1
Work by O’Brien The construction of a synthetic “Mondo” 6 lane 400m IAAF and UK Athletics track with associated infield facilities at Eastwood School, Leigh -on- Sea in Essex. Also included is a full size FIFA compliant football pitch on the infield. The works involved reduced level excavation, “cut and fill” to formation with the disposal of 15000m3 of residual spoil being disposed off site, including associated drainage sub base build up and macadam civils works and the installation of long jump, triple jump, high jump, pole vault and circle for throwing events. The infield was top soiled, seeded and marked accordingly. Client Eastwood School Project Athletic Track Location Essex Value £700K Duration 17 weeks

Sport Pitch Construction for Eastwood School

Embed Size (px)

DESCRIPTION

The construction of a synthetic “Mondo” 6 lane 400m IAAF and UK Athletics track with associated infield facilities at Eastwood School, Leigh -on- Sea in Essex. Also included is a full size FIFA compliant football pitch on the infield. The works involved reduced level excavation, “cut and fill” to formation with the disposal of 15000m3 of residual spoil being disposed off site, including associated drainage sub base build up and macadam civils works and the installation of long jump, triple jump, high jump, pole vault and circle for throwing events. The infield was top soiled, seeded and marked accordingly.

Citation preview

Page 1: Sport Pitch Construction for Eastwood School

Work by O’Brien

The construction of a synthetic “Mondo” 6 lane 400m IAAF and UK

Athletics track with associated infield facilities at Eastwood School, Leigh

-on- Sea in Essex. Also included is a full size FIFA compliant football

pitch on the infield.

The works involved reduced level excavation, “cut and fill” to formation

with the disposal of 15000m3 of residual spoil being disposed off site,

including associated drainage sub base build up and macadam civils works

and the installation of long jump, triple jump, high jump, pole vault and

circle for throwing events. The infield was top soiled, seeded and

marked accordingly.

Client Eastwood School Project Athletic Track Location Essex Value £700K Duration 17 weeks