1
Stage 25 I New Land Release Lot Frontage Setback - m Area - m 2 Price 765 20 4.5 690 Under Contract 768 18 4.5 576 Available 771 19 4.5 617 Under Contract 776 25 4.5 840 Under Contract 777 21 4.5 685 Under Contract 781 18 4.5 582 Available 783 18 4.5 706 Available 785 20 4.5 550 Available 787 20 4.5 638 Under Contract 789 16 4.5 538 Available 790 16 4.5 538 Under Contract 792 16 4.5 666 Available masterplan. THESE PLANS ARE CONCEPTUAL AND FOR DISCUSSION PURPOSES ONLY. ALL AREAS, DIMENSIONS AND LAND USES ARE PRELIMINARY, SUBJECT TO INVESTIGATION, SURVEY, ENGINEERING, AND LOCAL AUTHORITY AND AGENCY APPROVALS. N stage 25. Firewheel Release Sales Consultant - Steve Pozzebon Phone 0467 773 172 Email [email protected]

stage 25. Firewheel Release - Amazon S3

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: stage 25. Firewheel Release - Amazon S3

Stage 25 I New Land ReleaseLot Frontage Setback - m Area - m2 Price

765 20 4.5 690 Under Contract

768 18 4.5 576 Available

771 19 4.5 617 Under Contract

776 25 4.5 840 Under Contract

777 21 4.5 685 Under Contract

781 18 4.5 582 Available

783 18 4.5 706 Available

785 20 4.5 550 Available

787 20 4.5 638 Under Contract

789 16 4.5 538 Available

790 16 4.5 538 Under Contract

792 16 4.5 666 Available

masterplan.

THESE PLANS ARE CONCEPTUAL AND FOR DISCUSSION PURPOSES ONLY. ALL AREAS, DIMENSIONS AND LAND USES ARE PRELIMINARY, SUBJECT TO INVESTIGATION, SURVEY, ENGINEERING, AND LOCAL AUTHORITY AND AGENCY APPROVALS.

N

stage 25. Firewheel Release

Sales Consultant - Steve PozzebonPhone 0467 773 172

Email [email protected]