PERATURAN WALIKOTA PONTIANAK TAHUN 2013 TANPA TANPA TANPA TANPA HARGA TERMASUK HARGA TERMASUK HARGA TERMASUK HARGA TERMASUK KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (OVERHEAD) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) A. A. A. A. UPAH UPAH UPAH UPAH 1 Mandor Lapangan Org/hari L.061 91,000.00 9,100.00 100,100.00 2 Mekanik Org/hari L.071 91,000.00 9,100.00 100,100.00 3 Kepala Tukang Org/hari L.073 91,000.00 9,100.00 100,100.00 4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 84,000.00 8,400.00 92,400.00 5 Operator terlatih Org/hari L.081 75,000.00 7,500.00 82,500.00 6 Operator semi terlatih Org/hari L.082 67,000.00 6,700.00 73,700.00 7 Sopir Org/hari L.091 75,000.00 7,500.00 82,500.00 8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 67,000.00 6,700.00 73,700.00 9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 75,000.00 7,500.00 82,500.00 WALIKOTA PONTIANAK WALIKOTA PONTIANAK WALIKOTA PONTIANAK WALIKOTA PONTIANAK SUTARMIDJI SUTARMIDJI SUTARMIDJI SUTARMIDJI HARGA HARGA HARGA HARGA NO NO NO NO TENAGA KERJA TENAGA KERJA TENAGA KERJA TENAGA KERJA KODE KODE KODE KODE SATUAN SATUAN SATUAN SATUAN LAMPIRAN II : TENTANG TENTANG TENTANG TENTANG STANDAR HARGA SATUAN UPAH, BAHAN, STANDAR HARGA SATUAN UPAH, BAHAN, STANDAR HARGA SATUAN UPAH, BAHAN, STANDAR HARGA SATUAN UPAH, BAHAN, ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI) ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI) ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI) ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI) DAN ANALISA E KOTA PONTIANAK DAN ANALISA E KOTA PONTIANAK DAN ANALISA E KOTA PONTIANAK DAN ANALISA E KOTA PONTIANAK

Standar Harga Walikota

Embed Size (px)

DESCRIPTION

Standar Harga Walikota

Citation preview

  • PERATURAN WALIKOTA PONTIANAK TAHUN 2013

    TANPATANPATANPATANPA HARGA TERMASUKHARGA TERMASUKHARGA TERMASUKHARGA TERMASUK

    KEUNTUNGANKEUNTUNGANKEUNTUNGANKEUNTUNGAN KEUNTUNGANKEUNTUNGANKEUNTUNGANKEUNTUNGAN KEUNTUNGANKEUNTUNGANKEUNTUNGANKEUNTUNGAN

    (OVERHEAD)(OVERHEAD)(OVERHEAD)(OVERHEAD) (OVERHEAD)(OVERHEAD)(OVERHEAD)(OVERHEAD) (OVERHEAD)(OVERHEAD)(OVERHEAD)(OVERHEAD)

    (Rp)(Rp)(Rp)(Rp) (Rp)(Rp)(Rp)(Rp) (Rp)(Rp)(Rp)(Rp)

    A.A.A.A. UPAHUPAHUPAHUPAH

    1 Mandor Lapangan Org/hari L.061 91,000.00 9,100.00 100,100.00

    2 Mekanik Org/hari L.071 91,000.00 9,100.00 100,100.00

    3 Kepala Tukang Org/hari L.073 91,000.00 9,100.00 100,100.00

    4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 84,000.00 8,400.00 92,400.00

    5 Operator terlatih Org/hari L.081 75,000.00 7,500.00 82,500.00

    6 Operator semi terlatih Org/hari L.082 67,000.00 6,700.00 73,700.00

    7 Sopir Org/hari L.091 75,000.00 7,500.00 82,500.00

    8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 67,000.00 6,700.00 73,700.00

    9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 75,000.00 7,500.00 82,500.00

    WALIKOTA PONTIANAK WALIKOTA PONTIANAK WALIKOTA PONTIANAK WALIKOTA PONTIANAK

    SUTARMIDJISUTARMIDJISUTARMIDJISUTARMIDJI

    HARGAHARGAHARGAHARGA

    NONONONO TENAGA KERJATENAGA KERJATENAGA KERJATENAGA KERJA KODEKODEKODEKODESATUANSATUANSATUANSATUAN

    LAMPIRAN II :

    TENTANGTENTANGTENTANGTENTANG

    STANDAR HARGA SATUAN UPAH, BAHAN,STANDAR HARGA SATUAN UPAH, BAHAN,STANDAR HARGA SATUAN UPAH, BAHAN,STANDAR HARGA SATUAN UPAH, BAHAN,

    ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)

    DAN ANALISA E KOTA PONTIANAKDAN ANALISA E KOTA PONTIANAKDAN ANALISA E KOTA PONTIANAKDAN ANALISA E KOTA PONTIANAK