2390000003986EHV Site Specific 0.017 191.28 2.16 2.16
880 2300000792050 EHV Site Specific 0.276 191.28 2.05 2.05
8812300000634415
2376552766015EHV Site Specific 0.276 191.28 2.82 2.82
882 2300000826383 EHV Site Specific 5.359 11.27 0.74 0.74
883
2376503230011
2376508010017
2390000002440
2390000002459
EHV Site Specific 0.275 191.28 2.64 2.64
884 2300000233754 EHV Site Specific 0.016 95.64 2.28 2.28
886 2380001187667 EHV Site Specific 0.317 95.64 1.91 1.91
887 2380001432843 EHV Site Specific 0.259 95.64 2.19 2.19
888
2380001448611
2380001448620
2380001448630
2380001448649
2380001448658
EHV Site Specific 0.110 478.19 1.73 1.73
889 2380001564275 EHV Site Specific 0.165 2.42 1.59 1.59
797 2390000079381 EHV Site Specific - Generation Exempt 0.470 2.20 1.78 1.78
798 2380001746400 EHV Site Specific 33.67 1.21 1.21
799 2380001812550 EHV Site Specific 0.282 32.81 1.18 1.18
821 2380001851381 EHV Site Specific 0.286 4.08 3.60 3.60
8222380001883036
2380001883045EHV Site Specific 0.286 10.27 3.60 3.60
823 2380001877557 EHV Site Specific 0.122 17.40 5.41 5.41
824 MSID 7275 EHV Site Specific 15.61 2.16 2.16
826 2380001874087 EHV Site Specific 0.268 28.63 3.79 3.79
8662346534400013
2346534400022EHV Site Specific 0.801 95.64 2.03 2.03
827 2380001838371 EHV Site Specific 0.002 2.28 1.19 1.19
768 2380001882798 EHV Site Specific 0.016 4.26 2.95 2.95
801 2380001905070 EHV Site Specific 1.188 2.50 3.21 3.21
792 2380001951360 EHV Site Specific 19.18 1.26 1.26
806 TBC EHV Site Specific 0.073 45.72 2.52 2.52
803 2380001909066 EHV Site Specific 14.15 2.08 2.08
NORTHERN POWERGRID (YORKSHIRE) PLC 36 of 48 FEBRUARY 2014 - V1.0
Annex 2a - Schedule of Import Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Import
Unique
Identifier
LLFCImport
MPANs/MSIDsName
Import
Super Red
unit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceeded
capacity rate
(p/kVA/day)
805 TBC EHV Site Specific 0.189 32.93 3.87 3.87
825 2380002022460 EHV Site Specific 0.087 4.10 2.58 2.58
8022380001909075
2380001909084EHV Site Specific 0.162 263.74 1.81 1.81
807 2380002032360 EHV Site Specific 195.18 1.94 1.94
NORTHERN POWERGRID (YORKSHIRE) PLC 37 of 48 FEBRUARY 2014 - V1.0
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Super Red Time Band
16:00 to 19:30
All the above times are in UK Clock time
Export
Unique
Identifier
LLFCExport
MPANs/MSIDsName
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded
capacity rate
(p/kVA/day)
90 2394000039650 EHV Site Specific 104.52 0.13 0.13
82 2394000039660 EHV Site Specific 468.88 0.13 0.13
76 2394000039641 EHV Site Specific 434.72 0.13 0.13
75 2394000039679 EHV Site Specific 444.83 0.13 0.13
95 2394000060226 EHV Site Specific ( 0.146) 796.98 0.13 0.13
602300000233736
2300000880975EHV Site Specific - Generation Exempt
62 2300000457410 EHV Site Specific - Generation Exempt
802300000948904
2300000948913EHV Site Specific - Generation Exempt
662300000233912
2300000996990EHV Site Specific - Generation Exempt
67MSID 7020
MSID 7021EHV Site Specific - Generation Exempt
92 2394000019176 EHV Site Specific ( 0.043) 5,964.66 0.13 0.13
742394000002925
2394100008408EHV Site Specific - Generation Exempt
87 2394000024440 EHV Site Specific ( 0.223) 1,347.35 0.13 0.13
77 2300000233610 EHV Site Specific - Generation Exempt
78 2300000443825 EHV Site Specific - Generation Part Exempt 414.54 0.13 0.13
81 2300000790550 EHV Site Specific - Generation Exempt
83 2300000974408 EHV Site Specific - Generation Exempt
84 2300001007256 EHV Site Specific - Generation Exempt
Notes
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final EDCM export charges
Time Periods for Designated EHV Properties
Time periods
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
NORTHERN POWERGRID (YORKSHIRE) PLC 38 of 48 FEBRUARY 2014 - V1.0
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Export
Unique
Identifier
LLFCExport
MPANs/MSIDsName
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded
capacity rate
(p/kVA/day)
85 2394000011646 EHV Site Specific - Generation Exempt
862391100013704
2394000011502EHV Site Specific - Generation Exempt
88 2394000027673 EHV Site Specific ( 0.313) 1,593.26 0.13 0.13
89 2394000043364 EHV Site Specific ( 0.103) 1,555.09 0.13 0.13
94 2394000056790 EHV Site Specific 816.71 0.13 0.13
93 2394000058333 EHV Site Specific ( 0.338) 270.91 0.13 0.13
91
2394000047581
2394000047590
2394000047606
EHV Site Specific 1,796.90 0.13 0.13
97 2394000055174 EHV Site Specific 9,724.21 0.13 0.13
98 2394000072198 EHV Site Specific 5,211.58 0.13 0.13
73 2300000233587 EHV Site Specific ( 1.864) 11.32 0.13 0.13
68 2300000233898 EHV Site Specific ( 0.168) 40.27 0.13 0.13
71 2394000016040 EHV Site Specific - Generation Exempt
72 2394000022132 EHV Site Specific - Generation Exempt
69 2300000930377 EHV Site Specific ( 5.359) 84.37 0.13 0.13
70 2394000039590 EHV Site Specific ( 0.165) 93.22 0.13 0.13
99 2394000079398 EHV Site Specific - Generation Exempt
61 2394000083311 EHV Site Specific 2,721.33 0.13 0.13
51 2394000089457 EHV Site Specific ( 0.282) 3,281.15 0.13 0.13
52 2394000093027 EHV Site Specific 272.20 0.13 0.13
532394000095831
2394000095840EHV Site Specific 266.02 0.13 0.13
54 2394000097068 EHV Site Specific 3,754.98 0.13 0.13
55 MSID 7275 EHV Site Specific 538.45 0.13 0.13
57 2394000094590 EHV Site Specific 3,435.58 0.13 0.13
58 2394000091952 EHV Site Specific ( 0.074) 274.00 0.13 0.13
59 2394000095804 EHV Site Specific 272.03 0.13 0.13
105 2394000098805 EHV Site Specific 316.29 0.13 0.13
96 2394000102693 EHV Site Specific 1,574.78 0.13 0.13
109 TBC EHV Site Specific 1,973.30 0.13 0.13
107 2394000099074 EHV Site Specific 1,771.09 0.13 0.13
108 TBC EHV Site Specific 4,621.45 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 39 of 48 FEBRUARY 2014 - V1.0
Annex 2b - Schedule of Export Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-
users)
Export
Unique
Identifier
LLFCExport
MPANs/MSIDsName
Export
Super Red
unit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceeded
capacity rate
(p/kVA/day)
56 2394000110630 EHV Site Specific 393.12 0.13 0.13
1062394000099056
2394000099065EHV Site Specific ( 0.187) 1,776.54 0.13 0.13
63 2394000111660 EHV Site Specific 1,717.58 0.13 0.13
NORTHERN POWERGRID (YORKSHIRE) PLC 40 of 48 FEBRUARY 2014 - V1.0
Annex 3 - Schedule of Charges for use of the Distribution System to Preserved/Additional LLFC Classes
Closed LLFCs PCs Unit rate 1 p/kWh Unit rate 2 p/kWh Unit rate 3 p/kWhFixed charge
p/MPAN/day
Domestic Unrestricted 101, 400, 401, 999 1 2.263 4.71
Domestic Two Rate 121, 123, 402, 403, 413 2 2.829 0.101 4.71
Domestic Off Peak (related MPAN) 130, 131, 414, 415, 416 2 0.390
Small Non Domestic Unrestricted 241, 404, 405 3 2.254 4.32
Small Non Domestic Two Rate 249, 250, 275, 406, 407, 417, 418 4 2.946 0.185 4.32
Small Non Domestic Off Peak (related
MPAN)268, 419, 420 4 0.503
LV Medium Non-Domestic 280, 287, 408, 409, 421 5-8 2.236 0.063 30.40
HV Medium Non-Domestic 410 5-8 1.764 0.036 210.59
LV Generation NHH 17, 18, 21, 411, 412 8 ( 0.574)
Closed LLFCs PCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess Capacity
charge
p/kVA
LV HH Metered 244, 248, 257, 291, 297 0 9.377 0.963 0.051 13.06 1.46 0.329 1.46
LV Sub HH Metered 472 0 8.256 0.786 0.040 43.66 1.93 0.269 1.93
HV HH Metered 500, 501, 502, 741, 742, 743, 744 0 6.522 0.573 0.027 111.03 1.81 0.198 1.81
LV Generation Intermittent 12, 40 0 ( 0.574) 0.134
LV Sub Generation Intermittent 14 0 ( 0.504) 0.128
HV Generation Intermittent 15, 41 0 ( 0.357) 117.36 0.098
Notes:
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final LV and HV tariffs
NHH preserved charges/additional LLFCs
All NHH tariffs detailed above are closed to new customers, the charges are mapped to the relevant active tariff in Annex 1
HV Medium Non-Domestic - this tariff if no longer available and all new HV connections will be required to be half-hourly metered
Notes:
HH preserved charges/additional LLFCs
All HH tariffs detailed above are closed to new customers, the charges are mapped to the relevant active tariff in Annex 1
Details of the relevant time periods can be found on Annex 1
NORTHERN POWERGRID (YORKSHIRE) PLC 41 of 48 FEBRUARY 2014 - V1.0
Annex 4 - Charges applied to LDNOs with HV/LV end users
Time periods Red Time Band Amber Time Band Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16:00 to 19:3008:00 to 16:00
19:30 to 22:00
00:00 to 08:00
22:00 to 24:0016:00 to 19:30
08:00 to 16:00
19:30 to 22:00
00:00 to 08:00
22:00 to 24:00
Saturday and Sunday
All Year00:00 to 24:00 08:00 to 22:00
00:00 to 08:00
22:00 to 24:00
Notes 00:00 to 24:00
Copy from CDCM table 3701 "Tariffs!D43:I81" and paste values into D14Unique billing
identifierPCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA
LDNO LV: Domestic Unrestricted 150 1 1.420 2.96
LDNO LV: Domestic Two Rate 151 2 1.775 0.063 2.96
LDNO LV: Domestic Off Peak (related MPAN) 152 2 0.245
LDNO LV: Small Non Domestic Unrestricted 153 3 1.414 2.71
LDNO LV: Small Non Domestic Two Rate 154 4 1.848 0.116 2.71
LDNO LV: Small Non Domestic Off Peak (related MPAN) 155 4 0.316
LDNO LV: LV Medium Non-Domestic 156 5-8 1.403 0.040 19.07
LDNO LV: LV HH Metered 157 0 5.883 0.604 0.032 8.19 0.92 0.206 0.92
LDNO LV: NHH UMS category A 132 8 0.695
LDNO LV: NHH UMS category B 133 1 0.940
LDNO LV: NHH UMS category C 134 1 1.760
LDNO LV: NHH UMS category D 135 1 0.536
LDNO LV: LV UMS (Pseudo HH Metered) 170 0 13.796 0.531 0.029
LDNO LV: LV Generation NHH 172 8 ( 0.574)
LDNO LV: LV Generation Intermittent 173 0 ( 0.574) 0.134
LDNO LV: LV Generation Non-Intermittent 174 0 ( 3.423) ( 0.621) ( 0.039) 0.134
LDNO HV: Domestic Unrestricted 158 1 0.788 1.64
LDNO HV: Domestic Two Rate 159 2 0.985 0.035 1.64
LDNO HV: Domestic Off Peak (related MPAN) 160 2 0.136
LDNO HV: Small Non Domestic Unrestricted 161 3 0.784 1.50
LDNO HV: Small Non Domestic Two Rate 162 4 1.025 0.064 1.50
LDNO HV: Small Non Domestic Off Peak (related MPAN) 163 4 0.175 .
LDNO HV: LV Medium Non-Domestic 164 5-8 0.778 0.022 10.58
LDNO HV: LV HH Metered 165 0 3.263 0.335 0.018 4.55 0.51 0.114 0.51
LDNO HV: LV Sub HH Metered 166 0 4.701 0.448 0.023 24.86 1.10 0.153 1.10
LDNO HV: HV HH Metered 167 0 4.641 0.408 0.019 79.00 1.29 0.141 1.29
LDNO HV: NHH UMS category A 136 8 0.385
LDNO HV: NHH UMS category B 137 1 0.521
LDNO HV: NHH UMS category C 138 1 0.977
LDNO HV: NHH UMS category D 139 1 0.298
LDNO HV: LV UMS (Pseudo HH Metered) 171 0 7.653 0.295 0.016
LDNO HV: LV Generation NHH 175 8 ( 0.574)
LDNO HV: LV Sub Generation NHH 176 8 ( 0.504)
LDNO HV: LV Generation Intermittent 177 0 ( 0.574) 0.134
LDNO HV: LV Generation Non-Intermittent 178 0 ( 3.423) ( 0.621) ( 0.039) 0.134
LDNO HV: LV Sub Generation Intermittent 179 0 ( 0.504) 0.128
LDNO HV: LV Sub Generation Non-Intermittent 180 0 ( 3.007) ( 0.545) ( 0.034) 0.128
LDNO HV: HV Generation Intermittent 181 0 ( 0.357) 0.098
LDNO HV: HV Generation Non-Intermittent 182 0 ( 2.139) ( 0.384) ( 0.024) 0.098
LDNO HVplus: Domestic Unrestricted 183 1 0.662 1.38
LDNO HVplus: Domestic Two Rate 184 2 0.827 0.030 1.38
LDNO HVplus: Domestic Off Peak (related MPAN) 185 2 0.114
LDNO HVplus: Small Non Domestic Unrestricted 186 3 0.659 1.26
LDNO HVplus: Small Non Domestic Two Rate 187 4 0.861 0.054 1.26
LDNO HVplus: Small Non Domestic Off Peak (related MPAN) 188 4 0.147
LDNO HVplus: LV Medium Non-Domestic 189 5-8 0.654 0.018 8.89
LDNO HVplus: LV Sub Medium Non-Domestic - 5-8 0.711 0.019 20.65
All the above times are in UK Clock time
All the above times are in UK Clock time
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final LDNO tariffs
Copy from EDCM table 6005 "LDNORev!B513:G637" and paste values into D54
Time Bands for Half Hourly Unmetered Properties
Time periods
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Monday to Friday
(Including Bank Holidays)
April to October and March Inclusive
Saturday and Sunday
All other times
Time Bands for Half Hourly Metered Properties
NORTHERN POWERGRID (YORKSHIRE) PLC 42 of 48 FEBRUARY 2014 - V1.0
Annex 4 - Charges applied to LDNOs with HV/LV end users
Copy from CDCM table 3701 "Tariffs!D43:I81" and paste values into D14Unique billing
identifierPCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA
LDNO HVplus: HV Medium Non-Domestic - 5-8 1.033 0.021 123.25
LDNO HVplus: LV HH Metered 190 0 2.742 0.281 0.015 3.82 0.43 0.096 0.43
LDNO HVplus: LV Sub HH Metered 191 0 3.906 0.371 0.019 20.65 0.91 0.127 0.91
LDNO HVplus: HV HH Metered 192 0 3.820 0.336 0.016 64.99 1.06 0.116 1.06
LDNO HVplus: NHH UMS category A 140 8 0.301
LDNO HVplus: NHH UMS category B 141 1 0.408
LDNO HVplus: NHH UMS category C 142 1 0.764
LDNO HVplus: NHH UMS category D 143 1 0.233
LDNO HVplus: LV UMS (Pseudo HH Metered) 194 0 5.985 0.230 0.013
LDNO HVplus: LV Generation NHH 195 8 ( 0.271)
LDNO HVplus: LV Sub Generation NHH 196 8 ( 0.295)
LDNO HVplus: LV Generation Intermittent 197 0 ( 0.271) 0.063
LDNO HVplus: LV Generation Non-Intermittent 198 0 ( 1.618) ( 0.293) ( 0.018) 0.063
LDNO HVplus: LV Sub Generation Intermittent 199 0 ( 0.295) 0.075
LDNO HVplus: LV Sub Generation Non-Intermittent 315 0 ( 1.760) ( 0.319) ( 0.020) 0.075
LDNO HVplus: HV Generation Intermittent 316 0 ( 0.357) 117.42 0.098
LDNO HVplus: HV Generation Non-Intermittent 317 0 ( 2.140) ( 0.384) ( 0.024) 117.42 0.098
LDNO EHV: Domestic Unrestricted 318 1 0.463 0.96
LDNO EHV: Domestic Two Rate 319 2 0.578 0.021 0.96
LDNO EHV: Domestic Off Peak (related MPAN) 320 2 0.080
LDNO EHV: Small Non Domestic Unrestricted 321 3 0.461 0.88
LDNO EHV: Small Non Domestic Two Rate 322 4 0.602 0.038 0.88
LDNO EHV: Small Non Domestic Off Peak (related MPAN) 323 4 0.103
LDNO EHV: LV Medium Non-Domestic 324 5-8 0.457 0.013 6.21
LDNO EHV: LV Sub Medium Non-Domestic - 5-8 0.497 0.014 14.44
LDNO EHV: HV Medium Non-Domestic - 5-8 0.723 0.015 86.19
LDNO EHV: LV HH Metered 325 0 1.918 0.197 0.010 2.67 0.30 0.067 0.30
LDNO EHV: LV Sub HH Metered 326 0 2.731 0.260 0.013 14.44 0.64 0.089 0.64
LDNO EHV: HV HH Metered 327 0 2.672 0.235 0.011 45.45 0.74 0.081 0.74
LDNO EHV: NHH UMS category A 144 8 0.211
LDNO EHV: NHH UMS category B 145 1 0.285
LDNO EHV: NHH UMS category C 146 1 0.534
LDNO EHV: NHH UMS category D 147 1 0.163
LDNO EHV: LV UMS (Pseudo HH Metered) 329 0 4.185 0.161 0.009
LDNO EHV: LV Generation NHH 330 8 ( 0.190)
LDNO EHV: LV Sub Generation NHH 331 8 ( 0.206)
LDNO EHV: LV Generation Intermittent 332 0 ( 0.190) 0.044
LDNO EHV: LV Generation Non-Intermittent 333 0 ( 1.131) ( 0.205) ( 0.013) 0.044
LDNO EHV: LV Sub Generation Intermittent 334 0 ( 0.206) 0.052
LDNO EHV: LV Sub Generation Non-Intermittent 335 0 ( 1.231) ( 0.223) ( 0.014) 0.052
LDNO EHV: HV Generation Intermittent 336 0 ( 0.250) 82.11 0.069
LDNO EHV: HV Generation Non-Intermittent 337 0 ( 1.497) ( 0.269) ( 0.017) 82.11 0.069
LDNO 132kV/EHV: Domestic Unrestricted 338 1 0.309 0.64
LDNO 132kV/EHV: Domestic Two Rate 339 2 0.386 0.014 0.64
LDNO 132kV/EHV: Domestic Off Peak (related MPAN) 340 2 0.053
LDNO 132kV/EHV: Small Non Domestic Unrestricted 341 3 0.308 0.59
LDNO 132kV/EHV: Small Non Domestic Two Rate 342 4 0.402 0.025 0.59
LDNO 132kV/EHV: Small Non Domestic Off Peak (related MPAN) 343 4 0.069
LDNO 132kV/EHV: LV Medium Non-Domestic 344 5-8 0.305 0.009 4.15
LDNO 132kV/EHV: LV Sub Medium Non-Domestic - 5-8 0.332 0.009 9.64
LDNO 132kV/EHV: HV Medium Non-Domestic - 5-8 0.482 0.010 57.54
LDNO 132kV/EHV: LV HH Metered 345 0 1.280 0.131 0.007 1.78 0.20 0.045 0.20
LDNO 132kV/EHV: LV Sub HH Metered 346 0 1.823 0.173 0.009 9.64 0.43 0.059 0.43
LDNO 132kV/EHV: HV HH Metered 347 0 1.784 0.157 0.007 30.34 0.49 0.054 0.49
LDNO 132kV/EHV: NHH UMS category A 302 8 0.141
LDNO 132kV/EHV: NHH UMS category B 303 1 0.190
LDNO 132kV/EHV: NHH UMS category C 304 1 0.357
LDNO 132kV/EHV: NHH UMS category D 305 1 0.109
LDNO 132kV/EHV: LV UMS (Pseudo HH Metered) 349 0 2.794 0.108 0.006
LDNO 132kV/EHV: LV Generation NHH 350 8 ( 0.127)
NORTHERN POWERGRID (YORKSHIRE) PLC 43 of 48 FEBRUARY 2014 - V1.0
Annex 4 - Charges applied to LDNOs with HV/LV end users
Copy from CDCM table 3701 "Tariffs!D43:I81" and paste values into D14Unique billing
identifierPCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA
LDNO 132kV/EHV: LV Sub Generation NHH 351 8 ( 0.138)
LDNO 132kV/EHV: LV Generation Intermittent 352 0 ( 0.127) 0.030
LDNO 132kV/EHV: LV Generation Non-Intermittent 353 0 ( 0.755) ( 0.137) ( 0.009) 0.030
LDNO 132kV/EHV: LV Sub Generation Intermittent 354 0 ( 0.138) 0.035
LDNO 132kV/EHV: LV Sub Generation Non-Intermittent 355 0 ( 0.822) ( 0.149) ( 0.009) 0.035
LDNO 132kV/EHV: HV Generation Intermittent 356 0 ( 0.167) 54.82 0.046
LDNO 132kV/EHV: HV Generation Non-Intermittent 357 0 ( 0.999) ( 0.179) ( 0.011) 54.82 0.046
LDNO 132kV: Domestic Unrestricted 358 1 0.163 0.34
LDNO 132kV: Domestic Two Rate 359 2 0.204 0.007 0.34
LDNO 132kV: Domestic Off Peak (related MPAN) 360 2 0.028
LDNO 132kV: Small Non Domestic Unrestricted 361 3 0.163 0.31
LDNO 132kV: Small Non Domestic Two Rate 362 4 0.212 0.013 0.31
LDNO 132kV: Small Non Domestic Off Peak (related MPAN) 363 4 0.036
LDNO 132kV: LV Medium Non-Domestic 364 5-8 0.161 0.005 2.19
LDNO 132kV: LV Sub Medium Non-Domestic - 5-8 0.175 0.005 5.09
LDNO 132kV: HV Medium Non-Domestic - 5-8 0.255 0.005 30.39
LDNO 132kV: LV HH Metered 365 0 0.676 0.069 0.004 0.94 0.11 0.024 0.11
LDNO 132kV: LV Sub HH Metered 366 0 0.963 0.092 0.005 5.09 0.22 0.031 0.22
LDNO 132kV: HV HH Metered 367 0 0.942 0.083 0.004 16.02 0.26 0.029 0.26
LDNO 132kV: NHH UMS category A 306 8 0.074
LDNO 132kV: NHH UMS category B 307 1 0.101
LDNO 132kV: NHH UMS category C 308 1 0.188
LDNO 132kV: NHH UMS category D 309 1 0.057
LDNO 132kV: LV UMS (Pseudo HH Metered) 369 0 1.476 0.057 0.003
LDNO 132kV: LV Generation NHH 370 8 ( 0.067)
LDNO 132kV: LV Sub Generation NHH 371 8 ( 0.073)
LDNO 132kV: LV Generation Intermittent 372 0 ( 0.067) 0.016
LDNO 132kV: LV Generation Non-Intermittent 373 0 ( 0.399) ( 0.072) ( 0.005) 0.016
LDNO 132kV: LV Sub Generation Intermittent 374 0 ( 0.073) 0.018
LDNO 132kV: LV Sub Generation Non-Intermittent 375 0 ( 0.434) ( 0.079) ( 0.005) 0.018
LDNO 132kV: HV Generation Intermittent 376 0 ( 0.088) 28.95 0.024
LDNO 132kV: HV Generation Non-Intermittent 377 0 ( 0.528) ( 0.095) ( 0.006) 28.95 0.024
LDNO 0000: Domestic Unrestricted 378 1 0.066 0.14
LDNO 0000: Domestic Two Rate 379 2 0.083 0.003 0.14
LDNO 0000: Domestic Off Peak (related MPAN) 380 2 0.011
LDNO 0000: Small Non Domestic Unrestricted 381 3 0.066 0.13
LDNO 0000: Small Non Domestic Two Rate 382 4 0.086 0.005 0.13
LDNO 0000: Small Non Domestic Off Peak (related MPAN) 383 4 0.015
LDNO 0000: LV Medium Non-Domestic 384 5-8 0.065 0.002 0.89
LDNO 0000: LV Sub Medium Non-Domestic - 5-8 0.071 0.002 2.07
LDNO 0000: HV Medium Non-Domestic - 5-8 0.103 0.002 12.35
LDNO 0000: LV HH Metered 385 0 0.275 0.028 0.001 0.38 0.04 0.010 0.04
LDNO 0000: LV Sub HH Metered 386 0 0.391 0.037 0.002 2.07 0.09 0.013 0.09
LDNO 0000: HV HH Metered 387 0 0.383 0.034 0.002 6.51 0.11 0.012 0.11
LDNO 0000: NHH UMS category A 310 8 0.030
LDNO 0000: NHH UMS category B 311 1 0.041
LDNO 0000: NHH UMS category C 312 1 0.076
LDNO 0000: NHH UMS category D 313 1 0.023
LDNO 0000: LV UMS (Pseudo HH Metered) 389 0 0.599 0.023 0.001
LDNO 0000: LV Generation NHH 390 8 ( 0.027)
LDNO 0000: LV Sub Generation NHH 391 8 ( 0.030)
LDNO 0000: LV Generation Intermittent 392 0 ( 0.027) 0.006
LDNO 0000: LV Generation Non-Intermittent 393 0 ( 0.162) ( 0.029) ( 0.002) 0.006
LDNO 0000: LV Sub Generation Intermittent 394 0 ( 0.030) 0.008
LDNO 0000: LV Sub Generation Non-Intermittent 395 0 ( 0.176) ( 0.032) ( 0.002) 0.008
LDNO 0000: HV Generation Intermittent 396 0 ( 0.036) 11.76 0.010
LDNO 0000: HV Generation Non-Intermittent 397 0 ( 0.214) ( 0.038) ( 0.002) 11.76 0.010
NORTHERN POWERGRID (YORKSHIRE) PLC 44 of 48 FEBRUARY 2014 - V1.0
Annex 5 – Schedule of Line Loss Factors
Period 1 Period 2 Period 3 Period 4
Winter Peak Other Winter Weekday Night All other times
Monday – Friday
(Apr – Oct)00:00 – 07:00 07:00 – 24:00
Monday – Friday
(Nov – Feb)16:00 – 19:00
07:00 – 16:00
19:00 – 20:0000:00 – 07:00 20:00 – 24:00
Monday – Friday
(Mar)00:00 – 07:00 07:00 – 24:00
Saturday and Sunday
(All Year)00:00 – 07:00 07:00 – 24:00
Notes
5 6 7 8 4
Metered voltage Period 1 Period 2 Period 3 Period 4 Associated LLFC
Low Voltage Network 1.100 1.090 1.073 1.081
12, 17, 18, 20, 21, 22, 24,
30, 40, 100, 101, 111, 120,
121, 123, 130, 131, 214,
240, 241, 244, 246, 248,
249, 250, 257, 268, 275,
280, 281, 287, 290, 291,
297, 400, 401, 402, 403,
404, 405, 406, 407, 408,
409, 411, 412, 413, 414,
415, 416, 417, 418, 419,
420, 421, 813, 814, 815,
816, 817, 913, 999
Low Voltage Substation 1.047 1.046 1.047 1.044 14, 23, 25, 471, 472
High Voltage Network 1.033 1.031 1.024 1.027
15, 26, 28, 41, 410, 500,
501, 502, 580, 581, 741,
742, 743, 744
High Voltage Substation 1.022 1.022 1.019 1.020
16, 27, 29, 68, 69, 70, 71,
72, 73, 685, 686, 831, 832,
833, 834, 835, 836, 837,
838, 839, 840, 841, 842,
843, 844, 845, 846, 847,
848, 849, 850, 851, 852,
853, 854, 855, 856, 857,
858, 859, 860, 861, 862,
863, 864, 865, 866, 867,
868, 869, 870, 871, 872,
873, 874, 875, 876, 877,
878, 879, 880, 881, 882,
883, 884, 885, 886, 887,
888, 889, 890, 891, 892,
893, 894, 895, 896, 897,
898, 899, 900
Greater than 22kV
connected - generation1.016 1.015 1.012 1.014
55, 56, 59, 63, 64, 65, 96,
108, 109, 110
Greater than 22kV
connected - demand1.016 1.015 1.012 1.014
768, 792, 805, 806, 807,
808, 809, 810, 811, 824,
825, 828, 829, 830
All the above times are in UK Clock time
Northern Powergrid (Yorkshire) plc - Effective from April 2014 - Final LLF Time Periods
Time periods
Generic demand and generation LLFs
Metered voltage, respective periods and associated LLFCs
NORTHERN POWERGRID (YORKSHIRE) PLC 45 of 48 FEBRUARY 2014 - V1.0
Annex 5 – Schedule of Line Loss Factors
Site Period 1 Period 2 Period 3 Period 4 Associated LLFC
Site 1 1.022 1.024 1.024 1.024 750
Site 2 1.003 1.003 1.003 1.003 751
Site 3 1.015 1.015 1.033 1.015 753
Site 4 1.010 1.010 1.029 1.012 754
Site 5 1.009 1.009 1.025 1.012 755
Site 6 1.006 1.006 1.012 1.007 756
Site 7 1.002 1.002 1.002 1.002 757
Site 8 1.000 1.000 1.000 1.000 758
Site 9 1.007 1.007 1.007 1.007 759
Site 10 1.004 1.004 1.004 1.004 760
Site 11 1.000 1.000 1.000 1.000 761
Site 12 1.006 1.006 1.005 1.006 762
Site 13 1.004 1.004 1.004 1.004 763
Site 14 1.000 1.000 1.000 1.000 764
Site 15 1.013 1.013 1.012 1.013 765
Site 16 1.000 1.000 1.008 1.009 766
Site 17 1.006 1.016 1.026 1.016 767
Site 18 1.015 1.015 1.019 1.017 769
Site 19 1.009 1.009 1.009 1.009 770
Site 20 1.012 1.011 1.011 1.011 771
Site 21 1.008 1.008 1.008 1.008 772
Site 22 1.009 1.009 1.009 1.009 773
Site 23 1.020 1.019 1.013 1.016 774
Site 24 1.010 1.010 1.008 1.009 775
Site 25 1.011 1.010 1.007 1.009 777
Site 26 1.001 1.001 1.001 1.001 778
Site 27 1.000 1.000 1.000 1.000 780
Site 28 1.004 1.009 1.038 1.012 781
Site 29 1.015 1.014 1.012 1.013 782
Site 30 1.011 1.011 1.008 1.009 783
Site 31 1.035 1.032 1.026 1.029 784
Site 32 1.007 1.007 1.007 1.007 785
Site 33 1.004 1.004 1.004 1.004 786
Site 34 1.004 1.003 1.003 1.003 787
Site 35 1.013 1.013 1.010 1.011 788
Site 36 1.005 1.004 1.003 1.004 789
Site 37 1.004 1.004 1.004 1.004 790
Site 38 1.000 1.009 1.007 1.008 791
Site 39 1.023 1.020 1.017 1.018 793
Site 40 1.018 1.016 1.014 1.016 794
Site 41 1.017 1.009 1.101 1.010 795
Site 42 1.000 1.000 1.000 1.001 796
Site 43 1.013 1.013 1.010 1.012 797
Site 44 1.005 1.007 1.004 1.004 798
Site 45 1.016 1.015 1.012 1.014 799
Site 46 1.016 1.015 1.012 1.014 801
Site 47 1.016 1.015 1.012 1.014 802
Site 48 1.016 1.015 1.012 1.014 803
Site 49 1.016 1.015 1.012 1.014 821
Site 50 1.016 1.015 1.012 1.014 822
Site 51 1.016 1.015 1.012 1.014 823
Site 52 1.016 1.015 1.012 1.014 826
Site 53 1.004 1.004 1.006 1.005 827
EHV site specific LLFs
Demand
NORTHERN POWERGRID (YORKSHIRE) PLC 46 of 48 FEBRUARY 2014 - V1.0
Annex 5 – Schedule of Line Loss Factors
Site Period 1 Period 2 Period 3 Period 4 Associated LLFC
Site 1 1.016 1.015 1.012 1.014 51
Site 2 1.016 1.015 1.012 1.014 52
Site 3 1.016 1.015 1.012 1.014 53
Site 4 1.016 1.015 1.012 1.014 54
Site 5 1.016 1.015 1.012 1.014 57
Site 6 1.000 1.001 1.000 0.999 58
Site 7 1.002 1.001 1.001 1.001 60
Site 8 0.995 0.994 0.994 0.995 61
Site 9 1.004 1.004 1.001 1.002 62
Site 10 1.002 1.001 0.999 1.000 66
Site 11 0.995 0.987 0.975 0.987 67
Site 12 1.032 1.029 1.010 1.021 74
Site 13 0.978 0.981 0.968 0.987 75
Site 14 0.995 0.995 0.978 0.991 76
Site 15 1.014 1.014 1.009 1.011 77
Site 16 1.000 1.000 1.000 1.000 78
Site 17 1.005 1.004 1.003 1.004 80
Site 18 0.991 0.990 0.960 0.987 81
Site 19 1.000 1.000 1.000 0.997 82
Site 20 1.013 1.016 1.000 1.011 83
Site 21 1.024 1.020 1.008 1.016 84
Site 22 1.007 1.005 1.001 1.004 85
Site 23 1.001 1.001 1.000 1.001 86
Site 24 1.007 1.006 0.999 1.003 87
Site 25 1.019 1.017 1.007 1.013 88
Site 26 1.007 1.007 1.004 1.006 89
Site 27 1.015 1.014 0.982 1.009 90
Site 28 1.006 1.000 0.998 1.000 91
Site 29 0.984 0.984 0.985 0.985 92
Site 30 1.010 1.009 1.003 1.006 93
Site 31 1.003 1.003 1.002 1.003 94
Site 32 1.002 1.002 1.001 1.001 95
Site 33 1.019 1.014 1.005 1.011 97
Site 34 0.999 0.999 0.999 0.999 98
Site 35 1.020 1.017 1.011 1.014 99
Site 36 1.016 1.015 1.012 1.014 105
Site 37 1.016 1.015 1.012 1.014 106
Site 38 1.016 1.015 1.012 1.014 107
Generation
EHV sites specific LLFs
NORTHERN POWERGRID (YORKSHIRE) PLC 47 of 48 FEBRUARY 2014 - V1.0