Upload
kerry
View
33
Download
0
Tags:
Embed Size (px)
DESCRIPTION
SPO Overview and Power Template. Agenda Power Industry Background and Drivers Business environment SPF as an industry distinctive SPO Overview 2007/2008 Modularized approach From SPO to power template SPO power template 2008 content, product versions and schedule - PowerPoint PPT Presentation
Citation preview
SPO Overview and Power Template
Agenda Power Industry Background and Drivers
Business environment SPF as an industry distinctive
SPO Overview 2007/2008 Modularized approach From SPO to power template
SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example
ContractorProject Systems
SP Enterprise for Owner Operators – SPO Overview 2007/2008 –
ERP / EAM
DCS
ReliabilityManagement
SafetyManagement
ContentManagement
I-Sketch
SPEL
SPF
SP3D
SPRD
SPI
SPPI
D
SPMat
SSKSPEIntegration
I-Sketch
SPEL
SPF
SPRD
SPI
SPPI
DSSK
SPO Solutionware
SPEIntegration
I-Sketch
SPEL
SPF
SPRD
SPI
SPPI
D
SPO
Project ExecutionSP
OOp
erat
ing
Plan
t
SPOCore
SS KSPEIntegration
3 discrete solutions coveringthe complete life-cycle
SPO 2007– Maintenance &Engineering Browser –
ERP (SAP, Maximo, Ventyx, Oracle EAM)
DCS/Automation Reliability
Safety
Dynamic Design Basis
ContentManagement
Common Web Portal
Integrated Project Execution
I-Sketch
SPEL
SPF
SPRD
SPI
SPPI
D
SSKSPEIntegration
SPO Roadmap
This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
Construction
Design/EngineeringProcurement
MechanicalCompletion
EPC Contractors
OO Green/brown field Projects
Commissioning
Feed/Pre engineering
OO Operations and M&M
Preparationfor Operations
OO Early Phase
Feasibility
Concept
Operations
ModificationsProject
Execution
I-Sketch
SPEL
SPF
SPRD
SPI
SPPI
D
SSK
SPO Solutionware
SPEIntegrationDynamic
Exchange/Handover
OO Challenge and SPO Solutions
SPO CORE• Plant Information Loading & QC• Plant Breakdown Structure (PBS) and Tag
Management• Document Management• On Plant Engineering & Design• Conceptual Engineering• Vendor data capture• Inspections & Audits Assistant
SPO Project Execution• Change Management (MoC) in Projects• Interface Control• Technical/Site queries and issues• Non-conformities/Waivers• Fabrication Records Management• Uncertainty/Risk management• Commissioning/Completion (Start up)
SPO Operating Plant • Plant Information Browser• Operation changes management• Isometric maintenance• Brownfield data capture • Brownfield/Greenfield data validation,
transformation and loading• Engineering assistant for Reliability• Engineering assistant for Maintenance• Engineering assistant for Safety• DCS Change Management• Intelligent Manuals• Plant Optimization Assistant
SPO2007
SPO2007
SPO2008
SPO2008
SPO2008
SPO Overview and Power Template
Agenda Power Industry Background and Drivers
Business environment SPF as an industry distinctive
SPO Overview 2007/2008 Modularized approach From SPO to power template
SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process
Going Forward
Solution Banner Solution Business Package
SPO
SPX
SPLS
Core
Operating Plant
Core
Power
Project Execution
Core
Verification
FoundationKickStarts
Core
Tool Integrat.
Docs
Change
PBS
2D/3D Nav.
Data Sheet
Xmtl
WBS
Tag
Model / Asset
Office Integrat.
Eng. & Dgn
Data Capture
Concept. Eng.
VTL
Browsing
Reliability
Cable Est.
Power Content
VTL
Offline Edit
NCR TQ
Each Business Package is…
Core
Solution Banner Solution Business Package
SPO
SPX
SPLS
Core
Operating Plant
Core
Power
Project Execution
Core
Verification
KickStart
Tool Integrat.
Docs
Change
PBS
2D/3D Nav.
Data Sheet
Xmtl
WBS
Tag
Model / Asset
Office Integrat.
Eng. & Dgn
Data Capture
Concept. Eng.
VTL
Browsing
Reliability
Cable Est.
Power Content
VTL
Offline Edit
DocumentationDocumentationWorkflowsWorkflowsAVIsAVIsDocumentsDocuments
ContentContentSchemaSchemaLoad FilesLoad FilesSeed DBsSeed DBs
CodeCodeExtensionsExtensionsCustomizationsCustomizations
SPO Overview and Power Template
Agenda Power Industry Background and Drivers
Business environment SPF as an industry distinctive
SPO Overview 2007/2008 Modularized approach From SPO to power template
SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example
Construction
Design/EngineeringProcurement
MechanicalCompletion
EPC Contractors
OO Green/brown field Projects
Commissioning
Feed/Pre engineering
OO Operations and M&M
Preparationfor Operations
OO Early Phase
Feasibility
Concept
Operations
ModificationsProject
Execution
I-Sketch
SPEL
SPF
SPRD
SPI
SPPI
D
SSK
SPO Solutionware
SPEIntegrationDynamic
Exchange/Handover
OO Challenge and SPO Solutions
SPO CORE• Plant Information Loading & QC• Plant Breakdown Structure (PBS) and Tag
Management• Document Management• On Plant Engineering & Design• Conceptual Engineering• Vendor data capture• Inspections & Audits Assistant
SPO Project Execution• Change Management (MoC) in Projects• Interface Control• Technical/Site queries and issues• Non-conformities/Waivers• Fabrication Records Management• Uncertainty/Risk management• Commissioning/Completion (Start up)
SPO Operating Plant • Plant Information Browser• Operation changes management• Isometric maintenance• Brownfield data capture • Brownfield/Greenfield data validation,
transformation and loading• Engineering assistant for Reliability• Engineering assistant for Maintenance• Engineering assistant for Safety• DCS Change Management• Intelligent Manuals• Plant Optimization Assistant
SPO2008
SPO2008
SPO2008
SPO EPC templates• Power template• Others to follow
SPO Overview and Power Template
Agenda Power Industry Background and Drivers
Business environment SPF as an industry distinctive
Overview 2007/2008 Modularized approach From SPO to power template
SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example
SPO Power TemplateVersion 1 and Road Map
Version 1 delivery is planned for end of 2008 Based on SPF 4.2 and SP 2007 applications
SPF 4.2 is seen as precondition for nuclear control and approval authorities
Road Map 2009, 2009+ User access control (based on new SPF 4.2 functionality and
implemented practices OOTB Integration with SPI and SPEL Central KKS TAG management in SPF? Design variations in SPPID …
This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
SPO Power TemplateThe Business Packages
New Business Packages for Core (these Business Packages will be part of SPO power template) SPRD with DIN specifications
18 PAS piping specifications 32 power related piping specifications
SPRD with Pipe Service Index (PSI) Interface between SPRD and SPPID Transfer piping specifications, allowed media per specification and selected
components per specification
SPRD feeds SAP MM with component data Other Business Processes from SPO might be included
SPO – SPx for powerExample Workflow for PSI
SPO Power Template The Business Packages 1 of 2
Power related features for SPF
KKS based integration (SPPID and SP3D)
KKS related schema extensions PBS based on KKS
SP3D Content for OOTB Drawing Generation
in SP3D HVAC catalogue for SP3D Cable catalogue for SP3D
This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
SPO Power Template The Business Packages 2 of 2
SPPID with KKS KKS content with user
friendly GUI KKS mapping schema OOTB KKS based
integration with SP3D and SPF
Additional SPPID symbols with KKS relation
SPPID PSI Load SPRD Pipe Service
Index Manage PSI data for
projects Activate/deactivate revisionsThis Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry
demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
SPO Overview and Power Template
Agenda Power Industry Background and Drivers
Business environment SPF as an industry distinctive
Overview 2007/2008 Modularized approach From SPO to power template
SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example
SPx Power Template Future drum calculation process
For clarification of the business process Are your current processes for
cable and drum handling comparable?
How should this process overview be changed?
System Cable Drumming Calculation Workflow
Off ice
SPEL
SPMAT
Def ine cable meter quantity basing on the inf ormation coming f rom the drum calculation result and f rom cable meter quantity final estimation
Drum Calculation
Modif y the drum set coming f rom Calculation
Drum List rev ised
Cable List
Drum List
1
1
2
3
CableReportSPEL
SP3DAutorouter
Publish CableTags w/ Lengths
Process Managed by SPF Integration
Areas Being Evaluated for Power Template Concept
VGB KKS conform naming conventions in P&ID Integrate SPPID with SPF and SP3D based on VGB KKS Standardized 2D drawing generation form 3D model Reference piping data for ANSI, DIN, JIS ready for SP3D PSI (Pipe service Index) Integration SPRDSPPID Integration SPRDSAP