    NationalEngineeringHandbook

    Part 642 Specifcations orConstructionContracts

  • 8/22/2019 Specifications for Construction Contracts

    2/487

    National Engineering HandbookSpecifcationsPart 642

    (210-VI-NEH, January 2009)

    Originally issued May 2001

    First Revision issued November 2005

    Second Revision issued January 2009

    The U.S. Department o Agriculture (USDA) prohibits discrimination in all

    its programs and activities on the basis o race, color, national origin, age,

    disability, and where applicable, sex, marital status, amilial status, parentalstatus, religion, sexual orientation, genetic inormation, political belies,

    reprisal, or because all or a part o an individuals income is derived rom

    any public assistance program. (Not all prohibited bases apply to all pro-

    grams.) Persons with disabilities who require alternative means or commu-

    nication o program inormation (Braille, large print, audiotape, etc.) should

    contact USDAs TARGET Center at (202) 720-2600 (voice and TDD). To fle a

    complaint o discrimination write to USDA, Director, Ofce o Civil Rights,

    1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800)

    795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity

    provider and employer.

  • 8/22/2019 Specifications for Construction Contracts

    3/487

    i(210-VI-NEH, January 2009)

    Part 642 Specifcations orConstruction Contracts

    Contents: Chapter 1 General Contract Specifcation Procedures

    642.0100 General 11

    (a) Nonederal construction contract ................................................................11

    (b) Federal construction contract .....................................................................11

    (c) Purpose ...........................................................................................................11

    642.0101 Terms and defnitions 12

    642.0102 Applicability 12

    642.0103 National standard construction specifcations 13

    642.0104 National standard material specifcations 13

    642.0105 Selecting appropriate national standard specifcations 14

    642.0106 Interim specifcations 14

    642.0107 One-time-use specifcations 15

    642.0108 Bid schedule 16

    (a) Designating the items o work ......................................................................16

    (b) Division o the work into items ....................................................................16

    (c) Numbering and titling ....................................................................................17

    (d) Pay items .........................................................................................................17

    642.0109 Contract specifcations 18

    (a) Compilation .....................................................................................................18

    (b) Identiying .......................................................................................................18

    (c) Measurement and payment ...........................................................................19

    (d) Preparing construction details .....................................................................19

    Examples Example 11 Typical bid schedule ..................................................................17

    Example 12 Typical construction detail or a specifc contract .............110

    or excavation

    Example 13 Typical construction detail to cross reerence a .................114

    subsidiary item

  • 8/22/2019 Specifications for Construction Contracts

    4/487

    National Engineering HandbookSpecifcations or Construction

    Contracts

    Part 642

    ii (210-VI-NEH, January 2009)

    Chapter 2 National Standard Construction Specifcations

    - - - - - - - Eective date - - - - - - - -Instruction Specifcation

    Site preparation

    1Clearing 1/09 5/01

    2Clearing and Grubbing 1/09 5/01

    3Structure Removal 1/09 5/01

    4Channel Clearing and Shaping 1/09 5/01

    5Pollution Control 1/09 1/09

    6Seeding, Sprigging, and Mulching 1/09 5/01

    7Construction Surveys 1/09 1/09

    8Mobilization and Demobilization 1/09 5/01

    9Trafc Control 1/09 5/0110Water or Construction 1/09 1/09

    Foundation work

    11Removal o Water 1/09 5/01

    12Relie Wells 1/09 5/01

    13Piling 1/09 5/01

    14Pressure Grouting 1/09 5/01

    Earthwork

    21Excavation 1/09 5/01

    22(Reserved)

    23Earthfll 1/09 1/0924Drainfll 1/09 5/01

    25Rockfll 1/09 5/01

    26Topsoiling 1/09 5/01

    27Diversions and Waterways 1/09 5/01

    28Lime Treated Earthfll 1/09 1/09

    29Soil-Cement 1/09 1/09

    Concrete and reinorcement

    31Concrete or Major Structures 1/09 1/09

    32Structure Concrete 1/09 1/09

    33Shotcrete 1/09 1/09

    34Steel Reinorcement 1/09 1/0935Concrete Repair 1/09 1/09

    36Roller Compacted Concrete 1/09 1/09

  • 8/22/2019 Specifications for Construction Contracts

    5/487

    iii

    National Engineering HandbookSpecifcations or Construction

    Contracts

    Part 642

    (210-VI-NEH, January 2009)

    - - - - - - - Eective date - - - - - - -Instruction Specifcation

    Nonmetal pipe conduits and drains

    41Reinorced Concrete Pressure Pipe Conduits 1/09 5/01

    42Concrete Pipe Conduits and Drains 1/09 5/01

    43Clay Pipe 1/09 5/01

    44Corrugated Polyethylene Pipe 1/09 1/09

    45Plastic Pipe 1/09 1/09

    46Tile Drains 1/09 11/05

    Metal pipe conduits

    51Corrugated Metal Pipe 1/09 5/01

    52Steel Pipe 1/09 5/01

    53Ductile-Iron Pipe 1/09 5/01

    Riprap and slope protection

    61Rock Riprap 1/09 1/09

    62Grouted Rock Riprap 1/09 5/01

    63Treatment o Rock Suraces 1/09 5/01

    64Gabion Baskets and Mattresses 1/09 1/09

    Water control gates and valves

    71Water Control Gates 1/09 5/01

    Miscellaneous structural work

    81Metal Fabrication and Installation 1/09 5/0182Painting Metalwork 1/09 11/05

    83Timber Fabrication and Installation 1/09 1/09

    84Painting Wood 1/09 11/05

    Miscellaneous construction

    91Chain Link Fence 1/09 5/01

    92Field Fence 1/09 1/09

    93Identifcation Markers or Plaques 1/09 5/01

    94Contractor Quality Control 1/09 1/09

    95Geotextile 1/09 5/01

    96Field Ofce 1/09 5/01

    97Flexible Membrane Liner 1/09 11/05

    98Geosynthetic Clay Liner 1/09 11/05

  • 8/22/2019 Specifications for Construction Contracts

    6/487

    National Engineering HandbookSpecifcations or Construction

    Contracts

    Part 642

    iv (210-VI-NEH, January 2009)

    Chapter 3 National Standard Material Specifcations

    Eective date

    Foundation materials

    511Steel Piles 5/01

    512Wood Piles 5/01

    513Precast Concrete Piles 5/01

    514Cast-In-Place Concrete Piles With Shells 5/01

    Aggregates and rock

    521Aggregates or Drainfll and Filters 5/01

    522Aggregates or Portland Cement Concrete 5/01

    523Rock or Riprap 11/05

    524Aggregates or Roller Compacted Concrete 11/05

    Concrete materials

    531Portland Cement 5/01

    532 Supplementary Cementitious Materials 1/09

    533Chemical Admixtures or Concrete 11/05

    534Concrete Curing Compound 1/09

    535Preormed Expansion Joint Filler 5/01

    536Sealing Compound or Joints in Concrete and Concrete Pipe 1/09

    537Nonmetallic Waterstops 5/01

    538Metal Waterstops 5/01

    539Steel Reinorcement (or concrete) 1/09

    Nonmetal pipe and fttings

    541Reinorced Concrete Pressure Pipe 5/01

    542Concrete Culvert Pipe 11/05

    543Nonreinorced Concrete Pipe 5/01

    544Clay Pipe and Drain Tile 11/05

    545(Reserved)

    546(Reserved)

    547Plastic Pipe 1/09

    548Corrugated Polyethylene Pipe 1/09

    Metal pipe and fttings551Coated Corrugated Steel Pipe 11/05

    552Aluminum Corrugated Pipe 5/01

    553Ductile-Iron Pipe 5/01

    554Steel Pipe 5/01

    Water control gates and valves

    571Slide Gates 1/09

    572Flap Gates, Metal 1/09

    573Radial Gates 5/01

  • 8/22/2019 Specifications for Construction Contracts

    7/487

    v

    National Engineering HandbookSpecifcations or Construction

    Contracts

    Part 642

    (210-VI-NEH, January 2009)

    Eective date

    Miscellaneous structural materials581Metal 11/05

    582Galvanizing 5/01

    583Coal Tar-Epoxy Paint 11/05

    584Structural Timber and Lumber 5/01

    585Wood Preservatives and Treatment 1/09

    Miscellaneous construction materials

    591Field Fencing Material 1/09

    592Geotextile 1/09

    593Lime 11/05

    594Flexible Membrane Liner 1/09

    595Geosynthetic Clay Liner 11/05

  • 8/22/2019 Specifications for Construction Contracts

    8/487

    National Engineering HandbookSpecifcations or Construction

    Contracts

    Part 642

    (210-VI-NEH, January 2009)

  • 8/22/2019 Specifications for Construction Contracts

    9/487

    (210VINEH, January 2009) 11

    Chapter 1 General Contract SpecifcationProcedures

    642.0100 General

    (a) Non-Federal construction contract

    The body o a non-Federal construction contract con-

    sists o the general provisions, bid schedule, specifca-

    tions, drawings, and, when applicable, special provi-

    sions and wage rate decisions. The general provisions

    are administrative and technical requirements that

    apply to all items o construction and to all contracts.

    In Natural Resources Conservation Service (NRCS)

    practice, these general provisions are urnished in a

    preprinted Form SCS-AS-43. The special provisionsare administrative instructions and requirements that

    apply to the specifc contract and are prepared by the

    responsible administrative ofce.

    The bid schedule tabulates the items o work or

    which direct payment will be made, shows the estimat-

    ed quantities o work and the units o measurement,

    and provides space or the entry o contract prices.

    The specifcations and drawings include the technical

    details and requirements o the contract. The ofce

    responsible or the design o the work develops the

    drawings and specifcations and, in cooperation withthe responsible administrative ofce, the bid schedule.

    (b) Federal construction contract

    The body o a Federal construction contract is assem-

    bled ollowing the uniorm contract ormat shown in

    Federal Acquisition Regulations (FAR) 14.201-1. Each

    section o an invitation or bids contains specifc kinds

    o inormation or the contractor.

    SectionAistheStandardForm1442

    Construction Contract cover sheet.

    SectionBisthebidscheduleasinnon-Federal

    contract.

    SectionCisthespecicationsanddrawingsor

    a reerence to their attachment as Section J.

    SectionD,packaginginstructions,isusually

    blank.

    SectionsE,F,andGhavetheinspection,per-

    ormance time, and contract administration

    data, respectively.

    SectionHisthemostsimilarsectiontothe

    non-Federal special provisions.

    SectionIistheboilerplate provisions common

    to all construction contracts. It may include

    most clauses by reerence.

    SectionJisthelistofattachments. SectionsK,L,andMareinstructionsand

    certifcations necessary to complete the bid

    package properly. These three sections do not

    become part o the contract.

    The technical specialist responsible or the design

    must work closely with the contracting ofcer to as-

    sure that the contract clauses are coordinated with the

    design requirements.

    (c) Purpose

    The purpose o Part 642, Specifcations o the National

    Engineering Handbook (NEH) is to establish national

    standard construction and material specifcations and

    procedures or developing interim and one-time-use

    specifcations, preparing contract specifcations, and

    bid schedules.

  • 8/22/2019 Specifications for Construction Contracts

    10/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)12

    642.0101 Terms and deinitions

    The ollowing terms and defnitions are established or

    use in all NRCS documents, publications, and corre-

    spondence relating to specifcations or construction

    contracts:

    National Standard Construction Specifcations

    State the technical and workmanship requirements or

    the various operations required in the construction o

    the works, the methods o measurement, and the basis

    o payment.

    National Standard Material SpecifcationsState

    the quality o materials to be incorporated in the per-

    manent works.

    Interim SpecifcationsSpecifcations prepared by

    States or use in contracts that include construction

    items or materials not covered by national standard

    specifcations.

    Standard SpecifcationsNational standard and

    interim specifcations.

    Unique or One-Time-Use SpecifcationsSpeci-fcations or construction or material items that are

    unique to the contract and are not covered by national

    standard specifcations or State interim specifcations.

    The specifcations are prepared within the State and

    intended or one-time-use only in a specifc contract.

    Construction DetailsPrepared by the design ofce

    and state the special requirements peculiar to a spe-

    cifc work o construction. They may take the orm o

    written addenda to the standard construction specif-

    cations or notes on the drawings.

    Contract specifcationsThe complete specifca-

    tions prepared or a specifc contract and consist o

    an assembly o appropriate standard and one-time-use

    specifcations supplemented by lists and descriptions

    o items o work and construction details.

    642.0102 Applicability

    The national standard specifcations in this handbook

    were prepared or use in construction work adminis-

    tered by NRCS. They were developed to

    ensureadherencetolawsandregulations,

    preventconictswithinthespecicationsand

    between the specifcations and other contract

    requirements,

    preventomissionofessentialelements,

    preventinclusionofextraneousmaterials,

    provideauniformbasisforinterpretation,and

    ensureuniformqualityofNRCSprojectworks.

    NRCS policy on preparation and use o these specifca-

    tionsisintheNationalEngineeringManual,Part542,

    Specifcations.

    National standard specifcations are prepared or con-

    struction operations and construction materials re-

    quentlyrequiredinNRCSprojects.Nationalstandard

    construction specifcations are in chapter 2 o thishandbook. National standard material specifcations

    are in chapter 3. These specifcations will be modifed

    bytheConservationEngineeringDivisionwheneverit

    appears appropriate to do so. Suggestions or changes,

    additions, deletions, or corrections should be submit-

    tedtotheDirectoroftheConservationEngineering

    Division.

  • 8/22/2019 Specifications for Construction Contracts

    11/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 13(210VINEH, January 2009)

    642.0103 National standard con-

    struction speciications

    National standard construction specifcations are to

    be used verbatim. Some national standard specifca-

    tions have sections that contain alternative methods

    o achieving work. The specifcation writer may delete

    the methods not used in the contract; however, the

    method selected must be used verbatim. Only methods

    identifed in the specifcation may be deleted rom the

    nationalstandardconstructionspecication.Details

    on how to delete the methods and revise the section

    are included in the instructions.

    Each o the construction specifcations is supplement-

    ed by instructions or its use. These instructions state

    the applicability o the specifcation and describe the

    items o inormation that must be included in the con-

    tract specifcations and drawings to completely defne

    the specifed item. They also give the conditions under

    which it may be appropriate to use any o the various

    methods listed. These supplementary instructions are

    included or use by design personnel and are not to be

    included in contract specifcations.

    All construction specifcation packages shall includeConstruction Specifcation 94, Contractor Quality

    Control. I single specifcations are used or conserva-

    tion practices, Construction Specifcation 94 is recom-

    mended.

    642.0104 National standard

    material speciications

    National standard material specifcations are prepared

    or those materials whose quality must be uniorm in

    all areas o applicability. National standard material

    specifcations are to be used verbatim. They are not

    supplemented by instructions or use. Items o inor-

    mation that must be included in the contract specifca-

    tions to completely describe the materials required or

    a specifc contract are listed in the instructions or use

    o the construction specifcations to which the mate-

    rial specifcations are complementary.

    Reerence to material specifcations may be in the na-

    tional standard construction specifcations or may be

    placed in the construction details (either written in the

    specifcations or noted on the contract drawings).

  • 8/22/2019 Specifications for Construction Contracts

    12/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)14

    642.0105 Selecting appropriatenational standard speciications

    The type o work to be done or the type o structural

    detail required oten dictates the construction method

    or sequence. The specifcation requirements must

    be compatible with the methods that must be used.

    The specifcation writer must also make sure that the

    methods selected in one specifcation are compat-

    iblewiththoseselectedinanother.Forexample,the

    methodofdesignatingpaylimitsforexcavationand

    earthfll.

    642.0106 Interim speciications

    States may prepare interim specifcations or use in

    their State or items not covered by national stan-

    dard construction and material specifcations (such

    as methods or materials unique to a given locality) i

    there is a recurring need. Interim specifcations are not

    to be developed i an industry standard is available,

    OMBA119.

    Interim construction specifcations must:

    Conformtotheformatofthenationalstandard

    construction specifcations.

    Benumberedconsecutivelystartingwith

    number 200 and be dated and identifed. In-

    terim construction specifcations prepared by

    the ormer National Technical Centers (NTC's)

    that continue to have application need to be

    adapted as a State interim and numbered ac-

    cordingly.

    Containtermsanddenitionsthatarecompat-

    ible with those used in the national standard

    construction specifcations.

    Beconciseandfreefromambiguousclauses.

    Containmeasurementandpaymentclauses

    written in the same manner as those in the

    national standard construction specifcations.

    Interim construction specifcations are to be used ver-

    batim. Some interim specifcations have sections that

    contain alternative methods o achieving work. The

    specifcation author may delete the methods not used

    in the contract; however, the method selected must be

    used verbatim. Only methods identifed in the specif-

    cation may be deleted rom the interim construction

    specication.Detailsonhowtodeletethemethods

    and revise the section are included in the instructions.

  • 8/22/2019 Specifications for Construction Contracts

    13/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 15

    Interim material specifcations must:

    Conformtotheformatofthenationalstandard material specifcations.

    Benumberedconsecutivelystartingwiththe

    number 300 or States and be dated and identi-

    ed.Materialspecicationspreparedbythe

    ormer NTC's that continue to have application

    need to be adapted by the State and numbered

    accordingly.

    DescribematerialsbyreferencetoAmerican

    SocietyforTestingandMaterials(ASTM)and

    other accepted reerence standards and specif-

    cations.

    Interimmaterialspecicationsaretobeused

    verbatim.

    The geographical area o application o each interim

    construction or material specifcation must be identi-

    fed at the lower let corner o each page o the specif-

    cation. The identiying symbol should consist o NRCS

    anddatefollowedbytheStateabbreviationandproj -

    ect name:

    NRCS 12/99

    OKWhiteCloud#2

    States are to review and concur with all interim speci-fcations when conducting peer reviews or designs

    conducted by another State. For Class VIII engineering

    designapprovallevelprojects,interimspecications

    need to be submitted and identifed when transmitting

    totheDirectoroftheConservationEngineeringDivi-

    sionforreview.Whenthespecicationforamaterial

    coveredbyanexistingASTMorotheracceptedspeci -

    fcation or standard has requirements other than those

    includedintheexistingspecicationorstandard,the

    engineering sta that prepared the specifcation shall

    prepareawrittenjusticationforthedeviation.This

    justicationissubmittedwiththespecicationtothe

    State that will conduct the peer review.

    Interim specifcations that are technically sound and

    have proven to be national in scope will be considered

    or inclusion in the national standard construction and

    material specifcations.

    642.0107 One-time-use specii-

    cations

    Unique or one-time-use specifcations are prepared

    or construction work or construction materials not

    covered by standard specifcations and are or one-

    time-use in a specifc contract. These specifcations

    shall be approved beore their use by the state conser-

    vation engineer. I such one-time-use specifcations are

    later considered or adoption as interim specifcations,

    they shall be submitted or approval according to the

    procedures prescribed or review o interim specifca-

    tions. One-time-use specifcations shall be ormatted

    according to the national standard specifcations. They

    shall be numbered in the 400's or construction specif-

    cations and in the 600's or material specifcations. The

    conditions and requirements or interim specifcations

    are also applicable to one-time-use specifcations.

  • 8/22/2019 Specifications for Construction Contracts

    14/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)16

    642.0108 Bid schedule

    The bid schedule orms the basis or payments to the

    contractor and must list all items o work or which di-

    rect payment will be made. Since the efciency o con-

    tract administration is directly aected by the manner

    in which the schedule is organized, the preparation o

    the bid schedule requires the close cooperation o the

    responsible design engineer and the contracting o-

    fcer. Operating procedures must include provision or

    administrative review o the bid schedule in the early

    stages o its development as well as upon completion.

    Example11showsatypicalbidschedule.

    (a) Designating the items o work

    Considerablejudgmentbasedondesign,construction,

    andcontractingexperienceisrequiredtodividethe

    work into items or inclusion in the bid schedule. The

    schedule must be sufciently comprehensive to allow

    the contractor to make reasonably accurate estimates

    o the cost o doing the work. It must also enable the

    contracting ofcer to keep orderly records o work

    progress and to accurately compute progress and

    fnal payments due. On the other hand, the numbero scheduled items should be held to the minimum

    needed to accomplish these purposes. The practi-

    cableextenttowhichtheworkshouldbedividedinto

    scheduleditemsmustbejudgedinlightofthequanti-

    ties o work involved and local construction practices

    and procedures. The bid schedule should include

    those items necessary to result in air and equitable

    treatment o the owner(s) and the contractor.

    (b) Division o the work into items

    Formaximumefciencyofcontractadministration,the work should be divided into items based on the ol-

    lowing principles:

    The work should be divided into items in a man-

    ner that ensures reasonable refnement o unit

    prices. The cost o any given type o work will vary

    accordingtoitscomplexityandthecomplicatingef -

    ects o the conditions under which it must be done.

    Generally,thescopeofabiditemshouldbelimitedto

    agiventypeofworkofaparticularorderofcomplex -

    ityandcost.Exceptionstothisrulemaybejustiedon

    smalljobsinvolvingrelativelysmallquantitiesofwork.

    The work should be divided into items to prevent

    conusion o supplemental job requirements.

    Similar types o work may involve dierent sizes o

    components or dierent qualities o materials. To

    prevent conusion, each variation o a given type o

    work should be established as a separate item o work.

    Also, the grouping o nonrelated items or similar com-

    ponents o separate works o improvement should be

    avoided.

    The work should be divided into items in a man-

    ner consistent with the cost sharing arrange-ments established in the watershed plan and the

    project agreement. Formanyprojects,certainworks

    o improvement may be paid or entirely or partly by

    the local sponsoring organization. To acilitate ac-

    countingofprojectcosts,theworkforsuchimprove-

    ments should be established as separate items o work

    in the bid schedule.

  • 8/22/2019 Specifications for Construction Contracts

    15/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 17

    (c) Numbering and titling

    Biditemsmustbenumberedconsecutivelybeginningwith the number one (1). Subitem numbers shall not

    be used. Each bid item shall be given a descriptive

    title that distinctly identifes the work to be done.All

    items that involve signifcant quantities o work

    (or signifcant procurement cost in the case o

    preabricated units) should be designated as a

    separate bid item.

    (d) Pay items

    Measurableitemswhosequantitiesmaybesubjectto

    variation should be designated or payment on a unit

    price basis. The estimated quantity o work and units

    o measurement must be shown in the schedule. Items

    that involve signifcant quantities o work, but are

    either not conveniently measurable or have quantities

    thatarenotsubjecttovariation,maybedesignatedfor

    payment on a lump-sum basis.

    An item involving arelatively insignifcant quantity

    ofworkthatissubjecttoonlyminor variation may

    be designated as a subsidiary item. Compensation orthis item is included in the payment or another item

    that has a logical relationship to the subsidiary item.

    Subsidiary items are not numbered nor listed in the

    bid schedule, but must be designated and described

    inthe"ItemsofWorkandConstructionDetails"ofthe

    itemandalsoreferencedinthe"ItemsofWorkand

    ConstructionDetails"sectionofthespecicationfor

    the pay item to which it is subsidiary.

    Units o measurement must be compatible with the

    measurement and payment clauses o the specifca-

    tions.

    Example 11 Typical bid schedule

    Bid Schedule

    Item Work Spec. Est. Unit Unit Amountno. quan. price

    1 Clearing,classA 1 12.5 acre _____ ________

    2 Mobilizationanddemobilization 8 1 job xxxx ________

    3 Excavation,common 21 300 cubicyard _____ ________

    4 Rockriprap 61 500 ton _____ ________

    Total $__________

  • 8/22/2019 Specifications for Construction Contracts

    16/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)18

    642.0109 Contract speciications

    Contract specifcations shall consist o an assembly o

    the appropriate standard and one-time-use construc-

    tion and material specifcations. Each construction

    specifcation will be supplemented by a section en-

    titledItems of Work and Construction Details. The

    supplemental section o each construction specifca-

    tion shall

    bepreparedespeciallyforeachinvitation,

    designatebynumberandtitleallofthebid

    items(exactlyasnumberedandtitledinthe

    bid schedule) to be perormed in conormance

    with the requirements o the specifcation,

    designateallsubsidiaryitemstobeperformed

    in conormance with the requirements o the

    specifcation,

    foreachdesignateditemofwork,statesuch

    supplemental requirements and items o inor-

    mation as are needed to relate the construction

    specicationtothejobathand,

    bearthenumberthatisnextinsequenceafter

    the number o the last section o the standard

    specifcation, and

    beinsertedintothecontractspecicationas

    the last page(s) o the construction specifca-

    tion.

    (a) Compilation

    A contract specifcation must conorm verbatim to the

    standardconstructionormaterialspecicationexcept

    where a section in the standard specifcation contains

    more than one method, only the applicable method

    need be included. The methods selected must becompatible with one another and with the conditions,

    materials, and methods prevalent in the area o appli-

    cability and the requirements o the specifed structural

    element.

    Morethanonemethodmaybeincludedinanysec -

    tion o a construction specifcation, in which case, the

    methodsshallbenumberedsequentially(i.e.,Method1,Method2,).Themethodapplicabletoeachre -

    spective item o work, material, measurement, and

    payment shall be identifed in the construction detail

    section. The optional methods are identifed in the

    instructions or each construction specifcation.

    Whenonlyonemethodofmeasurementandpayment

    is included in the construction specifcation, dele-

    tions are required in the standard specifcation. In

    addition to deletion o the other methods contained

    inthestandardspecication,thetextAll Methods

    The following provisions apply to all methods of

    measurement and payment must be deleted romthelastparagraphandtheremainingtextleftjustied.

    This guidance is included with the instruction associ-

    ated with each construction specifcation.

    (b) Identiying

    The title o each contract specifcation shall be the

    same as that o the standard construction or material

    specifcation. One-time-use specifcations shall have

    titlesthatdonotconictwiththestandardspecica-

    tions in the contract.

    Whenaconstructionspecicationismodiedfora

    specicjobbydeletingspecicmethodsfromthestan -

    dardspecication,thestateabbreviationandproject

    name shall be added. This indicates to the user and

    reviewers that the standard specifcation has been

    modifed. The date at the bottom o the pages o the

    national standard specifcation shall not be changed.

    The pages should be renumbered consecutively.

    WhenaStateelectstouseaspecicselectionof

    methods rom a standard construction specifcation as

    a State construction specifcation, the State version o

  • 8/22/2019 Specifications for Construction Contracts

    17/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 19

    this specifcation shall bear the same number and date

    as the standard construction specifcation plus the

    State name added. The pages should be renumberedconsecutively.

    Whenaconstructionspecicationisnotmodiedby

    deleting specifc methods rom the standard specif-

    cation, the numbering and ooter inormation on the

    standard specifcation shall not be changed.

    TheItems of Work and Construction Detailspages

    shall have ooters containing the ollowing inorma-

    tion:

    NRCSeffectivedateoftheIWCD

    StateabbreviationProjectName

    Specicationnumber

    Pagenumber

    The inormation shall be displayed consistently

    throughout specifcations.

    (c) Measurement and payment

    Each construction specifcation contains a section that

    describes the method o measurement to be used or

    the work perormed or the material urnished and the

    payment method or ull compensation o the work

    described. The basis or designating separate work

    itemswasdescribedin642.0108,Bidschedule.Within

    the conditions described therein, each o the construc-

    tion specifcations may be modifed to include a lump

    sum payment method. The ormat and wording o the

    method is generally as ollows:

    For items o work or which specifc lump

    sum prices as established in the contract, the

    quantity o work will not be measured or pay-

    ment. Payment or this item will be made atthe contract lump sum price or the item and

    will constitute ull compensation or comple-

    tion o the work.

    (d) Preparing constructiondetails

    The construction details or each item o work should

    be concise. They normally include the ollowing items.

    (An individual instruction or use o each construction

    specifcation is in chapter 2 o this handbook.)

    Denitionsanddescriptionsneededtodene

    the scope o work.

    Informationrequiredtodenethetypesand

    qualities o materials to be used in the work.

    Specialrequirements,suchasfoundation

    preparation, grading tolerances, provisions or

    coordinating with other work, and obtaining

    "as built" geology data.

    Otheritemsofinstructionnecessarytodene

    the construction requirements peculiar to the

    item o work.

    The construction details should contain only inorma-

    tion and instructions needed to relate the construction

    specicationtothejob.Provisionsofthespecication

    do not need to be emphasized or interpreted by repeti-

    tion o the provisions in the construction details in the

    same or similar words.

    In preparing construction details, notes on the draw-

    ings have the eect o specifcations in defning the

    type and quality o materials to be urnished and in

    defning the scope o the work. Supplemental inorma-

    tion or requirements that are directly related to details

    shown on the drawings may be stated in notes on the

    drawings rather that in the specifcations i that ar-

    rangement more conveniently and eectively conveys

    the inormation to the individuals benefting rom the

    data. The engineer responsible or the design must use

    goodjudgmentindecidingwherevarioussupplemental

    datashouldbelocatedformaximumeffectiveness.Generally,informationshownbynotesonthedrawings

    need not be repeated in the specifcations; however, i

    there is a compelling reason or doing so, great care

  • 8/22/2019 Specifications for Construction Contracts

    18/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)110

    mustbetakentopreventconictsbetweenthenotes

    and the specifcations.

    Constructiondetailsshouldnotconictwithorinter-

    pret the general terms and conditions o the contract.

    They may modiy a clause in the standard specifca-

    tions i the standard specifcation contains the phrase

    "unlessotherwisespecied."

    NRCS05/01

    INBUSSERONL-1 216

    Example 12 Typicalconstructiondetailforaspeciccontractforexcavation

    11. Items o Work and Construction Details

    Items o work to be perormed in conormance with this specifcation and construction details are:

    a. BidItem7,Excavation,Foundation,Common

    (1) Thisitemshallconsistoftheexcavationofunsuitablematerialsfromthefoundationof

    the main dam in areas that are located within the base area o the dam, but outside thelimits o cuto trench.

    (2) Thedepthofexcavationrequiredisestimatedve(5)feetatthecentralhalfofthebase

    area o the dam and tapering to about two (2) eet at the edges. The actual depths and

    extentoffoundationexcavationwillbedeterminedbytheengineerafterexaminationof

    the material encountered.

    (3) Thesidesofallfoundationexcavationsshallbesteeperthan11/2horizontalto1verti-

    cal.

    (4) InSection5,UseofExcavatedMaterials,method1willapply.

    (5) InSection6,DisposalofWasteMaterials,method2willapply.

    (6) InSection10,MeasurementandPayment,method1willapply.

    Example12showsatypicalconstructiondetailpre-

    paredforaspeciccontractforexcavation.Thisin-

    ormation is inserted at the end o Construction Speci-cation21,Excavation.Example13showsatypical

    construction detail to cross-reerence a subsidiary

    item,earthll(seeexample12,itemg).Thisdetail

    would be written or a specifc contract and inserted

    into Construction Specifcation 23, Earthfll.

  • 8/22/2019 Specifications for Construction Contracts

    19/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 111

    Example 12 TypicalconstructiondetailforaspeciccontractforexcavationContinued

    b. BidItem8,Excavation,CutoffTrench,Common

    (1) Thisitemconsistsofallcommonexcavationrequiredwithinthelimitsofthecutoff

    trench as shown on the drawings.

    (2) Thedepthofexcavationrequiredisestimatedtoextendgenerallydowntoneareleva-

    tion1105.Theactualdepthsofexcavationwillbedeterminedbytheengineerafter

    examinationofthematerialsencountered.

    (3) InSection5,UseofExcavatedMaterials,method1willapply.

    (4) InSection6,DisposalofWasteMaterials,method2willapply.

    (5) InSection10,MeasurementandPayment,method1willapply.

    c. BidItem9,Excavation,CutoffTrench,Rock

    (1) Thisitemconsistsofallrockexcavationrequiredwithinthelimitsofthecutofftrench

    as shown on the drawings.

    (2) InSection4,Blasting,ablastingplanshallbefurnishedtotheengineerforreviewprior

    to the start o any blasting operations.

    (3) InSection5,UseofExcavatedMaterials,method1willapply.

    (4) InSection6,DisposalofWasteMaterials,method2willapply.

    (5) InSection10,MeasurementandPayment,method1willapply.

    d. BidItem10,Excavation,PrincipalSpillway,Common

    (1) Thisitemconsistsofallcommonexcavationrequiredwithinthelimitsshownonthe

    drawings or the installation o the pipe conduit, riser ooting, and outlet structure

    exceptforthatportionoftheexcavationlocatedwithinthelimitsofthecutofftrenchor

    abovethelowerlimitoffoundationexcavation.

    (2) InSection5,UseofExcavatedMaterials,method1willapply.

    (3) InSection6,DisposalofWasteMaterials,method2willapply.

    (4) InSection10,MeasurementandPayment,method1willapply.

    NRCS05/01

    INBUSSERONL1 217

  • 8/22/2019 Specifications for Construction Contracts

    20/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)112

    NRCS05/01

    INBUSSERONL1 218

    Example 12 TypicalconstructiondetailforaspeciccontractforexcavationContinued

    e. BidItem11Excavation,PrincipalSpillway,Rock

    (1) Thisitemconsistsofallrockexcavationrequiredwithinthelimitsshownonthedrawings

    fortheinstallationofthepipeconduit,riserfooting,andoutletstructureexceptforthat

    portionoftheexcavationlocatedwithinthelimitsofthecutofftrench.

    (2) InSection4,Blasting,ablastingplanshallbeprovidedtotheengineerforreviewpriorto

    the start o any blasting operations.

    (3) InSection5,UseofExcavatedMaterials,method1willapply.

    (4) InSection6,DisposalofWasteMaterials,method2willapply.

    (5) InSection10,MeasurementandPayment,method2willapply.

    f. BidItem12,Excavation,EmergencySpillway,Common

    (1) Thisitemconsistsofallcommonexcavationrequiredwithinthelimitsshownonthe

    drawings or the construction o the emergency spillway.

    (2) Thegradingtolerancesforemergencyexcavationcontrolsection(EmergencySpillway

    Stations 11+30 to 12+10) shall be plus or minus 0.1 oot rom grade shown. The grading

    tolerancesforotheremergencyspillwayexcavationsshallbeplusorminus0.2footfrom

    the grades shown.

    (3) InSection5,UseofExcavationMaterials,method1willapply.

    (4) InSection6,DisposalofWasteMaterials,method2willapply.

    (5) InSection10,MeasurementandPayment,method1willapply.

  • 8/22/2019 Specifications for Construction Contracts

    21/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009) 113

    g. SubsidiaryItem,Excavation,Borrow,Common

    (1) Thisitemconsistsofallcommonexcavationrequiredtoobtainsuitableearthllmateri-

    als required to construct the permanent works.

    (2) InSection8,BorrowExcavation,allborrowareasshallbegradedtopreventtheponding

    o water. Finished slopes shall not be steeper than our (4) horizontal to one (1) vertical.

    (3) InSection10,MeasurementandPayment,noseparatepaymentwillbemadeforborrow

    excavation.CompensationforborrowexcavationwillbeincludedinthepaymentforBid

    Item 13, Earthfll Zone I.

    NRCS05/01

    INBUSSERONL1 219

    Example 12 TypicalconstructiondetailforaspeciccontractforexcavationContinued

  • 8/22/2019 Specifications for Construction Contracts

    22/487

    Part 642

    National Engineering Handbook

    General Contract Specifcation

    Procedures

    Chapter 1

    (210VINEH, January 2009)114

    10. Items o work and construction details

    Items o work to be perormed in conormance with this specifcation and construction details are:

    a. BidItem13,Earthll,ZoneI

    (1) This item consists o placing and compacting all suitable materials required to construct

    Zone I o the embankment and the desilting pond. It also includes backflling the cuto

    trench and constructing a two (2) oot thick blanket on the let abutment as shown on the

    drawings.

    (2) InSection2,Materials,thefollowingshallapply:

    (a) The material or Zone I shall be the natural deposits o gravel, sands, silts, and clays

    obtainedfromborrowarea1andsuitablematerialsfromtherequiredexcavations.

    (b) MaterialselectedtoconstructionZoneI,Earthll,shallcontainnotlessthan35per-

    cent fnes (material passing the No. 200 sieve) when determined on a dry weight basis

    o the portion o the mass smaller than three (3) inches in nominal diameter, when

    testedinaccordancewithASTMD-1140.

    (c) Unsuitable or oversize material shall be removed rom fll materials beore placement

    on the embankment and shall be wasted in the designated disposal locations shownonthedrawings.Acceptablerockmaterialslargerthansix(6)inchesindiameter

    shall be removed rom Zone I and placed in Zone II or placed as rock riprap as appli-

    cable.

    (3) InSection4,Placement,thellshallbeplacedinlayersnotexceedingnine(9)inchesin

    thicknesspriortocompaction.Themaximumsizeofrockincorporatedinthellmatrix

    shallbesix(6)inches.

    (4) InSection5,ControlofMoisture,themoisturecontentofthellmatrixatthetimeofcom-

    paction shall be maintained with the range o two (2) percentage points below to two (2)

    percentage points above optimum moisture content.

    (5) InSection6,Compaction,compactionshallbeClassA.Thellmatrixshallbecompacted

    toatleastninety-ve(95)percentofthemaximumdensitydeterminedbycompactiontests

    ofthellmaterialsbytheappropriatemethodoutlinedinASTMD698.

    (6) InSection9,MeasurementandPayment,Method2and6willapply.Suchpaymentwill

    constitutefullcompensationforrelatedSubsidiaryItem,Excavation,Borrow,Common.

    NRCS05/01

    INBUSSERONL1 239

    Example 13 Typical construction detail to cross reerence a subsidiary item

  • 8/22/2019 Specifications for Construction Contracts

    23/487

    (210VINEH, January 2009) 1I1

    Chapter 2 National Standard ConstructionSpecifcations

    Instructions or use

    Construction Specifcation 1Clearing

    1. ApplicabilityConstruction Specication 1 is applicable to the clear-

    ing o vegetation at construction sites where grubbing

    is not required.

    2. Material specifcationsNo material specications complement Construction

    Specication 1.

    3. Included items

    Items to be included in contract specications anddrawings ollow:

    a. When the area(s) to be cleared is denable on

    the project layout map or other construction

    plan view drawing, the limits o each class (A,

    B, or C as dened in Section 2 Classication) o

    clearing must be shown and clearly dened.

    b. When the area(s) to be cleared is not denable

    on the drawings (which may occur or many

    channel improvement projects), the extent

    o each class o clearing required must be

    described by notes and by designation o right-o-way boundaries and station limits. The ull

    extent o work to be perormed must be clearly

    dened.

    c. When replacement plants are required because

    o damage caused by the contractor, the speci-

    ic size, number, and species needs to be speci-

    ed in section 8. Example: "Any tree removed

    that was designated to remain or is irreparably

    damaged shall be replaced with two 15-gallon

    valley oak (Quercus lobata) as directed by the

    contracting ocer."

    d. When measurement and payment are identiedto be in accordance with method 2, section 7,

    the survey line(s) along which the length o

    cleared area(s) is to be measured must be des-

    ignated. The lateral extent and station reaches

    o the area(s) to be cleared must be clearly

    dened.

    e. Areas in which disposal o reuse/waste mate-

    rial is not allowed or areas where disposal is

    restricted or limited must be clearly dened or

    shown on the drawings.

    . Required minimum depth o earth cover over

    buried materials, i applicable.

    g. Required surace grading over buried materi-

    als, i applicable. Existing natural fow patterns

    onto or rom the construction site onto other

    properties must be a consideration in the nal

    grading.

    h. Restrictions on the use o explosives, i any.

    i. Restrictions on the burning o combustible

    materials as a disposal procedure, i any.

    j. Special requirements to control erosion, water

    pollution, and air pollution, i applicable. Re-

    quirements o this specication must be com-

    patible with any and all requirements outlined

    in Construction Specication 5, Pollution

    Control, when included as part o the contract.

    k. Method(s) o measurement and payment i the

    standard specication includes more than onemethod.

    4. Methods

    Section 7, Measurement and payment

    Methods 1 and 3Intended or use when the

    area(s) to be cleared is extensive and can be dened

    in area units on the ground and clearly shown on the

    drawing(s). Section 8 should speciy horizontal or

    surace measurements to be used to determine area

    cleared. A reservoir project is a good example o this

    type o site.

    Method 2Intended or use when the area(s) to be

    cleared is long and narrow, and cannot be clearly de-

    ned on the drawings. Section 8 should speciy hori-

    zontal or surace measurements to be used to deter-

    mine area cleared. A channel right-o-way is a typical

    example o this type o site.

  • 8/22/2019 Specifications for Construction Contracts

    24/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009)1I2

    Method 4Intended or use when the area(s) to be

    cleared cannot be measured practically and when it

    is reasonable to expect that variations in the quantityo clearing to be perormed will be minor. For method

    4, the procedures that will be used to determine the

    amount o work satisactorily completed or progress

    payment need to be identied in section 8. Options

    may include:

    Anonsiteagreed-toestimateofthepercentof

    work satisactorily completed at time o pro-

    gess payment cuto.

    Requirethecontractortoprovidemeasure-

    ments o all areas and those that have been

    satisactorily cleared, and use a percentage othe total item.

    Othersuitableandfairmethods,oneofwhich

    could be related to the construction schedule.

    When all but one method is deleted or use in a con-

    tract specication, delete rom the last paragraphAll

    MethodsThe ollowing provisions apply to

    all methods o measurement and payment. Let

    justiy the remaining text.

    5. Items o work and construction detailsStarting at the top o page 12, prepare and outline

    job specic "Items o Work and Construction Details"

    (IWCD) in accordance with these instructions.

  • 8/22/2019 Specifications for Construction Contracts

    25/487

    11(210VINEH, May 2001)

    1. ScopeThe work shall consist o the clearing and disposal o trees, snags, logs, brush, shrubs, stumps, and rubbish rom

    the designated areas.

    2. ClassifcationUnless otherwise specied in section 8, clearing will be classied according to the ollowing denitions:

    Class ARequires that trees and other woody vegetation be removed so that the remaining stumps extend no

    higher than 4 inches above the ground surace.

    Class BRequires that trees and other woody vegetation be removed so that the remaining stumps extend no

    higher than 12 inches above the ground surace.

    Class CRequires that trees and other woody vegetation be removed as near the ground surace as conventional

    tools or eld conditions will permit or as specied in section 8.

    3. Protection o existing vegetationTrees and other woody vegetation designated to remain undisturbed shall be protected rom damage throughout

    the entire construction period. Any damage resulting rom the contractor's operations or neglect shall be repaired

    by the contractor.

    Earthll, stockpiling o materials, vehicular parking, and excessive oot or vehicular trac shall not be allowed

    within the dripline o vegetation designated to remain in place. Vegetation damaged by any o these or similar ac-

    tions shall be replaced with viable vegetation o the same species or as specied in section 8 and approved by the

    contracting ocer.

    Any cuts, skins, scrapes, or bruises to the bark o the vegetation shall be careully trimmed and local nursery ac-

    cepted procedures used to seal damaged bark.

    Any limbs or branches 0.5-inch or larger in diameter that are broken, severed, or otherwise seriously damagedduring construction shall be cut o at the base o the damaged limb or branch fush with the adjacent limb or tree

    trunk.

    All roots 1 inch or larger in diameter that are cut, broken, or otherwise severed during construction operations

    shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations

    shall be covered with moist earth and/or backlled as soon as possible to prevent them rom drying.

    4. MarkingThe limits o the areas to be cleared will be marked by stakes, fags, tree markings, or other suitable methods. Trees

    to be let standing and uninjured will be designated by special markings placed on the trunks at a height o about 6

    eet above the ground surace.

    5. ClearingAll trees not marked or preservation and all snags, logs, brush, shrubs, stumps, rubbish, and similar materials shall

    be cleared rom within the limits o the marked areas.

    Construction Speciication 1Clearing

  • 8/22/2019 Specifications for Construction Contracts

    26/487

    12 (210VINEH, May 2001)

    6. DisposalAll materials cleared rom the designated areas shall be disposed o at locations shown on the drawings or in a

    manner specied in section 8. The contractor is responsible or complying with all local rules and regulations and

    the payment o any and all ees that may result rom the disposal at locations away rom the construction location.

    7. Measurement and paymentMethod 1For items o work or which specic unit prices are established in the contract, the cleared area is

    measured to the nearest 0.1 acre. Payment or clearing is made or the total area within the designated limits at the

    contract unit price or the specied class o clearing. Such payment will constitute ull compensation or all labor,

    equipment, tools, and all other items necessary and incidental to the completion o the work.

    Method 2For items o work or which specic unit prices are established in the contract, the length o the

    cleared area is measured to the nearest ull station (100 eet) along the line designated on the drawings or in the

    specications. Payment or clearing is made or the total length within the designated limits at the contract unit

    price or the specied class o clearing. Such payment will constitute ull compensation or all labor, equipment,

    tools, and all other items necessary and incidental to the completion o the work.

    Method 3For items o work or which specic unit prices are established in the contract, the cleared areas is

    measured within the specied limits to the nearest 0.1 acre. The cleared areas are determined by measuring the

    width cleared, within the specied limits, at representative sections and multiplying the average width between

    sections by the linear distance between sections. Payment or clearing is made at the contract unit price or theitem and shall constitute ull compensation or all labor, equipment, tools, and all other items necessary and inci-

    dental to the completion o the work.

    Method 4For items o work or which specic lump sum prices are established in the contract, payment or

    clearing is made at the contract lump sum prices. Such payment shall constitute ull compensation or all labor,

    equipment, tools, and all other items necessary and incidental to the completion o the work.

    All MethodsThese provisions apply to all methods o measurement and payment. Compensation or any item o

    work described in the contract, but not listed in the bid schedule is included in the payment or the item o work to

    which it is made subsidiary. Such items and the items to which they are made subsidiary are identied in section 8.

    8. Items o work and construction details

  • 8/22/2019 Specifications for Construction Contracts

    27/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009) 2I1

    1. ApplicabilityConstruction Specication 2 is applicable to the clear-

    ing and grubbing o woody vegetation and the removal

    o trash and rubbish at construction sites.

    2. Material specifcationsNo material specications complement Construction

    Specication 2.

    3. Included items

    Items to be included in contract specications anddrawings ollow:

    a. When the area(s) to be cleared and grubbed, in-

    cluding area(s) o rubbish removal, is denable

    on the project layout map or other construction

    plan view, the limits must be shown and clearly

    dened.

    b. When the area(s) to be cleared and grubbed is

    not denable on the drawings (which may oc-

    cur or many channel improvement projects),

    the extent o clearing and grubbing required

    must be described by notes and by designationo right-o-way boundaries and station limits.

    c. When replacement plants are required because

    o damage caused by the contractor, the speci-

    ic size, number, and species needs to be speci-

    ed in section 7. Example: "Any tree removed

    that was designated to remain or is irreparably

    damaged shall be replaced with two 15-gallon

    valley oak (Quercus lobata) as directed by the

    contracting ocer."

    d. When measurement and payment are identi-

    ed to be in accordance with method 2, section

    6, the survey line(s) along which the cleared

    and grubbed area(s) length is to be measured

    must be designated. The lateral extent and

    station reaches o the area(s) to be cleared and

    grubbed must be clearly dened.

    e. Areas in which disposal o reuse/waste mate-

    rial is not allowed or areas where disposal is

    restricted must be clearly dened or shown on

    the drawings.

    . Special requirements or grubbing depth, i

    required.

    g. Required depth o earth cover over buried ma-

    terials, i applicable.

    h. Required surace grading over buried materi-

    als, i applicable. Existing natural fow patterns

    onto the construction site or rom the site onto

    other properties must be a consideration in the

    nal grading.

    i. Restrictions on the use o explosives, i any.

    j. Restrictions on the burning o combustible

    materials as a disposal procedure, i any.

    k. Special requirements or control o erosion,

    water pollution, and air pollution, i applicable.

    Requirements o this specication must be

    compatible with any and all requirements out-

    lined in Construction Specication 5, Pollution

    Control, when included as part o the contract.

    l. Method(s) o measurement and payment i the

    standard specication includes more than one

    method.

    4. MethodsSection 6, Measurement and payment

    Method 1Intended or use when the area(s) to be

    cleared and grubbed is extensive and can be dened

    in units o area on the ground and on the drawings.

    Section 6 should speciy horizontal or surace mea-

    surements to be used to determine area cleared and

    grubbed. A reservoir area is a typical example o this

    type o site.

    Instructions or use

    Construction Speciication 2Clearing and Grubbing

  • 8/22/2019 Specifications for Construction Contracts

    28/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009)2I2

    Method 2Intended or use when the area(s) to be

    cleared and grubbed is long and narrow. Section 6

    should speciy horizontal or surace measurements tobe used to determine length o clearing and grubbing.

    A channel right-o-way is a typical example o this type

    o site.

    Method 3Intended or use when the area(s) to be

    cleared and grubbed is extensive, but the vegetation

    consists mainly o scattered trees, stumps, or snags

    that can be measured individually.

    Method 4Intended or use when the area(s) to be

    cleared and grubbed cannot be measured practically

    and when it is reasonable to expect that variations in

    the estimated quantity o work to be perormed willnot occur ater the contract is awarded. For method

    4, the procedures that will be used to determine the

    amount o work satisactorily completed or progress

    payment need to be identied in section 7. Options

    may include:

    Anonsiteagreed-toestimateofthepercentof

    work satisactorily completed at time o cuto.

    Requirethecontractortoprovidemeasure-ments o all areas and identiy those that have

    been satisactorily cleared and grubbed, and

    use a percentage o the total bid item.

    Othersuitableandfairmethods,oneofwhich

    could be related to construction schedule.

    Whenallbutonemethodisdeletedforusein

    a contract specication, delete rom the last

    paragraphAll MethodsThe ollowing pro-

    visions apply to all methods o measure-

    ment and payment. Ater deleting, let justiy

    the remaining text.

    5. Items o work and construction detailsStarting at the top o page 23, prepare and outline

    job specic "Items o Work and Construction Details"

    (IWCD) in accordance with these instructions.

  • 8/22/2019 Specifications for Construction Contracts

    29/487

    21(210VINEH, May 2001)

    1. ScopeThe work consists o clearing and grubbing and disposal o trees, snags, logs, brush, stumps, shrubs, and rubbish

    rom the designated areas.

    2. Protection o existing vegetationTrees and other vegetation designated to remain undisturbed shall be protected rom damage throughout the dura-

    tion o the construction period. Any damages resulting rom the contractor's operations or neglect shall be repaired

    by the contractor.

    Earthll, stockpiling o materials, vehicular parking, and excessive oot or vehicular trac shall not be allowed

    within the drip line o vegetation designated to remain in place. Vegetation damaged by any o these or similar ac-

    tions shall be replaced with viable vegetation o the same species, similar condition, and like size unless otherwise

    approved by the contracting ocer.

    Any cuts, skins, scrapes, or bruises to the bark o the vegetation shall be careully trimmed and local nursery ac-

    cepted procedures used to seal damaged bark.

    Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged

    during construction shall be cut o at the base o the damaged limb or branch fush with the adjacent limb or tree

    trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction opera-

    tions shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other opera-

    tions shall be covered with moist earth or backlled as soon as possible to prevent the roots rom drying out.

    3. MarkingThe limits o the area(s) to be cleared and grubbed will be marked by stakes, fags, tree markings, or other suitable

    methods. Trees to be let standing and uninjured will be designated by special markings placed on the trunk about

    6 eet above the ground surace.

    4. Clearing and grubbingAll trees not marked or preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall

    be cleared rom within the limits o the designated areas. Unless otherwise specied, all stumps, roots, and root

    clusters that have a diameter o 1 inch or larger shall be grubbed out to a depth o at least 2 eet below subgrade or

    concrete structures and 1 oot below the ground surace at embankment sites and other designated areas.

    5. DisposalAll materials cleared and grubbed rom the designated areas shall be disposed o at locations shown on the draw-

    ings or in a manner specied in section 7. The contractor is responsible or complying with all local rules and regu-

    lations and the payment o any and all ees that may result rom disposal at locations away rom the project site.

    6. Measurement and paymentMethod 1For items o work or which specic units prices are established in the contract, the cleared and

    grubbed area is measured to the nearest 0.1 acre. Payment or clearing and grubbing is made or the total area

    within the designated limits at the contract unit price. Such payment will constitute ull compensation or all labor,

    equipment, tools, and all other items necessary and incidental to the completion o the work.

    Construction Speciication 2Clearing and Grubbing

  • 8/22/2019 Specifications for Construction Contracts

    30/487

    22 (210VINEH, May 2001)

    Method 2For items o work or which specic unit prices are established in the contract, the length o the

    cleared and grubbed area is measured to the nearest ull station (100 eet) along the line designated on the drawing

    or identied in the specications. Payment or clearing and grubbing is made or the total length within the des-

    ignated limits at the contract unit price. Such payment will constitute ull compensation or all labor, equipment,

    tools, and all other items necessary and incidental to the completion o the work.

    Method 3For items o work or which specic unit prices are established in the contract, each tree, stump, and

    snag having a diameter o 4 inches or larger and each log having a diameter o 4 inches or larger and a length o 10

    eet are measured beore removal. The size o each tree and snag is determined by measuring its trunk at breastheight above the natural ground surace. The size o each log is determined by measuring the butt and by measur-

    ing its length rom butt to tip. The size o each stump is measured at the top. Diameter is determined by dividing

    the measured circumerence by 3.14.

    Payment or clearing and grubbing o each tree, stump, and snag having a diameter o 4 inches or larger and each

    log having a diameter o 4 inches or larger and a length o 10 eet or larger is made at the contract unit price or its

    size designation as determined by the ollowing schedule:

    Measured diameter Size designation

    (in) (in)

    4 to 8 6

    8 to 12 1012 to 24 18

    24 to 36 30

    36 to 60 48

    Over 60 60

    The sum o such payments shall constitute ull compensation or clearing and grubbing (including the clearing and

    grubbing o smaller trees, stumps, snags, logs, brush, shrubs, and roots), applicable permits and associated ees,

    and rubbish removal. Such payment shall constitute ull compensation or all labor, equipment, tools, and all other

    items necessary and incidental to the completion o the work.

    Method 4For items o work or which specic lump sum prices are established in the contract, payment or

    clearing and grubbing is made at the contract lump sum price. Such payment shall constitute ull compensation orall labor, equipment, tools, and all other items necessary and incidental to the completion o the work.

    All MethodsThe ollowing provisions apply to all methods o measurement and payment. Compensation or any

    item o work described in the contract, but not listed in the bid schedule will be included in the payment or the

    item o work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identi-

    ed in section 7.

    7. Items o work and construction details

  • 8/22/2019 Specifications for Construction Contracts

    31/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009) 3I1

    1. ApplicabilityConstruction Specication 3 is applicable to the re-

    moval o all types o structures (including ences)

    rom construction sites.

    2. Material specifcationsNo material specications complement Construction

    Specication 3.

    3. Included items

    Items to be included in contract specications anddrawings ollow:

    a. The location and description o each structure

    or ence to be removed or the area rom which

    structures are to be removed must be shown on

    the drawings. I structure removal is designated

    by area limits, the location and description

    o all buried structures to be removed must

    be shown together with area boundaries. All

    known inormation regarding the structure

    must be shown.

    b. The location and types o structures or encesto be preserved in place or to be salvaged must

    be shown on the drawings.

    c. The required extent and depth o removal.

    d. The locations o storage areas or salvaged

    structural materials must be shown on the

    drawings or indicated by appropriate notations.

    Note: A separate bid item may be required as

    a result o cost sharing arrangements when

    structure salvage is included in the contract.

    e. Areas where disposal o reuse material is not

    permitted or areas where disposal is limited, iknown. I reuse materials must be disposed o

    outside the right-o-way or work limits, make

    appropriate notation.

    . Structures, including ences, to be removed by

    others.

    g. Required minimum depth o earth cover, soil

    density requirements, and surace grading over

    buried materials, i applicable.

    h. Restrictions on the use o explosives, i any.

    i. Special requirements or control o erosion,

    water pollution, and air pollution, i applicable.

    Requirements o this specication must be

    compatible with any and all requirements out-

    lined in Construction Specication 5, Pollution

    Control, when included as part o the contract.

    j. Method(s) o measurement and payment, i the

    standard specication includes more than one

    method.

    4. MethodsSection 2, Marking

    Method 1Intended or use when the structures to

    be removed are o signicant size or when structures

    at several easy to identiy locations must be removed.

    Whenever possible, this method is preerred over

    method 2.

    Method 2Used when several small structures lo-

    cated within the work limits are to be removed.

    Section 3, Removal

    Method 1Compatible with Method 1, Marking, and

    must be used accordingly.

    Method 2Compatible with Method 2, Marking, and

    must be used accordingly.

    Section 6, Measurement and payment

    Method 1For measurement and payment on a unit

    basis.

    Instructions or use

    Construction Speciication 3Structure Removal

  • 8/22/2019 Specifications for Construction Contracts

    32/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009)3I2

    Method 2For payment on a lump sum basis. For

    this method, section 7 should include the procedures

    that will be used to determine extent o satisactorycompleted work or progress payment purposes.

    When using only one o the methods in the contract,

    deleteAll MethodsThe ollowing provisions

    apply to all methods o measurement and pay-

    ment. Let justiy the remaining text.

    5. Items o work and construction details

    Starting at the top o page 32, prepare and outline

    job specic "Items o Work and Construction Details"

    (IWCD) in accordance with these instructions.

  • 8/22/2019 Specifications for Construction Contracts

    33/487

    31(210VINEH, May 2001)

    1. ScopeThe work shall consist o the removal, salvage, and disposal o structures (including ences) rom the designated

    areas.

    2. MarkingMethod 1Each structure or structure part to be removed will be marked with stakes, fags, paint, or other suit-

    able method.

    Method 2The area boundaries rom which structures must be removed will be marked using stakes, fags, paint,

    or other suitable method. Structures to remain undisturbed or to be salvaged will be designated by special mark-

    ings.

    3. RemovalMethod 1All structures designated or removal in the contract shall be removed to the specied extent and

    depth.

    Method 2Within the areas so marked, all visible and buried structures identied shall be removed to the speci-

    ed extent and depth.

    4. SalvageStructures or structure parts that are designated to be salvaged shall be careully removed and neatly placed in the

    specied or approved storage location. Salvaged structures that are capable o being disassembled shall be disman-

    tled into individual members or sections. Such structures shall be neatly and systematically match marked with

    paint beore disassembly. All connectors and other parts shall be marked to indicate their proper location within

    the structure and shall be astened to the appropriate structural member or packed in suitable containers.

    Material rom ences designated to be salvaged shall be placed outside the work area on the property on which

    the ence was originally located. Fence wire shall be rolled into uniorm rolls o suitable size and neatly piled withother salvaged materials. Posts and rails shall be neatly stacked.

    5. Disposal o reuse materialsReuse materials resulting rom structure removal shall be disposed o in a manner and at locations specied in

    section 7 o this specication or in an acceptable manner and at locations approved by the contracting ocer. Dis-

    posal by burning shall be in accordance with local rules and regulations.

    6. Measurement and paymentMethod 1For items o work or which specic unit prices are established by the contract, payment or the

    removal o each structure unit, except ences, is made at the contract unit price. Fences removed or removed and

    salvaged are measured to the nearest linear oot. Payment or ence removal or removal and salvage is made at the

    contract unit prices or each type and size o ence.

    Such payment will constitute ull compensation or all labor, equipment, tools, applicable permits and associated

    ees or burning and disposal o reuse, and all other items necessary and incidental to the completion o the work.

    Method 2For items o work or which specic lump sum prices are established by the contract, payment or

    structure removal is made at the contract lump sum price.

    Construction Speciication 3Structure Removal

  • 8/22/2019 Specifications for Construction Contracts

    34/487

    32 (210VINEH, May 2001)

    Such payment will constitute ull compensation or all labor, equipment, tools, applicable permits and associated

    ees or burning and disposal o reuse, and all other items necessary and incidental to the completion o the work.

    All MethodsThe ollowing provisions apply to all methods o measurement and payment. Compensation or any

    item o work described in the contract, but not listed as a contract line item number in the bid schedule, is included

    in the payment or the item o work to which it is made subsidiary. Such items and items to which they are made

    subsidiary are identied in section 7 o this specication.

    7. Items o work and construction details

  • 8/22/2019 Specifications for Construction Contracts

    35/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009) 4I1

    1. ApplicabilityConstruction Specication 4 is applicable to the clear-

    ing, removal, and disposal o woody and other veg-

    etation; removal and disposal o trash and rubbish;

    and the earth shaping o the bottom and sides o the

    channel. This specication is applicable or natural

    foodways, constructed channels, and other drainage

    systems.

    2. Material specifcationsNo material specications complement Construction

    Specication 4.

    3. Included itemsItems to be included in contract specications and

    drawings

    a. The special markings indicating trees to be let

    standing, undisturbed, and uninjured must be

    described.

    b. For Section 2, Protection o Existing Vegeta-

    tion, when the specic size o replacement

    plant is known or is desired, speciy the num-ber, size, and species o the replacement in sec-

    tion 8. Example: "Any tree designated to remain

    or is irreparably damaged shall be replaced

    with two 15-gallon valley oak (Quercus lobata)

    as directed by the contracting ocer."

    c. Areas in which disposal o reuse material or

    other waste materials resulting rom channel

    clearing and shaping activities is not allowed or

    areas where disposal is limited or restricted, i

    known.

    d. Restrictions on the burning o combustible

    materials as a disposal procedure, i any.

    e. The reaches o the stream or channel where

    shaping is to be perormed.

    . An illustration or description that provides the

    shaping requirements.

    g. Method(s) o measurement and payment i the

    standard specication includes more than one

    method.

    4. MethodsSection 7, Measurement and Payment

    Method 1Intended or irregularly shaped reaches

    that need to be physically measured in the eld.

    Section 8 should speciy horizontal or surace mea-

    surements to be used to determine area cleared and

    shaped.

    Methods 2 and 3Intended or long channel reaches

    that have a uniorm width and minor variations in

    width, respectively. Section 8 should speciy horizontal

    or surace measurements to be used to determine area

    cleared and shaped.

    Method 4Intended or use where the amount o

    work required is relatively consistent throughout the

    described work area. For this method, procedures that

    will be used to determine the amount o work satis-

    actorily completed or progress payment need to be

    identied in section 8. Options may include:

    Anonsiteagreed-toestimateofthepercentof

    work satisactorily completed at time o cuto.

    Requirethecontractortoprovidesupporting

    calculations to determine extent o work satis-

    actorily completed.

    Othersuitableandfairmethods,oneofwhich

    could be related to the construction schedule.

    Instructions or use

    Construction Speciication 4Channel Clearing and Shaping

  • 8/22/2019 Specifications for Construction Contracts

    36/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009)4I2

    Method o measurement and paymentWhen all but one method are deleted or use in a

    contract specication, delete rom the last paragraphAll MethodsThe ollowing provisions apply to

    all methods o measurement and payment. Let

    justiy the remaining text.

    5. Items o work and constructiondetailsStarting at the top o page 43, prepare and outline

    job specic "Items o Work and Construction Details"

    (IWCD) in accordance with these instructions.

  • 8/22/2019 Specifications for Construction Contracts

    37/487

    41(210VINEH, May 2001)

    1. ScopeThe work consists o clearing designated areas by the removal and disposal o trees, logs, stumps, shrubs, brush,

    and rubbish, and the shaping o the channel.

    2. Protection o existing vegetationTrees and other vegetation designated to remain undisturbed shall be protected rom damage throughout the dura-

    tion o the construction period. Any damages resulting rom the contractor's operations or neglect shall be repaired

    by the contractor.

    Earthll, stockpiling o materials, vehicle or equipment parking, and excessive oot or vehicle trac shall not be

    allowed within the drip line o vegetation designated to remain in place. Vegetation damaged by any o these or

    similar actions shall be replaced with viable vegetation o the same species, similar condition, and like size unless

    otherwise approved by the contracting ocer.

    Any cuts, skins, scrapes, or bruises to the bark o the vegetation shall be careully trimmed and local nursery ac-

    cepted procedures used to seal damaged bark.

    Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged

    during construction shall be cut o at the base o the damaged limb or branch fush with the adjacent limb or tree

    trunk.

    All roots 1 inch or larger in diameter that are cut, broken, or otherwise severed during channel shaping shall have

    the end smoothly cut perpendicular to the root. Roots exposed during channel shaping operations shall be covered

    with moist soil as soon as possible to prevent roots rom drying out.

    3. MarkingThe limits o the area(s) to be cleared and shaped are marked by stakes, fags, paint, tree markings, or other suit-

    able methods or as specied in section 8 o this specication, or they will be shown on the drawings. Trees toremain standing, undisturbed, and uninjured are designated by special markings.

    4. ClearingTrees and other vegetation marked or clearing shall be cut o as near the ground surace as conventional tools

    and equipment normally permit. All trees not marked or preservation and all snags, logs, brush, shrubs, stumps,

    and rubbish shall be cleared rom within the area limits identied.

    5. DisposalAll woody material, vegetation, and rubbish resulting rom clearing rom designated areas shall be disposed o at

    the locations and in a manner shown on the drawings, or as specied in section 8 o this specication.

    6. ShapingThe channel bottom and side slopes shall be shaped as shown on the drawings. The resulting shaped channel sur-

    ace shall be reasonably smooth. Material excavated during the channel shaping operation shall be removed rom

    the channel and disposed o as specied in section 8 o this specication.

    7. Measurement and paymentMethod 1For items o work or which specic unit prices are established by the contract, the designated cleared

    and shaped area is measured and the area determined to the nearest 0.1 acre. Payment or clearing and shaping is

    Construction Speciication 4Channel Clearing and Shaping

  • 8/22/2019 Specifications for Construction Contracts

    38/487

    42 (210VINEH, May 2001)

    made at the contract unit price or the item and shall constitute ull compensation or all labor, equipment, tools,

    applicable permits and associated ees or burning and disposal o reuse, and all other items necessary and inci-

    dental to the satisactory completion o the work.

    Method 2For items o work or which specic unit prices are established by the contract, the length o the

    cleared and shaped channel designated is measured to the nearest 100 eet. Payment or clearing and shaping is

    made at the contract unit price or the item and shall constitute ull compensation or all labor, equipment, tools,

    applicable permits and associated ees or burning and disposal o reuse, and all other items necessary and inci-

    dental to the satisactory perormance o the work.

    Method 3For items o work or which specic unit prices are established by the contract, the cleared and

    shaped area(s) is measured and the area determined to the nearest 0.1 acre. The designated cleared and shaped

    area(s) is determined rom the measured width at representative sections and the distance between the sections.

    Payment or clearing and shaping is made at the contract unit price or the item and shall constitute ull compensa-

    tion or all labor, equipment, tools, applicable permits and associated ees or burning and disposal o reuse, and

    all other items necessary and incidental to the satisactory completion o the work.

    Method 4For items o work or which specic lump sum prices are established by the contract, the extent o

    clearing and shaping is not measured or determined or payment. Payment or clearing and shaping is made at the

    contract lump sum price or the item and shall constitute ull compensation or all labor, equipment, tools, appli-

    cable permits and associated ees or burning and disposal o reuse, and all other items necessary and incidental

    to the satisactory completion o the work.

    All MethodsThe ollowing provisions apply to all methods o measurement and payment. Compensation or any

    item o work described in the contract, but not listed in the bid schedule is included in the payment or the item o

    work to which it is made subsidiary. Such items and items to which they have been made subsidiary are identied

    in section 8 o this specication.

    8. Items o work and construction details

  • 8/22/2019 Specifications for Construction Contracts

    39/487

    Part 642

    National Engineering Handbook

    National Standard Construction

    Specications

    Chapter 2

    (210VINEH, January 2009) 5I1

    1. ApplicabilityThis specication is applicable to the control or reduc-

    tion o pollution rom all construction activities.

    2. Material specifcationsNo material specications complement this speci-

    cation. Any material specications required shall be

    specied in section 8 o this specication.

    3. Included itemsItems to be included in contract specications and

    drawings ollow:

    a. The area to be controlled should be dened,

    and the limits to be treated shall be shown on

    the drawings or described in the construction

    specications, or both.

    b. I areas to be treated are not easily denable on

    the site map, such as some channel projects,

    the extent o treatment shall be ully described

    by notes or designated by stations or right-o-

    way limits.

    c. Restrictions or special requirements limiting

    the selection o best management practices or

    control or treatment should be specied.

    d. Special requirements designating the sequence

    o construction operations are included. These

    requirements might require temporary or pro-

    longed shutdown o some or all construction

    operations.

    e. Alternate methods o control, i applicable.

    . Any restrictions on amount o area disturbed

    beore treatment is started.

    g. Any restriction on timing o installation, opera-

    tion, or removal o any o the controls or treat-

    ments. Stabilization and structural practices,

    such as diversions, stream crossings, sediment

    basins, sediment lters, and waterways, are

    typically specied as temporary and to be re-

    moved. I any o these practices are to remain

    in place, speciy in section 8, along with any

    maintenance or changes required beore nal

    acceptance.

    h. Special pollution control requirements, such as

    sectional excavation or placement o materials,

    burying operations, waste area reclamation,

    blasting, clearing, dredging, or other unique

    construction procedure or operation.

    i. Water and chemicals or dust control is covered

    in section 5. Payment or water or dust controlmay be included as an item o work under this

    specication or Construction Specication

    10, Water or Construction. The intent is to be

    covered in section 8 o this specication.

    j. Any other special requirements pertaining to

    this specication, including reerence to appli-

    cable state and local laws and regulations.

    k. Storm Water Pollution Prevention Plan (SWP-

    PP) requirements. Environmental Protection

    Agency or State requirements shall be ollowed

    as applicable.

    l. Method o measurement and payment.

    4. Construction methods to be applied incontracts to control pollutionThe ollowing list does not include all possible ero-

    sion and pollution control methods. All personnel

    concerned with planning, design, and construction

    should study the site careully and speciy needed

    practices required to control erosion, sediment, and

    air pollution. Pollution control specications are to be

    coordinated with the SWPPP requirements developed

    to meet the National Pollution