SQT Quality Manual

Embed Size (px)

Citation preview

  • 7/31/2019 SQT Quality Manual

    1/82

    SQTs Quality Manual

    Section 1 Communications

    Section 2 Equality

    Section 3 Staff Recruitment and DevelopmentSection 4 Access Transfer and Progression

    Section 5 Programme Development, Delivery and Review

    Section 6 Fair and consistent assessment of learners

    Section 7 Protection for Learners

    Section 8 Sub-contracting/Procurement Programme Delivery

    Section 9 Evaluation of Programmes and Services/Quality Management System

    Section 10 Quality

    Section 11 Data Protection

  • 7/31/2019 SQT Quality Manual

    2/82

    Section 1

    Communications

  • 7/31/2019 SQT Quality Manual

    3/82

    SQT-P1 Rev 3

    Communications Policy

    SQT Training is committed to facilitating effective communications with all stakeholders in

    our work. Our policy is to ensure that communication with tutors, administrative staff,

    learners, customers and external agencies is clear, accurate and timely.

    SQT Training believes that good communication is a two-way process that involves

    providing clear, accurate information and receiving constructive feedback. To this end we

    are committed to providing relevant information on our courses and services to all

    stakeholders and encouraging and capturing their feedback, which we utilise to ensure that

    our services consistently meet or exceed the needs and expectations of learners and other

    stakeholders.

    All key SQT records are kept for a minimum of three years.

    Relevant Procedures and Work Instructions are:

    SOP-P1-1 - SQT Communications with Learners

    SOP-P1-2 - SQT Communications with staff

    SOP-P1-3 - SQT Communications with Stakeholders

    WI-002 Public Course Administration

    WI-005 In-House Course Administration

    WI-003-Communications-Marketing to Customers

    WI-007 Course Assessment Forms

  • 7/31/2019 SQT Quality Manual

    4/82

    Procedure Title: SOP-P1-1 Communication with Learners Rev 2

    SOP-PI-!

    Purpose: This procedure describes how SQT Training ensures there are effective, relevant, accurate and tlearners.

    Staff Involved: Course Managers and Tutors

    Method(s) used to carry out this procedure Who does it Evidence generated

    SQT Trainings website provides information on all availablecourses plus a 6 monthly course schedule with traininglocations, cost and detailed tutor profiles.

    Marketing Manager Course Brochure

    SQT Website

    6-monthly Course T

    Course Assessment Forms are completed by each delegateon completion of a course to provide feedback on coursestrengths and weaknesses to both Course Tutor and SQTmanagement. Similar form completed by course tutors.

    Learners

    Tutor

    Course Assessmen

    Tutor Report

    Communications-Marketing to Customers (WI-003) Marketing Manager Monthly email and f

    Advertising in print

    Course Assessment Forms (WI-007) Managing Director

    Course Managers

    Course Assessmen

    Course Organisers

    Access DatabaseTutor Reports

    Weekly KPI Report

  • 7/31/2019 SQT Quality Manual

    5/82

    Procedure Title: SOP-P1-1 Communication with Learners Rev 2

    SOP-PI-!

    Public Course Administration (WI-002) and In-House CourseAdministration (WI-005) detailing all aspects of learnercommunication with SQT training at all stages of the bookingand training process.

    Course Manager Enquiry mailsBooking forms

    Records of Course

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Course Managers Daily

    Weekly

    Review of booking system and enquiries

    Review of Course Assessment Forms and T

    Managing Director Weekly Review of Course Assessment Forms and T

    Managing Director Weekly Review Company KPIs (Key Performance I

    Tutor Per Course Review of Course Assessment Forms

  • 7/31/2019 SQT Quality Manual

    6/82

    Procedure Title: SOP-P1-2 Communication with Staff Rev 2

    Purpose: This procedure describes how SQT Training ensures there are effective, relevant, accurate and tTraining Staff.

    Staff Involved: Managing Director, Tutors, Administration Staff

    Method(s) used to carry out this procedure Who does it Evidence generated

    Weekly Staff Meetings Administration Staff Meeting Minutes

    Open Items Databa

    Email confirmations to tutors will full details of course

    arrangements and logistics

    Course Managers Email records

    Access Database R

    Tutor Report completed by course tutor following coursedelivery to provide feedback and suggestions forimprovement

    Course Tutors Tutor Report

    PIN (Potential for Improvement Notice) completed for anyimprovements to be implemented in either the logistics,organisation or running of a particular course. It showsresponsibility, action and timeframe for completion.

    Administration Staff PIN Reports

    Academic Committee Meetings Managing DirectorProgrammeManager

    Meeting Minutes

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    SOP-PI-2

  • 7/31/2019 SQT Quality Manual

    7/82

    Managing Director Weekly Meeting Minutes

    Open Items Database

    Managing Director Weekly Review KPIs (Key Performance Indicators)

    SOP-PI-2

  • 7/31/2019 SQT Quality Manual

    8/82

    Procedure Title: SOP-P1-3 Communication with Stakeholders Rev 2

    Purpose: This procedure describes how SQT Training ensures there are effective, relevant, accurate and tStakeholders (Training venues, Employers of Learners, Awarding bodies etc.) in our Training Act

    Staff Involved: Administration Staff, Managing Director, Tutors

    Method(s) used to carry out this procedure Who does it Evidence generated by

    Weekly Staff Meetings Administration Staff Meeting Minutes

    Open Items Database

    Course arrangements and confirmations to hotels and

    other training venues as appropriate

    Course Managers Email confirmations fro

    Course Programme review and discussion with Companycourse organisers

    Course Managers

    Tutors

    Course Brochures/Rev

    Marketing of 6-monthly SQT Course Calendar (Ref WI 003)

    Marketing Manager SQT Training Calendar

    Communication with Awarding bodies e.g., FETAC,HETAC, IRCA, FAS, Chamber Ireland, NEBOSH, IOSH,IEMA.

    Managing DirectorCourse Managers

    Exam Secretary

    Reports/Written Corres

    Website showing all SQT course offerings and details ofcourses delivered

    Marketing Manager Current Website

    SOP-P1-3

  • 7/31/2019 SQT Quality Manual

    9/82

    Email instructions on layout and logistic requirements forHotel Training Facilities

    Course Managers Training Facilities Spec

    Approved Venue Log

    Emails of course confir

    Communications-Marketing to Customers (WI 003)

    showing course offerings, dates, locations etc.

    Marketing Manager Mailshots/Fax shots

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director /

    Course manager

    Weekly Review KPIs

    Weekly Staff Meetings

    Review Website

    Review Calendar (prior to publication)

    SOP-P1-3

  • 7/31/2019 SQT Quality Manual

    10/82

    Section 2

    Equality

  • 7/31/2019 SQT Quality Manual

    11/82

    SQT-P2 Rev 3

    Equality Policy

    SQT Training is committed to providing equality to all learners and staff regardless of their

    age, gender, marital status, disability, religion, sexual orientation, race, nationality, or

    ethnicity.

    SQT Training aim to provide learners and staff with an environment free from discrimination

    and harassment and ensures that its policies, procedures and practices do not create any

    disadvantage or disincentive to any staff, learners or potential learners.

    SQT Training recognise that the learning environment for both staff and learners must be

    one that values and promotes individual differences.

    Relevant Procedures and Work Instructions are:

    SOP-P2-1 - SQT Equality Training

    SOP-P2-2 - SQT Equality Planning

    WI-010-Staff Recruitment & Development

  • 7/31/2019 SQT Quality Manual

    12/82

    Procedure Title: SOP-P2-1 Equality Training Rev 2

    Purpose: This procedure describes how SQT Training ensures that staff are aware of equality issues and hequality and combat discrimination

    Staff Involved: Tutors, Administrative Staff, Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    All administrative staff and tutors are provided with a copy ofthe SQT Equality policy. Staff Induction Training (Ref WI -010)

    Managing Director Equality Policy (SQ

    Training Records

    Information to tutors to make tutors aware of equality issuesto combat discrimination and understand their role inembracing diversity

    Managing Director/

    Marketing Manager

    Record of informati

    Weekly Staff Meetings Administrative Staff Meeting Minutes

    Open Items Databa

    Weekly KPIs

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director/Course

    Managers

    Per Course Feedback on Course Assessment Forms

    Tutor Reports

    Customer visits

    Managing Director 6-monthly Review Training Records

    Managing Director Annually Review Equality Policy

    SOP-P2-1

  • 7/31/2019 SQT Quality Manual

    13/82

  • 7/31/2019 SQT Quality Manual

    14/82

    Section 3

    Staff Recruitment and

    Development

  • 7/31/2019 SQT Quality Manual

    15/82

    SQT-P3 Rev 3

    Staff Recruitment and Development Policy

    SQT Training will pursue employment policies and practices that will promote equality of

    opportunity. In addition, SQT Training will ensure that personnel practices, covering such

    areas as recruitment and selection, training and development, terms and conditions of

    employment of full-time and part-time staff, reflect the principles of our Equality and other

    policies.

    Selection for employment, promotion, training or any other benefit will be based solely on

    aptitude and ability.

    The aim of this policy is to help all staff to develop their full potential so the talents and

    resources of SQT Training can be fully utilised to maximise the efficiency of our organisation

    and the services we provide to our customers.

    Relevant Procedures and Work Instructions are:

    SOP-P3-1 - SQT Staff Recruitment and Allocation

    SOP-P3-2 - SQT Staff Induction

    SOP-P3-3 - SQT Staff Development

    SOP-P3-4 - SQT Organisation

    WI-010-Staff Recruitment & Development

  • 7/31/2019 SQT Quality Manual

    16/82

    Procedure Title: SOP-P3-1 Staff Recruitment and Allocation Rev 2

    SOP-P3-1

    Purpose: This procedure describes how SQT Training recruits, allocates and monitors new members to the

    Staff Involved: Managing Director, Programme Managers/Tutors, Administrative Staff

    Method(s) used to carry out this procedure Who does it Evidence generated

    Website (Vacancies section) Marketing Manager Current Website

    Selection of Programme Managers/Tutors Managing Director

    ProgrammeManagers

    Details of Academic

    Meeting minutes

    References

    Tutor Business Agr

    Course Tutors Competency Criteria to ensure trainers areselected for their academic, training and practical hands-onexperience relevant to their field of training.

    Managing Director Programme Delivercourse tutors

    Course Assessmen

    Selection of Administration Staff Managing Director Job Advertisements

    Job Descriptions

    Applicant CV Datab

    Shortlists of Applic

    Interview Records

    Monitoring

  • 7/31/2019 SQT Quality Manual

    17/82

    Procedure Title: SOP-P3-1 Staff Recruitment and Allocation Rev 2

    SOP-P3-1

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director Per Course Review Course Assessment Forms per tuto

    Managing Director Every 6 months Review Meeting with Programme Managers

  • 7/31/2019 SQT Quality Manual

    18/82

    Procedure Title: SOP-P3-2 Staff Induction Rev 2

    Purpose: This procedure describes how SQT Training provides induction training

    Staff Involved: Administration Staff, Programme Managers, Tutors, Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    Meetings/Induction Pack for all new ProgrammeManagers/Tutors

    Induction training for all new Administration staff

    Competent Staff Minutes meetings

    Training Records

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director Weekly KPI performance

    SOP-P3-2

  • 7/31/2019 SQT Quality Manual

    19/82

    Procedure Title: SOP-P3-3 Staff Development Rev 2

    Purpose: This procedure describes how SQT Training ensures that our staff training, development and supaddressed.

    Staff Involved: Administration Staff, Tutors, Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    Review of training, development and support needs Managing Director Review meetings toratings/feedback antraining and develo

    Training Plan

    Training budget

    Consultancy Tutors Various Data

    Attendance on training Courses All Updated Tutor CVs

    Training Records

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director 6 monthly Review meetings with Tutors/Administration

    SOP-P3-3

  • 7/31/2019 SQT Quality Manual

    20/82

    Procedure Title:SOP-P3-4

    SQT Organisation Rev 5 Date: 25 Nov08

    SQT Governing Body

    Academic Committee Examination Board SQT AdministrationTutors

    SQT Governing Body

    Lily Collison MA, MSc

    Siobhan Cunningham ND Electronics

  • 7/31/2019 SQT Quality Manual

    21/82

    Procedure Title:SOP-P3-4

    SQT Organisation Rev 5 Date: 25 Nov08

    SQT Academic Committee

    There are ten SQT Academic Committees. The Academic Committees report to the SQT Governing

    Body.

    In each case, the Academic Committee consists of the relevant Programme Manager and SQT

    Director. The current Programme Managers are as follows:

    Subject Area Programme Manager

    Six Sigma / Lean John RyanContinual Process Improvement Albert Plant

    Project Management Liam Dillon

    Quality / Health & Safety / Environment / Management Systems /Energy Management

    Gerry Higgins

    Occupational Health Gloria Grace

    Leadership & Personal Development Skills Janet Grene

    Food Safety / Nutrition Denis Kiely

    Laboratory Liam O'hAlmhain

    Healthcare 1 Mary Rose O'Mahony

    Healthcare 2 John Lafferty

    Role of the Academic Committee

    The Academic Committee is responsible for all aspects of the academic integrity of all

    programmes/courses. A number of formal meetings of the committee are held to ensure

    compliance with SQT and relevant external procedures.

    For the approval of new programmes, the Academic Committee for that subject area meets each

    time there is a proposal to ensure that it is designed and approved in accordance with SOP-P5-2.

    For the ongoing monitoring of programmes, the Academic Committee for HETAC accreditedcourses meets twice per year to conduct the biannual review in accordance with SOP-P5-1. For

    other courses, the Academic Committee meet at an appropriate frequency.

    SQT Examination Board HETAC accredited courses

    The SQT Exam Board consists of:

    - SQT Director

    - SQT Examination Secretary- Relevant Programme Manager- Relevant External Examiner

    SQT Examination Board FETAC accredited courses

  • 7/31/2019 SQT Quality Manual

    22/82

    Procedure Title:SOP-P3-4

    SQT Organisation Rev 5 Date: 25 Nov08

    The SQT Exam Board (Results Approval Board) consists of:

    - SQT Director- SQT Examination Secretary

    Role of SQT Examination Board:

    - Ensure the fair and consistent assessment of learners

    Role of External Examiner:- Moderate assessment process to ensure fair and consistent assessment of learners- Evaluate effectiveness of assessment of learners to ensure compliance with awarding bodys

    standards

    - Issue annual external examiners report

  • 7/31/2019 SQT Quality Manual

    23/82

    Procedure Title:SOP-P3-4

    SQT Organisation Rev 5 Date: 25 Nov08

    SQT Administration

    Eilish CumminsCourse / Systems

    Manager

    Aishling KellyCourse/Marketing

    Manager

    Lisa KeatingCourse Manager

    Kim FeehanAccounts

    Administrator /Course Manager

    Frances KilleenCourse Materials

    Manager

    Margie SheehanCourse Materials

    Mgt. SystemDevelopment

    Process Efficiency

    IT SystemAdministration, Server,

    Network, Telephone

    Website / AccessMaintenance

    Outside Agency ExamSecretary Co -ordinator

    Database Administration

    Marketing Administration(Mailshots, Faxshots,

    Calendar)

    Website / AccessMaintenance

    In-House Sales / AdminPublic Courses Sales/

    Admin

    Searches/Key words/speed

    Website Development

    In-House Sales / AdminPublic Courses Sales/

    Admin

    QuickbooksAdministration

    Accounts PayableAccounts Receivable

    Procurement AdminSuppliers/Pricing Neg

    Master LibraryMaintenance

    Course Manual PrepCourse Training Kits

    PhotocopierMaintenance

    Course Manual PrepCourse Training Kits

    PhotocopierMaintenance

    In-House Sales /Admin

    Public Courses Sales/Admin

    Tutor ReportingCourse Quality Metrics

    Marketing Administration(Mailshots, Faxshots)

    Public Courses Sales/Admin

    In-House Sales / Admin

    SQT Administration Staff

    Sinead ClintonCourse Manager

    Public Courses Sales/Admin

    In-House Sales / Admin

    Ann GriffinCourse Materials

    Course Manual PrepCourse Training Kits

    PhotocopierMaintenance

  • 7/31/2019 SQT Quality Manual

    24/82

    Section 4

    Access Transfer and

    Progression

  • 7/31/2019 SQT Quality Manual

    25/82

    SQT-P4 Rev 3

    Access, Transfer and Progression Policy

    SQT Training aim to ensure that all potential learners can avail of fair and transparent entry

    arrangements to all courses. This will be achieved by providing learners with accurate and

    reliable information that will enable them to plan their learning on the basis of clear

    understanding of information such as the awards available, the objectives of the courses, themain subject matters covered and timescales involved.

    As a provider of Special Purpose/Minor FETAC/HETAC Awards, at present SQT Training

    does not grant credits for recognition of prior learning. We are committed to meeting

    FETAC/HETAC requirements in this regard.

    Relevant Procedures and Work Instructions are:

    SOP-P4-1 - SQT Information Provision

    SOP-P4-2 - SQT Learner Entry Arrangement

    WI-003-Communications-Marketing to Customers

    WI-024-Review of Course Applications

  • 7/31/2019 SQT Quality Manual

    26/82

    Procedure Title: SOP-P4-1 Information Provision Rev 2

    Purpose: This procedure describes how SQT Training ensures that learners have sufficient information on associated services to allow them to make informed choices

    Staff Involved: SQT Administration Staff, Programme Manager, Tutors, Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    Course Brochures

    These give an overview of the course, the mainlearning objectives of the course and a description of

    the types of learners e.g. job function, priorknowledge/experience etc. who should considerattending.

    These also identify any certificates or professionalqualifications that will be achieved by attending thecourse.

    Discussion with delegates at course booking stage on coursecontent and assessment methods

    Introduction to course by tutor at course commencement

    Administration Staff

    Administration Staff

    Course Tutor

    Course Description

    Course Objectives

    Who should attend?Assessment Metho

    6-monthly calendar (dates, locations, durations, costs) Marketing Manager Calendar records (o

    Website Marketing Manager Current website (ww

    SOP-P4-1

  • 7/31/2019 SQT Quality Manual

    27/82

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director /

    Programme Manager

    6 monthly Review of course brochures prior to publica

    calendars

    SOP-P4-1

  • 7/31/2019 SQT Quality Manual

    28/82

    Procedure Title: SOP-P4-2 Learner Entry Arrangements Rev 2

    Purpose: This procedure describes how SQT Training ensures that learner entry requirements are clearly iprospective delegates and these arrangements are fair and transparent.

    Staff Involved: Administration Staff, Programme Managers and Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    Course Brochures

    These give an overview of the course, the main learning

    objectives of the course and a description of the types oflearners e.g. job function, prior knowledge/experience etc.and who should consider attending.

    Training proposals also identify any maximum coursedelegate numbers.

    Administration Staff Course Description

    Course Objectives

    Assessment Metho

    Who should attend?

    6-monthly calendar (dates, locations, durations, costs) Marketing Manager Calendar records (o

    Website Marketing Manager Current website (ww

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director/Programme Managers

    6 monthly Review of course brochures prior to issuing

    SOP-P4-2

  • 7/31/2019 SQT Quality Manual

    29/82

    Section 5

    Programme

    Development, Delivery

    and Review

  • 7/31/2019 SQT Quality Manual

    30/82

    SQT- P5 Rev 3

    Programme Development, Delivery and Review Policy

    SQT Training aim to ensure that the courses they offer are developed, delivered and

    reviewed consistently, professionally and safely. SQT Training believe that programme

    development and delivery should focus on a number of critical criteria, namely;

    Identification of learner needs i.e. knowledge, skills and behaviour to be disseminated.

    Development of effective evaluation methods to assess learning achieved.

    Determination of learning methodologies that facilitate the learning process.

    Generation of learning materials of the highest quality.

    Delivery of programmes in a relevant, competent and consistent manner in a safe

    environment.

    To this end, SQT Training has developed detailed guidelines and procedures that detail the

    processes required when developing, delivering and reviewing approved programmes.

    SQT Training pay particular attention to the feedback of our learners, staff and tutors as a

    method of identifying opportunities to continually improve the quality and effectiveness of the

    courses and services we deliver.

    Relevant Procedures and Work Instructions are:

    SOP-P5-1 Ongoing Monitoring of Programmes (Programme Review)

    SOP-P5-2 Programme Development

    SOP-P5-3 Programme Delivery and Maintenance of Learner Records

    WI-002 Public Course Administration

    WI-005 In-House Course Administration

    WI-006 Management of Course Materials

    WI-007 Course Assessment Forms

    1

  • 7/31/2019 SQT Quality Manual

    31/82

    Procedure Title: Ongoing Monitoring of Programmes Rev 2 Date: 26 NovSOP-P5-1 (Programme Review) 2008

    1.0 PURPOSE

    To outline the process to be applied for ongoing formal monitoring of SQT training

    courses.

    2.0 DEFINITIONS

    Programme Review The process whereby SQT reflects on its courses to ensure

    their continued relevance

    3.0 PROCEDURE

    3.1 Ongoing monitoring of Programmes is carried out in two ways:

    - Weekly Programme Review

    - Biannual Programme Review for HETAC accredited courses. At

    appropriate frequency for all other courses

    3.2 The Weekly Programme Review is conducted to monitor the performance of each

    individual course immediately following delivery. The Course Assessment Forms

    (completed by the Learners on the course), are reviewed by the Tutor, the Course

    Manager and the SQT Director. The Tutor report is reviewed by the Course Manager

    and the SQT Director. The feedback from these reviews are actioned and changes

    made to course materials/delivery where appropriate. Quality course ratings are

    inputted into weekly KPIs which are reviewed at weekly meetings.

    3.3 The Biannual Programme Review is conducted by the Academic Committee after the

    January to June and July to December delivery periods (and at other times as

    deemed necessary). The Academic Committee shall review SQTs training and

    development portfolio to ensure its current offerings continue to be relevant to

    learners and match the need of the markets and sectors it serves. This review shall

    include that courses remain current and valid in the light of developing knowledge in

    the discipline and practice of its application.

  • 7/31/2019 SQT Quality Manual

    32/82

    Procedure Title: Ongoing Monitoring of Programmes Rev 2 Date: 26 NovSOP-P5-1 (Programme Review) 2008

    3.4 Inputs to Biannual Programme Review include :

    Feedback from awarding bodies ( eg IRCA, NEBOSH, IOSH, FETAC, HETAC, IEMA,

    ILM)

    Tutor reports

    Course Assessment Forms (completed by Learners)

    KPIs (Key Performance Indices, completed weekly)

    PINs (Potential for Improvement Notices)

    Assessment Pass Rates

    Review of course brochure

    Verbal/written communications from companies who book learners onto training

    courses

    Feedback from SQT Tutors and Course Managers

    Review of new developments in training delivery

    Research into programmes offered by other providers

    3.4 Outputs from Biannual Programme Review include:

    No change to existing course. A hard copy of the course brochure will be signed by

    the Managing Director and Programme Manager as evidence of the course brochure

    having been reviewed and no change required.

    Plans for changes to existing courses. (Plans for changes will be submitted to

    awarding bodies as required)

    Plans for design of new courses. (Ref SOP-P5-2)

  • 7/31/2019 SQT Quality Manual

    33/82

    Procedure Title: Programme Development Rev 4 Date: 15 Jan 08SOP-P5-2

    1.0 Purpose

    To outline the process for Programme Development within SQT Training.

    Programme Development is carried out in two phases:

    Design, development and approval of Course Specification (For HETAC approved

    courses, the Programme Submission Document is the course specification. For

    other SQT courses, the course brochure is the course specification.)

    Design, development and approval of Course Materials

    2.0 Definitions

    Academic Committee SQT Managing Director and Programme Manager in

    that subject area

    Course Manager The individual assigned with the administrative

    responsibility for a course

    Programme Manager The individual assigned with the academic

    responsibility for a group of courses. (This person may

    also be the tutor and the subject matter expert)

    Course Material This includes Delegate manuals; Tutor Manuals;

    Powerpoint slides; Case study (where applicable);

    Assessment (where applicable); Standards (where

    applicable); Handouts. etc.

    Master Course A master list of courses. This shows SQTs current

    Register portfolio of courses. It is maintained on SQTs access

    database

    Programme Submission The Document describing a course in detail submitted

    Document to HETAC for course approval

    Course Brochure Course specification including background, courseobjectives, who should attend, course programme,

    course tutor and course times

  • 7/31/2019 SQT Quality Manual

    34/82

    Procedure Title: Programme Development Rev 4 Date: 14 Jan 08SOP-P5-2

    Course File File containing course specification; design and

    development review meeting minutes; course approval

    letters etc.

    3.0 Design, Development and Approval of Course Specification

    The following flowchart provides an overview of the process for the design,

    development and approval of new or revised course specifications.

  • 7/31/2019 SQT Quality Manual

    35/82

    Procedure Title: Programme Development Rev 4 Date: 14 Jan 08SOP-P5-2

    Process

    Create Course

    Design Specification

    Approved ?

    No

    Make Amendments

    Yes

    Record

    Communication from

    Outside Body / Customer

    Course File

    Course Design

    Specification

    Specification Sign

    Off

    Responsibility

    Academic Committee

    Programme Manager

    Academic Committee

    Idea

    Open Course File

    Market Demand/

    Demand for

    Change(s)

    External Approval

    Required ?

    Correspondence

    from External Body

    Systems Manager

    Academic Committee

    Design, Development and Approval of Course Specification

    Submit to External

    Body

    Approved ?

    No

    Make Amendments

    Yes

    Managing DirectorCorrespondence

    from External Body

    No

    Yes

    Add to Master

    Course Register

  • 7/31/2019 SQT Quality Manual

    36/82

    Procedure Title: Programme Development Rev 4 Date: 14 Jan 08SOP-P5-2

    3.1 Ideas for the development of new courses come from Customers, Course Tutors,

    Programme Manager, SQT Director or Course Manager. They often result from the

    ongoing monitoring of courses (SOP P5-1).

    3.2 Each proposal is evaluated by the Academic Committee for the course to see if it

    satisfies the following criteria:

    Relevance of course to SQTs mission statement and strategic plans

    Alignment with National Framework of Qualifications

    Accreditation body requirements

    Relevance of the course to the Irish, European and International

    labour markets

    Learner demand for course

    Implications of providing new courses including human resources, IT

    requirements, financial implications, physical and support facilities

    Relationship of proposed course to be developed with other courses

    offered by SQT.The outcome of this deliberation can be to approve the development of a new

    course.

    3.3 When the decision has been taken to develop a new course, a course file shall be

    opened under the Systems Manager, and shall be updated as design and

    development progresses.

    3.4 The Programme Manager shall create a course specification.

    3.5 (a) A design review meeting shall be held by the Academic Committee to approve all

    newly developed course specifications. Minutes shall be maintained to record all

    actions identified and agreed.

    (b) If a course specification is not approved, the Programme Manager is responsible

    for making any necessary amendments and the revised course specification is

    resubmitted to the Academic Committee. The course file shall be updated

    accordingly.

  • 7/31/2019 SQT Quality Manual

    37/82

    Procedure Title: Programme Development Rev 4 Date: 14 Jan 08SOP-P5-2

    3.6 For courses requiring external accreditation (e.g., IRCA, NEBOSH, IOSH, IEMA, ILM,

    FETAC, HETAC), the Managing Director is responsible for ensuring that all

    accreditation requirements of the external body are met.

    3.7 Design, Development and Approval of Course Materials

    The following flowchart provides an overview of the process for the design,

    development and approval of course materials.

    Develop Course Material

    Approved ?Make AmendmentsNo

    Yes

    1st Course Delivery(Pilot)

    Course Management

    Review

    Approved NoMake Amendments

    Yes

    Course

    Material

    Review

    Minutes

    Course

    Assessment Forms

    & Tutor Report

    Review

    Minutes

    Programme Manager / Tutor

    Programme Manager

    Academic Committee

    Academic Committee

    Academic Committee

    Course File

    Course Master

    Register

    Course Approved

    Tutor

    All ongoing requirements of

    external body, (e.g.,

    HETAC, FETAC etc.) met.

    Managing Directore.g. Self

    Evaluation

    Report, External

    Evaluation Report

    Design, Development and Approval of Course Materials

  • 7/31/2019 SQT Quality Manual

    38/82

    Procedure Title: Programme Development Rev 4 Date: 14 Jan 08SOP-P5-2

    3.8

    e

    d

    nning of assessment to

    nsure that the course meets its intended learning outcomes. Refer to procedure

    3.9

    first course delivery for inclusion in the course management

    review. Learner Course Assessment Forms shall be maintained and subject to a

    3.10 e

    ms, and

    tutor feedback but shall include a rigorous review of delegate and tutor manuals.

    .13 Any actions arising from a Course Management Review shall be implemented by the

    .1 The use of any copyrighted marks for advertising is agreed in advance with the

    The Programme Manager shall develop the relevant course material working with

    other subject matter experts where appropriate. Where tutors other than the

    Programme Manager will be involved in course delivery, they should be involved

    where practical in the course development. All new course material shall be

    consistent with the layout and style of existing material and should be electronically

    backed-up at regular intervals during course development. Development of course

    material shall include consideration of mode of delivery and pedagogy relevant to th

    course (skills and knowledge required in the science and principles of education an

    training). Development of course material shall include pla

    e

    SOP-P6-1 Fair and Consistent Assessment of Learners.

    In all cases, the Programme Manager is responsible for briefing Tutor(s) prior to

    delivery. Tutor(s) shall be responsible for making appropriate notes, in the Tutor

    Report, during the

    rigorous review.

    The Programme Manager shall convene a Course Management Review following th

    first delivery of a new course. The purpose of the review shall not be limited to

    reviewing the performance of the course, Learner Course Assessment For

    Minutes of such reviews shall be maintained and stored in the course file.

    3

    Programme Manager.

    4 ADVERTISING

    4

    relevant agency/body.

  • 7/31/2019 SQT Quality Manual

    39/82

    Procedure Title:SOP-P5-2

    Programme Development Rev 4 Date: 14 Jan 08

    4.2 Any promotion, advertising of approved courses is agreed in advance between SQT

    and the relevant awarding body (eg IRCA, NEBOSH, IOSH, FETAC, HETAC, IEMA,

    ILM).

  • 7/31/2019 SQT Quality Manual

    40/82

    Procedure Title:SOP-P5-3

    Programme Delivery andMaintenance of Learner Records Rev 4 Date: 1 Oct

    2008

    1.0 PURPOSEThis procedure describes the process for delivery of SQT courses andmaintenance of learner records.

    3.0 DEFINITIONS

    N/A

    4.0 PROCEDURE

    4.1 Course Planning

    4.1.1 The Managing Director/Marketing Manager shall develop a 6-monthlytraining calendar with Programme Managers in approximately Marchfor the forthcoming July to December calendar and October for theforthcoming January to June calendar.

    4.1.2 The Course Manager shall confirm all public course dates with tutorsvia a course confirmation sheet which the relevant tutor signs. TheCourse Manager is responsible for booking of training facilities (hotels)for public courses.

    4.1.3 The Marketing Manager is responsible for the production anddistribution of the training calendar and course brochures. The mostup-to-date copy of each course brochure is available on the website.

    4.1.4 The Course Managers are responsible for managing the bookingprocess with customers for both public and in-house courses.

    4.1.5 For public courses, tutors may need to contact a prospective delegateto discuss specific technical elements of a course, in advance of adelegate making a booking,

    4.1.6 For all in-house courses, the Tutor must contact the client company atleast two weeks in advance of the course to discuss and confirm thecourse content. For courses with on-site practical work e.g. InternalAudit, the tutor must also obtain relevant documentation, procedures,etc

    4.1.7 All course material should be submitted to SQT at latest 10 workingdays to course delivery. Materials should be submitted as follows;

    1. MANUALEach manual will show a revision level. This revision level will be

    referenced on the Contents Page of the manual (ideally as a footer atthe bottom of the page)

  • 7/31/2019 SQT Quality Manual

    41/82

    Procedure Title:SOP-P5-3

    Programme Delivery &Maintenance of Learner Records

    Rev 4 Date: 1 Oct 2008

    2. TABLE OF CONTENTS PAGEEach manual should have a table of contents page - this contents pageshould contain the "manual revision" as the footer. The course table ofcontents contains the course title, plus a list of all course material,notes and slides.

    The following headings are ideally required for the Contents

    Section No

    Section TitleReference No (if relevant)Rev NoNo of Pages

    3. SECTIONS IN THE MANUALEach Section within the manual is to reflect the Contents Page - itshould contain;a) Title of the Section on page 1. Each page of the section shouldcontain a "footer" with the following information;b) Reference - this can be an abbreviation of the section title or aunique numberb) Rev Level of section -again a unique number or date, which willchange as amendments to the section are carried outc) Page numbers as follows. This format would be best. (WordDocuments : 1 of 66, 2 of 66 etc), (PowerPoint Documents : 1 of 66, 2of 66 etc Slide No's)

    4. LAYOUT OF TEXT/SLIDE FOR EACH SECTIONIf using Word Documents - maintain a 3 cm Margin on the Left Handside of the page to facilitate the punching process

    If using PowerPoint Documents - Ideally Print with 2 slides to a page or1 Slides with Notes sections below. If printing One slide to a page,please ensure it has a 3 cm border from the edge to be punched toavoid infringement on the slide text.

    4.1.8 The Material Manager maintains a master copy of course materialcontaining the most up-to-date revision and old versions are madeobsolete.

    4.1.9 The Materials Manager is responsible for supplying copies of all

    relevant course material including manuals, course assessment forms,

  • 7/31/2019 SQT Quality Manual

    42/82

    Procedure Title:SOP-P5-3

    Programme Delivery &Maintenance of Learner Records

    Rev 4 Date: 1 Oct 2008

    smile cards, writing instruments, etc. direct to the training courselocation/venue.

    4.1.10 The Materials Manager is responsible for providing the tutor with acopy of the course notes for his/her own use during the course.

    4.1.11 If a course contains pre-course material, it is the responsibility of theCourse Manager to forward it to all confirmed delegates in a timelymanner, in advance of course commencement.

    4.1.12 All course material is to be produced to a consistently high qualitystandard and presented in SQT presentation folders.

    4.1.13 The Tutor is responsible for double-checking and ensuring that thecorrect issue and revision of the relevant powerpoint slides are on thelaptop, and a backup copy is available. The Tutor is responsible forensuring that all presentation equipment needed is available andworking.

    4.1.14 If a decision is taken by the Course Manager not to proceed with apublic course (mainly as a result of insufficient delegate numbers),delegates are contacted and offered a transfer to a similar course onanother date or course fees are refunded.

    4.1.15 Where reasonable, learners will be accommodated and facilitated toundertake courses with SQT without prejudice.

    4.1.16 Special requirements should be flagged to SQT prior to a learnerbooking a place on an SQT Training programme so that all efforts willbe made to fully accommodate any special needs and conditions in aco-ordinated and planned way.

    4.1.17 SQT Training will accommodate non-English speaking learners wherethis is reasonable. Translators are welcome once a request is madeprior to booking a place on a course and once the translator isapproved by SQT Training.

    4.1.18 Where there is a demand for our courses to be delivered in a foreignlanguage (non-English), SQT Training will endeavour to provide thisthrough the use of approved translators.

  • 7/31/2019 SQT Quality Manual

    43/82

    Procedure Title:SOP-P5-3

    Programme Delivery &Maintenance of Learner Records

    Rev 4 Date: 1 Oct 2008

    4.2 Training Facilities & Resources (incl Health & Safety)

    4.2.1 The Course Manager is responsible for selecting course venues whichmust satisfy SQTs training and development requirements. Onlyvenues which satisfy this specification shall be approved and used

    4.2.2 Public Training locations are required to provide adequate facilities and

    equipment to ensure the health and safety of both SQT tutors andlearners and any non-adherences to this rule should be recorded onthe Course Tutor Report so that immediate corrective action can beimplemented. SQTs Safety Statement ( SQT P10) and Incident &Accident Reporting and Investigation procedures (SOP-P10-1) apply toall SQT specified training locations.

    4.2.3 All public training locations must facilitate full and easy access to alllearners regardless of physical disability.

    4.2.4 For in-house courses, the Course Manager will work closely with the

    client organisation to ensure that the training venue specifications aremet. Responsibility for ensuring these requirements are delivered lieswith the client organisation.

    4.2.5 All SQT public training facilities are set up as per Training FacilitiesSpecification S-001 unless otherwise specified by Course Tutor. Theset-up is designed to maximise learner involvement in the trainingprocess and tutor interaction with delegates.

    4.3 Course Delivery

    4.3.1 At the start of each course the Tutor must cover health and safetyprecautions to be followed during the course, point out fire exits, etc.

    4.3.2 Each delegate who attends a course receives a delegate manual whichincludes a copy of the slides/notes used throughout the course.Handouts may be provided and retained by delegates.

    4.3.3 All course assessment must be carried out per SOP-P6-1 (Fair &Consistent Assessment of Learners).

  • 7/31/2019 SQT Quality Manual

    44/82

    Procedure Title:SOP-P5-3

    Programme Delivery &Maintenance of Learner Records

    Rev 4 Date: 1 Oct 2008

    4.4 Learner Records

    4.4.1 Delegates must complete a Course Assessment Form on completion ofthe course. The tutor collects the completed forms and returns them tothe Course Manager for analysis and review.

    4.4.2 At each public course the Tutor must mark the delegates attendancelist to indicate all delegates present. On in-house courses anattendance list must be passed around and the tutor should confirmthat all those in attendance have their names accurately recorded. Adatabase of attendees on both public and in-house courses ismaintained by course title and date in SQT Training.

    4.4.3 All delegates are issued with an SQT Certificate of Attendance.Records of all certificates issued by SQT Training shall be maintained.

    4.4.4 Any data required by any outside body for production of awards,funding of courses, statistical analyses etc (eg FAS, FETAC, ChambersBusiness School) must be collected. The Exam Secretary or CourseManager is responsible for informing the tutor of same.

    4.5 Course Performance

    4.5.1 The tutor report affords the tutor with the opportunity to reflect on andreview the effectiveness of his/her work and seek improvement. Fromthe course assessment forms any specific delegate comments whichcould improve course performance should be included in the Tutorreport and used as an input to subsequent course reviews.

    4.5.2 From the Learner Course Assessment Forms, the Course Manageranalyses and prepares a score for each course delivered.

    4.5.3 On In-House training courses, feedback from the course organiser issought by telephone first and failing that by email. (The courseorganiser may/may not have actually attended the course).

    4.5.4 The Course Manager shall bring to the Managing Directors immediateattention any adverse course performance gleaned from any of thesources above. The PIN system shall be used for corrective action.

    4.5.5 If a course does not achieve the desired minimum rating of 4.0 then adiscussion will take place between the course manager and the tutorand a PIN raised (Performance Improvement Notice). In certain

    circumstances, at the discretion of course manager/tutor and subject tono adverse comments being received on the course assessment forms,

  • 7/31/2019 SQT Quality Manual

    45/82

    Procedure Title:SOP-P5-3

    Programme Delivery &Maintenance of Learner Records

    Rev 4 Date: 1 Oct 2008

    a PIN will be deemed to be unnecessary, notwithstanding the fact thatthe overall score was less than 4.0.

    4.5.6 The details of any enquiries re courses received directly by tutors shallbe given to the Course Manger for processing

    4.5.7 When visiting a client company, where possible, the Tutor is toascertain the correct contact person for the following functions; training,environment, quality, and health and safety and complete theInformation Sheet. This information is used to ensure the customer

    contact details are kept up to date on the SQT Training database.

  • 7/31/2019 SQT Quality Manual

    46/82

    Section 6

    Fair and consistent

    assessment of learners

  • 7/31/2019 SQT Quality Manual

    47/82

    SQT- P6 Rev 4

    Fair and Consistent Assessment of Learners Policy

    SQT Trainings policy is that all learners should receive fair and consistent assessment of

    their achievement of the learning objectives defined for our programmes.

    SQT Training has developed guidelines and procedures describing in detail the approach to

    be taken when assessing learners on approved programmes.

    Learners will be made aware of the methods of assessment and their responsibilities for

    achieving and demonstrating the achievement of the required knowledge and skills.

    Special circumstances of students will be taken into consideration and our procedure will

    detail guidelines for approaches and acceptable facilitation of special needs.

    Evidence of assessment will be maintained where appropriate to allow verification and

    validation of the assessment process by both internal and external agencies and for review

    in the case of appeal by learners.

    External Examiners and External Authenticators will be appointed in accordance with SOP-

    P6-1. They will moderate for all HETAC and FETAC courses respectively.

    Relevant Procedures and Work Instructions are:

    SOP-P6-1 - SQT Fair and Consistent Assessment of Learners

    SOP-P5-3 - SQT Programme Delivery & Maintenance of Learner Records

    WI-023-Fair and Consistent Assessment of Learners on HETAC accredited courses

    WI-025-Fair and Consistent Assessment of Learners on FETAC accredited courses

  • 7/31/2019 SQT Quality Manual

    48/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    Purpose: The purpose of this procedure is to ensure that fair and consistent assessment of learners is provide

    Staff Involved: Administration Staff, Programme Manager, Tutors, Examination Secretary, External examine

    Method(s) used to carry out this procedure Who does it Evidence gen

    SQT manage exams/awards by a number of awarding bodies.The exact requirements of each awarding body will be followedto ensure that the assessment process for each awarding bodyis managed effectively and efficiently.

    6.1 Coordinated Planning of Assessment

    Assessments are planned at programme design stage to ensurethat they reflect the course content, delivery and the needs oflearners.

    Detailed Work Instructions covers HETAC accredited courses(WI-023) and FETAC accredited courses (WI-025)

    Examination Secretary

    Managing Director

    Programme Manager

    Managing Director

    Examination Secretary

    Course Desigminutes

    Assessment R

  • 7/31/2019 SQT Quality Manual

    49/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    6.2 Information to Learners

    Detailed information for assessment of learners is available:

    - In the course brochure

    - On the SQT website www.sqt.ie and

    - During the delivery of the training courses.

    Tutors

    Course Managers

    Examination Secretary

    Course Broch

    SQT Website

    Training progr

  • 7/31/2019 SQT Quality Manual

    50/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    6.3 Security of Assessment Related Processes and Material

    All assessment masters are securely stored in SQT Trainingunder the specific Course file and with the course tutor.Learners do not have access to assessment modules prior tothe assessment.

    The SQT tutor or SQT administrator directly supervises allassessments either during course or after course completion asappropriate.

    Learner assessment material is sent by registered post or it isdirectly hand transmitted by the tutor to the SQT office and viceversa

    Records of assessment for each delegate are maintainedsecurely in hard copy files under course name and number.

    Results of assessments are maintained electronically andbacked up onto removable media for storage.

    Assessment records, whether electronic or paper aremaintained for 3 years.

    Tutors

    Examination Secretary

    Assessment m

    Project/Assign

    Course Asses

    SQT Access R

  • 7/31/2019 SQT Quality Manual

    51/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    6.4 Reasonable Accommodation

    Where reasonable, learners will be accommodated andfacilitated to undertake assessment without prejudice.

    Special requirements should be flagged to SQT prior to alearner booking a place on an SQT Training programme so thatall efforts will be made to fully accommodate any special needsand conditions in a co-ordinated and planned way.

    Details on reasonable accommodation are available on SQTwebsite

    Tutors

    Course Managers

    Exam Secretary

    SQT Website

    Training of sta

    Management

    6.5 Consistency of Marking between Assessors

    SQT will endeavour to ensure that assessors are markinglearner assessments in a consistent fashion.

    For example on a random audit basis, a tutor not directlyinvolved in the course assessment process, will independentlyreview assessment results to ensure the consistency of markingof paper based assessments. This audit e.g., will evaluate if theassessment is following the model answers and markingschemes for that specific course.

    This role is also fulfilled by the External Examiner on HETAC

    courses and External Authenticator on FETAC courses

    Tutors

    External Examiner(HETAC)

    External Authenticator(FETAC)

    Records of As

    Reports of ExAuthenticator

    6.6 Assessment performed by Third Parties

    At present assessments are not carried out by 3rd partiesemployed by SQT Training.

    Managing Director N/A

  • 7/31/2019 SQT Quality Manual

    52/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    6.7 Internal Verification

    6.8 External Authentication / External Examiner

    SQT operate all FETAC assessments per FETAC guidelines.Refer to WI-025

    SQT operate all HETAC assessments per HETAC guidelines.Refer to WI-023

    Internal Verific

    Reports of ExAuthenticator

    6.9 Feedback to Learners

    Learners are given timely feedback on their performance

    directly by tutors during course delivery.Learners are given timely feedback on results of theirassessment by SQT Exam Secretary. Refer to WI-025/WI-023

    Tutors

    Exam Secretary

    Statement of r

    6.10 Learner Appeals

    The Learner appeals process is documented on the SQTwebsite for FETAC and HETAC assessment processes.

    The Learner appeals process is documented on the NEBOSHwebsite for the NEBOSH assessment process.

    Tutors

    Exam Secretary

    Course Managers

    External Examiner(HETAC)

    External Authenticator(FETAC)

    Records of ap

    Records of de

  • 7/31/2019 SQT Quality Manual

    53/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    6.11 Results Approval

    All approved results will be submitted to FETAC and HETAC bythe Exam Secretary per FETAC and HETAC guidelines and WI-023 and WI-025

    Exam Secretary

    Managing Director

    Results record

    6.12 Corrective Action

    Any non-conformance identified during the assessment processwill be recorded on a PIN form (Potential for Improvement). Thiswill identify the course/programme, the date, the details of non-conformance.

    SQT staff will meet to review the non-conformance to determineits validity, root cause and potential impact.

    Based on this meeting a corrective action will be agreed toinitiate immediate response and action required to preventrecurrence of the cause.

    FETAC/HETAC will be notified as required of any identified non-conformance and the agreed corrective actions

    Tutors

    Course Managers

    Exam Secretary

    Managing Director

    PIN forms

    Minutes of Co

    Record of notappropriate)

  • 7/31/2019 SQT Quality Manual

    54/82

    Procedure Title: SOP-P6-1 Fair and Consistent Assessment of Learners Rev 4

    SOP-P6-1

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Tutors

    Course Managers

    Exam Secretary

    Managing Director

    External Authenticator (FETAC)External examiner (HETAC)

    Every six months Course Review Meetings

    Review of Records

    Training Records

    Review of Internal Audit Reports

    Minutes exam board meetingsExternal Authenticator report

    External examiners annual report

  • 7/31/2019 SQT Quality Manual

    55/82

    Work InstructionTitle: WI-023

    Title : Fair and ConsistentAssessment of Learners onHETAC accredited courses

    Rev 4 Date: 12 Aug2008

    Page 1 of 5

    Purpose: This work instruction covers requirements for HETAC accredited coursesover and above requirements specified in SOP-P6-1.

    1.0 SCOPEThis work instruction describes the process for assessment of learners onHETAC accredited Courses

    2.0 REFERENCES / ATTACHMENTSN/A

    3.0 DEFINITIONSN/A

    4.0 RESPONSIBILITYThe Examinations Board is responsible for the fair and consistent assessmentof Learners on HETAC accredited courses. The examinations board willoperate per HETAC guidelines.

    5.1 Assessment of Project Proposal and Written Project Report

    One Lecturer assesses the Project Proposal and Written Project Report. Internalcalibration is carried out between Lecturers by Programme Manager to ensure thereis fair and consistent assessment of Learners.

    5.2 Assessment of Oral Presentation (Black Belt Level 8 and Black Belt Service &Transaction Level 8)

    A Project Presentation day is organised by SQT Training. The Formal OralPresentation is made by the Learner to an audience drawn from:

    Class peers

    Project Champion from the Learners own organisation

    SQT Managing Director, and

    Programme Lecturer

    Marks are allocated by SQT/ASST personnel based on the quality of the Learnerspresentation demonstrating their use and understanding of Six Sigma Methodologyand Tools and their ability to handle questions from the audience. If the audience do

  • 7/31/2019 SQT Quality Manual

    56/82

    Work InstructionTitle: WI-023

    Title : Fair and ConsistentAssessment of Learners onHETAC accredited courses

    Rev 4 Date: 12 Aug2008

    Page 2 of 5

    not have questions, the Programme Lecturer will ask questions of the Learner. Againinternal calibration is carried out by Programme Manager to ensure there is fair andconsistent assessment of Learners.

    5.3 All course Lecturers will meet with the Programme Manager at 6 monthlyfrequency to ensure that there is fair and consistent assessment of Learners. Thepurpose of this meeting is to ensure that there is:

    Common understanding of the marking scheme

    The reliable application of the marking scheme.

    This meeting will be chaired by the Programme Manager

    5.4 Lecturers will submit the results for course assessments in advance of theExamination Board meeting

    5.5 An Examinations Board meeting will be held in the SQT offices twice per year.The attendees at the Examination Board meeting will include:

    SQT Director (Chairman)

    SQT Examinations Secretary

    Programme Manager

    Course Lecturers External Examiner

    The External Examiner will be invited to attend both meetings. Attendance at oneexamination Board meeting per year will be expected.

    5.6 The Examination Board will consider all the examination results to:

    Ensure the fair and consistent assessment of Learners (including butnot limited to: consistency of marking between lecturer, consistency ofmarking between courses, consistency of standards with CourseLevels)

    Consistency of marking with National Standards as applicable

    Role of External Examiner:- Moderate assessment process to ensure fair and consistent assessment of

    learners- Evaluate effectiveness of assessment of learners to ensure compliance with

    awarding bodys standards- Issue annual external examiners report, and- Any other duties or responsibilities set down by HETAC

    5.7 A learner may appeal their result, if they fail. In the event of an appeal, a

  • 7/31/2019 SQT Quality Manual

    57/82

    Work InstructionTitle: WI-023

    Title : Fair and ConsistentAssessment of Learners onHETAC accredited courses

    Rev 4 Date: 12 Aug2008

    Page 3 of 5

    different Lecturer will blind mark the project report. The first and second marks arecompared by the Programme Manager and a decision is made. If the original markstands, the learner will be afforded the opportunity to do further work on their project,within the time constraints of the course. A pass will be awarded either through theoriginal mark being upgraded or the satisfactory resubmission of their project. Thismark will be ratified at the next exam board meeting.

  • 7/31/2019 SQT Quality Manual

    58/82

    Work InstructionTitle: WI-023

    Title : Fair and ConsistentAssessment of Learners onHETAC accredited courses

    Rev 4 Date: 12 Aug2008

    Page 4 of 5

    Flow Chart HETAC Assessment Process

    1 AssessmentTutors conduct assessments precisely per Programme Submission Document

    2 Submitting entries to HETAC. (Learner registration)At least 6 weeks prior to the examinations, (before end October for 15

    thDecember

    exam Board meeting), Examination secretary submits to HETAC: The Learner Registration Declaration Form

    A detailed Fee Breakdown Full fee payment by cheque

    3 HETAC uploads learner files to HETAC database and issues broadsheet inadvance of the exam board meeting date

    4 Agenda for Exam Board meeting sent to Martina Collins

    5 All examination materials for learners are collated by end of Oct in ASST

    6 Internal Verification completed by ASST- Verify that all assessment procedures have been applied- Check all exam marks- Completed Boxes transferred to SQT

    7 SQT enter results on broadsheet, which is presented at exam board meeting

    8 Exam Board meeting is held per HETAC Examination Board MeetingGuidelines. External examiner (and possibly HETAC representative for initialexam board meeting) will be present

    9 SQT send broadsheet to HETAC. Provisional results may be communicatedto Learners.

    10 HETAC uploads broadsheet files to database and issues Result lists to SQTto confirm that data transfer is accurate. Approved results may becommunicated to Learners

    11 HETAC issues Parchments. SQT 100% check each on receipt.

    12 Conferring

  • 7/31/2019 SQT Quality Manual

    59/82

    Work InstructionTitle: WI-023

    Title : Fair and ConsistentAssessment of Learners onHETAC accredited courses

    Rev 4 Date: 12 Aug2008

    Page 5 of 5

    Reference documents:Letter Martina Collins to Lily Collison dated 15

    thMay 2008

    HETAC Awards Office Administration ProceduresExamination Board Meeting GuidelinesHETAC Examinations Marks and Standards 2001Requirements and guidelines for the Order of Conferring, Academic Dress and TestimonialDocumentation

  • 7/31/2019 SQT Quality Manual

    60/82

    Work InstructionTitle: WI-025

    Fair and ConsistentAssessment of Leanerson FETAC accreditedcourses

    Version: 2 Date: 5 Sept08

    Page 1 of 5

    Purpose: This work instruction describes the process of achieving certification forlearners who attend FETAC courses.

    1.0 SCOPEThis work instruction describes the process for administering FETAC learnerassessment evidence through to requesting FETAC Certification.

    2.0 REFERENCES / ATTACHMENTS- N/A

    3.0 DEFINITIONSAssessor / Tutor are interchangeable

    4.0 RESPONSIBILITYThe Exam Secretary is responsible for ensuring this work instruction iseffectively and efficiently implemented.

    5.0 WORK INSTRUCTIONSQT Assessment Process

    Overview: 5 Key Stages

    1. Assessment

    establish and implement assessment policies, processes and procedures devise assessment instruments, marking schemes and assessment criteria assess and judge learner evidence record outcome

  • 7/31/2019 SQT Quality Manual

    61/82

    Work InstructionTitle: WI-025

    Fair and ConsistentAssessment of Leanerson FETAC accreditedcourses

    Version: 2 Date: 5 Sept08

    Page 2 of 5

    2. Authentication Process

    a) Internal verification- verify that all assessment procedures have been applied

    - monitor the outcome of the Assessment Process i.e. the assessment results on a

    sample basis

    b) External authentication- assign an external authenticator per award based on broad award/field of learning

    expertise- external authenticator to moderate assessment results by sampling learner

    evidence according to the providers own sampling strategy

    3. Results Approval establish a Results Approval Panel approve and sign-off assessment results make results available to learners

    4. Appeals Process establish an Appeals Process allow a minimum of 14 days for learners to lodge an appeal of the assessment

    process or result

    process all appeals

    5. Request for Certification submit all learner results to FETAC when doing so, flag results under appeal

    5.1 Assessment Process

    5.1.1 The tutor implements SQT assessment guidelines for FETAC programmes inline with FETAC Assessment Guidelines for Tutors S-018.

  • 7/31/2019 SQT Quality Manual

    62/82

    Work InstructionTitle: WI-025

    Fair and ConsistentAssessment of Leanerson FETAC accreditedcourses

    Version: 2 Date: 5 Sept08

    Page 3 of 5

    5.2 Authentication (Internal Verification)5.1.1 The Internal Verification process involves two key elements:

    A) The Internal verifier (SQTs Exam Secretary) checks that the assessmentprocedures have been applied across the range of assessment activities

    B) confirms assessment results by checking learner evidence exists and

    marks and grades are recorded accurately. Cross checkDelegate Name,Date of BirthPPS NosTotal Marks on Individual Candidate Marking Sheet(s) vs Assignments.Total Individual Candidate Mark Sheet vs Summary Sheet

    C) Complete delegate details under Global/ FETAC / FETAC AssessmentResults - mmm-yy.xls.

    Delegate work is then stored in individual coloured wallets (to distinguish

    course from course) until assessment time.

    5.1.2 Internal Verification is carried out in line with FETACs Guidelines for InternalVerifiers by the Exam Secretary.

    5.1.3 At the end of this process an Internal Verification Report is completed. ThisReport should be made available toa) External Authenticatorb) Results Approval Panel andc) FETAC Monitor, whenever visit is conducted

    5.1.4 Preparation of work for External Authenticator

    a) Create a Roll Class for each course (year and No). Attendee records arekept in date order, so the number each class sequentially starting with theoldest date.

    b) Once an authenticator has been employed, create labels for Roll ClassBoxes using FETAC/Docs Needed at Assessment Time/ExternalAuthenticator Checklist - Master Doc

    c) Create labels which contain, Roll Class, Surname, First Name from

  • 7/31/2019 SQT Quality Manual

    63/82

    Work InstructionTitle: WI-025

    Fair and ConsistentAssessment of Leanerson FETAC accreditedcourses

    Version: 2 Date: 5 Sept08

    Page 4 of 5

    Global/ FETAC / FETAC Assessment Results - mmm-yy.xls for colouredwallets. Add a separate label which has Module Title & Code (Labelsunder FETAC/Docs Needed at Assessment Time)

    d) Box the coloured wallets into their relevant boxes. Using the ExternalAuthenticator Checklist check off the the rest of the information requirede.g. FETAC Module Descriptor, Assignment / Exam Brief, MarkingScheme, etc. Wallets should laid out in alphabetical order by surname for

    easy reference.

    5.2 Authentication (External Authenticator)5.2.1 Ann external authenticator will be employed. Their purpose will be to;

    A) Moderate assessment resultsB) Ensure fair and consistent assessment of learners consistent with

    providers procedures and FETAC requirementsC) Sample learner evidenceD) Produce an external authentication report and sign-off on results

    5.3.2 In the event that an external authenticator has concerns regarding the

    results, he/she will outline their concerns and identifying the irregularitiesfound on their report. SQT will then take appropriate corrective action.

    5.4 Results Approval Panel (Exam Board Meeting)5.4.1 The panel which includes the managing director, tutor (where possible) and

    the exam secretary willa) meet as required to review and approve assessment resultsb) review reports of the internal verification and external authenticationprocessc) agree to the submission of final results to FETAC to request certificationd) identify any issues arising in relation to the results and makerecommendations for corrective action.

    5.5 Processing Appeals5.5.1 Refer to SQT Website Appeals:

    the assessment process, if they perceive any irregularities/inequality inimplementation

    the assessment results (Only approved results can be formallyappealed)

    5.6 Requesting Certification

    5.6.1 Final approved results are submitted to FETAC via the Candidate web entry

  • 7/31/2019 SQT Quality Manual

    64/82

    Work InstructionTitle: WI-025

    Fair and ConsistentAssessment of Leanerson FETAC accreditedcourses

    Version: 2 Date: 5 Sept08

    Page 5 of 5

    systemwww.fetac.net See FETAC Folder at Exam Secretaries desk forinstructions and passwords etc.

    5.6.2 Follow on screen instructions for entering Learner information i.e. name,PPSN etc

    5.6.3 FETAC will issue certificates to all learners

    5.6.4 Following notification of the outcome of the providers appeals process, anew certificate will be reissued if required

    RECORDS

    Title Description Retention period(Where applicable)

    FETACAssessmentsFolder

    Records of learners who havesubmitted evidence forassessment held in FilingCabinet

    Indefinite

    FETACAssessmentBox(es)

    Assessment to be submitted totutor until after the deadline. Inplace at Exam SecretariesDesk

    Indefinite

    FETAC HETACAssignmentReport.xls

    Report to record status ofevidence being assessed byTutor

    Indefinite

    InternalVerificationReport F-027

    Report used to record qualitychecks made by the InternalVerifier

    Indefinite

    ExternalAuthenticationReport F-028

    Report used to record qualitychecks made by the ExternalAuthenticator

    Indefinite

    Results ApprovalProcess Report F-029

    Report used to approve resultsbefore submitting the to FETACfor certification

    Indefinite

    http://www.fetac.net/http://www.fetac.net/http://www.fetac.net/
  • 7/31/2019 SQT Quality Manual

    65/82

    Section 7

    Protection for Learners

  • 7/31/2019 SQT Quality Manual

    66/82

    SQT- P7 Rev 3

    Protection for Learners Policy

    SQT Training is committed to completing courses once they have commenced. In its 18

    years of operation to date, SQT Training has never failed to complete a course once it had

    commenced.

    SQT Training is committed to ensuring that Learners are protected by offering a credit or a

    full refund of fees to companies who book learners on courses in the event of

    cancellation/cessation of a course.

    Relevant Procedures and Work Instructions are:

    SOP-P7-1 - SQT Cessation of Programme

    WI-002-Public Course Administration

  • 7/31/2019 SQT Quality Manual

    67/82

    Procedure Title: SOP-P7-1 Cessation of Programme (Protection for Learners) Rev 2

    Purpose: This procedure describes how SQT Training ensures learners are protected in the event of cance

    Staff Involved: Administration Staff, Managing Director

    Method(s) used to carry out this procedure Who does it Evidence generated

    The main cancellation which occurs on public courses occursprior to Learner commencement on the course due to lownumbers booking on the course. WI-002 Public CourseAdministration covers the procedure to be followed in the

    event of the cancellation of a public course. Delegates areoffered a credit or full refund of fees paid, whichever is theirchoice.

    Should a tutor be forced to exit a course during delivery, wewill endeavour to replace the tutor immediately or completethe course at the nearest available date.

    Course Manager Cancelled Course c

    Email and receipt.

    Monitoring

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director 6 monthly Review of cancelled courses

    SOP-P7-!

  • 7/31/2019 SQT Quality Manual

    68/82

    Section 8

    Sub-contracting /

    Procurement

    Programme Delivery

  • 7/31/2019 SQT Quality Manual

    69/82

    SQT- P8 Rev 2

    Sub-contracting/Procuring Programme Delivery Policy

    SQT Training is committed to ensuring that all our programmes are delivered consistently

    and within the framework of our various policies and procedures. When SQT engage a

    second provider to provide an approved programme we will ensure that they are;

    Competent in the subject matter of the programme and competent to deliver the

    programme.

    Aware of our policies and procedures and their responsibilities under these.

    Have agreed (via contract/written agreement) to follow our approaches and

    requirements defined and detailed within our Quality System.

    Are aware of all requirements for reporting and recording evidence of compliance with

    our policies and procedures.

    Are reviewed and monitored appropriately to ensure compliance.

    At present SQT Training do not sub-contract the delivery of any programme so detailed

    procedures supporting this policy have not been developed at this time.

  • 7/31/2019 SQT Quality Manual

    70/82

    Section 9

    Evaluation of

    Programmes and

    Services/QualityManagement System

  • 7/31/2019 SQT Quality Manual

    71/82

    SQT- P9 Rev 3

    Evaluation of Programmes and Services/Quality Management System Policy

    SQT Training is committed to ongoing periodic evaluation of its training programmes and

    services and auditing of its quality management system to;

    Identify opportunities for improvement.

    Assess the effectiveness of our Policies and Procedures in achieving a consistent and

    high quality service in line with our business goals and objectives.

    Ensure we are meeting commitments and requirements of our business, customers,

    external agencies and staff.

    Evaluations/Audits will be carried out by individuals who are;

    Competent in the activity of evaluation/audit

    Independent of the activity to allow for objectivity and impartiality.

    Professional and systematic in their approach.

    Evaluations/audits will be scheduled and carried out at an appropriate frequency.

    Relevant Procedures and Work Instructions are:

    SOP-P9-1 - SQT Evaluation of Programmes and Services

    SOP-P9-2 - SQT Evaluation of Quality Management System

    WI-004-System Auditing, Preventive, Corrective Action & Customer Complaints

  • 7/31/2019 SQT Quality Manual

    72/82

    Procedure Title: SOP-P9-1 Evaluation of Programmes and Services Rev 2

    SOP-P9-1

    Purpose: This procedure describes how SQT Training evaluates its training programmes and additional su

    Staff Involved: Tutors, Administration Staff, Managing Director, External Evaluators, Learners, Graduates o

    Method(s) used to carry out this procedure Who does it Evidence generated

    Formal evaluations of the provision of courses and relatedservices will be carried out to ensure:

    - Quality improvements are made to courses- Courses remain relevant to learner needs

    Self Evaluation

    The internal phase of evaluation will be a Self Evaluation. TheSelf Evaluation Checklist will be used to evaluate theeffectiveness of the courses and the supporting systems inplace. A Self Evaluation Report will be written based on thefindings of the Self Evaluation. Self Evaluation will be carriedout at frequencies specified by FETAC/HETAC. The SelfEvaluation Report will be forwarded to FETAC/HETAC asrequired.

    Learner Involvement in programme evaluation will befacilitated via the review of completed Course Assessmentforms as well as specific interviews of previous learners.

    Administration Staff

    Tutors

    Managing Director

    Learners

    Graduates

    Self Evaluation Che

    Self Evaluation Rep

    Course AssessmenLearner interviews

    Communications w

  • 7/31/2019 SQT Quality Manual

    73/82

    Procedure Title: SOP-P9-1 Evaluation of Programmes and Services Rev 2

    SOP-P9-1

    External Evaluation

    An External evaluation will be carried out after the SelfEvaluation.

    Selection of External Evaluators SQT will choose people familiar with the courses who canbring support, recognition and positive suggestions forimprovement. The External Evaluators selected will be peoplewho have no personal, professional, academic or businessinterest with SQT that could conflict with their role as ExternalEvaluator. The roles and responsibilities of the external

    evaluator are to ensure that the courses meet national andinternational standards and are in line with the NationalFramework of Qualifications.

    The external evaluators shall review the Self EvaluationReports and conduct their own evaluations. The externalevaluation shall culminate in an External Evaluation Report.SQT can comment on the final draft of the External EvaluationReport before it is formally submitted to SQT for considerationand action. SQT shall forward a copy of the final ExternalEvaluation Report to HETAC/FETAC. SQT will implement anyrecommendations from HETAC/FETAC

    Managing Director

    External Evaluators

    Profiles of chosen E

    External Evaluation

    A Programme Improvement Plan resulting from theProgramme Evaluation Reports will be drawn up highlightingthe areas for improvement to be addressed. The Plan willidentify the priorities for action and detail how, when and bywhom they will be addressed.

    Managing Director

    Administration Staff

    Tutors

    Programme Improve

  • 7/31/2019 SQT Quality Manual

    74/82

    Procedure Title: SOP-P9-1 Evaluation of Programmes and Services Rev 2

    SOP-P9-1

    Monitor (Job Title) Frequency Monitoring Method(s)

    Managing Director On completion Review and take action arising from:

    Programme Self Evaluation Report

    Programme External Evaluation Report

    Programme Improvement Plans

    Recommendations from HETAC/FETAC

  • 7/31/2019 SQT Quality Manual

    75/82

    Procedure Title: SOP-P9-2

    Evaluation of Quality ManagementSystem

    Rev 3 Date: 15 Jan2008

    SOP-P9-1Page 1 of 1

    1.0 Purpose:

    This procedure describes how SQT Training evaluates its quality management system and qualityassurance procedures.

    2.0 Staff Involved:

    SQT Governing Body, Managing Director, System Manager, Internal Auditors

    3.0 PROCEDURE

    3.1 Internal Audit of procedures

    Internal audits are conducted by the managing director and internal auditors to

    1. Determine the level of compliance to SQT Policies, Procedures and Work Instructions

    2. Determine the level of compliance to awarding body requirements including IRCA, NEBOSH,IOSH, IEMA, FETAC, HETAC, FAS

    3. Evaluate the effectiveness of those procedures

    The Managing Director and System Manager produce an Annual Internal Audit Schedule.

    Internal auditors must have completed an auditor training course. They are selected by the ManagingDirector on the basis of their auditing skills and personal suitability.

    Audits and audit reports are completed in compliance with Work Instruction WI-004

    Auditing findings are discussed at staff meetings.

    3.2 Annual Management Review of Quality Management System

    Once per year, the Governing Body of SQT will review its quality management system to ensure itscontinuing suitability, adequacy and effectiveness. This review shall include assessing opportunities forimprovement and the need for changes to the quality management system, including the quality policyand quality objectives.

    The output from this review is the Management Review Minutes detailing the actions that have beendecided.

    3.3 Periodic External Review of Quality Management System

    As required, SQT will have its quality system evaluated by an awarding body e.g., IRCA, FETAC, HETAC.

  • 7/31/2019 SQT Quality Manual

    76/82

    Work InstructionTitle: WI-004

    System Auditing,Preventive, CorrectiveAction & CustomerComplaints

    Rev 4 Date: 15/1/08

    WI 004 Page 1 of 3

    Purpose: This work instruction describes the process for System Auditing, Potentialfor Improvement, Preventive and Corrective action and dealing withCustomer Complaints within our quality management system.

    1.0 DEFINITIONS- N/A

    2.0 RESPONSIBILITYThe Systems Manager is accountable for ensuring this work instruction iseffectively and efficiently implemented.

    3.0 WORK INSTRUCTION

    3.1 Systems AuditingSQT audits its Policies, Procedures and Work Instructions on an annual basisAudits are carried out by people who are:

    Formally trained in auditing Independent of the activity being audited

    At the beginning of the year, an audit plan is drawn up of the areas to beaudited.

    3.1.1 A Procedure/work instruction is selected

    3.1.2 Draw up an audit checklist of records to be checked for compliance againstthe procedure / work instruction

    3.1.3 Make records of observations, answers to questions etc on the Audit Check

    List.

    3.1.4 After the audit, summarise the findings on the Audit Plan.

    3.1.5 Feedback the findings of the audit to that area including suggestions forfurther improvement and make the relevant changes (if required).

    3.1.6 Close out Audit by completing the details on the Audit Plan. Date and Sign.

    3.1.7 If there are major discrepancies between the document and actual, completea PIN Form. This form records the proposed action required, who is

  • 7/31/2019 SQT Quality Manual

    77/82

    Work InstructionTitle: WI-004

    System Auditing,Preventive, CorrectiveAction & CustomerComplaints

    Rev 4 Date: 15/1/08

    WI 004 Page 2 of 3

    responsible for implementing the change, how the change is recorded withinthe operation and the timeframe in which the change should be implemented.The form must be approved by the Company Director.

    3.1.8 Follow Up a month later to confirm that any changes identified are nowworking.

    3.2 Review of Procedure for Process Improvement3.2.1 After the audit, review the existing procedure with the process owner to

    remove non value add actions or include new actions.

    3.2.2 Review all forms, record templates and specifications relevant to theprocedure for continuing relevancy and updating as necessary

    3.2.3 Update the procedure and change the relevant Rev nos, date etc. and updatethe R-012 - Master List of SQT Documents.xls

    3.2.4 Notify other process owners of the change

    3.3 Potential for Improvement (PIN)3.3.1 This is the process used within SQT for structured approach to problem

    solving; identify a problem clearly, work out cause and then corrective action.Corrective actions are also followed up to ensure they are effective. The PINform F-015 is used to record all the steps. The PIN is a 4 step process:1 Details of Non-Conformance2 Immediate Follow-up action3 Corrective Action4 Corrective Action Follow Up and Close Out

    3.3.2 All PINs raised must be recorded in KPIs (WI-011) and followed up at weeklymeetings until closed out. A copy of each PIN must be stored in the PIN file.

    3.4 Preventive Action3.4.1 Preventive action is action which may be taken to prevent a problem arising.

    An example would be a downward trend in a measure. Preventive action maybe taken before and to prevent the measure going outside specification e.g., ifthere is a negative trend observed in KPIs. The PIN (Potential for

    improvement) system is used to record all actions.

  • 7/31/2019 SQT Quality Manual

    78/82

    Work InstructionTitle: WI-004

    System Auditing,Preventive, CorrectiveAction & CustomerComplaints

    Rev 4 Date: 15/1/08

    WI 004 Page 3 of 3

    3.5 Corrective Action3.5.1 When a problem is identified from any source e.g., Tutor report, Course

    Assessment Forms, the PIN (Potential for improvement) system is used torecord all actions taken as above.

    3.6 Customer Complaints3.6.1 If we receive a customer complaint, record the details under Standard

    Documents/Customer Complaints File and again complete a PIN Form torecord actions taken.

  • 7/31/2019 SQT Quality Manual

    79/82

    Section 11

    Quality

  • 7/31/2019 SQT Quality Manual

    80/82

    SQT- P11 Rev 2

    Quality Policy

    SQT Training Quality Policy (Mission Statement)

    SQT Training Ltd. develops and delivers training courses which meet the needs of ourlearners.

    We are committed to quality throughout our operation. Our policy of excellence will be

    achieved through:- Selection of and continual vetting of course tutors- Continual assessment of training courses delivered- Active listening, communicating and interfacing with our customers- Reviewing Key Performance Indicators- Providing the resources to meet the requirements of awarding bodies which accreditcourses

    Lily Collison

    Managing Director

  • 7/31/2019 SQT Quality Manual

    81/82

    Section 12

    Data Protection

  • 7/31/2019 SQT Quality Manual

    82/82

    SQT-P12 Rev 1

    Data Protection Policy

    Information obtained by SQT becomes part of the data held by SQT for the purposes of

    training course administration in accordance with Data Protection Acts 1988 and 2003. This

    information will remain confidential to SQT and in all cases will be carefully controlled and

    restricted to the minimum necessary for the purpose.

    Relevant Procedures and Work Instructions are:

    SOP-P1-1 - SQT Communications with Learners

    WI-003-Communications-Marketing to Customers

    WI-007 Course Assessment Forms