Solar-B Launch Operations Scenarios
ISAS/JAXA Solar-B projectPrepared by T. Shimizu
For Wallops face-to-face meeting
Launch operation
Table 4. Orbit element (at launch) TOD
Item Unit Nominal value Variation
Epoch UTC 309s after launch ― ― ― ―
hp km 250 +8/-25
ha km 600 ± 120
i deg 97.79 ± 0.6
Ω deg 308.75 ± 0.35
ω deg 150.91 ― ― ― ―
M deg 4.96 ― ― ― ―
longitude of ascending (north-bound) node, which defines at what longitude Solar-B crosses the earth equator
Solar-B will be launched from USC (Kagoshima Uchinoura Space Center, Japan).
Launch window: 21:32:46-21:41:04 UT in 23 August 2006 to 26 September 2006.
The initial orbit to be installed by a M-V rocket is as follows:
ブラジル
フランス領ギアナ
スリナム
ガイアナベネズエラ
コロンビア
エクアドル
ペルー
ボリビア
パラグアイ
アルゼンチンウルグアイ
チリ
太陽
equator
3段ロケット燃焼終了
AGO局
図.2.3-4 打ち上げからパドル展開までの姿勢変更を示す図
衛星分離Time X+510 sec
レートタ ン゙フ 、゚太陽サ ーチ開始
太陽捕捉完了
Time X+660 sec
Time X+1980 sec
SAP展開開始Time X+1982sec
SAP展開完了Time X+2162 sec
SAp展開開始
SAP展開完了
打ち上げ
3段ロケット燃焼完了
309sec 201sec
衛星分離
レートダンプ
150sec
太陽捕捉完了
太陽サーチ開始
1320sec 180sec
Sun
3-stage engine burn out
Satellite separation
Start rate dumping and search sun
Complete sun acquisition by
Start SAP deploymentComplete SAP deployment
JAXA USC
JAXA PER
JAXA AGO
NASA WPS
JAXA AGO
StationX=21:32:46 Lift off
21:49-21:56
Visible window
22:18-22:27
22:37-22:46
23:50-23:59
~21:40
S/C EventsActions at station
21:41:16 Satellite separation21:44:01 Start attitude RSA control mode (rate dumping and search the sun)
22:06:01 Start deployment of solar array paddle (SAP)22:09:23 Resume attitude RSA control mode22:12 Complete sun acquisition (Attitude directed to sun)
23:47:46 Fine sun sensors (UFSS) & Star tracker (STT) ON23:47:49 Enable telescopes’ survival heaters
Times given here are not finalLaunch case: 23 Aug 2006
Complete sun acquisition (Attitude directed to sun)
Confirm SAP deployment, sun acquisition, power supply SHNT mode
Confirm sun acquisition mode, power supply SHNT mode
Confirm UFSS/STT ON, telescopes’ survival heaters
If off-nominal cases, may perform a recovery/trouble-shooting procedure
If off-nominal cases, may perform a recovery/trouble-shooting procedure
If off-nominal cases, may perform a recovery/trouble-shooting procedure
Note: AGO (U.Chili) measures El/Az
(UT)
(RSA= RCS sun acquisition mode)
Check orbit and status
Backup for AGO Rev.0
Solar-B Battery In case that the solar array paddle is not deployed, the battery can supply the power for 160 min.
Orbit maneuvers for sun-sync. polar orbit
Table 5. Orbit element (at observation phase)
item unit Value
Hight km 630km
i deg 97.9
(Near Sun Sync. orbit)
Solar-B will be finally installed to the sun-synchronous polar orbit with maneuver operation in the next page.
Y+3 Y+6
TEST Maneuver ⊿a #0
⊿a #1
⊿a #2
⊿a #3
⊿i ⊿final
RSA MSA
GAS STT
Y+11 Y+14 Y+17 Y+20
Attitude Mode
A.D. Sensor
(around Z axis)
Complete of orbit control
Launch
Final Adjustment of inclination
⊿hp≒ 10km
⊿hp≒ 188km
⊿hp≒ 188km
⊿ha≒ 40km
Y+days