    Jawaharlal Nehru TechnologicalUniversity AnantapurANANTHAPURAMU 515 00

    !P"#$%$#AT$&N! ' ($) )UM"NT

    %&R TH" *&R+

    ,)esign- !upply- $nstallation- Testing an. #o//issioning o 00+*

    roun.Mo.el !olar Photo 2oltaic Power Plant aggregate. capacity with %ive

    3ears o#o/prehensive Maintenance #ontract4

    Page 1of 6

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    2/37

    JNTU701809097T!7R:0 August 018

    Ta;le o #ontents

    1< $NTR&)U#T$&N 9

    < $NT"NT &% !P"#$%$#AT$&N 9

    < "N"RA= PR&J"#T $N%&RMAT$&N 6

    8< !#&P" &% *&R+! AN) !"R2$#"! 6

    5

    6< M&)U=" M&UNT$N !TRU#TUR" 1

    ?< !TR$N #&M($N"R (&@ &R ARRA3 JUN#T$&N (&@"! 1

    >< $N2"RT"R! 7 P&*"R #&N)$T$&N$N UN$T P#UB 18

    10< "N"R3 M"T"R$N 16

    11< )ATA A#CU$!$T$&N ' =&$N 1?

    1< P&*"R ' #&NTR&= #A(="! 1>

    1< A# )$!TR$(UT$&N (&AR) ' =T PAN"= 0

    18< "ARTH$N ' =$HTN$N PR&T"#T$&N !3!T"M 0

    15< !&=AR ' *"ATH"R M&N$T&R$N !3!"M 0

    19< #$2$= *&R+! 1

    16< PR&J"#T !#H")U=" ' PR&R"!! M&N$T&R$N

    1?< )RA*$N!- )ATA AN) )UM"NT! 8

    1>< UARANT"" 5

    0< )"=$2"R3 9

    1< $N!P"#T$&N 9

    < T"!T! AN) $N!P"#T$&N 9

    < $N!TA==AT$&N U$)"=$N"! 6

    8< "R"#T$&N- T"!T$N ' #&MM$!!$&N$N ?

    Page of 6

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    3/37

    5< TRA$N$N 0

    )esign- !upply- $nstallation- Testing an. #o//issioning o 00+*

    roun. Mo.el !olar Photo 2oltaic Power Plant aggregate. capacity

    with %ive 3ears o #o/prehensive Maintenance #ontract

    1< $NTR&)U#T$&N

    The State Government of Andhra Pradesh through A.P. Govt. Act No.30 of2008 has separated the erstwhile NT! into four di"erent !niversities vi#.$

    NT !niversit% Anantapur$ NT !niversit% &a'inada$ NT !niversit%(%dera)ad and NA*+A !niversit% (%dera)ad.

    JNT University Anantapur started functioning from the ,,- acrescampus of one of its onstituent ollege at Anantapur$ since August/

    2008. As a )udding !niversit% it is committed to develop and nurture aTechnical ducation S%stem in the four districts of 1a%alaseema vi#.$Anantapur$ hittoor$ S1$ &urnool districts and SPS1 Nellore district whichwould produce s'illed man power of high ualit% compara)le to the )estin the world and in adeuate num)ers to meet the comple4 technologicalneeds of the econom%.

    JNTUAat present$ has an average power demand of around 800 '5 andpea' demand of ,.2 65 and imports grid power from 7S96 at ,, ':su)station.

    NT!A plans to generate solar power )% installing a 200 '5p capacit%Ground 6odel Solar P: power plant.

    $ntent of this speci;cation is to specif% the reuirement of NT!A$ hereinafter referred to as the mplo%er$ so as to ena)le the prospective )iddersto su)mit their )est techno

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    4/37

    The speci;cation shall )e read in totalit% and the )id shall )e preparedaccordingl%. The )idders shall consider and include in their o"er an%euipment= s%stem = service not speci;call% mentioned in thisspeci;cation )ut essential for the completeness of the pro>ect in allrespects as envisaged )% the mplo%er.

    < "N"RA= PR&J"#T $N%&RMAT$&N

    ,. mplo%er awaharlal Nehru Technological!niversit%

    AnantapurAnanthapuramuect Title nstallation of 200 &5p Ground modelSolar P: Power Plant at NT!A$Ananthapuramu

    3. Pro>ect ?ocation awaharlal Nehru Technological!niversit%AnantapurAnanthapuramu

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    5/37

    Power ontrol !nit including 6PPT and s%nchroni#ing facilit% at

    @,-:$-0(#

    A 7istri)ution Hoard

    Au4iliar% A * 7 power s%stem for control and protection s%stem for the

    total plant comple4 including Hatter% and Hatter% charger.

    Plant 6onitoring 7es'

    monitoring s%stem for all electrical parameters of the solar P: plant

    Solar 9)servator%=5eather 6onitoring s%stem to chec' Solar rradiation$

    5ind Speed * Am)ient Temperature

    Protection and 6etering s%stem for the complete installation including

    6eters$ 1ela%s and other associated devices arthing and ?ightning Protection s%stem for the complete installation

    A=7 Power and ontrol a)les and accessories

    ommunication s%stem with e4isting plant installations and controlrooms

    Nomenclature$ 7anger Plates$ Name Plate$ nstructions etc.

    ivil wor's including$ foundations$ electrical control )uilding$

    Houndar%=fencing * gate$ roads and drains etc. 7ewatering s%stem for

    the entire power plant There should )e provision for the pro>ect to )e e4tended to , 65 in

    future.

    !cope o "/ployerD

    Site leveling and grading suita)le for installing solar arra% %ard and7ewatering s%stem.

    7rin'ing water service in the power plant comple4 and suita)le watersuppl% for periodic cleaning of solar P: modules.

    Necessar% power and line facilit% up to the plant control room for feedingau4iliar% and control power to the entire power plant shall )e provided.

    !cope o the successul ;i..er shall also inclu.e D

    Site Surve%$ 6easurement of Soil 1esistivit%$ Soil ?oad Hearing apacit%$6easurement of solar insolation and other relevant parameters reuiredfor design of the s%stem.

    omplete 7esign $ engineering$ preparation and su)mission of drawingsuipment and material speci;cation preparation .

    Procurement and e4pediting of all supplies and 7eliver% of euipmentand material to >o) site.

    Pre

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    6/37

    are reuired for erection$ testing and commissioning and satisfactor%operation of the solar power plant are deemed to )e included in thescope of the speci;cation unless speci;call% e4cluded on turn'e% )asis.

    Provision of Safet% items li'e hand gloves$ shoc' treatment charts$ ru))ermats$ danger=caution )oards.

    Suppl% of all commissioning spares and Suppl% of special tools and

    tac'les Pro>ect management including pro>ect administration $ pro>ect

    coordination$ scheduling $ progress reporting to emplo%er.

    Adhering to safet% practices during erection $ commissioning andsu)seuent operation and maintenance of the s%stem including ;reprevention.

    There should )e provision to e4tend the pro>ect upto , 65 in future.

    5< !3!T"M PH$=&!&PH3 AN) )"!$N #&N!$)"RAT$&N!

    !yste/ Philosophy

    The solar power generation s%stem of 200&5 is reuired to generate amin of -00-000 '5h of solar energ% in the ;rst %ear of operation$su)>ect to power outage pattern$ site and weather conditions. The )iddershall design the ma>or components and su)ect is appro4imatel% 3000 S mtr. The

    ;i..er shoul. visit the site to assess the suita;ility an.suEciency o the space availa;le or the proFectunction )o4 will have suita)le 1everse

    Hloc'ing 7iodes of ma4imum 7 )loc'ing voltage of B00: = ,000:$

    whichever causes less power loss$ with suita)le arrangement for its

    connecting

    The string com)iner )o4= Arra% >unction Ho4 will also have suita)le surge

    protection device.

    The current carr%ing ratings of the string com)iner )o4= >unction )o4 shall

    )e suita)le with adeuate safet% factor$ to inter connect the Solar P:

    s%stem corresponding to the pro>ect capacit%$ as designed )% thecontractor

    Necessar% sensors and transducers shall )e provided in the string

    com)iner )o4es to facilitate monitoring of all string parameters in the

    data acuisition s%stem.

    String level remote monitoring facilit% shall )e incorporated to monitor

    generation and faults at string level.

    >< $N2"RT"R! 7 P&*"R #&N)$T$&N$N UN$T P#UB

    nverter=P! shall )e centrali#ed grid tied in nature$ shall consist of 6PPT

    controller$ inverter shall )e decided )ased on arra% design=suita)le rating

    in case of string design$ associated control and protection devices etc all

    integrated into P!. t shall provide necessar% protections for Grid

    S%nchroni#ation. The nverters should convert 7 power produced )% SP:

    modules in to A power and must s%nchroni#e automaticall% its A

    output to the e4act A :oltage and freuenc% of Grid.

    The 7 energ% produced has to )e utili#ed to ma4imum and supplied to

    the )us for inverting to A voltage to e4tract ma4imum energ% from solararra% and provides 3

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    12/37

    The dimension$ weight$ foundation details etc. of the P! shall )e clearl%

    indicated in the detailed technical speci;cation.

    The P! shall )e capa)le of complete automatic operation$ including

    wa'e

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    13/37

    M nverter over temperature

    P! shall )e capa)le to s%nchroni#e independentl% * automaticall% with

    grid power line freuenc% to attain s%nchroni#ation and e4port power

    generated )% solar plant to grid.

    The P! shall )e capa)le of operating in parallel with the grid utilit%

    service and shall )e capa)le of interrupting line fault currents and line toground fault currents.

    The P! shall )e a)le to withstand an un)alanced load conforming to

    standard C=

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    14/37

    M 7escription of electrical and mechanical characteristics of units

    M 6aintenance and fault ;nding procedures.

    M Safet% precautions

    M Software for data monitoring with detailed description.

    M 7etails of data acuisition

    M +actor% test reports in details on various parameters.

    M Trou)le shooting procedures

    M All maintenance reuirements and their schedules$ including detailedinstructions on how to perform each tas'.

    M 7etailed schematics of all power instrumentation and controleuipment and su)s%stems along with their interconnection diagrams.

    Schematics shall indicate wiring diagrams$ their num)ers anduantities$ t%pe and ratings of alt components and su)s%stems.

    M A detailed )ill of materials which shall list components modelnum)ers$ uantities and manufacturer of each supplied item.

    M All documents and write ups shall )e in nglish. The% shall )e cleanand legi)le$ and must )e chec'ed$ signed$ approved and dated )% acompetent representative of the contractor.

    The Hidder should note that nverters=P! is going to )e installed in an

    area which is prone to hot air of @8 to -0 degree centigrade. Thus the

    room shelter$ air )lower= fan Cauto operated as per reuirementD if

    reuired$ for nverter will )e in scope of suppl%. ntegrated solutions into

    prefa)ricated )uildings or in standard metallic container ma% )e

    accepted. The Hidder shall provide data sheet for nverter= Power

    onditioning !nit along with their o"er.

    10< "N"R3 M"T"R$N

    7igital ommunica)le nerg% 6eters shall )e provided for

    measuring power consumption )% grid side loads on continuous )asisand register the cumulative energ% on 30usta)leD$ dail%$ monthl% and annuall% the energ%generated. The nerg% 6eter shall have default displa% of umulative'5h. The following parameters to )e displa%ed on

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    15/37

    Separate 6eters shall )e provided for Solar Power Generation andAu4iliar% load consumption.

    n case more than one inverter circuits are used for s%nchroni#ingwith the grid than similar meters shall )e provided for each inverteroutput circuit. Additionall% one digital summator shall also )e providedfor calculation and displa% of total concurrent energ%= demand of all the

    feeders.

    6eters shall compl% with the reuirements of A 1egulations onnstallation * 9peration of 6eters.

    The functional Speci;cation of the energ% meters shall )e as follows

    M Applica)le S S ,3L or S ,@BL depending upon accurac% ofmeters.

    M Accurac% lass nde4 0.2S

    M Power factor range ero lagOunit%

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    16/37

    An integrating P%ranometer Class or )etterD should )e providedwith the sensor mounted in the plane of the arra% for measurement ofSolar rradiance. 1eadout should )e integrated with data loggings%stem. t shall )e possi)le to record and retrieve irradiation andirradiance data hourl%$ dail%$ wee'l%$ dail%$ monthl% and %earl%.

    ntegrated temp sensors for measuring the module surface temp.$

    inverter inside enclosure temp$ and am)ient temp to )e providedcomplete with readouts integrated with the data logging s%stem.

    The 7ata acuisition s%stem shall transfer the data to the entralomputer which shall have the facilit% of storage$ archiving anal%sisand displa% of the data related to the Solar P: s%stem. Suppl% of thesuita)le computer along with necessar% hardware and software shall )epart of the scope of suppl%. The software shall )e compati)le with an%5indow )ased 9S.

    7ata logger=P )ased monitoring s%stem must record all theseparameters for stud% of e"ect of various environmental * grid

    parameters on energ% generated )% the solar s%stem and variousanal%sis would )e reuired to )e provided through )ar charts$ curves$ta)les$ which shall )e ;nali#ed during approval of drawings.

    The data acuisition s%stem shall also communicate with the string

    com)iner )o4es for monitoring of each string of SP: arra%s.

    9verall it shall )e possi)le to record$ archive and displa% all electricaland environmental parameters in the s%stem for complete monitoringand control of the solar power generation s%stem.

    1< P&*"R ' #&NTR&= #A(="!D

    Power a)les of adeuate rating and speci;cation shall )e supplied and

    installed for interconnection of

    6odules=panels within arra%Arra% * Power ontrol !nitPower ontrol !nit and the )atter%

    Power control !nit to A distri)ution )oard A distri)ution )oard P!

    vacuation and transmission if reuired

    The power ca)les shall )e ,.,=,, 'v grade$ heav% dut%$ stranded copper =Aluminum conductor$ P: insulated$ galvani#ed steel wire=strip armored$Kame retardant low smo'e C+1?SD e4truded P: t%pe ST

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    17/37

    The permissi)le voltage drop from the SP: Generator to the P! shall not )e

    more than 2E of pea' power voltage of the SP: power source Cgeneratings%stemD. n the light of this fact the cross

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    18/37

    9ne Solar 9)servator% including testing facilities shall )e supplied. The

    Solar 9)servator% with associate s%stem shall include )ut not )e limited to

    the following

    P%ranometer Class or )etterD

    5ind sensor Temperature sensor

    The contractor is reuired to measure the Solar 1adiation and other climatic

    conditions. The ma>or categories of site

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    19/37

    4i. Testing and commissioning

    The ma>or milestones for the pro>ect are to )e highlighted in theschedule. The contractor shall su)mit an overall erection plan for theplant and euipment under his scope of suppl% along with the tender.

    The successful contractor shall have to su)mit the ?evel

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    20/37

    The contractor shall su)mit a list of all drawings and documents proposed

    to )e su)mitted. The list will )e approved )% emplo%er= consultant and ma%

    )e modi;ed if necessar%

    ach drawing= documents in the list shall )e identi;ed with a serial num)er$

    description and scheduled date of su)mission.

    %or Approval D

    uipment la%out plan

    Single line diagram with rating of all euipment$ ca)le si#es and details of

    protection and metering

    +ront view$ general arrangement of euipment with plan and sectional

    viewsF clearl% showing the position of various components$ and clearance

    )etween components. The ma'e and t%pe of components$ together with

    vital technical parameters shall also )e furnished along with GA drawings

    ontrol$ alarm$ indications$ interloc'ing and other schematics

    ?ighting la%out drawings with illumination levels$ t%pe and ma'e of ;ttings.

    5iring terminal plan drawings with ca)le connections

    arthing scheme and la%out of earthing networ' with design calculations$

    for outdoor switch %ard and other areas=premises$ if applica)le.

    a)le la%out drawings$ ca)le channels details

    nstallation drawings of all euipment with la%out of euipment$ ca)les$

    lighting s%stems$ Cif applica)leD and earthing networ'.

    alculation for design of ?T )usduct$ si#ing of )us)ars$ )us)ar supports

    considering the temperature rise and fault current.

    alculations for design of supporting structures for outdoor switch%ard w.r.t.wind pressure$ short circuit forces etc. Cif applica)leD.

    %or reerence

    +oundation details of each euipment

    nter panel wiring and terminal )loc' arrangement

    4ternal connection diagram$ panel wise and scheme wise

    $nstruction Manuals or &peration ' Maintenance

    omplete and comprehensive instruction manuals for operation and

    maintenance of the euipment with drawings. This shall include the

    following

    Preventive maintenance schedule for each euipment

    Procedure for shut down and start

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    21/37

    1>< UARANT""

    The ontractor will guarantee the euipment for its wor'manship$

    materials$ design and satisfactor% performance. The ontractor shall )e

    lia)le to replace an% parts= euipment that ma% fail or show signs of defects

    arising from fault% designs$ material$ or wor'manship$ erection or from an%

    act of commission of the ontractor. All such replacements shall )e madefree of cost at site )% the ontractor

    The o"ered Solar module should give L0E output of rated capacit% for ;rst,0 %ears$ 80E output of rated capacit% for 2- %ears

    nverter should have - %ears performance warrant% 9ther guarantee termsshall )e as per G

    0< )"=$2"R3

    The completion period of the pro>ect is limited to @ months.

    No further e4tension shall )e provided until there is some forceful

    circumstances occur.

    1< $N!P"#T$&N

    6anufacturing progress review$ inspection * testing of euipment coveredunder the technical speci;cation shall )e carried out )% the mplo%er at the

    manufacturers wor's=premises prior to dispatch$ to ensure that their ualit%* wor'manship are in conformit% with the contract speci;cations and

    approved drawings.

    The ontractor shall furnish the ualit% assurance plan for euipmentseparatel% with suggestive stages and hold points for underta'ing inspectionand testing )% the mplo%er. Total list of plant * euipment of the order shall)e su)mitted to the mplo%er prior to su)mission of UAP

    The mplo%er reserves the right to visit at an% stage of manufacture of plant

    and euipment and as' for additional inspection * tests )e%ond approvedUAP$ if it is found necessar% after completion of detailed design *engineering and approval of drawings

    < T"!T! AN) $N!P"#T$&N

    +ollowing tests shall )e conducted on euipment after erection and )eforeenergi#ing from point of view of completeness in the presence of emplo%er

    M :isual inspection of total s%stem

    M hec'ing of continuit% of power and control ca)les.

    Page 1of 6

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    22/37

    M hec'ing of insulation resistance for inter

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    23/37

    Special care shall )e ta'en to ma'e the enclosed euipment protectedagainst entr% of rats$ li#ard$ and creeping reptiles which ma% createelectrical short circuits.

    Approved ca)le mar'ers of reinforced concrete shall )e provided and

    ;4ed to mar' each and ever% diversion of all )uried ca)le routes. A

    mar'er shall also )e placed ever% -0 meters along straight portions of

    each route. A concrete ca)le mar'er shall also )e provided and ;4ed tomar' the position of ever% )uried >oints.

    7istinguishing la)els of non

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    24/37

    and other euipment and instruments and consuma)les$ allcommissioning euipment and instruments$ welding euipment$ winches$alignment tools$ precision levels$ etc.$ which ma% )e reuired for carr%ingout the erection and commissioning wor' eIcientl%.

    All instruments shall )e properl% cali)rated )efore use. !nless otherwise

    speci;ed$ the a)ove erection euipment= materials shall )e the propert%

    of the ontractor. (owever$ mplo%er/s prior permission shall )e reuiredfor removal of these erection euipment= materials from the site. Theontractor shall ensure that proper procedure and documentation ismaintained at entr% gate of mplo%er/s premises for such items as might)e carried )ac' )% the ontractor after completion of wor'.

    The ontractor shall provide erection consuma)les li'e o4%gen andacet%lene gas$ welding rods$ solder lugs$ oil$ grease$ 'erosene$ cottonwaste$ etc. reuired for erection of euipment and steel structures.

    The ontractor shall construct and maintain his own site oIces and

    stores as reuired for the wor' and arrange for maintaining in the areaplaced at the ontractor/s disposal in a neat manner.

    The ontractor shall provide his scheme for mo)ili#ation with Har hart

    indicating clearl% the resources$ manpower and machiner% proposed to

    )e deplo%ed to ensure timel% completion of wor' and ualit% of

    wor'manship

    9n reuest$ the mplo%er ma% help the ontractor )% providing an%

    special handling=construction euipment needed in the interest of wor'

    su)>ect to availa)ilit% and on pa%ment of hire charges and other

    conditions of mplo%er. The charges shall )e recovered from an% )ill ofthe ontractor due immediatel% thereafter.All safet%$ health and pollution control measures as reuired to )eadopted as per the Statutor% 1egulations and the Safet% conditions forontractors issued along with the tender or otherwise reuired or implied)% statutor% regulations or practices shall )e strictl% followed )% theontractor during the e4ecution of the ontract. The ontractor shall setup a suita)le safet% organi#ation of his own at site in this regard.

    ?a)or facilities such us shelter$ food shall )e arranged )% the contractor.9n reuest drin'ing water shall )e provided )% the emplo%er.

    The mplo%er shall deplo%=suppl% Supervising=operating * maintenancepersonnel and all raw materials$ utilities * services reuired forcommissioning.

    Au4iliar% power suppl% facilit% for s%stem testing * commissioning$nverter au4iliar%$ luminaries$ control room$ nverter room$ site oIce andother power consuming areas shall )e provided )% the mplo%er

    The results of pre commissioning Test$ startointl% )% the ontractor and the mplo%er. Anda cummilative report shall )e dul% su)mitted )% the contractor to NT!.

    The ontractor shall rectif% the defects o)served during the

    ommissioning period promptl%. successfull% commissioning as )e accepted if the complete s%stem

    remains s%nchroni#ed with the grid for a period of @8 hours without an%

    Page 8of 6

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    25/37

    distur)ance or interruption. 7uring this period the s%stem shall generatepower during sunshine hours and e4port power to the grid and duringdar' hours shall remain s%nchroni#ed with the grid. f there is an outageisolation from the grid during this period due to defects in the s%stem$then commissioning period shall start afresh after recti;cation of the saiddefect. (owever if the am)ient or the grid parameter are )e%ond thespeci;ed limits if an% shall not )e considered as stoppage.

    The ommissioning and pro>ect completion certi;cate shall )e issued )%

    the mplo%er su)>ect to relevant conditions.

    5< TRA$N$N

    ontractor personnel who are e4perienced instructors and who spea'understanda)le nglish shall conduct training. The ontractor shallarrange on its own cost all training platform reuired for successfultraining and understanding. The ontractor shall provide all necessar%

    training material. ach trainee shall receive individual copies of alltechnical manuals and all other documents used for training.

    The schedule$ location$ and detailed contents of each course will )e;nali#ed during mplo%er= onsultant and ontractor discussions.

    Training material shall include

    +unctioning of each and ever% euipments in the power plant$ theircircuit diagrams$ design and speci;cations.

    9peration of each and ever% guidelines and procedure with properdocumentation

    6aintenance guidelines and procedure with proper documentation Safet% and precautionar% measures

    %$NAN#$A= #R$T"R$A

    1BThe Annual turnover of the Hidder should )e not less than 1s. - r for

    an% one of the past 3 %rs starting from the +inancial %ear 20,,

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    26/37

    the successul ten.erer in the or/ o )

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    27/37

    under ta'ing is to )e given. f alread% having service station at

    Ananthapuramu proof to )e su)mitted.8D erti;cate to the e"ect that the Solar Pv 6odules supplied are

    indigenousl% manufactured VndiaW and not imported. O Proof to )e

    su)mitted.

    LD Hidders whose erti;cation=1egistration with Govt. of ndia O 6N1

    should )e valid while tendering and for atleast upto the completion of the

    present wor'.,0D All components should have 6N1 O certi;cation.,,D +or ivil wor's$ all the materials satisf%ing the relevant reuirements as

    per relevant codes are to )e used. +or 1 wor's minimum 62- concrete

    and +e -00 steel are to )e used. 9nl% designed concrete mi4es are to )e

    used.

    Technical !peciKcations D

    ,D The Solar panels to )e used in this pro>ect should )e from themanufacturers certi;ed )% the 6inistr% of New * 1enewa)le nerg%C6N1D.

    2D n addition an% components those are to )e used in the pro>ect shouldhave the certi;cation of 6N1.

    Pay/ent will ;e release. as ollows D

    Pa%ments will )e released as per !niversit% norms.

    Ten.er #on.itions D

    1BThe ;nal rates uoted should )e after deducting all su)sidies to )e given

    )% Govt.$ of ndia.BNT!A will not provide an% assistance in providing su)sidies. t is the

    complete responsi)ilit% of the )idder to get the su)sid%.B 1egarding su)sidies etc.$ the changes as applica)le from time to time as

    per the G.9s issued from time to time shall appl%.8B Supplier should )e )oth 6anufacturer and mplementer O proo to ;e

    su;/itte.ect9B nverter eIcienc% should )e Y LE CcertiKcate given ;y thir. party

    is to ;e enclose.D6BThere should )e provision to e4tend the pro>ect to , 65 in future.

    ?B Panel eIcienc% should )e Y ,-E CcertiKcate given ;y thir. party isto ;e enclose.B

    Page 6of 6

  • 7/25/2019 Solar 200 Kw,Final Tender Doc 23.08.2014.Doc_366080

    28/37

    eneral $nor/ation D

    aD The tender conditions and formats of di"erent forms can )e seen in

    the !niversit% we) site wwwection

    clause.

    dD The Technical )id opening date 16