Upload
miguelbarreto1219
View
341
Download
0
Embed Size (px)
Citation preview
THE OTHER SIDE IS CLOSER
EL OTRO LADO ESTÁ MÁS CERCA
The entrepreneurial dynamism of CONSTRUGOMES, has led us to the execution of works throughout the Iberian market, counting with specialized teams on building all kinds of viaducts, bridges, dams, tunnels and large-scale works.
The experience acquired over the years, makes CONSTRUGOMES, a reliable and competent company in carrying out all kinds of works on motorways, high-ways, high-speed trains, tunnels, wind farms, marine works waterworks and so on. Gathering the confidence already demonstrated by several large companies. We have know-how. We have the skills. We have labor.We know how to build.
The other side is closer!
El dinamismo emprendedor de CONSTRUGOMES, nos lleva a la ejecución de obras por todo el mercado ibérico, al contar con equipos especializados en todo tipo de viaductos, puentes, presas, túneles y obras de grandes dimensiones.
La experiencia comprobada a lo largo de los años, hace de CONSTRUGOMES, una empresa fiable y competente en la ejecución de todo tipo de obras en carreteras, alta velocidad, túneles, parques eólicos, obras marítimas, obras hidráulicas, etc, contando con la confianza ya demostrada por diversas grandes empresas.
Tenemos el conocimiento. Tenemos la capacidad. Tenemos los equipos. Sabemos construir.
El otro lado está más cerca!
Tipo de trabajos ejecutados con experiencia demostrada en variadas obrasType of work performed with proven experience in several works
Encofrado modular / Modular Formwork Todos los sistemas / All systems
Encofrado en Pilas / Formwork in Pillars Sistemas trepantes y auto-trepantes / Climbing and self-climbing systems
Dovelas cero / Segments zero Ejecutamos dovelas cero de grandes dimensiones / We execute large segments zero
Encofrado en paramentos de presas / Formwork wall in dams
Carros de avance / Formtravelers Tenemos 11 pares de carros de avance propios desde 120TM hasta 450TM por dovelas (de los mayores del mercado) Ejecutamos tableros hasta 30m de ancho a sección completa y hasta 200m de luz entre pilas We own 11 pairs of formtravelers from 120ton to 450ton per segment (the biggest in the market) We can build up to 30m wide decks at full section and up to 200m of span between piers
Autocimbras (MSS) / Movable Scaffolding systems (MSS) Ejecutamos puentes de hasta 70m de vano entre pilas Ciclos semanales de hormigonado We have built bridges up to 70m of span between pillars Weekly cycles concreting
Viaduto empujado con hidráulicos / Viaduct pushed with hydraulics Ejecutamos viaductos en hormigón con viga cajón hasta 1200m de longitud We have built concrete box girder viaducts up to 1200m long
Cimbra cuajada y cimbra porticada / Shoring and heavy duty propping system with trusses Ejecutamos tableros con cimbra cuajada y cimbra porticada hasta 40m de altura y 40m de vano entre torres We build decks with shoring and heavy duty propping systems up to 40m high and with trusses system up to 40m between towers
Carros de túnel / Tunnel formworks Ejecutamos diversos túneles con varios sistemas de encofrado We have built several tunnels with the major formwork solutions on the market
Elevación de cargas / Lifting loads Tenemos un sistema de elevación de cargas a traves de cables de preesfuerzo hasta 144TM We own a strand jacks hidraulic system to lift loads up to 144ton
7
Algunas de las obras ejecutadas por ConstrugomesSome works carried out by ConstruGomes
Arias Hermanos Puente de Cortegada (Cimbra porticada)
Begar Tramo de Navia de la Autopista del Cantabrico (Cimbra cuajada e cimbra porticada)
Comsa Tramo Lalín-Silleda del tren de Alta velocidad (AVE) (2 empujes con 1200m y 1100m - Récord Ibérico)
Dragados Tramo Arrasate-Eskoriatza de la Autopista AP1 en Basagoiti (Cimbra Porticada)
FCC Viaducto Concha-Artedo de la Autopista A-8 (Auto-cimbra y desdoblamiento del tablero)
FerrovialTramo Nordeste de la SCUT de las Açores (12 puentes, una de los cuales con 2 pares de carros de avance de 450TM hasta 185m entre pilas)Viaducto de Montabliz de la Autopista del Cantabrico (pilas variables a las 4 caras con 150m de altura ejecutados con autotrepas, 5 pares de carros de avance de 450TM con 175m entre pilas)2 puentes en carros de avance en la República de Irlanda
Infratunel (Somague e MSF) Viaducto V3 de la Autopista del Marão (2 autotrepas hasta 128m de altura. Cimbra porticada hasta 30m de altura. 3 pares de carros de avance hasta 450TM com 168m entre pilas)
Isolux Corsan Puente en Arizetta (ejecutada con carros de avance)
Mota Engil Pasos superiores y inferiores en el IC30 en Cascais
OHLViaducto de Trapagaran en la variante sur metropolitana de Bilbao (2 pares de carros de 450TM)Circunvalacion de Valladolid, circular exterior sur (ejecutado con carros de avance)Viaducto sobre el río Ebro en Zaragoza (ejecutado con carros de avance)
Pavasal Viaducto sobre el río Cabriel de la variante de Cofrentes N-330 (Autocimbra superior con 70m entre pilas – Récord Mundial)
SacyrPuente sobre la A2620 para la línea de Alta Velocidad (AVE) Mondragón-EskoriatzaVariados pasos superiores y inferiores de la autovía Cantabria-Meseta
San José Viaducto sobre el río Barbantiños en Carballiño (5 pares de carros de avance de 450TM. Carro de desdoblamiento del tablero)
Soares da Costa Depósitos de agua para el campo de golf en Río Maior
Vías y ConstruccionesTúnel Siete Aguas con 3km para la línea de Alta Velocidad a Levante (AVE) Valencia-Cuenca (3 carros de túnel con un hormigonado diário por cada carro)Viaducto de Salobral de la línea de Alta Velocidad NortePassos superiores e inferiores para el Metro del río Mondego en Coimbra
RRC y Obrecol 20 pasos superiores y inferiores en el IC6 en Tábua (obra en UTE con ULMA)
RRC Variante a la puente de Vila Formosa (Cimbra cuajada y vano central con pórtico de 38m) (obra en UTE con ULMA)
UTE Presa de Montoro (Ploder y Alpi) Ejecucíon de la presa de Montoro III (paramento de la presa, descargador de superficie y otros trabajos)
Necso (grupo acciona)Viaducto de Ferrerias de la Autopista del Cantabrico (tablero ejecutado en carros de avance)Viaducto de Raíces (tablero ejecutado en carros de avance) e viaducto de Vegarrozadas (viaducto de empuje) de la Autopista del Cantabrico
Eurovias Puente con autocimbra con 70m de vano entre pilas, en Eslovaquia
Pontave Pasos superiores y inferiores en los lotes 3, 4 e 8 del Duero Interior
Opway Tablero del viaducto V3 en el lote 8 del Duero Interior (con autocimbra)
CAET Viaducto naciente del puente sobre el río Corgo con cerca de 1300m de longitud y 25,30m de ancho (1ª fase ejecutada con autocimbra inferior de 60m de vano, 2ª fase desdoblamiento del tablero con un carro de alas) - Adjudicado
9
Ferrovial
Montabliz
Viaducto de Montabliz – Santander, España
Valor de la obra: 150 millones de Euros2º Puente mayor de Europa
CimentacionesDirectas y especiales
PilasHasta 148m de alturaEjecutados con sistema de encofrado autotrepante variable a las 4 caras
Tablero725 metros de longitud con sección variable175 metros de vano entre ejes de pilaresConstruído por el método de avances sucesivos, hasta 5 metros por dovelaEjecutado con 5 pares de carros de avance que soportan hasta 450TM por dovela
Montabliz Bridge – Santander, Spain
150 million Euros2nd Biggest bridge in Europe
FoundationsDirect and special foundations
PillarsUp to 148 meters highBuilt with self-climbing formwork variable in four sides Deck725 meters with variable seccionSpans of 175 meters between pillarsBuilt by the balanced cantilever bridge method with up to 5 meters per segmentBuilt with 5 pairs of segmental formtraveler equipment up to 450 ton per segment
Montabliz Bridge – Santander, Spain
11
Montabliz Bridge – Santander, Spain
13
Montabliz Bridge – Santander, Spain
15
Montabliz Bridge – Santander, Spain
17
Montabliz Bridge – Santander, Spain
19
21
Comsa
Silleda
Tren de alta velocidad - Lalín Silleda, España
Viaducto del DezaZapatas, arco ogival, pilas, estribos y tableroViaducto con 1200m en viga cajón ejecutado por el sistema de empuje (record ibérico)
Viaducto de Anzo 2Zapatas, pilas, estribos y tableroViaducto con 1100m en viga cajón ejecutado por el sistema de empuje
Viaducto de Anzo 1Zapatas, estribos y tablero cimbrado
Túnel del CarboeiroCimentaciones, drenajes, contrabóveda y bóveda
Túnel del AnzoCimentaciones, drenajes, contrabóveda y bóveda
High Speed Train – Lalin Silleda, SpainDeza viaductFoundations, abutments, folded arch, pillars and deckViaduct with 1200m made by incremental launching with pre-cast box girder seccion (iberian record)
Anzo 2 viaductFoundations, abutments, pillars and deckViaduct with 1100m made by incremental launching with pre-cast box girder seccion
Anzo 1 viaductFoundations, abutments and deck (using propping system)
Carboeiro tunnelFoundations, draining works and tunnel formworks
Anzo tunnelFoundations, draining works and tunnel formworks
High Speed Train - Lalín Silleda, Spain
23
High Speed Train - Lalín Silleda, Spain
25
High Speed Train - Lalín Silleda, Spain
27
High Speed Train - Lalín Silleda, Spain
29
High Speed Train - Lalin Silleda, Spain
31
Iberian record of incremental launching with pre-cast box girder seccionRecord Ibérico de viaducto en viga cajón ejecutado por el sistema de empuje1200 m
High Speed Train - Lalín Silleda, Spain
31
33
High Speed Train - Lalín Silleda, Spain
33
Dragados
Basagoiti
Viaducto de Basagoiti - EspañaTramo Arrasate - Eskoriatza de la Autopista AP-1 - Basagoiti, España
Viaducto de 250m ejecutado con cimbra porticada
Basagoiti viaduct - Spain
Tranche Arrasate - Eskoriatza from AP-1 Highway - Basagoiti, Spain
Viaduct with 250m long totally executed using heavy duty propping system
35
Basagoiti viaduct - Spain
37
Basagoiti viaduct - Spain
39
San José
Carballiño
Viaducto sobre el río Barbantiños - Carballiño, EspañaPilasHasta 95m de alturaEjecutados con sitema de encofrado trepante
Tablero760m de longitud con sección variableVanos de 128m entre pilasConstruído por el método de avances sucesivos hasta 5 m por dovelaEjecutado con 5 pares de carros de avance que soportan hasta 450TM por dovelaDesdoblamiento de tablero ejecutado con carro de alas
Viaduct over Barbantiños river – Carballiño, Spain
PillarsUp to 95m highBuilt with climbing formwork
Deck760 meters with variable seccionSpans of 128 meters between pillarsBuilt by the balanced cantilever bridge method with up to 5 meters per segmentBuilt with 5 pairs of segmental formtraveler equipment up to 450 ton per segmentThe transversal edges were built using a composite forming carriage
41
Viaduct over Barbantiño’s river - Carballiño, Spain
43
Viaduct over Barbantiño’s river - Carballiño, Spain
45
Viaduct over Barbantiño’s river - Carballiño, Spain
47
49
Infratúnel (Somague MSF)
Autopista del Marão
Viaducto V3 de la autopista del Marão – Amarante, PortugalPilasHasta 130m de altura con sección 12 x 10mEjecutados con sistema de encofrado auto-trepante
Tablero910m de longitud con sección variableConstruída por el método de avances sucesivos hasta 5m por dovela y 29m de anchoEjecutado a sección completa, con 3 pares de carros de avance que soportan hasta 450TM por dovelaLos extremos del puente ejecutados con cimbra porticada de alta capacidad, con 29m de ancho y hasta 40m de altura
Viaduct V3 for the Marão Highway – Amarante, Portugal
PillarsUp to 130 meters high and with transversal seccion of 12 x 10 metersBuilt with self-climbing formwork
Deck910 meters with variable seccionSpans of 148 meters between pillarsBuilt by the balanced cantilever bridge method with up to 5 meters per segment and 29 meters widthBuilt at full section, with 3 pairs of segmental formtraveler equipment up to 450 ton per segmentExtreme sides of the bridge made using heavy duty propping system, with 29 meters width and up to 40 meters high
Viaduct V3 for the Marão Highway – Amarante, Portugal
51
53
Viaduct V3 for the Marão Highway – Amarante, Portugal
Heavy duty propping system up to 40 meters high, 29 meters width and 80m long Cimbra porticada de alta capacidad, con 29m de ancho y hasta 40m de altura
55
Viaduct V3 for the Marão Highway – Amarante, Portugal
57
Viaduct V3 for the Marão Highway – Amarante, Portugal
59
Viaduct V3 for the Marão Highway – Amarante, Portugal
61
Viaduct V3 for the Marão Highway – Amarante, Portugal
63
Ferrovial
Scut de las AçoresTramo Nordeste de la SCUT en las Azores – S. Miguel de las Azores, Portugal
Trabajos ejecutados12 puentesPasos superioresPasos inferiores
Viaducto PrincipalViaducto “Despete que Suas”
PilasHasta 90 m de altura y con sección variable en 2 carasEjecutados con sistema de encofrado trepante
Tablero385m de longitud con sección variable185m de vano entre ejes de pilasConstruída por el método de avances sucesivos hasta 5m por dovelaEjecutado a sección completa, con 2 pares de carros que soportan hasta 450TM por dovelaExtremos del puente ejecutado con cimbra porticada de alta capacidad
Northeast tranche of “SCUT dos Açores” Highway - S. Miguel in Azores, PortugalGeneral task12 Bridges OverpassesUnderpasses
Main viaductViaduct “Despete que Suas”
Pillars Up to 90 meters high with variable seccion in 2 sidesBuilt with climbing formwork
Deck385 meters with variable seccionSpans of 185 meters between pillarsBuilt by the balanced cantilever bridge method with up to 5 meters per segmentBuilt at full section, with 2 pairs of segmental formtraveler equipment up to 450 ton per segmentExtreme sides of the bridge made using heavy duty propping system
Northeast tranche of “SCUT dos Açores” Highway - S. Miguel in Azores, Portugal
65
Northeast tranche of “SCUT dos Açores” Highway - S. Miguel in Azores, Portugal
67
Northeast tranche of “SCUT dos Açores” Highway - S. Miguel in Azores, Portugal
69
Mota Engil
IC30Autopista IC30 - Cascais, PortugalPasos superiores e inferiores con cimbra cuajada
IC30 Highway - Cascais, Portugal
Overpasses and underpasses with shoring system
71
IC30 Highway - Cascais, Portugal
73
75
IC30 Highway - Cascais, Portugal
OHL
ValladolidCircunvalación de Valladolid, Circular exterior sur - Valladolid, EspañaTablero100 m de longitud con sección variableConstruída por el método de avances sucesivos hasta 5 m por dovelaEjecutado a sección completa, con 2 pares de carros de avance que soportan hasta 150TM por dovela
Valladolid highway ring, Outer south circular - Valladolid, Spain
Deck100 meters with variable seccionBuilt by the balanced cantilever bridge method with up to 5 meters per segmentBuilt at full section, with 2 pairs of segmental formtraveler equipment up to 150 ton per segment
77
79
Valladolid highway ring, Outer south circular - Valladolid, Spain
81
Valladolid highway ring, Outer south circular - Valladolid, Spain
OHL
Trapagaran
Viaducto de Trapagaran de la variante sur metropolitana de BilbaoTrapagaran, España
Pilas6 pilas constantes ejecutadas con encofrado trepante
Tablero789 m de longitud con sección constante.125 m de vano entre ejes de pilasConstruída por el método de avances sucesivos hasta 5 metros por dovelaEjecutado a sección completa con 3 pares de carros de avance que soportan hasta 450TM por dovelaLos extremos del puente ejecutados con cimbra porticada de alta capacidad
Trapagaran viaduct in Bilbao’s metropolitan southern variantTrapagaran, Spain
Pillars6 pillars with constant seccion, built with climbing formwork
Deck789 meters with variable seccionSpans of 125 meters between pillarsBuilt by the balanced cantilever bridge method with up to 5 meters per segmentBuilt at full section, with 2 pairs of segmental formtraveler equipment up to 450 ton per segmentExtreme sides of the bridge made using heavy duty propping system
83
85
Trapagaran viaduct in Bilbao’s metropolitan southern variant - Trapagaran, Spain
87
Trapagaran viaduct in Bilbao’s metropolitan southern variant - Trapagaran, Spain
SACYR
Mondragón
Puente sobre A2620 para la línea de alta velocidad Mondragón-EskoriatzaMondragón, España
Tablero1392m de longitud con sección constante26 vanos de 56 metros entre ejes de pilasEjecutado con 1 autocimbra inferior (MSS) a sección completa
High speed train bridge over A2620, Mondragón-EskoriatzaMondragón, Spain
Deck1392 meters with constant seccion26 Spans with 56 meters between pillarsBuilt with a underslung Movable Scaffolding System (MSS) at full seccion
89
91
High speed train bridge over A2620, Mondragón-Eskoriatza - Mondragón, Spain
93
High speed train bridge over A2620, Mondragón-Eskoriatza - Mondragón, Spain
95
High speed train bridge over A2620, Mondragón-Eskoriatza - Mondragón, Spain
Vías y Construcciones
Túnel Siete Aguas
Línea de alta velocidad Madrid Valencia - Cuenca, España3 Km de túnel para línea de alta velocidad3 carros de túnel con 1 hormigonado diario por carro
High speed train, Madrid - Valencia - Cuenca, Spain
3km of tunnel for the high speed train3 tunnel formworks with one daily concreting for each
97
99
High speed train Madrid-Valencia - Cuenca, Spain
PAVASAL
Cofrentes
Variante de Cofrentes N-330, Viaducto sobre el río Cabriel Cofrentes, España
Pilas7 pilas hasta 47 metros de alturaEjecutados con encofrado trepante variable a las cuatro caras
Tablero520 metros de longitud con sección variableConstruída a sección completa, con 1 autocimbra superior auto-lanzada (MSS) para 70m de vano
Connection to Cofrentes N-330, Viaduct over Cabriel riverCofrentes, Spain
Pillars7 pillares up to 47 meters highBuilt with a climbing formwork variable in 4 sides
Deck520 meters with variable seccion8 Spans with 70 meters between pillarsBuilt with a overhead Movable Scaffolding System (MSS) at full seccion
101
103
Connection to Cofrentes N-330, Viaduct over Cabriel river - Cofrentes, Spain
105
Connection to Cofrentes N-330, Viaduct over Cabriel river - Cofrentes, Spain
First MSS in the world with 70m between pillarsEquipment with tecnology that simulates the human muscle – OPS system
Primera MSS en el mundo con 70m entre pilasEquipos con tecnología que simula el músculo humano - sistema OPS
107
Connection to Cofrentes N-330, Viaduct over Cabriel river - Cofrentes, Spain
RCC / ULMA
Variante del Puente de Vila Formosa
Variante del Puente de Vila Formosa - Vila Formosa, Portugal
Pilas5 pilas con 40 metros de vano entre ejes
Tablero235 metros ejecutados con cimbra cuajadaVano sobre el río con cimbra porticada de alta capacidad con 35 metros entre torres
Vila Formosa bridge’s variant - Vila Formosa, PortugalPillars5 pillars with 40 meters between axis
Deck235 meters built with shoring systemSpan over the river built using heavy duty propping system with 35 meters between towers
109
111
Vila Formosa bridge’s variant - Vila Formosa, Portugal
113
Vila Formosa bridge’s variant - Vila Formosa, Portugal
UTE
Montoro (PLODER y ALPI)
UTE Presa de Montoro (PLODER y ALPI)
PresaAbovedada de tipo de arco de gravedadAliviadero de superficie de ancho constante en el centro del cuerpo de la presaSistema de disipación de energía mediante trampolín y cuenca amortiguadoraPlazo de ejecución de 28 meses cumplido totalmente por Construgomes
Número de bloques 15 y arranquesVolumen de hormigón 260.000 m3Encofrado Trepante con trepa convencional
UTE Montoro (Ploder and ALPI)Arch dam
Gravity arch damArch’s central surface discharger with constant widthenergy dissipation system by trampoline and damping basinExecution time 28 months completed in full sucess by Construgomes
Number of blocks 15 and foundationsVolume of concrete 260.000 m3Climbing Formwork by convencional system
115
117
Arch Dam - Montoro, Spain
119
Arch Dam - Montoro, Spain
ConstruGomes en España
ConstruGomes, S. L.Calle Pedroso, nº847100 Tordesillas (Valladolid)España
Tel +34 983 771 167Fax +34 983 770 443e-mail [email protected]
ConstruGomes em Portugal
ConstruGomesRua dos Carvalhos, nº46Apartado 114750-626 PerelhalPortugal
Tel +351 253 894 322Fax +351 253 894 323e-mail [email protected]
www.construgomes.es