SPO Overview and Power Template Agenda Power Industry Background and Drivers Business environment SPF as an industry distinctive SPO Overview 2007/2008 Modularized approach From SPO to power template SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example

SPO Overview and Power Template

  • Upload
    kerry

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

SPO Overview and Power Template. Agenda Power Industry Background and Drivers Business environment SPF as an industry distinctive SPO Overview 2007/2008 Modularized approach From SPO to power template SPO power template 2008 content, product versions and schedule - PowerPoint PPT Presentation

Citation preview

Page 1: SPO Overview and Power Template

SPO Overview and Power Template

Agenda Power Industry Background and Drivers

Business environment SPF as an industry distinctive

SPO Overview 2007/2008 Modularized approach From SPO to power template

SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example

Page 2: SPO Overview and Power Template

ContractorProject Systems

SP Enterprise for Owner Operators – SPO Overview 2007/2008 –

ERP / EAM

DCS

ReliabilityManagement

SafetyManagement

ContentManagement

I-Sketch

SPEL

SPF

SP3D

SPRD

SPI

SPPI

D

SPMat

SSKSPEIntegration

I-Sketch

SPEL

SPF

SPRD

SPI

SPPI

DSSK

SPO Solutionware

SPEIntegration

I-Sketch

SPEL

SPF

SPRD

SPI

SPPI

D

SPO

Project ExecutionSP

OOp

erat

ing

Plan

t

SPOCore

SS KSPEIntegration

3 discrete solutions coveringthe complete life-cycle

Page 3: SPO Overview and Power Template

SPO 2007– Maintenance &Engineering Browser –

ERP (SAP, Maximo, Ventyx, Oracle EAM)

DCS/Automation Reliability

Safety

Dynamic Design Basis

ContentManagement

Common Web Portal

Integrated Project Execution

I-Sketch

SPEL

SPF

SPRD

SPI

SPPI

D

SSKSPEIntegration

Page 4: SPO Overview and Power Template

SPO Roadmap

This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

Page 5: SPO Overview and Power Template

Construction

Design/EngineeringProcurement

MechanicalCompletion

EPC Contractors

OO Green/brown field Projects

Commissioning

Feed/Pre engineering

OO Operations and M&M

Preparationfor Operations

OO Early Phase

Feasibility

Concept

Operations

ModificationsProject

Execution

I-Sketch

SPEL

SPF

SPRD

SPI

SPPI

D

SSK

SPO Solutionware

SPEIntegrationDynamic

Exchange/Handover

OO Challenge and SPO Solutions

SPO CORE• Plant Information Loading & QC• Plant Breakdown Structure (PBS) and Tag

Management• Document Management• On Plant Engineering & Design• Conceptual Engineering• Vendor data capture• Inspections & Audits Assistant

SPO Project Execution• Change Management (MoC) in Projects• Interface Control• Technical/Site queries and issues• Non-conformities/Waivers• Fabrication Records Management• Uncertainty/Risk management• Commissioning/Completion (Start up)

SPO Operating Plant • Plant Information Browser• Operation changes management• Isometric maintenance• Brownfield data capture • Brownfield/Greenfield data validation,

transformation and loading• Engineering assistant for Reliability• Engineering assistant for Maintenance• Engineering assistant for Safety• DCS Change Management• Intelligent Manuals• Plant Optimization Assistant

SPO2007

SPO2007

SPO2008

SPO2008

SPO2008

Page 6: SPO Overview and Power Template

SPO Overview and Power Template

Agenda Power Industry Background and Drivers

Business environment SPF as an industry distinctive

SPO Overview 2007/2008 Modularized approach From SPO to power template

SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process

Page 7: SPO Overview and Power Template

Going Forward

Solution Banner Solution Business Package

SPO

SPX

SPLS

Core

Operating Plant

Core

Power

Project Execution

Core

Verification

FoundationKickStarts

Core

Tool Integrat.

Docs

Change

PBS

2D/3D Nav.

Data Sheet

Xmtl

WBS

Tag

Model / Asset

Office Integrat.

Eng. & Dgn

Data Capture

Concept. Eng.

VTL

Browsing

Reliability

Cable Est.

Power Content

VTL

Offline Edit

NCR TQ

Page 8: SPO Overview and Power Template

Each Business Package is…

Core

Solution Banner Solution Business Package

SPO

SPX

SPLS

Core

Operating Plant

Core

Power

Project Execution

Core

Verification

KickStart

Tool Integrat.

Docs

Change

PBS

2D/3D Nav.

Data Sheet

Xmtl

WBS

Tag

Model / Asset

Office Integrat.

Eng. & Dgn

Data Capture

Concept. Eng.

VTL

Browsing

Reliability

Cable Est.

Power Content

VTL

Offline Edit

DocumentationDocumentationWorkflowsWorkflowsAVIsAVIsDocumentsDocuments

ContentContentSchemaSchemaLoad FilesLoad FilesSeed DBsSeed DBs

CodeCodeExtensionsExtensionsCustomizationsCustomizations

Page 9: SPO Overview and Power Template

SPO Overview and Power Template

Agenda Power Industry Background and Drivers

Business environment SPF as an industry distinctive

SPO Overview 2007/2008 Modularized approach From SPO to power template

SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example

Page 10: SPO Overview and Power Template

Construction

Design/EngineeringProcurement

MechanicalCompletion

EPC Contractors

OO Green/brown field Projects

Commissioning

Feed/Pre engineering

OO Operations and M&M

Preparationfor Operations

OO Early Phase

Feasibility

Concept

Operations

ModificationsProject

Execution

I-Sketch

SPEL

SPF

SPRD

SPI

SPPI

D

SSK

SPO Solutionware

SPEIntegrationDynamic

Exchange/Handover

OO Challenge and SPO Solutions

SPO CORE• Plant Information Loading & QC• Plant Breakdown Structure (PBS) and Tag

Management• Document Management• On Plant Engineering & Design• Conceptual Engineering• Vendor data capture• Inspections & Audits Assistant

SPO Project Execution• Change Management (MoC) in Projects• Interface Control• Technical/Site queries and issues• Non-conformities/Waivers• Fabrication Records Management• Uncertainty/Risk management• Commissioning/Completion (Start up)

SPO Operating Plant • Plant Information Browser• Operation changes management• Isometric maintenance• Brownfield data capture • Brownfield/Greenfield data validation,

transformation and loading• Engineering assistant for Reliability• Engineering assistant for Maintenance• Engineering assistant for Safety• DCS Change Management• Intelligent Manuals• Plant Optimization Assistant

SPO2008

SPO2008

SPO2008

SPO EPC templates• Power template• Others to follow

Page 11: SPO Overview and Power Template

SPO Overview and Power Template

Agenda Power Industry Background and Drivers

Business environment SPF as an industry distinctive

Overview 2007/2008 Modularized approach From SPO to power template

SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example

Page 12: SPO Overview and Power Template

SPO Power TemplateVersion 1 and Road Map

Version 1 delivery is planned for end of 2008 Based on SPF 4.2 and SP 2007 applications

SPF 4.2 is seen as precondition for nuclear control and approval authorities

Road Map 2009, 2009+ User access control (based on new SPF 4.2 functionality and

implemented practices OOTB Integration with SPI and SPEL Central KKS TAG management in SPF? Design variations in SPPID …

This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

Page 13: SPO Overview and Power Template

This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

SPO Power TemplateThe Business Packages

New Business Packages for Core (these Business Packages will be part of SPO power template) SPRD with DIN specifications

18 PAS piping specifications 32 power related piping specifications

SPRD with Pipe Service Index (PSI) Interface between SPRD and SPPID Transfer piping specifications, allowed media per specification and selected

components per specification

SPRD feeds SAP MM with component data Other Business Processes from SPO might be included

Page 14: SPO Overview and Power Template

SPO – SPx for powerExample Workflow for PSI

Page 15: SPO Overview and Power Template

SPO Power Template The Business Packages 1 of 2

Power related features for SPF

KKS based integration (SPPID and SP3D)

KKS related schema extensions PBS based on KKS

SP3D Content for OOTB Drawing Generation

in SP3D HVAC catalogue for SP3D Cable catalogue for SP3D

This Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

Page 16: SPO Overview and Power Template

SPO Power Template The Business Packages 2 of 2

SPPID with KKS KKS content with user

friendly GUI KKS mapping schema OOTB KKS based

integration with SP3D and SPF

Additional SPPID symbols with KKS relation

SPPID PSI Load SPRD Pipe Service

Index Manage PSI data for

projects Activate/deactivate revisionsThis Document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry

demand which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

Page 17: SPO Overview and Power Template

SPO Overview and Power Template

Agenda Power Industry Background and Drivers

Business environment SPF as an industry distinctive

Overview 2007/2008 Modularized approach From SPO to power template

SPO power template 2008 content, product versions and schedule Plan for 2009 and Siemens suggestions Cable/cable drum handling process example

Page 18: SPO Overview and Power Template

SPx Power Template Future drum calculation process

For clarification of the business process Are your current processes for

cable and drum handling comparable?

How should this process overview be changed?

System Cable Drumming Calculation Workflow

Off ice

SPEL

SPMAT

Def ine cable meter quantity basing on the inf ormation coming f rom the drum calculation result and f rom cable meter quantity final estimation

Drum Calculation

Modif y the drum set coming f rom Calculation

Drum List rev ised

Cable List

Drum List

1

1

2

3

CableReportSPEL

SP3DAutorouter

Publish CableTags w/ Lengths

Process Managed by SPF Integration

Page 19: SPO Overview and Power Template

Areas Being Evaluated for Power Template Concept

VGB KKS conform naming conventions in P&ID Integrate SPPID with SPF and SP3D based on VGB KKS Standardized 2D drawing generation form 3D model Reference piping data for ANSI, DIN, JIS ready for SP3D PSI (Pipe service Index) Integration SPRDSPPID Integration SPRDSAP