SOUTHBRIDGE SCHOOL MASTER PLAN REPORT
JANUARY 2016
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
REPORT REVISION DATE AUTHOR
SOUTHBRIDGE SCHOOL – MASTER PLAN REPORT 001 22 January 2016 R Webb & K Brice
SOUTHBRIDGE SCHOOL – MASTER PLAN REPORT 002 16 February 2016 R Webb & K Brice
25 Lichfield Street Central City
Christchurch 8011 PO Box 1025
Christchurch 8140
CONTACT // RICHARD WEBB
M // 021 713 010 E // [email protected]
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
CO
NTEN
TS
CONTENTS
CONTENTS 4
INTRODUCTION 6
SCHOOL INFORMATION 8
SITE LOCATION & CONTEXT 10
EXISTING BUILDINGS & INFRASTRUCTURE 12
BOILER HOUSE REMEDIATION 18
PROPOSED ROLL GROWTH CLASSROOMS 20
ANCHOR BUILDINGS 22
PROPOSED MASTER PLAN 24
MASTER PLAN OPTION 1 26
MASTER PLAN OPTION 2 28
MASTER PLAN OPTION 3 30
ZONE MAPPING 32
DEVELOPMENT STAGING 34
APPENDIX A – ROUGH ORDER OF COST, BOILER REMEDIATION 37
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
INTR
OD
UC
TION
INTRODUCTION
Southbridge School have appointed Logic Group to undertake a review of their existing buildings and infrastructure
for the purposes of establishing a Master Plan, to identify a blue print for future development at the School over
the next 5 to 10 year horizon.
In preparing this Master Plan report, Logic Group have undertaken detailed consultation with the MoE Education
Infrastructure Service Group and Board of Trustees, to ensure the proposed Master Plan reflects the needs of the
School and is aligned with the Southbridge School vision, goals and educational principles.
This Master Plan report has been prepared on the basis that existing buildings will be retained where the use,
functionality and ongoing economic viability support retention.
One of the primary objectives of this Master Plan is to provide for future growth of the school on the existing site.
Also addressed in this Master Plan is the viability of repairing the earthquake damaged boiler house. While
reported to be functioning efficiently, the boiler only services three cloakroom areas, while the rest of the school is
heated utilising heat pumps. As a result, installation of heat pumps in lieu of repairing the boiler house must be
investigated.
In addition to the above, there are safety concerns around the placement of the carpark, which is frequently used
by students as a thoroughfare between the street and the administration building. The Master Plan also identifies
opportunities to implement the recommendations of the cultural narrative that has been provided to the school,
and outlines landscaping alterations to support the changes to school facilities.
The scope of this Master Plan report does not extend to consider alternative uses of buildings, such as use by
external organisations, though this could be a consideration for the Board as a means of enhancing community
involvement with the school.
Consideration has not been given to any land disposal strategies and it is assumed that all land will be retained by
the Ministry of Education for future education use.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
INT
RO
DU
CT
ION
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
SCH
OO
L INFO
RM
ATIO
N
SCHOOL INFORMATION
BACKGROUND
Southbridge School was established in 1868 and currently operates as a decile 8 state primary school and caters for
students from years 1 to 6. The original roll in 1868 totalled 20 students, with a maximum roll in 1890 of 389
students. The primary school shared a site with Southbridge District High School across the road from the existing
site until 1924, though was relocated to 25 Hastings Street following a fire in the same year.
As a result of the long establishment of the school, in conjunction with occupation of sites across the road from
each other, the location of underground services are unconfirmed.
Unique to Southbridge School is their strong level of community involvement, including local iwi. Also of note is the
Southbridge School Seeds of Learning Programme, which offers context for learning through practical applications
such as development of edible gardens, rearing of salmon and care for chickens.
SCHOOL ROLL
Southbridge School have a fluctuating roll, due to variations in the resident township population, which is affected
by housing availability and changes made by local employers. Overall the roll is increasing however. As Selwyn
District is an area of growth, two new roll-growth classrooms have been designed and consented.
The school has an enrolment scheme in place, indicated by the catchment area shown in Figure 1 (outlined in
black).
The table below shows actual school roll as at July for the periods 2009 to 2015.
YEAR 2009 2010 2011 2012 2013 2014 2015
SCHOOL ROLL 161 169 168 167 173 160 159
CATCHMENT AREA AND POPULATION FORECASTS
Figure 1 identifies the potential catchment area for Southbridge School (area outlined in black).
Figure 2 shows the Statistics NZ (2013 base) age 0-14 population medium projections for Selwyn District. Note
these projections show all 0-14 year olds.
FIGURE 1 ENROLMENT HOME ZONE FOR SOUTHBRIDGE SCHOOL
FIGURE 2 STATISTICS NZ MEDIUM SELWYN DISTRICT POPULATION PROJECTION 0-14 YEAR OLDS
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
SC
HO
OL IN
FO
RM
AT
ION
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
SITE LOC
ATIO
N &
CO
NTEX
T
SITE LOCATION & CONTEXT
SITE LOCATION
Southbridge School is located at 25 Hastings Street, Southbridge. The Site comprises approximately 4.9ha.
The site is bounded by Hastings Street to the south east. The school has one primary entrance off Hastings Street,
though there is also parking for buses further toward the west.
ORIENTATION & PREVAILING WEATHER
The classrooms are orientated in an arc around a central play area, a layout which is repeated to the south of the
classroom blocks, in the layout of the hall and library. The latter is frequently used as breakout space and as an
overflow classroom.
Centralised courtyards and play areas comprise the communal outdoor spaces, surrounded by extensive grounds
for sport.
The location and orientation of the administration building has been carefully considered to ensure that the school
has a strong street presence and focal entry. Each of the existing classroom buildings are integral to the operation
of the school, and have been orientated to take advantage of the sun. Selwyn District experiences prevailing north
to north easterly winds, and the site, being open, is frequently exposed to high winds.
ACCESS & CARPARKING
Access to the site is from Hastings Street to the South, with the Administration block directly visible from the street,
and accessed directly through the staff car park. It is noted that car parking space is sufficient for the needs of the
school, with approximately 19 carparks available. However, the carpark also raises health and safety concerns, as
students frequently use it as a direct thoroughfare to the street.
The carpark is also used as a special needs drop off area, though being uncovered, provides little in the way of
protection from the elements for special needs students and caregivers.
LANDSCAPE
The School grounds are extensive for the size of the school, and are comprised predominantly of grassed playing
fields. The mounded area over the former swimming pool is used by students as a scooter ramp, a playing element
which is held in high regard by students. Other play areas include barked playing frames, painted concrete games,
while edible gardens and animal compounds (e.g. for chickens and salmon) are also accommodated on the site.
N
Block 4
Former
Dental
Clinic
Block 10
Seniors
Block 2
Administration
Block 1
BH
Caretaker’s
Drive-Through
Shed
Garage
Glasshouse
Shed Juniors
Middle
Primary Entrance
Prevailing Wind
SOUTHBRIDGE SCHOOL MASTER PLANNING SITE LOCATION & CONTEXT SK-01 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
Block 3
Hall Library
Staff Car Park
Pedestrians
Vehicles
Hazelnut Grove
& Protected
Trees
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
EXISTING BUILDINGS & INFRASTRUCTURE
EXISTING BUILDINGS
Each of the buildings located on the Southbridge School are of permanent materials, with most of the buildings on
the site constructed between 1926 and 1970. One newer block was added in 2009, with another two-classroom roll
growth block consented for construction during 2016.
Blocks 2, 3, 4, and 10 are low lying single storey brick buildings, while Block 1 is of weatherboard construction with
a high stud. The boiler house is concrete block, and all roofing is galvanised iron.
Further details relating to each of the buildings are summarised in Table 1 below
TABLE 1 PMIS DATA FOR EXISTING BUILDINGS
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
INFRASTRUCTURE
ELECTRICAL Neil Pritchard Electrical Consultants prepared a report on the condition of the electrical system at
Southbridge School during January 2015. The school currently has three separate metered electrical
connections via overhead supply. The report identified the need to replace the non-compliant switchboard in
the hall prior to increasing the load on the electrical system. Furthermore, replacement of two of the existing
three metered electrical connections with a new 150-amp central supply to the side of the boiler house would
be required to increase the capacity of the existing system safely for future growth classrooms. The
replacement of two of the electrical mains would further benefit the school with savings in line charges in
excess of $1,000.00 per year.
STRUCTURAL GHD Engineering Consultants have completed a Detailed Engineering Evaluation (DEE Report) on
the boiler house, with NBS calculations as follows:
“The boiler house currently has a calculated seismic in-plane capacity of 5% NBS in the transverse direction,
100% NBS in longitudinal direction and 41% NBS out of plane. The chimney has a calculated seismic capacity of
34% NBS”
From a structural perspective, the chimney and brick walls of the boiler house are independent, so lateral
strengthening would connect these through the use of tie beams.
The chimney itself is not classed as earthquake prone, though the boiler house is classed as ‘earthquake prone’,
as it is considered brittle and therefore categorised as ‘likely to collapse’ in a moderate earthquake.
If retained, the boiler house will require strengthening to bring the building to 67% NBS, for which a conceptual
strengthening scheme has been proposed by GHD. Strengthening to 67% NBS would involve removing the
chimney, installing a steel portal frame along with tie beams and either additional columns or roof trusses.
Repair of the concrete foundation using mortar is also recommended by GHD to protect the reinforcing.
DEE Reports were not available for any of the other buildings on the site, though they are understood to be
structurally sound.
PLUMBING & DRAINAGE As the school was first established in 1868 and has occupied two sites across the road
from each other, much of layout of the underground infrastructure is unconfirmed.
The school had been reporting significant water use over and above the expected average for a school site, and
was being charged for excess water use. Investigative work to the plumbing system was carried out in January
2016 to determine the source of leaks and subsequent water charges for the site. As a result of this
investigation, a major leak near Block 2 was repaired, with a number of smaller alterations and repairs carried
out across the site, including replacement of the water meter. The pipe network was not replaced as part of the
repairs, and are understood to be the older style ceramic pipes. Following the leak repairs, underground
plumbing is in good working condition and operating effectively across the site.
The school have reported that there are no problems with the drainage currently, so no further investigation
was carried out prior to Master Planning. There are currently no accurate as-built plans available for either the
plumbing or drainage system at Southbridge School.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
BLOCK 1
Block 1 forms the junior and middle student classrooms.
The building is of permanent construction, of painted timber weatherboard cladding and a high stud.
Externally and internally, the building is in good condition.
The building is fully utilised for teaching, with two of the cloakroom areas being used as breakout spaces in addition
to bag storage. The two cloakroom areas are heated by radiators powered by the boiler, while the classroom
spaces are warmed by heat pumps.
Block 1 incorporates 4 allocated teaching spaces.
The building was originally constructed in 1926, was upgraded in 1983 and is crown education owned.
BLOCK 2
Block 2 houses senior students in rooms two and three, which are adjacent to the administration area and staff
facilities.
The teaching section of the building is of permanent construction with full height brick cladding and galvanised iron
roofing. A raised timber deck with in-built seating has been constructed to the front of the teaching area, with
concrete accessible ramps. The administration section is comprised of a mixture of brick and painted lightweight
cladding (timber and fibre cement board). Window and door joinery is a mixture of timber and aluminium across
the block.
The building is in good condition, and in continuous use for both teaching and administrative functions.
Block 2 incorporates 2 allocated teaching spaces.
The building was originally constructed in 1962 and is crown education owned.
BLOCK 3
Block 3 is nominated as the school hall.
The building is of permanent construction comprising full height brick cladding with a galvanised iron roof. The
building has recently undergone extensive structural strengthening and as a result is in near-perfect condition for
its age, both internally and externally. Timber panelling features extensively throughout the interior, forming the
lower wall linings, ceiling beams, joinery and flooring, as well as the raised stage area.
Accessible concrete stairs, ramps and handrails have been added to the exterior of the building.
Block 3 does not incorporate any allocated teaching spaces.
The building was originally constructed in 1956 and is crown education owned.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
BLOCK 4
Block 4 is the former dental clinic. It is currently used for storage, and ad-hoc lessons as required.
The building is of permanent construction comprising lower cladding, timber windows and lightweight upper
cladding with a galvanised iron roof. The building has been well maintained and is in good condition externally.
Block 4 does not incorporate any allocated teaching spaces.
The building was originally constructed in 1970 and is crown education owned.
BLOCK 10
Block 10 houses senior students.
The building is of permanent construction with full height brick cladding and galvanised iron roofing. The building is
in good condition, and is being fully utilised.
Block 10 incorporates 1 allocated teaching space.
The building was originally constructed in 2009 and is crown education owned.
OTHER BUILDINGS AND ANCILLARY STRUCTURES
In addition to the buildings identified above, Blocks 5, 6, 7, 8 and 9 have been identified as ancillary buildings on
PMIS.
These do not incorporate any allocated teaching space, and are generally comprised of light weight storage sheds
e.g. the garage, drive-through caretaker’s shed and tool shed.
The boiler at Southbridge School currently services three of the cloakrooms, which are also used as breakout
spaces. Two of the boiler-heated cloakrooms are located in Block 1, while the other is located in Block 2. Heating in
the classrooms has been switched from boiler heating to heat pumps. The boiler is reportedly operating at
approximately 95% efficiency, as a result of the boiler maintenance and servicing programme carried out by the
school.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
EXISTING TEACHING SPACE SUMMARY
In summary blocks 1, 2, & 10 incorporate all of the existing allocated teaching spaces for the School. The proposed
new Block 11 (roll growth classrooms) will add an additional two teaching spaces once constructed.
BLOCK TEACHING SPACE ALLOCATION
Block 1 4
Block 2 2
Block 10 1
TOTAL TEACHING SPACES 7
TEACHING SPACE ENTITLEMENT
Based on the current school roll of 159 students (July 2015 roll), Southbridge School has a space entitlement as
shown on the following page. Note that this calculation includes the planned roll-growth block, which has not yet
been constructed. The space entitlement inclusive of the additional two classroom spaces is in line with the
projected roll growth for the school, and therefore no net rationalisation or additional construction is required at
this stage beyond what is planned for 2016.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
EXISTIN
G B
UILD
ING
S & IN
FRA
STRU
CTU
RE
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
BO
ILER H
OU
SE REM
EDIA
TION
BOILER HOUSE REMEDIATION
The boiler has been well maintained by the school, and as a result is reported to be operating at 95% efficiency. It
houses both the boiler unit itself, as well as providing storage for the school’s stage units. The boiler heating is
currently only servicing three cloakrooms however -two in Block 1, and one in Block 2, which are also used as
breakout spaces. Following the Detailed Engineering Evaluation (DEE Report) carried out as a result of the
Canterbury earthquakes, the boiler house requires strengthening and remediation to upgrade it to the minimum
required 67% NBS (Option A below). A Rough Order Cost Estimate of the repair strategy recommended by GHD
structural engineers has been carried out, demonstrating a rough order repair cost of $53,792.47 ex GST. A more
detailed breakdown of these costs is included in Appendix A.
As an alternative to repairing the boiler house, the boiler house could be demolished, with heat pumps installed to
the three classrooms that are currently heated by radiators (Option B below). The radiators would be capped off
and left in place. It is proposed that a new shed would be constructed to provide storage for the school’s stage
units and caretaker items. In order to install additional heat pumps, the switchboard to the hall will need to be
upgraded, as it is non-compliant and already at capacity. Replacing the switchboard would enable the additional
three heat pumps to be installed, though it is noted that on a long-term basis, installation of a new 150-amp central
electrical supply has been recommended by the electrician and would be required prior to the construction of the
2016 roll growth classrooms. Inclusive of the upgrade of the electrical switchboard, the rough order cost of Option
B would be $43,000.00 ex GST.
OPTION A: BOILER STRENGTHENING OPTION B: DEMOLISH BOILER
1. Enabling works & demolition $29,054.39 1. Demolish boiler & make good $8,000.00
2. Strengthening $7,853.61 2. Supply & install 3no. heat pumps $10,000.00
3. Reinstatement $5,117.36 3. Construct new storage garage $20,000.00
4. P&G, Margin & Contingency $11,767.54 4. Upgrade electrical switchboard $5,000.00
TOTAL $53,792.47 TOTAL* $43,000.00 * The above total for Option B does not take into account any return from the sale of the existing boiler unit. As the
boiler unit itself is in excellent condition, it is expected that the boiler unit could be sold to further offset the costs
of this option.
Based on the Rough Order of Costs above, Option B to demolish the boiler is the most cost effective option
currently available to the school, largely due to the use of heat pumps as a primary means of heating instead of
boiler heated radiators. It is further noted that the ongoing maintenance of a boiler to service only thee cloakrooms
is not an efficient use of maintenance funding on a long term basis.
Removal of the boiler house would open up the site entry, providing an inviting entry area and natural path toward
the hall and library. This could be further enhanced with feature planting, which would provide an ideal
opportunity for the selection of traditional species as described in the cultural narrative prepared for the school.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
BO
ILER H
OU
SE REM
EDIA
TION
Boiler House Remediation
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
PRO
POSED
RO
LL GR
OW
TH C
LASSR
OO
MS
Proposed
Roll Growth
Classrooms
PROPOSED ROLL GROWTH CLASSROOMS
Two new classrooms have been proposed for construction, in order to ensure that there are sufficient facilities to
accommodate the predicted roll growth at Southbridge School.
The proposed roll growth classrooms have been designed with AP Design Ltd as the lead consultant, and consent
has been approved. The plans were issued for tender, and contractor pricing received. However, a contract for
construction of the classrooms has not yet been awarded, as the tender prices exceeded the budgeted allowance,
and therefore the classroom design and pricing must be reviewed by the MoE before the project can proceed.
It is understood that the architectural and structural design of the classrooms has been reviewed separately by the
school’s project manager and the MoE, and is beyond the scope of the Master Plan. In contrast, the location of all
buildings on the site is a primary focus of the Master Plan and it has been noted that the planned location of the
new roll growth classrooms over the former swimming pool would require additional foundation work compared to
other areas of the site, incurring added cost accordingly. Siting the classrooms between the hall and Block 1 isolates
these areas and limits the strategic locations available for future classrooms to support the community orientated
nature of the school. It is appreciated that much consideration has been taken in determining the proposed
location of the new classrooms, though a number of alternative locations have been identified for discussion which
may offer the school greater long term benefits that could be achieved with classrooms sited over the former
swimming pool. Further details of these options have been provided for consideration in the Master Plan section of
this report.
N
Block 4
Former
Dental
Clinic
Block 10
Seniors
Block 2
Administration
Block 1
BH
Caretaker’s
Drive-Through
Shed
Garage
Glasshouse
Shed Juniors
Middle
Primary Entrance
Prevailing Wind
SOUTHBRIDGE SCHOOL MASTER PLANNING ROLL GROWTH CLASSROOMS 2016 SK-02 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
Block 3
Hall Library
Staff Car Park
Pedestrians
Vehicles
Proposed Roll Growth
Classrooms
Hazelnut Grove
& Protected
Trees
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
AN
CH
OR
BU
ILDIN
GS
Anchor Buildings
ANCHOR BUILDINGS
The majority of the buildings already on the school site will be retained, as they are fully utilised and in excellent
condition for their age; therefore there is no economic justification for their removal. These facilities will provide
anchor points to maximise connectivity opportunities. The two new roll growth classrooms that are scheduled for
construction during 2016 will also form anchor buildings for the site, and as such, their placement in relation to the
existing blocks is significant.
Key anchor buildings that have been identified following visual inspections of the school are summarised below:
BLOCK 1 (JUNIOR/MIDDLE STUDENT CLASSROOMS). Block 1 has a strong presence on the site, due to its high
stud and gabled roof. It has been well maintained and is ideally situated for connection of the junior students
with the rest of the school via the edible gardens and playing areas. ILE modifications are planned for Block 1 as
part of an upcoming 5YA project.
BLOCK 2 (ADMINISTRATION). The administration building provides a focal entrance point for the school from
Hastings Street. It is well located with a strong street presence due to highly visible signage and the extension in
parallel with Hastings Street. The building is in overall good condition and incorporates two teaching spaces,
which are currently used for senior students.
BLOCK 3 (HALL). The hall has recently undergone extensive structural strengthening, and has been preserved as
a community icon. The hall is extensively used by the school as a communal meeting area.
BLOCK 10 (SENIOR STUDENT CLASSROOMS). Block 10 houses the remaining senior students, and provides a key
teaching area for the school.
BLOCK 11 (PROPOSED CLASSROOMS). The roll growth experienced by Southbridge School necessitates the
addition of two new roll growth classrooms. The initial location of these roll growth classrooms was indicated to
the rear of Block 1, near the hall, above the site of the former swimming pool. This location was initially
selected in order to ensure the flow of teaching spaces and ensure connection of the junior students with the
rest of the school, while maintaining their own area. The initial location results in a divided school however,
providing a distinct segregation between the junior and senior schools, which given the low roll numbers in
relation to site area, would unnecessarily divide and isolate the school community. The alternative location of
the new roll-growth classrooms, as proposed in Master Plan Options 2 and 3 provides a centralised hub, around
which the school community is located. Each of the age groups are still able to have their own dedicated play
and work areas around the outer edge of the hub, while still retaining connection across the year levels through
the heart of the school.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
AN
CH
OR
BU
ILDIN
GS
Anchor Buildings
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
PRO
POSED
MA
STER PLA
N
Proposed
Master Plan
PROPOSED MASTER PLAN
The following section details three potential options for future development.
CARPARKING. A key health and safety concern arises from the frequent use of the main car park as a
thoroughfare by students. The Master Plan assumes that the existing entrance to the site will remain in its
current location along Hastings Street, as the administration building is well situated as a focal entrance for the
school. There are two options for addressing the health and safety concerns for the car park. Option A involves
installing a fence around the perimeter of the car park. This would make using the car park as a thoroughfare
more difficult, while still retaining direct access to the administration block for special needs students and their
carers. Option B involves remodelling the car park to provide a centralised pedestrian pathway from the street
to the administration building, with car parks relocated to either side of the path. Option B would also enable a
dedicated access for special needs vehicles, incorporating shelter for poor weather and enabling delivery of
these students directly to the administration area. Option A could be carried out during Stage 1 to quickly
address the key health and safety concerns around the car park, with Option B being implemented at a later
stage as funds permit.
SERVICE AREAS. The existing service buildings for the school (caretaker’s sheds, storage etc.) are spread across
the site. The former dental clinic and drive-through shed are currently located along the eastern boundary, with
storage sheds located to the west of Block 1 as well as the glasshouse and storage to the north of Block 3 and
garage to the west of Block 3. The Master Plan proposes the relocation of the shed near Block 1, along with the
storage near Block 3 to the southern site boundary alongside the garage. The pump shed and fence would be
demolished, while the glasshouse would be relocated to the East of the library and incorporated into a ‘living
garden’. Recycle bins, currently stored near the boiler could also be relocated here and screened in with a
combination of trellis and planting. The above would clear a key path from the Hastings Street entrance to the
library, hall and classrooms, which could further be developed with planting to enhance the school entrance.
The drive-through shed and former dental clinic would remain in their existing locations, as it would be
uneconomical to relocate them. Consolidating the location of storage and services along the southern boundary
provides a cohesive service compound and minimises unnecessary service traffic across the site, while leaving
core areas of the site free for student circulation and building placement.
EARTHQUAKE REMEDIATION OF BOILER HOUSE. Based on the Rough Order Cost estimates prepared for
Option A (repairing the boiler house in accordance with the recommendation made by GHD) and Option B
(demolishing the boiler house, installing heat pumps to the cloakrooms currently heated by the boiler as well as
constructing a new storage shed), the Master Plan indicates demolition of the boiler house as the most cost
effective option.
TEACHING SPACES AND FUTURE EXPANSION. The proposed 2-teaching-space classrooms that are planned for
2016 are in line with the projected roll growth for the school, and meet the Ministry’s requirements for space
entitlement. The Master Plan identifies the areas that would offer the optimal locations for future expansion on
the site, both with the roll growth classrooms that are anticipated for construction during 2016, as well as
future growth classrooms as the school roll expands further. These locations have been identified for the flow
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
PRO
POSED
MA
STER PLA
N
Proposed
Master Plan
that they generate from one year level to the next within the school, representing the growth and development
of a student as they progress from one building to the next. In addition, the connectivity between the buildings
strengthens the school community through forming a central area, the ‘heart’ of the school where all of the
students congregate and interact. Separate areas for sporting, and for year-specific activities are provided for
each classroom to the outer edge of the core. Note that prior to the construction of the 2016 roll growth
classrooms, it is recommended that two of the existing electrical connections to the school are replaced with a
new 150-amp central supply, in order to increase the capacity of the electrical system safely as per the Neil
Pritchard Electrical Inspection Report 2015.
LANDSCAPING & CULTURAL NARRATIVE. Southbridge School have successfully utilised landscaping as a means
of coordinating flow between the buildings and creating distinct outdoor ‘rooms’ for students to learn,
congregate and play respectively. Strategic landscaping can be further extended across the additional future
classrooms to direct the flow of pedestrian traffic and to support the definition of communal areas and learning
areas. It is important to also apply the concepts detailed in the cultural narrative provided by the local iwi.
Applicable elements of the cultural narrative include selective planting in the landscaped areas, incorporating
traditional species of plants, or those with a traditional medicinal, or ecological values. Plantings can then be
used as part of the teaching programme to demonstrate the uses of naturally occurring species, as well as the
lifestyle differences and resourcefulness of previous generations. Planting can also be used to enhance storm
water filtering around buildings, which can in turn be used to teach students about water supply and disposal
both on a developed site and in the ecosystem as a whole.
STAFFROOM EXTENSION. The school have identified a lack of space in Block 2 for administrative use and
staffroom facilities. With roll growth and the associated additional teaching and support staff required, the
space in Block 2 for administration and staff break facilities is anticipated to become further stretched. An
extension above 40m2 has been indicated on the Master Plan options to address the needs of a growing staff.
MoE funding for these areas is based upon the combined ancillary space available to the school, to enable the
school to allocate function to ancillary spaces as required to support the unique needs of their school. The
proposed extension shows the demolition of the timber-clad wing on the western end of the block, which
would be replaced with a new extension. While the administration area on its own demonstrates a deficit of
space, the combined ancillary space for the school is well beyond the overall allocation, in large part due to the
presence of the hall. As a result, the roll growth would need to increase significantly to meet the Ministry’s
requirements for funding consideration on an extension of the administration block. Alternatively, funding
could be raised by the BoT and/or through fundraising opportunities.
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
MA
STER PLA
N O
PTIO
N 1
Master Plan
Option
1
MASTER PLAN OPTION 1
Master Plan Option 1 shows positioning for four additional teaching spaces, in two-teaching-space blocks, with the
proposed 2016 roll growth classrooms located to the north west of Block 1. The glasshouse would be relocated to
the east of Block 3, around which a ‘living garden’ could be developed. This would also provide an ideal location for
recycle bins to be shifted to, as they would remain close to the courtyard area for use by students, while able to be
screened from view with trellis and planting. The boiler house, pump shed and fence would be demolished, making
way for an inviting entryway from the street toward the hall and library area. The existing sheds near the roll
growth classrooms would need to be demolished in order to make room for the new classrooms, though the
proposed new caretaker’s shed near the existing garage would provide ample storage space to compensate for this
shed as well as the demolished boiler house. Future roll growth classrooms are shown to the west of Block 10.
A full scale remodel of the car park is shown, creating a central pedestrian path from the street to the
administration block flanked by planters to create an inviting entrance while clearly directing pedestrian traffic.
Dedicated special needs parking is provided for close to the administration area, and additional room for
manoeuvring special needs vehicles. Note that this full-scale car park option can be developed in stages as funds
permit, with the carpark shown in the Master Plan targeted as the end result.
A staff room/administration extension for over 40m2 has been included to relieve the pressure of the cramped
facilities currently available to staff while a new breakout space between the cloakrooms of Block 1 has been
incorporated to optimise existing teaching space.
Pros:
Minimal alteration to existing landscaping
Dedicated entrance for special needs students, with ample room for manoeuvring transport vehicles.
Construction of new caretakers shed in the caretaker’s compound streamlines the location of services and limits
unnecessary services traffic across the site.
Cons:
Segregates the school into two sections physically, creating division between student in different classroom
blocks. No central hub for students to gather.
Classrooms exposed to wind
Students spread across the site, limiting the connectivity between buildings
Limited options for placement of future growth classrooms within the established footprint, and without
impacting the hazelnut grove/protected tree area, existing classrooms or developed play areas such as the fort.
Block 4
Former Dental Clinic
Block 10
1TS
Block 3
Caretaker’s
Drive-Through
Shed
Garage
Hall Library
4TS Block 1
Vehicles
Pedestrians
Vehicles
Pedestrians
Block 2
Stage 1
New Caretaker’s Shed
Future
Growth
Classroom
BH
1
2
3
4
5
6
7
8
9 10
11
12
13
14
15
16
17
18 19
Shed
Play Area
Glasshouse
Administration 2TS
Hazelnut Grove
& Protected
Trees
SOUTHBRIDGE SCHOOL MASTER PLANNING MASTER PLAN OPTION 1 SK-21 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
N
Existing buildings
New classrooms
New fencing
Demolish boiler house, pump shed & fence
Administration extension >40m2
New caretaker’s shed
Indicative flow from classrooms
KEY
Special needs drop-off area
New break-out area
Relocate glass house
Living garden & utility area
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
MA
STER PLA
N O
PTIO
N 2
Master Plan
Option
2
MASTER PLAN OPTION 2
Master Plan Option 2 shows positioning for four additional teaching spaces, in a combined block to the north west
of Block 10. Construction of this new block could be staged in two parts (of two teaching spaces each) to ensure
that the school has sufficient teaching space available for their roll at any given time. The new classrooms are
orientated around a new Astro-Turf playing area, which forms a centralised hub for the school. Additional future
teaching spaces could be installed in the existing location of Block 10 or Block 1. Based on roll growth predictions,
classrooms to replace Block 10/Block 1 would occur in a twenty-year timeframe rather than the ten-year timeframe
that the Master Plan is designed for, hence these classrooms have not been shown on the plans. It is likely at this
point in time, that Block 1 in particular may have reached the end of its useful economic life. The glasshouse would
be relocated to the east of the library/hall (Block 3). This would also provide an ideal location for recycle bins to be
shifted to, as they would remain close to the courtyard area for use by students, while able to be screened from
view with trellis and planting. The boiler house would be demolished, making way for an inviting entryway from the
street toward the hall and library area. The proposed new caretaker’s shed near the existing garage would provide
ample storage space to compensate for the demolished boiler house.
A simple modification to the existing car park is shown, with the installation of a fence around the perimeter to
discourage pedestrians from using the car park as a thoroughfare.
A staff room/administration extension for over 40m2 has been included to relieve the pressure of the cramped
facilities currently available to staff while a new breakout space between the cloakrooms of Block 1 has been
incorporated to optimise existing teaching space.
Pros:
Classrooms are sheltered from the wind
Car park modifications are straight forward and cost effective to implement
Classroom orientation formed around a centralised hub
Administration area looks out over the common area
Ample room for future classrooms development around the same footprint
Building connectivity provides a natural flow from one student group to the next
Hazelnut grove, protected trees and playing forts retained in existing locations
Cons:
Cost of landscaping to new classrooms and formation of an Astro Turf courtyard
No dedicated special needs entrance -existing car parking spaces must be used temporarily during pick-up and
drop-off times
N
Block 4
Former Dental Clinic
Block 10
1TS
4TS Block 1
BH
Block 3
Caretaker’s
Drive-Through
Shed
Garage
Shed
Hall Library
SOUTHBRIDGE SCHOOL MASTER PLANNING MASTER PLAN OPTION 2 SK-22 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
Stage 1
Future Growth Classroom
Play Area
New Caretaker’s Shed
Pedestrians
Astro Turf
Or Asphalt
1 2
3
4 5
6
15
14
13
12
11 10
9
8
7
16
17
18
19
Vehicles
KEY
Existing buildings
New classrooms
New fencing
Demolish boiler house, pump shed & fence
Administration extension >40m2
Artificial turf or asphalt
Indicative flow from classrooms
New caretaker’s shed
New break-out area
Relocate glass house
Living garden & utility area
Glasshouse
Block 2
Administration 2TS
Hazelnut Grove
& Protected
Trees
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
MA
STER PLA
N O
PTIO
N 3
Master PLan
Option
3
MASTER PLAN OPTION 3
Master Plan Option 3 shows positioning for four additional teaching spaces, in a combined block to the north west
of Block 10. Construction of this new block could be staged in two parts (of two teaching spaces each) to ensure
that the school has sufficient teaching space available for their roll at any given time. The new classrooms are
orientated around a central courtyard area. Additional future teaching spaces could be installed in the existing
location of Block 10 or Block 1. Based on roll growth predictions, classrooms to replace Block 10/Block 1 would
occur in a twenty-year timeframe rather than the ten-year timeframe that the Master Plan is designed for, hence
these classrooms have not been shown on the plans. It is likely at this point in time, that Block 1 in particular may
have reached the end of its useful economic life. The glasshouse would be relocated to the east of the library/hall
(Block 3). This would also provide an ideal location for recycle bins to be shifted to, as they would remain close to
the courtyard area for use by students, while able to be screened from view with trellis and planting. The boiler
house would be demolished, making way for an inviting entryway from the street toward the hall and library area.
The proposed new caretaker’s shed near the existing garage would provide ample storage space to compensate for
the demolished boiler house.
A simple modification to the existing car park is shown, with the installation of a fence around the perimeter to
discourage pedestrians from using the car park as a thoroughfare.
A staff room/administration extension for over 40m2 has been included to relieve the pressure of the cramped
facilities currently available to staff while a new breakout space between the cloakrooms of Block 1 has been
incorporated to optimise existing teaching space.
Pros:
Classrooms are sheltered from the wind
Car park modifications are straight forward and cost effective to implement
Classrooms orientation formed around a centralised hub
Administration area looks out over the common area
Ample room for future classrooms development around the same footprint
Building connectivity provides a natural flow from one student group to the next
Cons:
Cost of landscaping to new classrooms
One of the existing play areas would need to be re-established elsewhere to make way for the future growth
classrooms
No dedicated special needs entrance -existing car parking spaces must be used temporarily during pick-up and
drop-off times
N
Block 4
Former Dental Clinic
Block 10
1TS
4TS Block 1
Block 3
Caretaker’s
Drive-Through
Shed
Garage
Shed
Hall Library
SOUTHBRIDGE SCHOOL MASTER PLANNING MASTER PLAN OPTION 3 SK-23 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
BH
Future
Growth Classroom Stage 1
Play Area
Block 2
Administration 2TS
New Caretaker’s Shed
Pedestrians
Existing buildings
New classrooms
New fencing
Demolish boiler house, pump shed & fence
Administration extension >40m2
Indicative flow from classrooms
KEY
New caretaker’s shed
New break-out area
Relocate glass house
Living garden & utility area
Glasshouse
1 2
3
4 5
6
15
14
13
12
11 10
9
8
7
16
17
18
19
Vehicles
Hazelnut Grove
& Protected
Trees
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
ZON
E MA
PPIN
G ZONE MAPPING
Placement of the anchor buildings on the site has a key impact on the function, flow and cohesiveness of the
school.
In the development of the Master Plan, priority has been made to form a central communal area bordered by the
anchor buildings, to act as the ‘heart’ of the school, shown in red on the following area map. With the relatively
small roll of the school, this central area is designed to strengthen the school community by facilitating regular
interaction across the year levels. While at play, students in a central courtyard space can be passively supervised
(in addition to structured supervision) by staff in the administration block, as windows from this building look
straight out into the communal area. Also, the principal’s office, situated on the perimeter of the courtyard is
approachable, with the option of creating an ‘open door’ policy for students during playtimes.
The entrance, car park & welcome area also represents an important interface between the school and the school
community, so has been a focus of the Master Plan. This has been achieved through providing options for
increasing the safety of the front car parking area within an achievable budget, as well as offering a means of
improving access for special needs students and their carers. Demolishing the boiler house, pump shed and fence,
as well as relocating the glasshouse opens up the entrance toward the community areas of the school, including the
hall and library. Not only does this facilitate community use of school facilities, but it directs traffic flow for visitors
into the school, and with carefully considered planting, provides an enhanced first impression of the school.
Other functions served by the school campus have been streamlined and grouped into activity areas for sporting,
adventure, animal care and services. Rugby fields have been retained on the “L-shaped” fields to the north of the
site. This area is currently unoccupied by buildings, though it is understood that the school anticipate gazing sheep
along the eastern boundary of the rugby fields. Additional sporting facilities are available to the east of Block 1,
which the school may wish to re-surface depending on which sports are accommodated there. Keeping sporting
activities in the nominated areas ensures that the central courtyard area can be a safe space for students to linger,
without the danger of disruption from balls, scooters or other play equipment. In addition to these sporting areas,
the field to the north east of the classrooms could be developed as an adventure playground, with a mixture of
forts, surfaces and built-in equipment to extend imagination and learning through creative play. Applied learning
and animal care to some extent is available throughout the campus, such as with the placement of the edible
gardens, though a dedicated area for animal compounds has been provided for in the Master Plan to assist with
development of the site.
The caretaker facilities have been streamlined next to the existing garage, in order to create a safer environment
for students, by reducing traffic across the site. Consolidating the service area also simplifies processes for the
caretaker, as items are predominantly stored in the same area, preventing excess travel from one storage location
to the next.
N
SOUTHBRIDGE SCHOOL MASTER PLANNING Site Map SK-03 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
Entrance, car park & welcome area
Indoor & outdoor learning space
Library & community area
Sporting area/rugby fields
Caretaker’s compound
Adventure Playground
KEY
Applied learning/animal care
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
DEV
ELOPM
ENT STA
GIN
G
DEVELOPMENT STAGING
DEVELOPMENT STAGING
A principal consideration for the proposed Master Plan is to enable a solution that can be developed over stages to
allow the School to remain fully operational and functional while allowing an organic development of the site as roll
growth dictates. The diagram on the following page summarises the proposed development staging to allow the
Master Plan to be constructed in stages. The commentary below provides further clarification of the scope for each
stage. Note that projects listed under Stage 2 or Future Projects are able to be implemented at any stage during the
development, depending on the needs of the school and funding available:
STAGE ONE
Replace two electrical mains supplies with a new 150-amp central supply
Construct two new roll growth classrooms
Construct new break-out space between the existing cloakrooms in Block 1
Demolish the boiler house & install heat pumps to cloakroom/breakout spaces
Construct new caretaker’s shed
Install fencing around the existing staff car park or full development of front entrance
Stage 1
Construct new teaching spaces 2 Plus existing 7
Sub Total Teaching Spaces 9
Roll growth 57 Plus existing roll 159
Potential Maximum Roll 216
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
DEV
ELOPM
ENT STA
GIN
G
STAGE 2
Construct an additional two-teaching-space roll growth classroom unit
Stage 2 Teaching spaces
Construct new teaching spaces 2 Plus existing 9
Sub Total Teaching Spaces 11
Roll growth 25 Plus existing roll 216
Potential Maximum Roll 241
FUTURE STAGES
Develop pedestrian entranceway direct from the street to the administration building. Reconfigure parking
spaces to either side of the pathway and form dedicated special needs access (if not carried out prior)
Install artificial turf or asphalt court (BoT funded)
Extend administration area >40m2 to accommodate staff expansion
Future Roll Growth Teaching spaces
Construct new teaching spaces 2 Plus existing 11
Sub Total Teaching Spaces 13
Roll growth 46 Plus existing roll 241
Potential Maximum Roll 287
N
Block 4
Former Dental Clinic
Block 10
1TS
4TS
Block 3
Caretaker’s
Drive-Through
Shed
Garage
Glasshouse
SOUTHBRIDGE SCHOOL MASTER PLANNING STAGING PLAN SK-04 A
Drawing No. Revision
25 Lichfield Street
PO Box 1025
Christchurch 8140
Scale
NTS
Stage 1
New roll growth classrooms,
demolish boiler & pump shed,
relocate glasshouse, new
caretaker’s shed, fence car park &
ILE area to Block 1
Stage 2
Future growth classrooms
Future Projects
Redevelop car park & create
Astro Turf or asphalt court near
new classrooms. Extend
administration area
KEY
BH
Future
Growth Classroom Stage 1
Play Area
Block 2
Administration 2TS
New Caretaker’s Shed
Block 1
Hall Library
Shed
Relocated
Glasshouse
Hazelnut Grove
& Protected
Trees 1
2
3
4 5
6
15
14
13
12
11 10
9
8
7
16
17
18
19
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
This page has intentionally been left blank
SOUTHBRIDGE SCHOOL | MASTER PLAN REPORT 2016
APPEN
DIX
A – R
OU
GH
OR
DER
OF C
OST, B
OILER
REM
EDIA
TION
APPENDIX A – ROUGH ORDER OF COST,
BOILER REMEDIATION
Trade Summary
Code Description Unit Total User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
BOILER HOUSE
A NOTES & PREAMBLE Notes 0 0
B ENABLING WORKS & DEMOLITION 1.00 sum 29,054.39 29,054.39
C STRENGTHENING SCHEME 1.00 sum 7,853.61 7,853.61
D REINSTATEMENT WORKS 1.00 sum 5,117.36 5,117.36
Sub-total 42,025.36
G P&G @ 8% 1.00 sum 3,362.03 3,362
H Builders Margin @ 10% 1.00 sum 4,202.54 4,203
Contingency @ 10% 1.00 sum 4,202.54 4,202.54
TOTAL VALUE (excl GST.) 53,792.47
CostX25/01/2016 5:22:41 p.m.
Logic Cost Consultancy Ltd BIM Enabled Page 1 of 1
Trade Breakup
Ref. Description Quantity Unit Rate Total User1 User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
NOTES & PREAMBLE
A.1 NOTES:
A.2 Please note the following is a budget quote for theStrengthening of an existing school boiler house to67% NBS
note
A.3 It is assumed that the walls are plumb and repairableand do not require full rebuilds
note
A.4 No allowance has been made for non-structural repairsor strengthening unless affected by the structuralstrengthening
note
A.5 PREAMBLES
A.6 Please note the following is a budget quote for theStrengthening of an existing school boiler house to67% NBS
note
A.7 It is assumed that the walls are plumb and repairableand do not require full rebuilds
note
A.8 No allowance has been made for non-structural repairsor strengthening unless affected by the structuralstrengthening
note
A.9 Please note that this quote is based on the followinginformation
note
A.10 - GHD Strengthening Options Appendix E4 - 67%NBS
A.11 - GHD Block 5 Boiler House Quantitative DEE
A.12 Please note that option B has been eliminated due tothe presence of external structures
note
A.13 Please note that no site visit was carried out as part ofthis assessment and as such the scope of works isrestricted to what is visible in the provided documents
note
A.14 Please note that it is assumed the property will beempty for the duration of the works and full access toall elevations will be available
note
A.15 EXCLUSIONS
A.16 Consultants Fees note
A.17 Building & Resource Consents note
A.18 General repairs note
A.19 Landscaping note
A.20 Removal of dangerous materials note
NOTES & PREAMBLE 0
To Collection 0
CostX25/01/2016 5:23:43 p.m.
BIM Enabled Page 1 of 5
Trade Breakup
Ref. Description Quantity Unit Rate Total User1 User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
ENABLING WORKS & DEMOLITION
B.1 ACCESS
B.2 Allow for installation, maintenance and removal of anaccess scaffold, including ladder access to twoelevations
38.40 m2 35.00 1,344.00
B.3 Allow for rental of the above 4.00 weeks 76.80 307.20
B.4 Ditto but edge protection 12.80 m 5.00 64.00
B.5 Ditto but mobile scaffold tower to internal 1.00 no. 250.00 250.00
B.6 ENABLING WORKS
B.7 Allow for completion of an asbestos test and reportprior to works beginning on site
1.00 sum 725.00 725.00
B.8 Allow for removal and storage of boiler house contents 1.00 sum 220.00 220.00
B.9 Ditto but fix shelving and benches 1.00 sum 220.00 220.00
B.10 Allow for an electrician to temporary remove theexisting electrical services, wiring and fittings inlocalised areas of strengthening
1.00 Psum 700.00 700.00
B.11 Allow for protection of the existing boiler plant andassociated flues
1.00 sum 132.50 132.50
B.12 Allow for protection of the existing roof coverings with12mm CD plywood, including securing in place forH&S
36.12 m2 26.94 973.23
B.13 DEMOLITION
B.14 Allow for removal and disposal of the existing timberscotia
25.60 m 1.10 28.16
B.15 Allow for removal and disposal of the existing ceilinglinings
36.12 m2 2.50 90.30
To Collection 5,054
CostX25/01/2016 5:23:43 p.m.
BIM Enabled Page 2 of 5
Trade Breakup
Ref. Description Quantity Unit Rate Total User1 User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
ENABLING WORKS & DEMOLITION (Continued)
B.16 Allow for demolition and removal of the existingconcrete flue structure to no less than 1m from rooflevel, including cranage and saw cutting
1.00 Psum 24,000.00 24,000.00
ENABLING WORKS & DEMOLITION 29,054
To Collection 24,000
CostX25/01/2016 5:23:43 p.m.
BIM Enabled Page 3 of 5
Trade Breakup
Ref. Description Quantity Unit Rate Total User1 User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
STRENGTHENING SCHEME
C.1 STRUCTURAL STEEL
C.2 Portal Frame
C.3 200 PFC Portal Frame, supplied and erected 1.00 no. 1,907.57 1,907.57
C.4 Allow for 2no. M12 anchor bolts to concrete floor slab 2.00 no. 13.75 27.50
C.5 Allow a provisional sum for fixing to vertical structure /roof structure (More Info required)
1.00 Psum 55.00 55.00
C.6 Tie Beam
C.7 200 PFC Fixed to brickwork, assumed @ 1.0m c/cwith M12x150mm anchors
2.00 no. 1,220.57 2,441.14 Assumed spec
C.8 Bracing Truss
C.9 150x18 UB Truss, fixed to bond beam with 2no.M12x150mm Bolts
4.00 no. 567.00 2,268.00 Assumed Sizes
C.10 100x15 Diagonal Struts, weld site weld fixed to truss &tie beam
8.00 no. 144.30 1,154.40 Assumed Sizes
STRENGTHENING SCHEME 7,854
To Collection 7,854
CostX25/01/2016 5:23:43 p.m.
BIM Enabled Page 4 of 5
Trade Breakup
Ref. Description Quantity Unit Rate Total User1 User2
Project: Logic GroupBuilding: Southbridge School Boiler
Details: Boiler House Strengthening
REINSTATEMENT WORKS
D.1 CEILING LININGS
D.2 13mm Gib-board fixed to ceiling rafters 36.12 m2 32.00 1,155.84
D.3 40mm Radiata Scotia 25.60 m 12.94 331.16
D.4 PAINTING
D.5 2 Coats of a water based paint to walls 64.00 m2 18.00 1,152.00
D.6 Ditto but to ceilings 36.12 m2 18.00 650.16
D.7 Ditto but to scotia 25.60 m 9.50 243.20
D.8 ELECTRICAL
D.9 Allow for reinstatement of the removed electricalwiring, conduits and fittings
1.00 Psum 830.00 830.00
D.10 ROOF
D.11 Allow for removal of temporary protection boards 1.00 sum 55.00 55.00
D.12 Allow for supply and installation of a permanentpowder coated and sealed capping to the exposedchimney stack
1.00 Psum 350.00 350.00
D.13 SUNDRY
D.14 Allow for reinstallation of removed benches, shelvingand fixings
1.00 Psum 350.00 350.00
REINSTATEMENT WORKS 5,117
To Collection 5,117
CostX25/01/2016 5:23:43 p.m.