Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Embed Size (px)

Citation preview

Page 1: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Solar-B Launch Operations Scenarios

ISAS/JAXA Solar-B projectPrepared by T. Shimizu

For Wallops face-to-face meeting

Page 2: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Launch operation

Page 3: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Table 4. Orbit element (at launch) TOD

Item Unit Nominal value Variation

Epoch UTC 309s after launch ― ― ― ―

hp km 250 +8/-25

ha km 600 ± 120

i deg 97.79 ± 0.6

Ω deg 308.75 ± 0.35

ω deg 150.91 ― ― ― ―

M deg 4.96 ― ― ― ―

longitude of ascending (north-bound) node, which defines at what longitude Solar-B crosses the earth equator

Solar-B will be launched from USC (Kagoshima Uchinoura Space Center, Japan).

Launch window: 21:32:46-21:41:04 UT in 23 August 2006 to 26 September 2006.

The initial orbit to be installed by a M-V rocket is as follows:

Page 4: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

ブラジル

フランス領ギアナ

スリナム

ガイアナベネズエラ

コロンビア

エクアドル

ペルー

ボリビア

パラグアイ

アルゼンチンウルグアイ

チリ

太陽

equator

3段ロケット燃焼終了

AGO局

図.2.3-4 打ち上げからパドル展開までの姿勢変更を示す図

衛星分離Time X+510 sec

レートタ ン゙フ 、゚太陽サ ーチ開始

太陽捕捉完了

Time X+660 sec

Time X+1980 sec

SAP展開開始Time X+1982sec

SAP展開完了Time X+2162 sec

SAp展開開始

SAP展開完了

打ち上げ

3段ロケット燃焼完了

309sec 201sec

衛星分離

レートダンプ

150sec

太陽捕捉完了

太陽サーチ開始

1320sec 180sec

Sun

3-stage engine burn out

Satellite separation

Start rate dumping and search sun

Complete sun acquisition by

Start SAP deploymentComplete SAP deployment

Page 5: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

JAXA USC

JAXA PER

JAXA AGO

NASA WPS

JAXA AGO

StationX=21:32:46 Lift off

21:49-21:56

Visible window

22:18-22:27

22:37-22:46

23:50-23:59

~21:40

S/C EventsActions at station

21:41:16 Satellite separation21:44:01 Start attitude RSA control mode (rate dumping and search the sun)

22:06:01 Start deployment of solar array paddle (SAP)22:09:23 Resume attitude RSA control mode22:12 Complete sun acquisition (Attitude directed to sun)

23:47:46 Fine sun sensors (UFSS) & Star tracker (STT) ON23:47:49 Enable telescopes’ survival heaters

Times given here are not finalLaunch case: 23 Aug 2006

Complete sun acquisition (Attitude directed to sun)

Confirm SAP deployment, sun acquisition, power supply SHNT mode

Confirm sun acquisition mode, power supply SHNT mode

Confirm UFSS/STT ON, telescopes’ survival heaters

If off-nominal cases, may perform a recovery/trouble-shooting procedure

If off-nominal cases, may perform a recovery/trouble-shooting procedure

If off-nominal cases, may perform a recovery/trouble-shooting procedure

Note: AGO (U.Chili) measures El/Az

(UT)

(RSA= RCS sun acquisition mode)

Check orbit and status

Backup for AGO Rev.0

Page 6: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Solar-B Battery In case that the solar array paddle is not deployed, the battery can supply the power for 160 min.

Page 7: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Orbit maneuvers for sun-sync. polar orbit

Page 8: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Table 5. Orbit element (at observation phase)

item unit Value

Hight km 630km

i deg 97.9

(Near Sun Sync. orbit)

Solar-B will be finally installed to the sun-synchronous polar orbit with maneuver operation in the next page.

Page 9: Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting

Y+3 Y+6

TEST Maneuver ⊿a #0

⊿a #1

⊿a #2

⊿a #3

⊿i ⊿final

RSA MSA

GAS STT

Y+11 Y+14 Y+17 Y+20

Attitude Mode

A.D. Sensor

(around Z axis)

Complete of orbit control

Launch

Final Adjustment of inclination

⊿hp≒ 10km

⊿hp≒ 188km

⊿hp≒ 188km

⊿ha≒ 40km

Y+days