Stabilisattion for laong lasting pavement

Embed Size (px)

Citation preview

  • 7/26/2019 Stabilisattion for laong lasting pavement

    1/29

    StabilizationForLon

    LastingPavements

    MithraDewars

    c em s

    ouc no ogy

    m eNewDelhi

    .

  • 7/26/2019 Stabilisattion for laong lasting pavement

    2/29

    Re uirementsof

    Lon

    Lastin

    Stabilized

    Re uirements

    of

    Lon

    Lastin

    Stabilized

    PavementPavement

    Stable Sub Grade Less Chan es in Volume

    Stability with Variation in water content Good Drainage Provisions

    Better riding quality

    Durable pavement layers for less maintenance

  • 7/26/2019 Stabilisattion for laong lasting pavement

    3/29

    Pavement.Pavement.

    Faster & Green Construction

    Sustainable Strength

    Cost Effective

    Less Life Cycle Cost

  • 7/26/2019 Stabilisattion for laong lasting pavement

    4/29

    .

    .

    o emen a za on

    Soil LimeStabilization

    Lime

    Fly

    ash

    Stabilization

    SoilStabilizationwithCommerciallyavailable

    o

    a zers

  • 7/26/2019 Stabilisattion for laong lasting pavement

    5/29

    .

    .

    DiverseSoilTypes

    LongLeadsofMaterial

    ShortageofAggregate

    HighMaintenanceCost

  • 7/26/2019 Stabilisattion for laong lasting pavement

    6/29

    theChallenges.theChallenges.

    Suitable

    with

    any

    type

    of

    in

    situ

    soil

    ofsoil

    viz.

    CBR,

    UCS,

    PI

    &

    FSI

    Mustgiverequiredimpermeabilitytosoil

    Mustshow

    ALL

    WEATHER

    DURABILITY

  • 7/26/2019 Stabilisattion for laong lasting pavement

    7/29

    Materialsto

    Overcome

    the

    Challenges.Materials

    to

    Overcome

    the

    Challenges.

    Soil Type Fine Coarse Fine Coarse Fine Coarse

    Clay Clay Silt Silt Sand Sand

    Volume Stabil ity Very

    Poor Fair Fair Good Very Good Very Good

    Stabilizers Lime

    RBI Grade-81

  • 7/26/2019 Stabilisattion for laong lasting pavement

    8/29

    RBIGrade

    81.RBI

    Grade

    81.

    RBIGrade

    81

    has

    been

    Invented

    to

    provide

    comprehensive and irreversiblesoil

    s a za on spec ca y orroa

  • 7/26/2019 Stabilisattion for laong lasting pavement

    9/29

    van ageso

    s ng

    ra e

    .van ages

    o

    s ng

    ra e

    .

    Reduces Construction time

    Increases strength

    Treated soil is water resistant & prevents

    damage to the road foundation and

    durability leading to reduced pavement

    maintenance cost

  • 7/26/2019 Stabilisattion for laong lasting pavement

    10/29

    .

    .

    Reduces trans ort & earth-movin costs

    Reduces Maintenance Cost

    Reduces the Carbon Emission resulting

    in carbon credits

    x u

  • 7/26/2019 Stabilisattion for laong lasting pavement

    11/29

    PWD Approach Road to BBH Mines, Chitradurga

    Classification of Road: State Highway (SH48)

    Width: 8m Design Traffic

    500 CVPD with 20 T axle load

    500 CVPD with 12 T axle load

    19thJanuary2009

    to

    28th January

    2009

  • 7/26/2019 Stabilisattion for laong lasting pavement

    12/29

    AfterTreatmentAfterTreatment

  • 7/26/2019 Stabilisattion for laong lasting pavement

    13/29

    Soil

    Properties

    without

    &

    with

    RBI

    Soil

    Properties

    without

    &

    with

    RBI

    Grade81Grade81

    156

    55 MDD(g/cc)

    9

    12 PI

    CBR(%)

    2.1 2.46 2.5 2.563.8 3

    Soil Soil+2%RBI81 Soil+3%RBI81 Soil+4%RBI81

  • 7/26/2019 Stabilisattion for laong lasting pavement

    14/29

    Design:

    Conventional RBI Grade81

    , ,

    75mm,WBMGIII150

    mm,

    Soil

    +3%

    RBI

    Grade

    81

    150mm,WBMGIIExistingpavementconsideredas

    GSBTop150

    mm,

    GSB

    300mm,SubGrade

  • 7/26/2019 Stabilisattion for laong lasting pavement

    15/29

    ..

    ..

    Visual Observation by CRRI

    70

    70 59.5

    50

    60

    36.5

    20

    30

    0

    10

    Points

    Section

    Section

  • 7/26/2019 Stabilisattion for laong lasting pavement

    16/29

    1.54

    1.4

    1.6

    0.8

    1

    1.2

    0.63

    0.2

    0.4

    0.6

    0

    ConventionalSection RBIGrade81Section

  • 7/26/2019 Stabilisattion for laong lasting pavement

    17/29

    Field CBR DCP b CRRI

    Field CBR DCP b CRRI

    120

    80

    40

    60

    12

    0

    20

    ConventionalSection RBIGrade81Section

  • 7/26/2019 Stabilisattion for laong lasting pavement

    18/29

    Rou hness Di stick b CRRI

    Rou hness Di stick b CRRI

    2864

    2500

    3000

    1713

    1500

    2000

    500

    1000

    0

    Conventional RBIGrade81

    Section Section

  • 7/26/2019 Stabilisattion for laong lasting pavement

    19/29

    PavementModulus(FWD)byIRSM

    Load A lied: 560 kPa normalized from 600 kPa

    PavementModulus(FWD)byIRSM

    Load A lied: 560 kPa normalized from 600 kPa

    688

    600

    700

    400

    500

    291 267

    200

    300 177

    100

    ModulusofBaseLayer MeanModulusofPavementConventionalSection RBIGrade81Section

  • 7/26/2019 Stabilisattion for laong lasting pavement

    20/29

    Conclusions

    of

    Case

    Stud .Conclusions

    of

    Case

    Stud .RBI Grade81 enhances the properties of the soil

    RBI Grade

    81 Section indicate excellent functional and

    in wearing surface

    Bonding between stabilized soil layer & bituminous

    ayer oun a equate ntact

    RBI Grade81 ma be used to save natural resources

    like aggregates

  • 7/26/2019 Stabilisattion for laong lasting pavement

    21/29

    u e o a ou .

    o o

    Design: Sub Grade Stabilization up to a depth

    of 250 mm with 4% RBI Grade 81

    Stabilization of 2750 m length & 45 m wide

    Sub Grade was completed in 67 Days

  • 7/26/2019 Stabilisattion for laong lasting pavement

    22/29

    Before

    Treatment

  • 7/26/2019 Stabilisattion for laong lasting pavement

    23/29

    AfterTreatment

  • 7/26/2019 Stabilisattion for laong lasting pavement

    24/29

    Test

    Results

    B

    Geo au e

    on

    Sub

    Grade

    of

    Airfield

    Properties Required October2009 April2010 Increment

    (%)

    Stiffness(kG)

    MN/m 10.67 21.47 23.94 11.50

    EValue

    MPa 92.52 186.24 207.64 11.49

    CBR(%) 28 142 174.57 22.94

    UCS

    kg/sq

    cm

    5.50 22.60 23.94 5.93

  • 7/26/2019 Stabilisattion for laong lasting pavement

    25/29

    Runway

  • 7/26/2019 Stabilisattion for laong lasting pavement

    26/29

    Scarif in

    of

    Stabilized

    Sub rade

    of

    Airstri

  • 7/26/2019 Stabilisattion for laong lasting pavement

    27/29

    Cores

    Extracted

    From

    Field.

    RBI81Stabilized

    RBI81

    Stabilized

    Soil Sub Base

  • 7/26/2019 Stabilisattion for laong lasting pavement

    28/29

    Cores

    Extracted

    From

    Field.

    250

    mm,

    RBI

    81

    Stabilized Subgrade

  • 7/26/2019 Stabilisattion for laong lasting pavement

    29/29

    an

    ou

    RBIGrade81

    Pavement

    Material

    &

    a ura

    o

    a zer