Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
S:\Municipal\Projects\30395 Spokane Airport\01003 - TWY Reconfiguration Phase 2 Design\Close Out\ALP Update\ALP Update\ACAD Files\GEG-ALP-Airport Layout Plan-AUG 2014.APPROVED revE.dwg Jan 16, 2018 - 9:55am
TRUE
MAGN
ETIC
DECLINATION: 15° 23' EAPRIL 2012
ANNUAL RATE OF CHANGE0° 10' W
0 FEET
200'
400'
F15 Relocated Electrical Vault
Convenience Store / Gas Station F17
Active Airfield Pavement
Airport Property
Building - On Airport
Paved Road
Runway Safety Area (RSA)
Runway Object Free Area (ROFA)
Building - Off Airport
RSA
ROFA
RPZ
TOFA
BRL
Runway Protection Zone (RPZ)
Taxiway Object Free Area (TOFA)
Building Restriction Line (BRL)RVZRunway Visual Zone (RVZ)
Fence
Terrain Contour
Waterway/Ditch
EXISTING FUTURE
RSA
ROFA
RPZ
TOFA
BRL
RVZ
ULTIMATE
EXISTING FUTURE
N/A
N/A
N/A
N/A
Airfield Pavement To Be Removed N/A
Automobile Surface Parking
DRAWING LEGEND
++
Building - To Be Removed N/A
Transit Corridor
On Aerial
N/A
FACILITY LEGEND
Regulator Building23
1
Air Carrier Apron2
Terminal Parking Garage3
Airport Rescue and Fire Fighting4
Air Cargo5
Cargo Apron6
Terminal
Deicing ApronF2
Expanded Passenger Terminal: FututreF3
Air Carrier Apron: UltimateF7
Passenger Terminal Parking GaragesF4
Passenger Terminal Surface ParkingF5
Passenger Terminal: UltimateF6OF
NO. REVISION SPONSOR DATE
DATE: SHEETDESIGN: DRAWN:
The preparation of these documents was financed in part through a planning grant from the Federal Aviation Administration as provided under Section 505 of the Airport andAirway Improvement Act of 1982, as amended. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of these documents by the FAA doesnot in any way constitute a commitment on the part of the United States to participate in any development depicted herein nor does it indicate that the proposed development isenvironmentally acceptable in accordance with appropriate public laws.
REV. BY
SPOKANE INTERNATIONAL AIRPORTSPOKANE, WASHINGTON
AT/BM TE/BM AUGUST 2014 17
TERMINAL AREA BUILDING PLAN
12
1 TAXIWAY RECONFIGURATION PROJECT SPOKANE INTL. AIRPORTCWEC 1/27/17
26 Parking Operations Building and Garage
Operations Building 7
Snow Removal Equipment Building 10
10