Upload
truongdien
View
217
Download
0
Embed Size (px)
Citation preview
Solutions,Inc.
In2012,SolutionsInc.designedfabricatedandinstalledanewSteamandWaterSample(SWAS)SystemataCombinedCycleplantlocatedintheSouthwesternUSwithageneratingcapacityofapproximately490MW.Theplantconfigurationistwo‘blocks’oftwogasturbines/twoHeatRecoverySteamGenerators(HRSG’s)/onesteamturbinecombination(a“2-on-1”configuration).
TheoriginalSWAShadseveraldeficiencies:
1. The design did not meet the standards of ASTM D5540 governingsampleconditioningandflowcontrol;
2. Substandard components including back pressure valves androtameterswerecausinguncontrolledvariationsinsampleflow;
3. Solid particles, particularly magnetite in the sample streams weredepositinginsamplelinesandvalvesresultinginlossofsampleflow;
4. Aglycolrecoverytankwasmissing.SolutionsInc.designedanewSWASwhichsolvedthesedeficiencies.
ForQuestionsorBids:[email protected]
Website:www.samplepanels.com
SeetheBeforeandAfterPicturesbelow:
AfterUpgrade–chemicalpumpsremovedandnewsamplepanelinstalled
BeforeUpgrade–samplepanelandobsoletechemicalpumps
AfterupgradePanelRearViewwithglycolrecoverytank
BeforeUpgrade-RearView-insulationblanketsaretoalleviateradiantheatoverload