1 SOUTH KENSINGTON CWG: 06 JULY 2016
South Kensington: Consultative Working Group - Design Update
06 JULY 2016
2 SOUTH KENSINGTON CWG: 06 JULY 2016
Progress update: pre-application comments Further pre-app meeting with Royal Borough officers
Officers reviewed design and further considerations shared with TfL:
1) Greater design context to the existing station, with Edwardian fabric applied throughout
2) Consideration of canopy design and how it integrates with existing station
3) Use and type of brick stock applied throughout the station design
4) Style of ticket hall extension and the look and feel of facade
Site visit at Farringdon station arranged
3 SOUTH KENSINGTON CWG: 06 JULY 2016
Revised canopy design
4 SOUTH KENSINGTON CWG: 06 JULY 2016
Revised canopy design
5 SOUTH KENSINGTON CWG: 06 JULY 2016
Revised canopy design
6 SOUTH KENSINGTON CWG: 06 JULY 2016
Overbridge design
7 SOUTH KENSINGTON CWG: 06 JULY 2016
Reflecting on RBKC comments, further consideration on brick application around staircase, providing greater harmony with existing station design
Stairwell design and platform barrier
8 SOUTH KENSINGTON CWG: 06 JULY 2016
Emergency stairwell
9 SOUTH KENSINGTON CWG: 06 JULY 2016
Ticket hall design
10 SOUTH KENSINGTON CWG: 06 JULY 2016
Next Steps
29 June: meeting scheduled with RBKC officers
8 July: site visit with RBKC officers at Farringdon station
13 July: public drop-in session
July: submit listed building consent application
11 SOUTH KENSINGTON CWG: 06 JULY 2016
Questions?