Social Monitoring Report
# Semiannual Report July-December 2017
INO: West Kalimantan Power Grid Strengthening
Project
Prepared by PT PLN Pusmankon for the PT PLN and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 1 January 2018)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.0000735943
$1.00 = Rp13,588
NOTE
(i) In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
i
PT PLN (PERSERO) UIP KALBAGBGAR
Jl. Letjend Suprapto No. 50 G, Pontianak Kalimantan Barat
Strengthening West Kalimantan Power Grid Project
SOCIAL MONITORING
Semi Annual Report July – December 2017
ADB Loan No.3015-INO
AFD Loan No :CID102401B
Submitted by:
PT PLN (Persero)
January 2018
ii
Project Implementation Strengthening West Kalimantan Power Grid
Project
ADB Loan No.3015-INO and AFD Loan No.CID 1024 01B
Social Semi annual Report
July 01, 2017 to December 31, 2017
Submitted by:
PT PLN (Persero)
January 2018
i
Abbreviations
ADB Asian Development Bank
AFD Agence Francaise de Développment
AP Affected Person
BPHP Balai Pengelolaan Hutan Produksi (Production Forest Management Center)
BPDAS Balai Pengelola Daerah Aliran Air (Watershed Management Center)
BPN Badan Pertanahan Nasiona/ (National Land Agency)
DIR DASHL Direktorat Derah Aliran Sungai dan Hutan Lindung Directorate of Watershed and Protected Forest)
EMA External Monitoring Agency FGD Focus Group Discussions HH Household IDR, Rp. Indonesian Rupiah IOL Inventory Of Losses IP Indigenous People IR Involuntary Resettlement
LAC Land Acquisition Committee
MUSPIKA Musyawarah Pimpinan Kecamatan (Board of Subdistrict
Government Leaders)
OPGW Optical Groundwire PBHTP Biaya Pero/ehan Hak Atas Tanah dan Bangunan (Cost for
the Acquisition of the right Land and/or Buildings) PIC Project Implementation Consultant
PLN PT Perusahaan Listrik Negara (Persero) (State Owned
Electricity Enterprise)
RCCP Resettlement Customary Communities Plan
RCCDP Resettlement Customary Communities Development Plan
ROW Right-Of-Way
T, T. Tower
TL Transmission Line
TOR Terms of Reference
UPK Unit Pembangunan Konstruksi (Construction Development
Unit)
UIP Unit Induk Pembangkitan (Centra/ Generating Unit)
UPP Unit Pelaksana Proyek
ii
Weights and Measures
ha hectare
kg kilogram
km kilometer
kV kilovolt
m meter
m² square meter
iii
NOTE
This social monitoring report is a document of the borrower. The views expressed
herein do not necessarily represent those of ADB's Board of Directors, Management,
or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any
designation of or reference to a particular territory or geographic area in this
document, the Asian Development Bank does not intend to make any judgments as to
the legal or other status of any territory or area.
iv
Table of Contents
Abbreviations…...………………………………………………………………………………………..…i
Table of Contents………………………………..……………………………………………….............iv
Summary .................................................................................................................................... vii
1. Introduction ........................................................................................................................... 1
1.1 Introduction of Project and Basic Data ........................................................................... 1
1.2 Project Scope ................................................................................................................ 1
1.3 Project Location ............................................................................................................. 2
1.4 Project Administration .................................................................................................... 3
2. Resettlement, Community Customary and Social Issues ...................................................... 3
2.1 General Description ....................................................................................................... 3
2.2 Contractors’ construction activities for transmission lines and substations ..................... 5
3. RCCDP and RCCP Implementation Progress ....................................................................... 5
3.1 Land Acquisition Procedure and Grievance Process ...................................................... 7
3.2 Actual Land Acquisition Issues during This Period ......................................................... 8
3.3 Income Restoration ...................................................................................................... 10
4. Land Acquisition and Compensation Progress .................................................................... 11
4.1 Implementation of Compensation Process of ROW ..................................................... 16
5. Capacity Development and Awareness Services of PIC ..................................................... 20
6. Social Issue and Mitigation ................................................................................................. 21
7. Indigenous People/Custom Community in Project Location ................................................ 23
8. Actions and Strategies Developed to Improve the Project Social ........................................ 24
v
List of Maps
Map 1: Map of West Kalimantan Power Grid Strengthening Project
List of Figure
Figure 1: Leaflet Distribution to Affected Household of 150 kV Tayan – Sanggau Sekadau
TL
Figure 2: Project Grievance and Redress Mechanism
Figure 3: Documentation of Land Acquisition Payment for Tower Base in T.190
List of Tables
Table 1: Summary of subprojects – Description by Region and Corresponding Social
Safeguard Document
Table 2: Key Timelines Associated with Social Safeguards Imperatives for all Packages
Table 3: List of Socializations of Land Acquisition for 150 kV Tayan – Sanggau – Sekadau
TL
Table 4: Actual Land Acquisition Issues
Table 5: List of Affected Households Participated in CSR Program for 150 kV Bengkayang
– Ngabang – Tayan TL
Table 6: Status of Required Actions and Commitments Implementation based on
Forestry Area Permit
Table 7: Affected Asset Acquired for Sanggau and Sekadau Substation
Table 8: Summary of Affected Land for 150 kV Tayan – Sanggau – Sekadau TL up to
December 2017
Table 9: Affected Assets Acquired for Tayan - Sanggau - Sekadau TL up to December
2017
Table 10: List of Socialization Plant, Building, and Land/ROW Compensation for 150 kV
Bengkayan – Ngabang – Tayan TL
Table 11: Monitoring Progress ROW for 150 kV Bengkayang – Ngabang – Tayan TL
Table 12: The cost of resettlement for the 150 kV Tayan-Sanggau-Sekadau
transmission line up to December 2017
Table 13: Summary of Capacity Building Implementation
Table 14: List of social issues found at site and mitigation
Attachment
Attachment 1: Project Organization Charts
Attachment 2: Leaflet Distribution for Affected Household in 150 kV Tayan - Sanggau
- Sekadau Transmission Line
Attachment 3: Acknowledgement of socialization for Tayan – Sanggau – Sekadau TL
Attachment 4: The list of vulnerable AP living within the ROW corridor of the 275 kV
Bengkayang - Jagoibabang TL
vi
Attachment 5: Corporate Social Responsibility Implementation Report of the 275 kV
Bengkayang - Jagoibabang TL
Attachment 6: The list of vulnerable and severely AP living within the ROW corridor of
The 150 kV Ngabang – Tayan TL
Attachment 7: Corporate Social Responsibility APs in 150 kV Bengkayang – Ngabang –
Tayan TL
Attachment 8 Decree Letter of Bupati Sekadau about Location Assignment Permissions
for 150 kV Sekadau substations
Attachment 9: Decree Letter of Bupati Sanggau about Location Assignment Permissions
for 150 kV Sanggau substations
Attachment 10: Decree Letter of Bupati Sanggau for 150 kV Tayan – Sanggau – Sekadau
TL
Attachment 11: Permit from Territory Hall of Forest Area
Attachment 12: 150 kV Tayan – Sanggau - Sekadau TL Land Acquisition Monitoring Up
to December 2017
Attachment 13: 150 kV Bengkayang – Ngabang - Tayan TL socialization plant, building,
and land/ROW compensation
Attachment 14: Monitoring progress ROW for package 3 150 kV Bengakayan - Ngabang
– Tayan TL
Attachment 15: Implementation of Capacity Building for 150 kV Tayan – Sanggau –
Sekadau TL
Attachment 16: List of village for the electricity distribution program under the Grant
Measures
Attachment 17: Documentation of Indigenous People Customary Activities (Ngudas)
Attachment 18: BKPM Decree No 6/1/IPPKH/ PMDN: Permit Use of Forestry area for
SUTET 275 kV and 150 kV on behalf PT. PLN (Persero) 64,42 Ha at
Restricted production forest and permanent production forest at
Bengkayang Regency, Landak Regency and Sanggau Regency, West
Kalimantan
vii
Summary
Until December 2017, the progress of each packages are as follow, Package 1 Bengkayang –
Jagoibabang transmission line have been energized in January 2016, Package 2 Bengkayang
substation have been energized in May 2016. Given the projected delays in the implementation,
Package 3 is still in stringing process (31,5%), for Package 4 Ngabang substation has been
energized in September 2016, meanwhile for the extension of Tayan substation need to wait for
the stringing process to be done. Contracts of new Packages 6, 7 have been awarded in May
2017 and new Package 5 has been awarded in November 2017.
Land acquisitions for tower plots and compensation payments for affected trees in the ROW in
Package 1 have been completed. There was no compensation payment for the land use
restriction in the ROW. PLN agreed to mitigate the payment gap by providing an Income
Restoration and Rehabilitation Program (IRRP) through the Corporate Social Responsibility
(CSR) Program to be implemented in the period of June – December 2018. Budget for the
program will be provided by PLN corporate Communication Unit (SKOM). Survey and
preparation of proposal for the IRRP will be carried out by the HKP-UIP Kalbagtim. Regular
coordination meetings among PLN UIP, SKOM, and ADB need to be conducted to ensure timely
program implementation.
IRRP for packages 1 and 2 was implemented in October 2017 in the form of distribution of
pepper seedlings, fertilizer, farmer equipment, and agricultural training. In Package 3,
compensation payment for all 407 tower footprints (279 towers in Bengkayang – Ngabang and
128 towers in Ngabang – Tayan) and RoW clearance has been completed. Complaints raised by
people on the compensation payment have been settled and money has been deposited in the
court. IRRP for Packages 3 and 4 was implemented in December 2017 in the form of distribution
of pepper seedlings, fertilizer, farmer equipment, and agricultural training. The total of 11 affected
households participated in this program.
Land acquisition for 150 kV Sekadau substation (2.23ha) and 150 kV Sanggau substation
(2.24ha) completed in January and April 2017 respectively, with total amount of land and trees
compensation is Rp 12.643.087.410,00. Land for 234 of 235 towers in 150 kV Tayan - Sanggau
TL has been acquired and the remaining 1 tower will be completed in January 2018. Land for
115 to 125 towers in 150 kV Sanggau – Sekadau TL has been acquired and the remaining 10
towers need to be completed in March 2018.
Identification of AP and assets for ROW for Tayan-Sanggau-Sekadau is planning to be
conducted from February-October 2018. PLN needs to mobilize more resources to ensure timely
completion. An appraiser has been hired and ROW appraisal will be conducted in April-
December 2018. ROW payment will be conducted from May 2018-February 2019. Territory Hall
of Forest Area, Pontianak confirmed there is no tower traversing forest area.
A proposal of IRRP for Packages 5, 6, and 7 (towers) was submitted by UIP Kalbagbar to SKOM
in September 2017. The IRRP in the form of chicken husbandry and training will be delivered to
the new vulnerable groups and severely AHs for towers in September-October 2018. IRRP for
ROW will be implemented in the period of January-March 2019. For all packages, women will be
prioritized in the IRRP. Cultural ceremony prior to construction commencement has been done
by the contractor at a tower location at each affected village participated by customary leaders,
AHs, communities, and village staff.
viii
This report refers to the IMA phase 2 for 150 kV Bengkayang – Ngabang – Tayan TL that has
been submitted in April 2017 and also draft IMA phase 1 for 150 kV Tayan – Sanggau –
Sekadau TL and 150/20 kV Sanggau and Sekadau Substations.
Social Semi Annual Report July – December 2017 1
1. Introduction
1.1 Introduction of Project and Basic Data The Government of the Republic of Indonesia has signed loan agreements with the Asian
Development Bank (ADB) and the Agence Francaise de Dévelopment (AFD) in the amount of
US$ 49.5 million each to enable PT Perusahaan Listrik Negara (PLN) to realize the construction
of 82 km 275 kV transmission line from the border with Sarawak in East Malaysia to
Bengkayang in West Kalimantan, Indonesia, 275/150 kV substation at Bengkayang, 145 km
150 kV transmission line from Bengkayang to Ngabang and Tayan, 150/20 kV substation at
Ngabang and extension of 150120 kV Tayan substation. Construction works for the 125 km 275
kV Interconnector were completed on the Sarawak side in October 2015, and for the first circuit
on West Kalimantan side on 30 December 2015; the second circuit was completed on 23 March
2016. The first circuit of the 275 kV Interconnector and Bengkayang substation were energized
on 20 January 2016, and the second circuit was energized on 19 May 2016. Since the start of
supply PLN imports 50 to 100 MW of electricity produced by hydro power plants in neighbouring
Sarawak at a much lower cost than generated by PLN's own diesel and oil fired power plants in
West Kalimantan. The import of electricity is scheduled to increase during peak load periods up
to 230 MW. The signed power exchange agreement allows power trade between West
Kalimantan and Sarawak for 20 years.
Due to the remaining loan, it was decided to adding 3 packages of work including construction of
150/20 kV substations in Sanggau and Sekadau, 150 kV Tayan – Sanggau transmission lines
and 150 kV Sanggau – Sekadau transmission lines. The 150 kV Tayan – Sanggau –Sekadau will
be built as extension of West Kalimantan Power Grid Strengthening Project (275 kV Jagoibabang
– Bengkayang transmission line and 150 kV Bengkayang – Ngabang – Tayan transmission line).
PT PLN (Persero) has assigned PT PLN (Persero) PUSMANKON to carry out the monitoring of
resettlement and community development with regard to compliance to the Resettlement
Customary Communities Plan (RCCP) for the 150 kV transmission line and associated
substation, and Resettlement Customary Communities Development Plan (RCCDP) for the 275
kV transmission line and associated substation.
The present report shows the progress of land acquisition, social and vulnerability issues during
the construction for the period from July 1st, 2017, to December 31th , 2017.
1.2 Project Scope
The project comprises of design, supply, installation, testing, and commissioning of the
following works and associated Substations in West Kalimantan Strengthening Project. The
project is divided by seven packages that can be seen in Table 1.
Social Semi Annual Report July – December 2017 2
Table 1. Summary of subprojects – Description by Region and Corresponding Social
Safeguard Document
Package
No Project Name
Length/ Width
District Type of Works Safeguard
Document
1
275 kV TL
Bengkayang to
Jagoibabang
82 km Bengkayang
Construction double
transmission line
between Bengkayang
and Sarawak, East
Malaysia
Updated
RCCDP
August 2013
2 275/150 kV
Bengkayang SS Bengkayang
Construction of the
substation
Updated
RCCDP
August 2013
3
150 kV TL
Bengkayang-
Ngabang- Tayan
142.46 km
Bengkayang Landak
Construction of towers,
foundation, and erection
tower
Updated
RCCP March
2014
4 150 kV Ngabang
and Ext. Tayan Landak
Construction of
transmission line
Updated
RCCP March
2014
5 Sanggau-Sekadau
SS
1.535 ha
1.37 ha
Sanggau
Sekadau
Construction of
substation
RCCP
August 2016
6 TL Tayan-
Sanggau 48,3 ha Sanggau
Construction of
transmission line
RCCP
August 2016
7 TL Sanggau-
Sekadau
27.997
ha
Sanggau Sekadau
Construction of
transmission line
RCCP
August 2016
1.3 Project Location
The project is located on the Indonesian part of Borneo Island in West Kalimantan in three
districts Bengkayang, Landak, Sanggau, and Sekadau.
The West Kalimantan Power Grid Strengthening Project is presented on Map 1.
Map 1. Map of West Kalimantan Power Grid Strengthening Project
Social Semi Annual Report July – December 2017 3
1.4 Project Administration The re-organization of PLN resulted in changes of PLN's project administration. The
implementation of the project now is managed by PT PLN (Persero) Unit Induk Pembangunan
KALBAGBAR (UIP KBB) located in the offices of PLN in Pontianak (formerly UIP X in
Balikpapan) and Unit Pelaksana Proyek Kitring KALBAGBAR 3 (UPP KItring Kalbagbar 3) at
PLN's site office in Singkawang (formerly UPK 5 in Bengkayang). This unit is providing the
construction for package 1 (Bengkayang – Jagoibabang transmission line), package 2
(Bengkayang Substation), package 3 (Bengkayang – Ngabang – Tayan transmission line), and
package 4 (Ngabang and Extension Tayan Substation) and Unit Pelaksana Proyek KALBAGBAR
2 (UPP KBB Kitring 2) located in Sintang is providing the construction for package 5 to 7 (Tayan-
Sanggau – Sekadau transmission line and associated substations) .The organization charts of
PLN UIP KBB and UPP KBB 3 are shown in Attachment 1. PLN is supported by the Project
Implementation Consultant (PIC) whose organization chart is shown in Attachment 1 too.
Due to the remaining loan, it was decided to use the remaining loan by adding 3 packages of
work including construction. The project implementation is managed by PT PLN (Persero) Unit
Induk Pembangunan (UIP KBB) located in the PLN offices in Pontianak and Unit Pelaksana
Proyek Kitring KALBAGBAR 2 (UPP KBB 2) at PLN site offices in Sintang. This unit is provide
the monitoring of the Land Acquisition progress, social and vulnerability issues is carried out by
the PIC's Social and Resettlement Specialist and in cooperation with PLN and the contractors to
ensure that accurate data are provided and social issues are properly resolved under
consideration of local customary.
2. Resettlement, Community Customary and Social Issues
2.1 General Description
This report for the period July to December 2017 states the social aspects of the implementation
progress of the West Kalimantan Power Grid Strengthening Project. This report includes: a) an
update of land acquisition implementation by PT PLN (Persero) UPP Kitring KBB 2 (formerly
PT PLN (Persero) UPK RING KAL 1) of the approved RCCP 150 kV Transmission Line
Project; b) a compilation of Social Issues emerged from the land acquisition and resettlement
implementation by PLN UPP KBB 2 as well as the ones developed during civil works
implementation and how those have been mitigated; c) progress of Capacity Building services
provided by PT PLN (Persero) PUSMANKON to PLN and contractors; and d) action plan to
further improve project implementation and monitoring to meet the project policy and compliance
with RCCDP and RCCP.
PT PLN (Persero) as the Project Executing Agency is responsible for the implementation of the
land acquisition and resettlement plan, i.e. Resettlement Customary Communities Development
Plan (RCCDP) for 275 kV Bengkayang - Jagoibabang Transmission Line and Resettlement
Customary Communities Plan (RCCP) for 150 kV Bengkayang - Ngabang - Tayan
Transmission Line , and 150 kV Tayan – Sanggau – Sekadau Transmission Line. The
associated substations are covered in the RCCDP and RCCP too.
As refer to RCCP for Tayan – Sanggau – Sekadau, total land area to be acquired for 2 new
substations is 29,050 m2 and affected 2 HH, for tower bases (excluding total land needed to
construct 14 tower bases located in the forest area) is 76.275 m2 and affected 297 HH. 150 kV
transmission line RoW requires 20 m wide (10 m +10 m) along 71.13 km of the transmission line
Social Semi Annual Report July – December 2017 4
route from Tayan-Sanggau and along 77.29 km route from Sanggau to Sekadau. The total area
of 2,968,400 m2 of the land under the ROW will be affected by the project and some restrictions
on the use of the land and building, for instance to grow high standing trees and building, will be
applied.
The acquisition of the land required for the bases tower of the Tayan – Sanggau – Sekadau
transmission line and associated substations , PLN has established an internal land acquisition
team under PT PLN (Persero) Unit Induk Pembangunan (UIP KBB) and Unit Pelaksana Proyek
Kitring KALBAGBAR 2 (UPP KBB 2). This internal land acquisition team has been tasked also to
conduct inventory of losses for the Right-of-Way (ROW) of the 150 kV transmission line corridor,
i.e. identify trees and assets affected by the construction works and compensate landowners for
loss of land, trees, plants and assets.
The potential impact by the construction of transmission lines concern temporary access roads,
permanent land acquisition, and restricted use of land and clearance of trees within ROW
corridor. The construction of the transmission line also has positive impacts to the landowners
and communities located near the project area such as:
1) Affected households receive cash compensation payments which can be used for
reinvestment and needs of family life;
2) Creation of employment opportunities for the local people during land clearing and civil
works as well as in the period of construction depending on individual's capabilities;
3) Opportunity for local entrepreneurs to supply building materials and other services during
construction and post construction e.g. maintenance.
Implementation of the Resettlement Customary Communities Development Plan (RCCDP) for
the 275 kV Bengkayang - Jagoibabang Transmission Line and Resettlement Customary
Communities Plan (RCCP) for the 150 kV Bengkayang - Ngabang - Tayan Transmission Line
including the associated substations requires monitoring. PLN UIP KALBAGTIM (formerly as
UIP X) has awarded a contract for monitoring of the implementation of RCCDP and RCCP to
the independent monitoring agency (IMA), PT. Data Persada Consultant. The IMA shall
provide external monitoring reports to PLN UIP KALBAGTIM and PLN Head Office/PT PLN
(Persero) for any follow up actions required minimizing negative impacts of the RCCDP and
RCCP implementation. The draft of the IMA report was issued in April 2015 and the Final Report
was submitted to PLN in September 2015. On beginning of 2017, IMA has started to conduct
second monitoring that focused along the corridor of ROW for 275 kV and 150 kV. By the end
March 2017 the draft report of IMA for corridor 150 kV (Bengkayang - Ngabang- Tayan) has
been submitted to PLN.
PIC's Social Specialist assists the project to meet ADB's Involuntary Resettlement (IR) policy
requirements in delivering land acquisition and resettlement of the West Kalimantan Power Grid
Strengthening Project. The PIC's Social Specialist worked together with PLN UPP Kitring KBB 2
and the contractors to strengthen the project implementation process and solve social issues
caused by the construction works.
Several activities were conducted in the period of July – December 2017. Those activities
include capacity building and awareness to the contractors on the project compensation policy,
social issues identification, mitigation strategy, as well as a general orientation on local wisdom
and customary institutions relevant to project implementation. On site monitoring was conducted
in some critical areas in which social issues were reported. Most social issues originated from the
contractors' activities such as material transport, access road, cutting trees and local
Social Semi Annual Report July – December 2017 5
empowerment. The contractors' made good efforts to resolve social issues by coordinating with
head of village and youth leader. With strong leadership of the PLN UPP Kitring KBB 2 internal
land acquisition team, most of the issues raised have been solved in the meantime. The
contractors have adapted lessons learnt from PLN UPP Kitring KBB 2 land acquisition team and
used them to mitigate the issues raised during the construction activities.
2.2 Contractors’ construction activities for transmission lines and substations
The scope of works comprise of excavation, construction of foundations for the tower bases,
tower erection, and stringing of conductors and OPGW. PT. Bukaka Teknik Utama is the
contractor for the 275 kV Transmission Line from Bengkayang substation to Jagoibabang
(Package 1) and CG Consortium is the contractor for the construction of the 275/150 kV
Bengkayang substation (Package 2). The consortium of KEC and Mitsubishi Corporation for the
construction of the 150 kV Bengkayang - Ngabang - Tayan Transmission Line (Package 3) and
for 150/20 kV Tayan extension and Ngabang substation (Package 4). The construction of
Sanggau and Sekadau Substation (Package 5) is undertaken by PT. Siemens Indonesia
Consortium. Consortium of PT Krakatau Engineering and PT Citramas Heavy Industries is the
contractor for construction of 150 kV Tayan-Sanggau transmission line (Package 6) and 150 kV
Sanggau-Sekadau transmission line (Package 7).
For implementation of construction contractors need to recruit both locally and from other
areas of Indonesia. Local labors recruited from nearby villages and/or hamlets traversed by
the transmission lines. The labor recruitments usually involved local leaders and/or
village/hamlet heads to propose and select suitable workers for earth and civil works, and
transport of materials to the tower locations.
Temporary access roads are required for transport of materials for civil works activities and
erection of towers, as well as for stringing of conductors. In case of damage to trees/crops
the contractors have to pay compensation to the owners of land and vegetation.
3. RCCDP and RCCP Implementation Progress PLN has updated the Resettlement Customary Communities Development Plan (RCCDP)
for the 275 kV Transmission Line of the Strengthening West Kalimantan Power Grid Project
in August 2013. The updated RCCDP covers 82 km 275 kV Transmission Line from 275/150
kV Bengkayang Substation to the border with Sarawak at Jagoibabang. This updated
RCCDP for the 275 kV transmission line also includes due diligence for the land purchased
by PLN prior to the ADB approval of the RCCDP. The total number of transmission line
towers of the 275 kV Bengkayang- Jagoibabang transmission line is 201.
Following the RCCDP and RCCP approval, PLN UPK 5 internal land acquisition team continued
acquisition of the remaining land for tower sites. It is reported that the land acquisition for the
remaining tower sites of the 275 kV Bengkayang - Jagoibabang Transmission Line is consistent
with the updated RCCDP.
In August 2016 PLN submitted the Resettlement and Customary Communities Plan (RCCP) for
the 150 kV Tayan – Sanggau – Sekadau Transmission Line route. This RCCP covers the 150
kV Tayan – Sanggau Transmission Line, 150 kV Sanggau – Sekadau Transmission Line, and
150/20kV Sanggau – Sekadau Substations. Following the RCCP approval, PLN UPP
KITRING KBB 2 internal land acquisition team continued acquisition of the remaining land
for tower sites. It is reported that the land acquisition for the remaining tower sites of the
Social Semi Annual Report July – December 2017 6
150 kV Tayan – Sanggau - Sekadau Transmission Line has deviation, due to change of
Sanggau and Sekadau substations location. The number of towers changed from 223 to
235 for 150 kV Tayan – Sanggau transmission line (Package 6) and changed from 135 to
125 towers for 150 kV Sanggau – Sekadau Transmission line (Package 7). The summary of
RCCP in the form of leaflets has been posted on all affected village office boards and distributed
to affected households, contractors, and other relevant stakeholders in December 2017, sample
of leaflet distribution can be seen in Figure 1 and detailed leaflet distribution in several villages is
shown in Attachment 2.
Figure 1. Leaflet Distribution to Affected Household of 150 kV Tayan – Sanggau Sekadau TL
Key timelines shown in Table 2 are pertinent to note under social safeguards as Project
management transitions to more relevant and comprehensive documentation of forthcoming
monitoring periods.
Table 2. Key Timelines Associated with Social Safeguards Imperatives for all Packages
No Subject Person in-charge Timeline
Package 1 to 4
1 Implementation of Income Restoration and Rehabilitation Program (IRRP) to mitigate payment gap for land use restriction in Package 1 a. Survey and need assessment
b. Preparation of IRRP proposal c. Submission of the proposal from
UIP to SKOM d. Review and approval by SKOM e. Budget disbursement f. Coordination meetings
PLN UIP Kalbagtim PLN UIP PLN UIP PLN UIP SKOM SKOM PLN UIP
June-December 2018
a. W2 Dec 2017 – W4 Jan 2018
b. February 2018 c. W1 March 2018 d. W4 April 2018 e. W2 May 2018 f. February, April 2018
2 Implementation of IRRP for vulnerable and severely AHs for Package 3 and 4
PLN (UIP, Kalbagbar) December 2017
3 Land ownership (certificate) updates for all packages
PLN (KR-KAL, UIP, UPP)
September 2018
4 Implementation of actions set in the Forestry Land Use Permit (IPPKH)
PLN (UIP, DIV PPT) Starting 2017
Social Semi Annual Report July – December 2017 7
No Subject Person in-charge Timeline
Package 5 to 7
1 a. Update of RCCP b. Translation of RCCP into Bahasa
Indonesia c. Submission of Updated RCCP to
ADB for approval
PLN (UIP, Pusmankon) PLN (UIP, PPT)
a. June 2018 b. January 2017
c. June 2018
2 Distribution of leaflets on the summary of RCCP to the APs and relevant stakeholders
PLN (UIP, UPP, Pusmankon)
W2 – W4 of December 2017
3 Complete compensation payment/land acquisition for tower footprints a. 1 of 235 tower plots (Tayan-
Sanggau) b. 19 of 125 tower plots (Sanggau-
Sekadau)
PLN (UIP, UPP)
a. January 2018
b. March 2018
4 ROW: Identification of affected assets and land use restriction for ROW. PLN to add more team
PLN (UIP, UPP) Starting by April 2018
5 ROW: Valuation of affected assets by appraiser for the ROW
PLN UIP June 2018
6 ROW: Compensation payment for the ROW (Tayan-Sanggau-Sekadau)
PLN (UIP, UPP) Starting July 2018
7 Completion of Land ownership update a. SKT b. Certificate
PLN (UIP, UPP) a. Completed b. July 2017 –
December 2018 8 Income Restoration and Rehabilitation
Program (IRRP) PLN (UIP, Wilayah KalBar)
September – October 2018 (tower, substation) January – March 2019
9 Mobilization of PIC social safeguard specialist
PLN UIP/Pusmankon January 2018
10 Mobilization of 2 field social safeguard officers from contractors for Package 6, 7. (Current status: 1 Social Safeguard officer from GA for both packages)
PLN (UIP, PIC) January 2018
11 Submission of External monitoring report
PLN UIP 30 January 2018
3.1 Land Acquisition Procedure and Grievance Process
The land acquisition was undertaken by PLN UPP Kitring KBB 2 in Sintang and PLN UPP Kitring
3 in Singkawang, in collaboration with the local governments. The procedures for land acquisition
are as follows:
1) Consultations with relevant stakeholders to inform on the purposes of the project
development, potential impacts and land acquisition activities.
2) Identify of land owner and inventory of property and vegetation.
3) Announcement of inventory results (14 working days after)
4) Land valuation based on Public Appraisal Service (Kantor Jasa Penilai Publik, KJPP).
5) Socializations with APs, announcement of compensation
6) Transfer of compensation amount to landowner.
7) Release of land title from the APs to PLN.
Social Semi Annual Report July – December 2017 8
With regard to disputed land parcels, PLN UPP Kitring KBB 2 in Sintang and PLN UPP Kitring
KBB 3 in Singkawang also conducted a series of meetings with MUSPIKA and local district
government. Documents required to solve such disputes are:
1) A Minutes of Meeting involving owner(s) of disputed land, MUSPIKA and head of Adat.
2) Signed Statement Letter of Dispute from Owner of disputed land
3) Document no 1) and 2) will be sent to PLN UPP Kitring 2 in Sintang and PLN UPP Kitring
3 in Singkawang if agreements have been reached between the owners of disputed land,
and compensation payment can be processed.
4) If there is no agreement, the case of the disputed parcels can be brought to Bupati (head
of district government) and the Governor of West Kalimantan.
5) If the case of disputed parcels cannot be resolved, PLN may take the case to the court of
law for adjudication. These phases also apply for other grievance issues.
These phases also apply for other grievance issues. The mechanism can be seen in
Figure 2.
Figure 2. Project Grievance and Redress Mechanism
3.2 Actual Land Acquisition Issues during This Period
Land acquisition for Package 1 to 4 has been completed. During this period, Land acquisition
for Sekadau substation and Sanggau substation completed in January and April 2017
respectively. Land acquisition for 150 kV Tayan – Sanggau - Sekadau - transmission line is
in the acquaintances process and has been released in several sub districts. A number of
stages are conducted in the process of land acquisition, including socialization to APs.
Social Semi Annual Report July – December 2017 9
Socializations for land acquisition compensation in Sanggau District have been conducted in
several times in 2015; in Sekadau District have been conducted in 2017, list of socialization
for land acquisition can be seen in Table 3. Socialization was attended by PLN UPP
KITRING KBB 2 (formerly UPK RING KAL 1), village officials, military apparatus, police
officers, and community representatives.
Generally, in the socialization PLN explained preliminary information about transmission
lines related to the length of the lane and the number of tower, the villages to be traversed
by transmission lines, free space of vertical and horizontal area for transmission line, land
acquisition for tower base and its compensation, clearance of trees or crops and its
compensation, the induction magnetic and electric field based on WHO, SNI and
Department of Health standards for the transmission line, results of magnetic and electr ic
fields measurements for transmission line, also there were question and answer sessions.
Table 3. List of Socializations of Land Acquisition for 150 kV Tayan – Sanggau – Sekadau
transmission line
No. District Sub - District Date
1. Sanggau Tayan Hilir October, 12th 2015
2. Sanggau Balai October, 13th 2015
3. Sanggau Tayan Hulu October, 21st 2015
4. Sanggau Parindu October, 16th 2015
5. Sanggau Kapuas October, 20th 2015
6. Sekadau Sekadau Hilir April, 11th
2017
Acknowledgement of its socialization is shown in Attachment 3.
Although a number of stages in land acquisition process have been implemented, there are still
remaining obstacles. The several issues during this period related to land acquisition in Tayan –
Sanggau – Sekadau Transmission line can be seen in Table.4.
Table 4. Actual Land Acquisition Issues for 150 kV Tayan – Sanggau – Sekadau
transmission line
Village Tower Number Number of
Tower Remark
Tayan – Sanggau
Cempedak T.07A 1 tower Land owner has been going abroad
Sanggau - Sekadau
Makkawing T.35 1 tower The tower base location affects a sacred
tree. Tower base will be reallocated
Binjai T.130R
1 tower Freehold title is in Bank due to personal loans by the land owner. Communicate with the land owner to use other freehold title.
T.131.R 1 tower Measurement of land area for land certificate
Social Semi Annual Report July – December 2017 10
Village Tower Number Number of
Tower Remark
T.132.R 1 tower Family-owned land issues
T.136R-T.137R 2 towers Land owner is still unknown
T.139 1 tower Measurement of land area for land certificate
T.140R
1 tower Freehold title is in Credit Agency due to personal loans by the land owner. Communicate with the land owner to use other freehold title.
Suka Gerundi T.147R Land owner is still unknown
T.149R Land owner is still unknown
3.3 Income Restoration
Income restoration shall be implemented for APs who have lost their productive base, business,
jobs or other income sources, regardless of whether they have lost their house. Based on RCCP
and RCCDP, APs identified as severely affected are those people who lose more than 10% of
their total productive land/assets, and APs who are categorized as vulnerable include elderly
headed households, disabled, landless, Indigenous People (IP), women headed households but
not considered poor and severely affected. Income restoration and rehabilitation program will be
provided for severely APs by PLN in close consultation with APs.
The income restoration program will be delivered in parallel with payment of compensation, using
Corporate Social Responsibility (CSR) program/budget under PLN UIP Kalimantan Bagian Barat.
For initial plan, one AH will get training on proper cultivation of pepper and provide good variety
of pepper seeds (100 seeds each AH). Women groups will be prioritized to participate in the
capacity building activities.
As result of verification from predecessor PIC (Tractebel) of vulnerable affected people at
package 1 (Jagoibabang –Bengkayang) is 6 people identified as vulnerable affected people and
2 personidentified as severely affected people in package 2 (Bengkayang substation). 2 of
6vulnerable affected people is very old and cannot work as farmer anymore and the others
affected people work as pepper and corn farmer as main income. Detail list of Vulnerable and
Affected people in corridor of 275 kV shown in Attachment 4. IRRP for packages 1 and 2 was
implemented in October 2017 in the form of distribution of pepper seedlings, fertilizer, farmer
equipment, and agricultural training for vulnerable and affected people, report of its
implementation shown in Attachment 5. A total of 10 AHs participated in this program and 1 AH
refuse to receive help in the form of pepper seeds due to physical condition that is no longer
possible, so the grant diverted with a 900 VA power connection (as per beneficiary request).
Result of short interview by Tractebel to severely and vulnerable affected people in 150 kV
Bengkayang – Ngabang - Tayan is 25 confirmed identified as vulnerable affected people and 0
person confirmed identified as severely affected people. Detail list of Vulnerable and Affected
people in corridor of 150 kV shown in Attachment 6. IRRP for package 3 and 4 was implemented
on December 22nd, 2017. PT PLN (Persero), represented by the Manager of UPP Kitring KBB 3,
Social Semi Annual Report July – December 2017 11
has hand over Corporate Social Responsibility (CSR) funds in the amount of Rp 110.240.000,- to
the affected people in Bengkayang – Ngabang – Tayan. The grants are in the form of distribution
of pepper seedlings, fertilizer, farmer equipment, and agricultural training. The total of 11 affected
households participated in this program. Remaining affected households will be participated in
other CSR program that will be conducted on February 2018. The list of CSR receiver can be
seen in the Table 5 below, for more completed data can be seen in the Attachment 7.
Table 5. List of Affected Households Participated in CSR Program for Bengkayang –
Ngabang – Tayan
No. Name Village Item CSR
1 Noren Cempedak
Pepper seedlings,
fertilizer, farmer
equipment, and
agricultural training
2 Sarum Cempedak
3 Sarsa Mak Awing
4 Annius Bebe Mak Awing
5 Anwar Mak Awing
6 Anggek Temiang Mali
7 L. Hadir Temiang Mali
8 Anyi Temiang Mali
9 Buncang Temiang Mali
10 Darius Acos Tae
11 Eneng Padi Kaye
4. Land Acquisition and Compensation Progress
The main project resettlement principle is to avoid and if that is not possible, to minimize
resettlement impacts, and restore the livelihood of all APs at least to their pre-project condition.
Compensation for lost land and non-land assets will follow the principle of replacement cost. The
compensation progress is performed as described below.
a. 275 kV Bengkayang - Jagoibabang Transmission Line and Bengkayang Substation.
In total 201 towers have been acquired by PLN for the implementation of the Bengkayang –
Jagoibabang transmission line. Land acquisition was completed on 30 September 2015. The
area for 150/20 kV Bengkayang Substations has been gradually developed as dwelling area,
thus the substation was moved about 6,5 km south of the original area.
b. 150 kV Bengkayang-Ngabang-Tayan Transmission Line and Ngabang – Tayan
Substations.
The 150 kV Bengkayang – Ngabang – Tayan Transmission Line comprise of 280 towers for the
Bengkayang – Ngabang section and 128 tower sites for the Ngabang– Tayan section as updated
by administrative consolidation, i.e. 408 towers in total. PLN has completed to released land for
408 towers in the 150 kV Bengkayang – Ngabang – Tayan transmission line by the end of
December 2016. Several tower site located in the forestry area. The land acquisition for Ngabang
Social Semi Annual Report July – December 2017 12
and Tayan substations has been completed. The payment for package 4 has been done in
December 2017.
The needed permit for the forestry area for Bengakayang – Jagoibabang and Bengkayang –
Nagabng – Tayan has been issued on January, 16th 2017 by Capital Investment
Coordinating Board (Badan Koordinasi Penanaman Modal-BPKM)
No:6/1/IPPKH/PMDN/2017 as seen in Attachment 18, Implementation of required actions and
commitments set in the permit is shown in Table 6 and the supporting data also can be seen in
Attachment 18.
Table 6. Status of Required Actions and Commitments Implementation based on
Forestry Area Permit
NO RESPONSIBILITY DESCRIPTION
ACTION PLAN
GANIS CANHUT
BPHP DIR
DASHL BPDAS UIP PUSAT
1
Making plans & implementation of reclamation and re-vegetation in forest area
No later than 1 year before the end of the
permit period
2 Watershed Planting rehabilitation
*The verification order of prospective locations for rehabilitation of the watershed No: S.86 / PDASHL-KTA / R2PKH / DAS.1 / 8/2017 dated 3rd August 2017
* Indicative map of watershed rehabilitation sites from BPDAS and Kapuas protected forest on 7th June 17
* Conducts consultant procurement for the implementation of verification-rehabilitation-evaluation of watershed planting
3 PNBP Payment Done annually Paid on
20/03/2017
4 Tree Inventory
Completed - report submitted to Provincial
Forestry Service & BPHP (dated 8 Sept
2017)
5 PSDH &/DR Payment
Can be executed after point 5 * Based on TC results, IPPKH holders will pay PSDH of 25% from determination of TC result * Head of the BPHP register the IPPKH holder to the SIPUHH application to obtain access rights. * After submission of the Logging Plan, 75% PSDH payment is made
Waiting for the determination of PSDH value from BPHP
6 Payment Compensation (If it is a rehabilitation forest )
N/A. Not Rehabilitation
Forest
7 Change the cost of invenstation & permit fee to the permit holder
Replacing the cost of the permit that has been issued by 1. PT Nitiyasa Idola 2. PT Sinar Kalbar Raya because PLN is crossing the company area.
Already coordinated with BPHP, is being asked how the implementation
Social Semi Annual Report July – December 2017 13
NO RESPONSIBILITY DESCRIPTION
ACTION PLAN
GANIS CANHUT
BPHP DIR
DASHL BPDAS UIP PUSAT
8 Maintenance of IPPKH border area
9 Forest protection IPPKH area
In the form: * marking of bulletin boards related to forest protection * watch tower / guard post / tower / other means * patrolling with the forest police
10 Secure the forest area
*Lists the names of forest groups * Inverted tower monitor input * Conduct joint patrols
11 Provide convenience for the apparatus
*Listing where the intended agency * Convey the purpose of the activity * Mention frequency of activity
12 Coordinate environmental activities & forest utilization
13 Empowering communities around the permit area
Implemented as CSR
14 Make periodic reports every 6 months
c. Tayan – Sanggau – Sekadau Transmission Line and Sanggau - Sekadau Substations.
Land acquisition for Sekadau substation (2.4ha) and Sanggau substation (2.2ha) completed
in January and April 2017 respectively. Location assignment permissions for 150 kV
Sekadau substations is based on Bupati Sekadau decree No.671.32/133/UMUM/2016
dated March,1st 2016, for 150 kV Sanggau substation based on Bupati Sanggau decree
No.19 Tahun 2015 dated January,16 th 2015, shown in Attachment 8 and Attachment 9
respectively. Affected asset acquired for substation include land and trees/crops can be
seen in Table 7.
Table 7. Affected Asset Acquired for Sanggau and Sekadau Substation
No. Name of AHs Address Affected
land (m2)
Trees/Crops
Total
compensation
(Rp)
1. Abang Mokmen
Mungguk Village, Sub
District Sekadau Hilir,
District Sekadau
13.203
Rubber, Leban
Meranti, Jengkol, Cempedak,
Durian, Mentawak, Rambutan,
Pelantan
Setopong, Entawak
Mango, Kepuak, Palm,Pinang
5.754.264.000
2. Hj. Setiban
Mungguk Village, Sub
District Sekadau Hilir,
District Sekadau
9.271
Rubber, Cempedak, Mentawak,
Durian
Bamboo, Pelasik
Jengkol, Kelengkeng
Rambutan, Local wood, Halaban,
Asam Bawang, Petai,Mango
3.513.820.100
Total Sekadau SS 22.474 m2 9.268.048.100
Social Semi Annual Report July – December 2017 14
No. Name of AHs Address Affected
land (m2)
Trees/Crops
Total
compensation
(Rp)
1. Yulia Ani
Jl. Simpang Embaong
Bunut Village, Kapuas
Sub-district, District
Sanggau
10.610
Rubber, Cerucuk, Durian, Star
Fruit, Medang, Kampas, Leban,
Ubah, Bamboo, Mentawak,
Rambutan, Pinang, Sawit, Asam
Kalimantan, Cempedak, Petai,
HGaharu, Salak, Chocolate,
Nyantoh, Asam Kendis, kayu
Malam, Tengkawang, Pekawai,
Mahang, Jambu Hutan, Pulai
1.580.250.200
2.
Alisius
Jl. Simpang Embaong
Bunut Village, Kapuas
Sub-district, District
Sanggau
8.280
Rubber, Tengkawang, mahang,
Nyantoh, Cempedak, Pulai,
Durian, Leban, Kapuak, Cerucuk,
Bamboo, Rambutan, Sawit,
Medang, Sagu, Kelengkeng,
Petai, Peluntan, Embaong,
Tekan, Local Wood
1.287.769.110
3. Solisman
Jl. Simpang Embaong
Bunut Village, Kapuas
Sub-district, District
Sanggau
3.414 Rubber, Cerucuk, Leban 507.020.000
Total Sanggau SS 22.304 m2 3.375.039.310
Total 2 Substations 44.778 12.643.087.410
Location assignment permissions for 150 kV Tayan – Sanggau- Sekadau is based on Bupati
Sanggau decree No.250 Tahun 2014, shown in Attachment 10 and Bupati Sekadau decree
No.671.32/133/UMUM/2016 dated March,1st 2016, shown in Attachment 8.
There is no tower traversing forestry area in both packages, the needed permit has been
issued by Territory Hall of Forest Area (Balai Pemantapan Kawasan Hutan Wilayah III), letter
No.S396/BPKH.III.2/2015 dated May 13 th, 2015, which is can be seen in Attachment 11.
For Tayan – Sanggau transmission line (Package 6), the number of towers changed from 223 to
235 towers due to the change of Sanggau substation locations. Contract amendment to Package
6 is required for 12 additional towers. Land for 234 of 235 towers (99.5%) has been acquired in
November 2017 and the remaining 1 tower (0.5%) will be completed in January 2018.
For Sanggau-Sekadau transmission line (Package 7), the number of towers changed from 135 to
125 towers due to the change of Sanggau and Sekadau substation locations. There are 18
towers must be rerouted. Land for 106 to 125 towers (84.8%) has been acquired and the
remaining 19 towers (15.2%) need to be completed in March 2018.
Affected Assets Acquired for Tayan - Sanggau - Sekadau Transmission Line up to December
2017 traversing farmland in private and institution ownership as summarize in Table 8. It has
been compensated in total amount of Rp. 8,271,472,800,00 as seen in Table 9. An example
documentation of land acquisition for tower base in Sanggau – Sekadau Transmission Line,
tower number T.190 in The Sebarra Village, Parindu Sub-district, Sanggau District compensated
in amount Rp 24.470.000,00, the land owner as affected household was a woman named
Petronila , shown in Figure 3.
Social Semi Annual Report July – December 2017 15
Figure 3. Documentation of Land Acquisition Payment for Tower Base in T.190
Table 8. Summary of Affected Land for 150 kV Tayan – Sanggau – Sekadau TL up to
December 2017
Section Number of
Tower
Actual
Acquired Owner
Occupation of
Land Width (m2)
Tayan –
Sanggau 235
228 Private Farmland 55,616
6 Institution Farmland 3,050
Sanggau -
Sekadau 125
101 Private Farmland 28,050
4 Institution Farmland 900
Total 360 339 87,616
Table 9. Affected Assets Acquired for Tayan - Sanggau - Sekadau TL up to December 2017
No. Village
Numb
er of
Tower
Acquired
Number
Width
(m2)
Acquired Date Total Compensation
I Sanggau District
Tayan Hilir Sub-district
1. Kawat 1 1 400 17 November 2017 30,443,000
2. Cempedak 23 22 5316 3 October 2016 452,229,500
Social Semi Annual Report July – December 2017 16
No. Village
Numb
er of
Tower
Acquired
Number
Width
(m2)
Acquired Date Total Compensation
3. Tebang Benua 12 12 2875 3 October 2016 255,629,500
Balai Sub-district
4. Makkawing 8 8 1975 22 September 2017 218,564,000
5. Temiang Mali 7 7 1750 22 September 2017 177,971,000
6. Hilir 3 3 1025 22 September 2017 101,354,000
7. Kebadu 19 19 4450 26 October 2017 384,667,500
8. Senyabang 14 14 3500 313,944,000
9. Temiang Taba 11 11 3000 18 October 2017 308,617,000
Tayan Hulu Sub-district
10. Menyabo 17 17 4175 11 October 2017 379,636,000
11. Sosok 16 16 4125 11 October 2017 380.415.000
12. Binjai 17 17 4000 11 October 2017 335.578.000
Parindu Sub-district
13. Suka Gerundi 15 15 3550 13 October 2017 326,726,000
14. Palem Jaya 16 16 4175 13 October 2017 387,598,000
15. Pusat Damai 18 18 4350 13 October 2017 445,748,500
16. Sebbara 10 10 2250 13 October 2017 215,250,000
Kapuas Sub-district 17. Lape 15 15 4125 15 November 2017 376,512,000
18. Sei Mawang 9 9 2150 15 November 2017 219,859,500
19. Bunut 5 5 1475 15 November 2017 144,245,000
Total (Tayan-Sanggau) 235 234 58.666 5,454,987,500
Kapuas Sub-district
1. Bunut 11 10 3225 15 November 2017 288,835,000
2. Beringin 12 12 2875 15 November 2017 270,927,500
3. Tanjung Kapuas 5 5 1300 15 November 2017 128,000,000
4. Penyeladi 20 20 4850 15 November 2017 455,771,400
Mukok Sub-district
5. Semuntai 12 12 2875 5 October 2017 200,831,400
II Sekadau District
Sekadau Hilir Sub-district 6. Sei Kunyit 12 12 2875 3 November 2017 246,727,000
7. Peniti 20 20 5025 3 November 2017 519,570,000
8. Ensalang 10 10 2425 3 November 2017 280,315,000
9. Sei Ringin 5 5 1125 3 November 2017 117.975.000
10. Sei Ringin (Re-route) 10 3 1075 132.933.000
11. Mungguk (Re-route) 8 6 1300 174.600.000
Total (Sanggau – Sekadau) 125 115 28.950 2,816,485,300
Total (Tayan – Sanggau – Sekadau)
360 349 87.616 8,271,472,800
Detailed list of 150 kV Tayan – Sanggau - Sekadau land acquisition monitoring can be seen
in Attachment 12.
4.1 Implementation of Compensation Process of ROW
Complaints by the landowners sometimes come up as the landowner feels that one or several of
his trees have not been compensated yet. Such issue may cause obstacles and delays to the
stringing activities as the landowner insists on clarification by PLN. In order to avoid such
Social Semi Annual Report July – December 2017 17
disputes during construction, PLN Land Acquisition team continuously goes for rapprochement to
landowners. Moreover, landowners demand prices much higher than the price offered by PLN for
plants and process of compensation for plants within corridor of ROW, i.e.
1) Consultations with relevant stakeholders to inform on the purposes of the project
development, potential impacts and Right of Way activities.
2) Identify of tree owner
3) Announcement of inventory results (14 working days after)
4) Plants valuation based on Public Appraisal Service (Kantor Jasa Penilai Publik, KJPP).
5) Socializations with APs, announcement of compensation
6) Transfer of compensation amount to tree owner.
7) Clearing the released ROW
First phase of socialization for ROW corridor of 150 kV Bengkayang – Ngabang – Tayan
Transmission Line was conducted on January - March 2016. The list of socialization can be seen
in Table 10. On first phase socialization, in each sub district LAC/PLN explained preliminary
information about stringing work and the compensation for trees to be granted as referred to
Bupati Landak Decree. PLN also gave general explanation about the free space required for the
transmission line.
Table 10. List of Socialization Plant, Building, and Land/ROW Compensation for 150 kV
Bengkayan – Ngabang – Tayan TL
No. District Village Date
1. Landak Antan Rayan 6th September 2016
2. Bengkayang Dharma Bakti 21st October 2016
3. Landak Ansang 2nd November 2016
4. Landak Mungguk 16th November 2016
5. Bengkayang Bani Amas 6th December 2016
6. Landak Jelimpo 31st March 2017
7. Sanggau Tae 21st April 2017
8. Sanggau Padi Kaye 19th April 2017
9. Sanggau Cempedak 28thJuly 2017
Detailed of 150 kV Bengkayang – Ngabang - Tayan socialization plant, building, and
land/ROW compensation can be seen in Attachment 13.
Second phase of socialization commence on September 2016 was conducted by PLN UPP
Kitring KBB 3 in Singkawang. Socialization was attended by PLN UIP Kalbagbar, PLN UPP
Kitring KBB 3, the public appraisal company KJPP, MUSPIKA, Head of Dewan Adat Dayak
(DAD), Army, Police and affected people. In this socialization, Head of Dewan Adat Dayak asked
the villagers not to obstruct the construction work and any concern to Adat problem should be
avoided. PLN explained to all affected people the compensation for land and plants within the
ROW corridor of the 150 kV transmission line based on Regulation no. 3812013 of Ministry of
Energy and Mineral Resources of the Republic Indonesia about compensation for land, building
and plant under the free space of high voltage transmission line. PLN will pay 15% of the
appraised land value as compensation for land located within the ROW corridor as the land still
belongs to the people but the use is restricted. Second phase of socialization of ROW
Social Semi Annual Report July – December 2017 18
compensation is completed on April 2017. Compensation payment for Package 3 150 kV
Bengkayang – Ngabang – Tayan TL, Section 1 Bengkayang – Ngabang has been completed in
2016, for section 2 Ngabang - Tayan completed in August 2017 in total amount payment of all
sections was Rp.110.096.233.344. The monitoring progress ROW for Package 3 is shown in the
Table 11.
Table 11. Monitoring Progress ROW for 150 kV Bengkayang – Ngabang – Tayan TL
No Section KJPP
Number
Tower/
Span
ROW
Length
Compensation
Amount Implementation Progress
1
Section 1
150 kV
Bengkayang
-Ngabang TL
KJPP Dwi
Haryanton
o Agustinus
Tamba
279
Tower/
278 Span
95,6 km
Rp
69,124,002,971
Socialization (September 2016)
Inventory (March 2016)
Assessment &compensation
assignment (September 2016)
Payment:
- Land/ Rp 10,608,316,800
- Building/ Rp 3330,990,001
- Trees/ Rp 58,184,696,170
- Payment Progress (100%)
2
Section 2
150 kV
Tayan-
Ngabang TL
KJPP Dwi
Haryanton
o Agustinus
Tamba
128
Tower/
127 Span
46,8 km Rp
40,972,230,363
Socialization (November 2016)
Inventory (June 2016)
Assessment &compensation
assignment (November 2016)
Payment:
- Land / Rp 5.442.465.000
- Building / Rp 3.315.000
- Trees / Rp 35.526.450.363
- Payment Progress (100%)
Detailed list of monitoring progress ROW for Package 3 can be seen in the Attachment 14.
Identification of APs and assets for ROW for Tayan – Sanggau – Sekadau is planned to be
conducted from February – October 2018. PLN needs to mobilize more resources to ensure
timely completion. An appraiser has been hired and ROW appraisal is planned to be conducted
in April-December 2018. ROW payment is planned to be conducted from May 2018 - February
2019.
4.2 Funds Availability and Sourcing and Limitations to RCCP Implementation
Funds for the implementation of the RCCP are part of the Project budget. Costs have been
estimated based on: (i). for affected land using the unit rate used during the construction
of West Kalimantan land acquisition of 150 kV Transmission Line Project Strengthening
West Borneo Power Grid 2014, with the consideration of the inflation rate of 8.36% per
year in 2014, 3.35% in 2015 and 4.7% in 2016, (ii) for affected structure based on unit rate
appraise by Independent Appraisal for affected structure in the Sp. Tanjung - Entikong
under TA Second Regional Road Development Project 2013 with consideration of inflation
rate (iii) For affected trees based on the the agreed unit rate in the socialization of
Social Semi Annual Report July – December 2017 19
development plan of 150 kV Siantan - Tayan Transmission Line, January 2015 and Bupati
Bengkayang Decree on Compensation of trees and crop, 2013.
Estimation cost is intended to principally provide PLN a basis for calculating the cost of
resettlement, particularly compensation for affected assets. Therefore, during the
Implementation Stage of the land acquisition process as mandated by the new Land
Acquisition Law of 2012 and PLN Decree No.289.K/D/2013, the PLN UIP Kalbagbar will
appoint a licensed property appraiser to do a detailed property appraisal of all affected
assets. The results of the work of the property appraiser will be used by the PLN LAC in
negotiating with AHs the levels of compensation for their affected assets. Table 12.
provides a breakdown of the resettlement costs.
Table 12. The cost of resettlement for the Tayan-Sanggau-Sekadau up to December
2017
Particulars/Items Unit rate (Rp) Estimated
Budget based on
RCCP (Rp)
Actual Budget (Rp)
Cash compensation for total land to
be acquired for 2 new substation
(29,050 m2)
60,000* 1,743,000,000 12,643,087,410
Cash compensation for total land area
to be acquired for tower base
(excluding total land need to construct
14 tower base located in the forest
area) (76,275 m2)
60,000* 4,576,500,000 8,271,472,800
Cash compensation for total land area
will be restricted by the transmission
line ROW (2,968,400 m2)***
9,000 26,715,600,000 N/A
Cash compensation for structures :
- House (permanent) 50 m2 - Farmshed (temporary) 12 m2
2,477,567**
1,160,517**
122,378,350
13,926,204
Cash compensation for trees ***:
- Small (818 trees) - Not bearing fruits (829 trees) - Bearing fruits (2574 trees)
Compensation for tall trees restricted
by transmission line ROW*****
65,181,000
173,739,400
843,322,000
N/A
Compensation for crops (5,649 m2) 18.028.519
Cost for IRP (100 pepper seeds x 137
AHs = 13,700 seeds) and training on
farming.
20,000*** 274,000,000
Sub-total (direct costs) 33,703,196,795
Cost contingencies (15% of direct
costs) which includes Appraisal Team
and IMA
5,055,479,519
Operational costs (3 % of direct costs) 1,011,095,904
Grand Total 39,769,772,218 20,914,560,210
* the unit rate used during the construction of West Kalimantan land acquisition of 150 kV Transmission Line Project
Strengthening West Borneo Power Grid 2014 (Rp. 48,000/m2), with the consideration of the inflation rate of 8.36% per
year in 2014, 3.35% in 2015 and 4.7% in 2016
Social Semi Annual Report July – December 2017 20
***) unit rate include budget for training proper pepper cultivation
** the reference unit rate appraised by Independent Appraisal for affected structure in the Sp. Tanjung – Entikong
under TA Second Regional Road Development Project 2013 with consideration of inflation rate of 8.36% per year in
2014, 3.35% in 2015 and 4.7% in 2016
***detailed calculation of estimation cost for replacement trees is shown in appendix 2
**** Easement fee in the amount of 15% of the current land value will be given for land area under the transmission line
without any deduction of tax (for transaction cost) and administrative cost)
*****Could not be estimated now, since the alignment of transmission line have not determined yet
5. Capacity Development and Awareness Services of PIC 5.1 Capacity development to Contractors
The workshop is particularly to guide the project implementation concerning the entitlement
matrix and eligibility in the compensation and resettlement policy principles as stated in the
RCCDP and RCCP. Other services provided included field assistance to cope with social
issues emerged including the issues faced by the contractors. Regular monthly meetings on the
project implementation progress were set up to continuously monitor the progress.
PT PLN (Persero) provided initial orientation to the contractors prior to the commencement of the
civil works to help and guide the contractors' supervisors to understand the potential social
safeguards/social issues, develop a plan for handling and mitigating complaints/issues emerging
during the project implementation, the clauses on contractual matters, and develop handling
OSH issues.
Capacity Building was held on November, 15th -16th 2017 at Orchard Gajah Mada Hotel
Pontianak to improve the capability of all workers. The subject discussed related to the report
to be made. The subject discussed seen in Table 13.:
Table 13. Summary of Capacity Building Implementation
Date Subject Description Attendances
Male Female
15th November
2017
Environmental
Safe Guard
- Requirement Environmental
Safe Guard for ADB-funded
project
- Describe identification of
Environmental Safe Guard
- Arrangement of Environmental
report
43 13
15th November
2017 Social Issues
- Implementation of social
problem solving
- Explain the types of Social
Report
- Purpose and scope of Social
Protection Document
43 13
16th November
2017
Contractual
Matters
- Type of FIDIC’s contract - General terms of EPC/Turnkey
Project’s General Terms
- Extension of task delivery time 43 13
Occupational
Safety and
Health
- OSH requirements for
monitoring report
Social Semi Annual Report July – December 2017 21
The complete document on capacity building in the form of mom and absent can be seen in
Attachment 15.
5.2 Support to PLN on the Compensation Payment Principle Analyze
PT PLN (Persero), as stated in the Project Administration Manual, is required to assign an
external monitoring agency to monitor the RCCDP implementation and analyze compensation
payment principles, severity and vulnerability impacts to affected persons following the
completion of RCCDP 275 kV Bengkayang - Jagoibabang implementation. The monitoring
report will be used to identify whether the compensation payments provided by PLN meet ADB
IR policy principles and suggest to PLN if there is corrective action needed.
Predecessor PIC has conducted survey related to the satisfaction of the APs for the
compensation received by the land acquisition and Right of Way for Package 1 to 4. Successor
PIC (Pusmankon) will conduct survey on AP for Tayan - Sanggau - Sekadau Transmission Line
and Substations relating to land acquisition tower and ROW simultaneously with ROW appraisal
in 2018.
6. Social Issue and Mitigation With regard to PIC services, Social Specialist assisted PLN to conduct a series of ad-hoc
consultations in the field. The first consultation meeting was about the project information
disclosure. It targeted the participation of generally impacted communities, affected
households as well as involving formal and informal leaders to inform about the benefits and
disadvantages of the project. The second consultation was more advanced and addressed the
needs of APs/ landowners, witnessed by officials of the government, police and military
officials. The socialization described the inventory of losses and how it was administered. Details
of compensation policy for land, plants/crops and other assets affected were also described. The
community was also informed about the PLN UPP KBB 2 internal land acquisition team and the
procedure for grievance related to the inventory of losses and the compensation to be paid.
Most of the social issues concern land acquisition and clearing of ROW corridor of trees as the
landowners claim a higher price than the price offered for compensation. The majority of the land
acquisition issues relate to disputed parcels due to overlapping borders that impact to plants
compensation, and that landowners do not agree with the price offered by PLN. Impact of
rerouting of towers also cause problems for land acquisition as LAC has done rapprochement
with landowners for the original location and has to conduct new process of land acquisition for
the new location.
Land acquisition issues cause obstacle to the construction as the landowners do not allow the
contractor to work in the area before the problem is resolved. PLN UPP KBB 2 continued
conducting meetings with landowners, MUSPIKA and head of Adat to resolve the land
acquisition issues to get agreement from the landowners. The process of problem resolving in
some cases takes even a few months. List of social issues found at site and mitigation can be
seen in Table 14.
Social Semi Annual Report July – December 2017 22
Table 14. List of social issues found at site and mitigation
No Social Issue Mitigation
1 Demand Higher Compensation
Negotiation conducted by PLN and coordinated with MUSPIKA
2 Disputed Land PLN coordinate with MUSPIKA and held meeting with dispute persons, facilitated by local leader.
3 Communities demand that their houses are connected to PLN distribution system
Include electrification of villages located near the 150 kV transmission line in list of villages to be electrified under grant measures.
4 Social Conflict Develop local empowerment opportunity during construction and develop local business by using local supplier for material for the construction of foundations.
5 Temporary loss as result of construction impact
Contractor compensates of temporary loss such as damage to structures, fallen trees and access road during the construction.
6 Customary Tradition Contractor finance the customary ceremony before cultivating land to start work construction, the ceremony called Paremahan tanah/Ngudas.
6.1 Electricity distribution program under Grant measures
The electricity distribution programme under the Grant measures covers 18 villages and
subvillages in the three districts Bengkayang, Landak and Sanggau (Attachment 16). At present
these subvillages use generators managed by each head of village. Only 5 of the listed 18
subvillages are located in the project area of the Bengkayang – Ngabang – Tayan transmission
line and none in the area of the 275 kV transmission line. The other 13 villages are far away from
the project sites and most sub villages are surrounded by Tembawang (adat forest). Income of
community members varies from Rp. 50,000 to 110,000/day. Their source of income is farming
(rubber, paddy and palm oil); farmers who own private palm plantations have an income of at
l’east Rp. 2,000,000/month. Even though the cost of electricity installation is expensive for the
community, about 50% of the households make an effort to pay the cost of electricity installation
in 2 or 3 instalments. The remaining 50% of households did not request yet for electric
installation as they cannot afford to pay the installation cost. The community expects to get
connected to PLN’s supply system as the transmission line pass their village such at Napal,
Amboyo and Angan village. In the Angan Village have 20 towers are located (tower 61 to 79 of
Section Bengkayang - Ngabang) but there is still no electricity supply. Amboyo village located 23
towers (tower no 208 to 230) has no electric supply either. On June, PIC visited to 3 villages in
project area which demand electricity i.e Amboyo Utara, Napal and Ansang (Ado) and at present
these 3 villages have completed electrified. The villages’ people pleased their villages connected
electricity, because without grant electricity distribution their village will not get electricity
connected sooner.
Social Semi Annual Report July – December 2017 23
7. Indigenous People/Custom Community in Project Location Often a social problem is related to local tradition and culture which are hardly understood by
other people (outsiders) who are engaged with the technical work. This type of issue sometimes
is also considered as irrational by the contractors as it bothers their work. However, culture
should be interpreted as a set of idea-behavior and behavioral outcome, which holistically has
been institutionalized and is believed by the people that support cultural values.
Tower construction is considered as interfering in nature and the balance of religious life, thus it
should be accompanied by activities such as ritual or traditional ceremony. However, not all
community groups supporting the culture and tradition are requesting ceremonies. Normally if
there are traditional ceremony requests that potentially will burden the project implementation
progress, coordination with local government, MUSPIKA, and Dewan Adat Dayak (DAD) will be
done as a precaution to avoid exploitation of traditional rituals by non-qualified groups. PLN has
convinced DAD about the importance and benefit of construction of the electricity network in the
subdistrict of Seluas area at West Kalimantan.
The time for the Adat activity is decided by Adat head and all cost are financed by the contractor.
The construction works are often disrupted because cultural activities have to be performed in
almost every banuaq (culture territories). By the lesson learnt of social cases which result from
the implementation of Adat activity, contractors have already understood, follow the Adat rules
and are more careful to work at the area within Adat rules.
Up to now, the Dayak indigenous of West Borneo still preserve their local traditions which are
heritages of their ancestors. Almost in the entire life cycle they pass through a series of
traditional rituals, either individually or as community. Traditional activities are more visible since
the "New Government Regime" era ended in 1998; since then there is more flexibility and
discretion in life related to ritual and spiritual traditions. In West Borneo it is characterized by the
existence of the Dayakologi Institute, an institution that is managed by a number of
academics and Dayak cultural figures with the aim to keep inventory, documenting,
protecting and continuing the ancestors' tradition of cultural heritages. In fact, ritual ceremony
that relates to a series of traditional ritual in Dayak culture is getting stronger but there are also
people who take advantage of rituals for their personal gain. In these cases Dayakologi Institute
plays its role. Since the beginning, Dayakologi Institute always socialized and motivated the
society to preserve culture and minimize its misuse. In order to make the implementation and
control easier, each area has its territory and cultural leader.
Related to this issue, contractors or PLN will be called by Tumenggung or cultural leader to
discuss about the culture to be respected before constructing towers. A series of traditional ritual
ceremonies will be held depending on rules of each region. In practice, the invitation or
announcement is delivered by local government (usually Headman or Sub-district Head) for
legality and administrative records. Financial matters are covered by the contractors, while
traditional ritual is carried out by local cultural institution.
Long before the ritual is performed, coordination has been made between the local government,
cultural institution or contractor/PLN and about payment of the cost for the ceremony. The
request for the fund is sent to the contractor through Sub district or Village. If all preparations
have been done, the invitation is sent out. After the traditional rituals are done, local government
prepare a report as the evidence that the area is practicing traditional rituals.
Social Semi Annual Report July – December 2017 24
Before the activity of tower construction, a series of traditional ceremonies were performed,
namely traditional Paremahan or Ngudas tanah ceremony. Ngudas tanah is a very important
ceremony for indigenous people which is a form of respect to the Almighty Power (Jubata) which
is held at the time will do the job of opening or cultivating land. Ngudas tanah also means of
requesting permission for when conducting cultivation of land, the Almighty protect and keep
workers away from disturbance and distress. Ceremony of Ngudas has been conducted in
several villages, the documentation of Ngudas Ceremony is shown in Attachment 17.
8. Actions and Strategies Developed to Improve the Project Social Key areas should be addressed to improve project implementation performance including:
Land preparation/clearing vs. tradition, cultural string of home living: Managing
problems that relate to preparing land, cutting trees for interest of the project. The
understanding of social aspect of culture especially cultural problem in Dayak people's live will
be the key-opener to the implementation of social communication with the community, through
Focus Group Discussions (FGD). During the operation of the project, contractors has
already build good relationship with local people and taking care all tradition customs as
demand of community before starting work of construction.
At the other issue concern to cutting trees process which conduct by sub-contractor need to
supervise intensively by main contractor to avoid wrong cutting trees as this issue could arise
as obstruction.
Social compensation: The preparation of some social compensation programs to
muffle the possibility of distractions and social conflict either emerged from their own society
or outside society that will disturb the project. This social compensation passing through some
steps discussion and FGD that prioritize NEED rather than WANT. People should understand
those aspects. PIC will take a lead to facilitate this and supported by PLN. Concern to social
compensation that will be implemented through income restoration program to some severely
and affected vulnerable people. PIC has to conduct survey direct to affect vulnerable and
severely people concern to their need.
Grievance Mechanism: On second socialization phase, LAC must ensure the procedure are
in place to allow affected people to lodge a complaint or a claim with the assurance of a timely
and satisfactory resolution of that complaint or claim. In addition, the project may have to
make special accommodations for women and members of vulnerable groups to ensure that
they have equal access to grievance redress procedures. Such accommodation may include
employment of women or members of vulnerable groups to facilitate the grievance redress
process or to ensure those groups representing the interests of women and other vulnerable
groups take part in the process.
Coordination: Implementation of coordination with some parties who control such land that
might be disturbed by project activity through:
i. Religious leaders, public figures, women, youth, etc., in locations controlled by people
and or prone locations, cultural reason, etc.
ii. Traditional leaders, traditional institutions, etc., especially in a number of locations that
are considered sacred with trust system, and the locations also have some cultural
heritages.
iii. Government institutions that control the land such as Ministry of Forestry, school, local
government, etc.
Social Semi Annual Report July – December 2017 25
iv. Government institution and other institutions that dominate important and vital objects in
the project sites such as Armed Forces Institute (ABRI).
All concerned project stakeholders will have to increase their participation.
Social empowerment and community development for impacted community and
executive power: This activity is not a recommendation for the direct impact of the project
activities, but it can be a form of social compensation that will be given (if any). A number of
activities such as counselling, saving electrical energy, training for managers of facilities,
sanitary facilities, counselling for Cleanliness and Health, Clean Water and Sanitation
Community-based (SANIMAS) for society, women's groups, etc.
One positive impact during the construction works is the establishment of new small businesses
i.e. temporary small shops near the substation and increase of income for coffee shops and
small restaurants near the tower locations. The contractor gives people who live near the
construction site the opportunity to provide catering for workers on site. The contractor also used
local empowerment for foundation works, material transport, and security to guard machines and
material, and local public communication.
The contractor needs hires local people by coordinating with the Head of Village, thus the
contractor cannot choose the local people whether vulnerable or not. Village leader or local youth
leader are arrange the people who can work on the project. As the skills of local people are
limited, the contractor only can give general work to local people; most workers come from Java
as they have more experience in working for construction of transmission lines.
Attachment 1
Project Organization Charts
ORGANIZATION CHART OF PT PLN (PERSERO) UIP KALBAGBAR
General
Manager
Rachmad Lubis
Planning Manager
Agus R.N.
Operation
Construction Manager
I Wayan Semudiarsa
Finance and HRD
Manager
Sab'atun Siti Nur Janah
Law, Communication
& Land Affairs
Manager
Cokky Antonius F. Y
Manager of Project on West
Kalimantan 3
Anang Istadi
ORGANIZATION CHART OF PT. PLN (Persero) UPP KALBAGBAR 3
MANAGER
Anang Istadi
ADMINISTRATION & FINANCE
SUPERVISOR
ASSISTANT MANAGER
M. Harry F
ASSISTANT MANAGER
LAND AFFAIRS
Rajuni Rahim
Civil Engineer
Electrical Engineer
Mechanical Engineer
Environmental and OSH
Engineer
Logistics
PMIS Management
Supervisor
Faizal Hidayatur
ORGANIZATION CHART OF PT. PLN (Persero) UPP KALBAGBAR 2
MANAGER
Joko Pribadi
ADMINISTRATION & FINANCE
SUPERVISOR
Hendy Guntur S.
TECHNICAL ASSISTANT
MANAGER
Dedy Wahyu R.
ASSISTANT MANAGER
LAND AFFAIRS
Ricko
PMIS Management
Supervisor
Wega Dwi Saputra
STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN
AFD 1024-01 B
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI
PROJECT COORDINATING AND REPORTING
PROJECT SUPERVISION
PROJECT TEAM LEADER
Chandra Sweaty
PROJECT ADMINISTRATOR
Secrctary Bilingual : Nungky M
Administrator Pelageran : TENAGA AHLI ENGINEER
Ahli Keuangan :
Ahli Konstruksi E/M :
Ahli Konstruksi Sipil :
Ahli Sosial dan LARP :
Eng, Lingkungan :
Eng, K3 :
Eng, Schedule :
MANAGER UMK II
NASIR TADJR
P/C
KTSK ( 1 orang )
Dedi Hartanto
P/C ADMINISTRATOR (2 orang)
Adm Proyek
Adm Umum Diena Rahmia Arif
Pengawas Lingkungan (1
orang)
Pengawas Sosial (1 orang )
Koer Proyek Gardu Induk
Isra Maulidas
Pengawas K3 (4 oirang)
Pengawas Sipil (6 orang)
Pengaewas E/M (6 orang)
Koer Proyek Tranamusi (1 orang)
Jama Prasetyo
Pengawas K3 (8 orang)
Maharisi
Pengawas Sipil (2orang)
Ikas, Rahmad Arif
Susantyo, Elsa Ayu
Kumala Putri.
Pengawas E/M (14 orang)
Sugeng, Samsul Arbi,
Agadia Priasmono, M.
Malik Ibrahim.
Pengawas Secadatel (4 orang)
Attachment 2
Leaflet Distribution for Affected Household in
150 kV Tayan - Sanggau - Sekadau Transmission
Line
1 2 3 4 5 6 7 8 9
1 T.166 Simplisianus HH 42 M Farmer/Petani 4
1 T.194 Donata/Pak Agus P HH 55 M PNS 5
2 T.196 Kurbinus/Sabinus HH 45 M Perangkat Desa 5
1 T.149 Yulia Widiawati HH 32 F Ibu Rumah tangga 4
2 T.155 Lusia HH 38 F Farmer/Petani 4
1 Solisman HH 33 M Farmer/Petani 3
2 Alicius HH 72 M Farmer/Petani 5
3 Tonel HH 63 M Farmer/Petani 4
1 Daniel HH 45 M Karyawan BUMN 5
2 T.173 Ignasius HH 50 M Wiraswasta 5
2. Village Sebera
3. Village Suka Gerundi
4. Village Bunut
5. Village Pusat Damai
SANGGAU DISTRICT
1. Village Palemjaya
LEAFLET DISTRIBUTION FOR AFFECTED HOUSEHOLD IN 150 kV TAYAN - SANGGAU - SEKADAU TRANSMISSION LINE
NO Tower Name HH Status Age Sex OccupationNumber of HH
memberDOcumentation
Attachment 3
Acknowledgement of socialization for Tayan
– Sanggau – Sekadau TL
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN TAYAN HULU KABUPATEN SANGGAU
Pada hari mi Rabu tanggal Dua Puluh Satu bulan Oktober tahun Dua Ribu Lima Belas ( 21 - 10 -
2015 ) kami masing - masing yang bertanda tangan dibawah mi
1. Daniel Thamrin Suen, S.Sos, M.Si
2. Ambari, S.I.P
3. Asep Trisman 4. Bambang S
5. Triyono
6. Rustiono 7. Zainab
8. Dekon Prisnadi
9. Ahyar 10.Eko Purwanto, ST. 11. Wawan Gunawan
12.Tatok Hermanto 13.Muhammad Hidayat
Camat Kapuas
Sekcam Kapuas Danramil Kapolsek Lurah Beringin Lurah Tanjung Kapus
Kades Penyeladi Perwakilan Masyarakat
Perwakilan Masyarakat Koord. P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL I
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUTT
150 kV Tayan - Sanggau di Kantor Kecamatan Kapuas.
1. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun
2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KIDIRJ20I3 tentang Pengadaan Tanah
untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah dan Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167) DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan Hilir, Balai, Tayan Hulu, Parindu, Kapuas dan Mukok.
Di capai kesepakatan lokasi Pembangunan tanah tapak tower sesuai hasil pendataan
Inventarisasi di lapangan.
Sosialisasi dihadiri oleh Camat Kapuas, Muspika Kapuas, Kelurahan Beringin, Kelurahan
Tanjung Kapuas, Kades Penyeladi, Tokoh Masyarakat, Pan itia Pengadaan Tanah clan ROW PT
PLN (Persero) UPK Jaringan Kalimantan I clan Pemilik Tanah. (daftar hadir terlampir).
3. Pembangunan SUIT 150 kV Tayan - Sanggau - Sekadau mencakup:
• Panjang jalur ± 113 km
• Jumlah titik tower ± 364 tower
4. Daerah yang dilalui jalur SUIT 150 kV Sanggau - Sekadau di Kecamatan Kapuas adalah:
• Kelurahan Beringin
• Kelurahan Tanjung Kapuas
• Desa Penyeladi
5. Ruang Bebas: adalah ruang yang dibatasi oleh bidang vertikal clan horizontal di sekeliling clan di sepanjang saluran udara dimana tidak boleh ada benda didalamnya demi keselamatan manusia, mahiuk hidup clan benda lainnya serta keamanan operasi.
6. Pengadaan lahan: a. Tanah tapak tower, dibebaskan dengan ganti rugi b. Luas tanah untuk tapak tower:
• 15 x 15 m2 untuk tower lurus
• 20 x 20 m2 untuk tower sudut
c. Penetapan nilai ganti rugi berdasarkan musyawarah antara PLN dengan pemilik
7. Pembebasan tanam tumbuh:
a. Tanam tumbuh yang dibebaskan adalah tanaman/tumbuhan keras clan dibudidayakan yang tingginya mencapai 4 meter, misalnya durian, karet, kelapa, sawit, cempedak, jati,
dli. b. Nilai ganti rugi berdasarkan ketentuan tarif yang berlaku di daerah setempat.
8. Induksi Medan Magnet & Medan Listrik berdasarkan Standar WHO, SN! clan Depkes untuk
SUTET adaiah:
a. Medan magnet = 0,1 mT
b. Medan listrik = 5 kV/m
9. Hasil pengukuran medan magnet & medan listrik pada SUIT clan SUTET:
a. Medan magnet = 0,001 - 0,0032 mT
b. Medan listrik = 1,32 - 2,4 kV/m
Sedangkan hasil pengukuran medan magnet pada handphone adalah 0,6 - 1,3 ml, Lebih besar
bila dibandingkan dengan medan magnet pada SUIT clan SUTET.
10. Sesi Tanya Jawab:
No. Nama SaranfPertanaan Tanggapan
Sainan • Bagaiman status penggantian • Akan dilakukan koordinasi dengan lahan - lahan yang dengan pihak perusahaan terkena perusahan sawit clan pemda terkait sesuai yang berupa HGU. dengan peruntukannya.
Kepada siapa Ijin • Tentunya PLN akan pelaksanaan pembangunan Berkoordinasi / Ijin dengan tapak tower tersebut. pihak perusahaan selaku
pemegang HGU clan warga
selaku pemilik tanah awal.
2 Ucat • Berapa Nilai ganti rugi I • Akan dilakukan penilaian Kompensasi yang akan di harga oleh tim Appraisal /
dapat pemilik lahan / tanah. Tim KJPP / Tim Penilai.
3 Triyono • Berapa lebar jalur di bawah • Dengan lebar 20 m clan jenis (Lurah Beringin) tapak tower yang akan d tanaman di atas 4 m yang
tebang clan jenis tanaman berpotensi memasuki area apa saja yang akan di tebang. ruang bebas.
• Bagaimana dengan status • Akan dilakukan pendataan tanah yang belum diketahui ulang clan verifikasi pemilik pemiliknya. kembali.
• Bagaimana dengan status • Akan dilakukan kompensasi bangunan yang ada di bawah sesuai dengan peraturan yang jalur ROW. berlaku (Permen ESDM
No.038 tahun 2013).
4 Bahtiar • Bagaimana status tanah yang • Diharapkan warga pemilik belum memiliki surat tanah dapat membuat surat - menyurat. menyurat sebagai bukti
kepem ilikan tanah.
5 Sakdah • Bagaimana status tanah • Status tanah di bawah jalur dibawah jalur apakah dapat dapat dimanfaatkan kembali dimanfaatkan kembali. oleh pemilik tanah clan PLN
Menghimbau agar pemilik tanah tidak menanam
tanaman dengan ketinggian diatas 4 m.
......... ......
.........
KFPi • -': L4J '.'s:
EN LAJt 1
Demikian Berita Acara Konsultasi Publik atau Sosialisasi mi dibuat sesuai dengan keadaan yang
sebenarnya.
YEc
•,/
_3cA H—pJP
N VON
1. Daniel Thamrin Suen. S.Sos. M.Si Camat Kapuas N G
2. Ambari.S.I.P Sekcam Kapuas
3. Ase, Trisman Danramil
4. Bambang S Kapolsek
5. Triyono Lurah Beringin
6. Rustiono Lurah Tanjung Kapuas
7. Zainab Kades Penyeladi
8. Dekon Prisnadi Perwakilan Masyarakat
9. Ahyar Perwaki Ian Masyarakat
10. Eko Purwanto, ST. .
Koordinator P2T PT PLN (Persero) UPK RING KAL 1
11. Wawan Gunawan Anggota P2T PT PLN (Persero) UPK RING KAL 1
12.Tatok Hermanto Anggota P2T PT PLN (Persero) UPK RING KAL I
13. Muhammad Hidavat Anggota P2T PT PLN (Persero) UPK RING KAL I
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN PARINDU HULU KABUPATEN SANGGAU
Pada hari mi Jumat tanggal Enam Belas bulan Oktober tahun Dua Ribu Lima Belas (16 - 10 -
2015) kami masing - masing yang bertanda tangan dibawah mi:
1. Drs. Paulus Usrin, M.Si
2. Marina Rona, M.H
3. L.S Aritonang
4. R. Hutahaean
5. Sartono
U. i'KUUIIIIUS
7. Bartolomeus
8. Mardiyanto
9. Ahin 10. Yordanus
ii. Eko Purwanto, ST.
12. \Vawan Gunawan
13.Tatok Hermanto
14. Muhammad Hidayat
Camat Parindu
Sekcam Parindu
Koramil
Polsek
Kades Suka Gerundi
Kades Palem Jaya
Sekdes Pusat Damai
Kades Sebbara
Penvakilan Masyarakat
Perwakilan Masyarakat
Koord. P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Anggota P2T PT PLN (Persero) UPK RING KAL I
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUTT
150 k\' Tayan - Sanggau di Kantor Kecamatan Parindu.
1. Sosialisasi dilakukan dengan berpedoman kepada
I. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk
Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun
2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk
Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KJDIRI20I3 tentang Pengadaan Tanah
untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah clan
Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167 /
DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
6. Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan
Hilir, Balal, Tayan Hulu, Parindu, Kapuas clan Mukok.
'-.1
7. Di capai kesepakatan lokasi Pembangunan tanah tapak tower sesuai hasil pendataan
Inventarisasi di lapangan.
2. Sosialisasi dihadiri oleh Camat Parindu, Muspika Parindu, Kades Suka Gerundi, Kades Palem
Jaya, Kades Pusat Damai, Kades Sebbara, Tokoh Masyarakat, Panitia Pengadaan Tanah clan ROW P1' PLN (Persero) UPK Jaringan Kalimantan I clan Pemilik Tanah. ( daftar hadir
terlampir).
3. Pembangunan SUn' 150 kV Tayan - Sanggau - Sekadau mencakup:
• Panjang jalur ± 119 km
• Jumlah titik tower ± 346 tower
4. Daerah yang dilalui jalur SUIT 150 kV Tayan - Sanggau di Kecamatan Parindu adalah:
• Desa Suka Gerundi
• Desa Palem Jaya
• L'esa iusat uamai
• Desa Sebbara
4 5. Ruang Bebas: adalah ruang yang dibatasi oleh bidang vertikal clan horizontal di sekeliling dan di sepanjang saluran udara dimana tidak boleh ada benda didalamnya demi keselamatan manusia, mahiuk hidup clan benda lainnya serta keamanan operasi.
6. Pengadaan lahan: a. Tanah tapak tower, dibebaskan dengan ganti rugi b. Luas tanah untuk tapak tower:
• 15 x 15 m 2 untuk tower lurus
• 20 x 20 m2 untuk tower sudut c. Penetapan nilai ganti rugi berdasarkan musyawarah antara PLN dengan pemilik
7. Pembebasan tanam tumbuh: a. Tanam tumbuh yang dibebaskan adalah tanaman/tumbuhan keras dan dibudidayakan
yang tingginya mencapai 4 meter. misalnya durian, karet, kelapa, sawit, cempedak, jati,
dli. b. Nilai ganti rugi berdasarkan kete!ituan tarif yang beriaku di daerah setempat.
8. Induksi Medan Magnet & Medan Listrik berdasarkan Standar WHO, SNI dan Depkes untuk SUTET adalah:
a. Medan magnet = 0,1 mT
b. Medan listrik = 5 kV/m
9. Hasii pengukuran medan magnet & medan listrik pada SUIT dan SUTET: a. Medan magnet = 0,001 - 0,0032 mT b. Medan listrik = 1,32 - 2,4 kV/m
Sedangkan hasH pengukuran medan magnet pada handphone adaiah 0,6 - 1,3 mT, Lebih besar biia dibandingkan dengan medan magnet pada SUIT clan SUTET.
10. Sesi Tanya Jawab:
No. Nama
1 Yulianus
SaranfPertanyaan
• Mohon keterbukaan untuk masalah harga ganti rugi / kompensasi sesuai dengan
aturan yang berlaku.
• Biaya Pemecahan SHM di tanggung oleh siapa.
• Berapa nominal biaya
kompensasi yang akan di
bayarkan.
Tan
• Untuk proses pembayaran clan musyawarah/
pengumuman harga
dilaksanakan secara terbuka
clan sesuai dengan harga dan tin; Appraisal / penhiai /
KJPP.
• Untuk Biaya pemecahan akan di tanggung oleh PLN.
• Untuk masalah harga akan di
nilaioleh oleh tim penilai /
2 lAgus • Kenapa terjadi perbedaan pemakaian luas lahan ada yang 15 x 15 = 225 m
2 dan 20 x 20 = 400 m 2 .
• Standar harga antara yang Ber SHM dan SPT gimana.
• PLN membebaskan sesuai dengan peruntukannya, terdapat tower lurus dan
sudut sesuai dengan arah jalur.
• Untuk masalah harga akan di nilai oleh oleh tim penilai / Anoraisal.
3 I Nikodimus • Bagairnana dengan pemilik tanah yang belum memiliki surat nienyurat.
• Diharapkan pemilik tanah sudah mulai melengkapi surat - surat kepmiiikan tanah agar proses pembayaran dapat segera di laksanakan.
5 I Dim.s
• Bagaimana teknis pembebasan tanah yang terkeria tanah wakaf atau adat.
• Gimana status tanah - tanah yang terkena jalur.
• Akan dilakukan Verifikasi
ulang jika memungkinkan untuk dilakukan pergeseran akan dilakukan pergeseran tapak tower.
• Selama proses pembangunan akan menjadi tanggung
jawab PLN clan kontraktor
4 I Kurbinus 4
6 Antonius • Bagaimana Surat tanah • Di harapkan kepada pemilik berupa SHM Hilang. agar segera mengurus surat -
menyurat tanahnya.
7 Bukuit • Bagaimanan dengan • Tidak dilakukan
penggantian tanaman kecil - penggantian bukan termasuk
kecil yang di tebang ketika objek ganti rugi.
proses inventarisasi.
8 Petrus yonar • Gimana status tanah yang • Akan merijadi milik negara
terkena tapak tower. dengan tuasan pembebasan tanah tapak tower, setelah
dilakukan pemecahan.
9 Sartono • Bagaiman terhadap tanah - • Akan dilakukan Verifikasi
tanah yang belum diketahui ulang kepemilikan tanah
pcIIliiikIIy4 imiggil u;heLaiIui pciii
tanah.
Demikian Berita Acara Konsultasi Publik atau Sosialisasi mi dibuat sesuai dengan keadaan yang
sebenarnya.
1. Drs. Paulus Usrin, M.Si Camat Parindu
\\ \
1 ............
2. Marina Rona, M.H Sekcam Parindu
N'r-A)
(
3. L.S Aritonang Koramil
4. R Hutahaean Polsek
5. Sartono Kades Suka Gerundi
6. Nikodimus Kades Palem Jaya
7. Bartolomeus
Sekdes Pusat Damai
8. Mardiyanto Kades Sebbara
9. Ahin Perwaki Ian Masyarakat
2}...................
L .........&tfl..
10.Yordanus
Perwakilan Masyarakat
11.Eko Purwanto, ST.
Koordinator P21 PT PLN (Persero) UPK RING KAL 1
12. Wawan Gunawan
Anggota P2T PT PLN (Persero) 1.JPK RING KAL I
13.Tatok Hermantp Anggota P2T PT PLN (Persero) UPK RING KAL I
14.Muhammad Hidayat Anggota P2T PT PLN (Persero) UPK RING KAL I
o', ®r,
DAFTAR HADIR
KONSULTASI PUBLIK ATAU SOSIALISASI
PEMBANGUNAN SUTT 150 kV TAYAN - SANGGAU
KECAMATAN PARINDU KABUPATEN SANGGAU
Hari /Tanggal : Jumat / 16 - 10 - 2015
Jam : 09.30 WIB - Selesai
Tempat : Kantor Kecamatan Parindu
NO. NAMA JABATAN I ALAMAT TANDA TANGAN
,4Ld 2
3
, p
y - - #2 .. __ • '-.., -. . - f -
3 / /
/ ç / :
••_• / -
L P .
5
I I/ A P
1p 7; W, )Ile- C_ f'zc14IEc /&n.
1 14n & i
Jfrii. 10
11 V6 12 kpu1- 12
13 13
14 / -,( 14
15 F*-117&r 15
16 E('Sc6G4 EL, 16
17 'c
17
18 rcfl10 18
i Sucin ti.9- 19
20 R.S 20
(.
• DAFTAR HADIR
KONSULTASI PUBLIK ATAU SOSIALISASI
PEMBANGUNAN SUTT 150 kV TAYAN - SANGGAU
KECAMATAN PARINDU KABUPATEN SANGGAU
Had /Tanggal : Jumat / 16 - 10 - 2015
Jam : 09.30 WIB - Selesal
Tempat : Kantor Kecamatan Parindu
NO. NAMA JABATAN I KEL. I KECAMATAN TANDA TANGAN
/7p rU3 UCo 21
EW 22
23 eq
ppy,cuyii1 p5p 24}
'5/t pwekz'
25
26 tA~000
26
27
— r WA 9 1 - t Qck, 27 ________________
28 Poiwi TlrAqw IPD Pvat Oo,nai 28
29 Lifpto 29 dfuA 1
30 /
30)
aL 31&
/4rDt1 1(4w T4rii 32
-E- 41 (- . I-_-•',, 1.. ________________
- 34 ,47 VCr- 34
35
,AAf All 37 V
19 :~fie
38 t4M4y • ___________________ _______________
L 40 L. S Icfl&41i C S9W Pk0A4 i) 40
\j \J
DAFTAR HADiR
KONSULTASI PUBLIK ATAU SOSIALISASI
PEMBANGUNAN SUTT 150 kV TAYAN - SANGGAU
KECAMATAN PARINDU KABUPATEN SANGGAU
Hari /Tanggal : Jumat/16-10-2015
Jam : 09.30 WIB - Se!esai
Tempat . Kantor Kecamatan Parindu
NO. NAMA JABATAN I KEL. I KECAMATAN TA DA TANGAN
52 j 52
53 53
54 54
55 55
56 56
57 57
38 58
59 59
DAFTAR HADiR
KONSULTASI PUBLIK ATAU SOSIALISASI
PEMBANGUNAN SUTT 150 kV TAYAN - SANGGAU
KECAMATAN PARINDU KABUPATEN SANGGAU
Han / Tanggal Jumat I 16- 10- 2015
Jam 09.30 WIB - Selesai
Tempat Kantor Kecamatan Parindu
No.[ NAMA JABATAN / KEL I KECAMATAN TANDA TANGAN
61
62 62
63 63
64 64
65 55
66 66
67 67
66 66
69 69
70 70
71 71
72 72
73 73
74 74
75 75
76 76
77 77
78 78
79 79
80 80
L.
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV TAYAN - SANGGAU - SEKADAU
KECAMATAN T 4WH -IttfiUPATEN SANGGAU
Pada hari mi Selasa tanggal Dua Puluh bulan Oktober tahun Dua Ribu Lima Belas ( 20— 10-2015
) kami masing - masing yang bertanda tangan dibawah mi:
1. Daniel Thamrin Suen, S.Sos, M.Si
2. Ambari, S.I.P
3. Asep Trisman 4. Bambang S
5. Hironimus
6. Petrus, Amd 7. Yohanes Yan
8. Slamet
9. Eko Purwanto, ST. 10. Wawan Gunawan 11.Tatok Hermanto 12.Muhammad Hidayat
Camat Kapuas Sekcam Kapuas Danramil Kapolsek Kades Sungai Mawang Seklur Bunut
Kades Lape Penvakilan Masyarakat Koord. P2T PT PLN (Persero) UPK RING KAL I Anggota P2T PT PLN (Persero) UPK RING KAL 1 Anggota P2T PT PLN (Persero) UPK RING KAL I Anggota P2T PT PLN (Persero) UPK RING KAL 1
Bersama - sama telah melakukan Konsultasi Publik atau Sosialisasi pembangunan tapak tower SUIT 150 kV Tayan - Sanggau di Kantor Kecamatan Kapuas.
1. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun 2012 tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KIDIRJ20I3 tentang Pengadaan Tanah untuk Kepentingan Penyediaan Tenaga Listrik, Biaya Oprasional Pengadaan Tanah dan Biaya Oprasional Kompensasi di Lingkup PT PLN (Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167 / DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di kalimantan Barat.
6. Keputusan Bupati Sanggau No. 250 Tahun 2014 tanggal 28 April 2014 Tentang
Penetapan Lokasi Tower Saluran Udara Tegangan Tinggi 150 kV di Wilayah Tayan Hilir, Balai, Tayan Hulu, Parindu, Kapuas dan Mukok.
7. Di capai kesepakatan lokasi Pembangunan tanah tapak tower sesuai hasil pendataan Inventarisasi di lapangan.
2. Sosialisasi dihadiri oleh Camat Kapuas, Muspika Kapuas, Kades Sungai Mawang, Kelurahan Bunut, Kades Lape, Tokoh Masyarakat, Panitia Pengadaan Tanah clan ROW PT PLN (Persero)
UPK Jaringan Kalimantan 1 clan Pemilik Tanah. (daftar hadir terlampir).
3. Pembangunan SUIT 150 kV Tayan - Sanggau - Sekadau mencakup:
• Panjang jalur ± 113 km
• Jumlah titik tower ± 364 tower
4. Daerah yang dilalui jalur SUIT 150 kV Tayan - Sanggau di Kecamatan Kapuas adalah:
• Desa Sungai Mawang
• Kelurahan Bunut
• Desa Lape
5. Ruang Bebas: adalah ruang yang dibatasi oleh bidang vertikal clan horizontal di sekeliling clan di sepanjang
saluran udara dimana tidak boleh ada benda didalamnya demi keselamatan manusia, mahiuk hidup clan benda lainnya serta keamanan operasi.
6. Pengadaan lahan: a. Tanah tapak tower, dibebaskan dengan ganti rugi
b. Luas tanah untuk tapak tower:
• 15 x 15 m2 untuk tower lurus
• 20 x 20 m2 untuk tower sudut c. Penetapan nilai ganti rugi berdasarkan musyawarah antara PLN dengan pemilik
7. Pembebasan tanam tumbuh: a. Tanam tumbuh yang dibebaskan adalah tanaman/tumbuhan keras clan dibudidayakan
yang tingginya mencapai 4 meter, misalnya durian, karet, kelapa, sawit, cempedak, jati, dli.
b. Niiai ganti rugi berdasarkan ketentuan tarif yang beriaku di daerah setempat.
8. Induksi Medan Magnet & Medan Listrik berdasarkan Standar WHO, SN! clan Depkes untuk SUTET adaiah:
a. Medan magnet = 0,1 mT b. Medan listrik = 5 kV/m
9. Hasil pengukuran medan magnet & medan listrik pada SUIT clan SUTET: a. Medan magnet = 0,001 - 0,0032 mT b. Medan listrik = 1,32 - 2,4 kV/m
Sedangkan hasil pengukuran medan magnet pada handphone adaiah 0,6 - 1,3 mT, Lebih besar bila dibandingkan dengan medan magnet pada SUIT clan SUTET.
10. Sesi Tanya Jawab:
No. Nama SaranlPertanyaan Tanggapan
Wellem Herman • Bagaimana Tahap • Proses Perijinan,
Pembebasan Lahan secara Inventarisasi, Sosialisasi / umum.. Konsultasi Publik,
Appraisal,.Penetapan harga, Pembayaran.
2 Heronimus • Pemilik akan bersedia • Akan dilakukan penilaian (Kades Sungai memberikan lahan / tanah harga oleh tim Appraisal I
mawang) asalkan harga / nilai ganti Tim KJPP / Tim Penilai. mgi sesuai dengan harga I
nilai pasaran setempat.
3 Bambang S • Diharapkan warga dapat • Pembangunan dapat berjalan (Kapolsek) menjaga situasi kondusif dengan balk clan lancar
agar pembangunan dapat berkat dukungan clan berjalan dengan balk clan partisipasi masyarakat. lancar.
4 Asep Trisman • Agar kepala Desa Dapat • Akan dilakukan Veriuikasi (Danramil) Mengumpulkan warganya kembali sebelum dilakukan
untuk memastikan bukti pembayaran ganti rugi. kepemilikan tanah.
5 Yohanes Yan • Bagaiman status penggantian • Akan dilakukan koordinasi (Kades Lape) dengan lahan - lahan yang dengan pihak perusahaan
terkena perusahan sawit clan pemda terkait. yang berupa HGU.
...........................
...............
zJ
v ..... ...
c .....................
Demikian Berita Acara Konsultasi Publik atau Sosialisasi mi dibuat sesuai dengan keadaan yang
sebenarnya.
Daniel Thamrin Suen. S.Sos. M.Si Camat Kapuas
2. Ambari.S.l.P Sekcam Kapuas
3. Asei, Trisman DanRamil
4. Bambang S Kapolsek
5. Hironimus Kades Sungai Mawang
6. Petrus, Amd Sekiur Bunut
7. Yohanes Yan Kades Lape
8. Slamet Perwakilan Masyarakat
9. Eko Purwanto. ST. Koordinator P2T PT PLN (Persero) UPK RING KAL 1
10.WawanGunawan
Anggota P2T PT PLN (Persero) UPK RING KAL 1 KIP9
11.Tatok Hermanto Anggota P2T PT PLN (Persero) UPK RING KAL 1
12. Muhammad Hidavat
Anggota P2T PT PLN (Persero) UPK RING KAL I
BERITA ACARA KONSULTASI PUBLIK ATAU SOSIALISASI PEMBANGUNAN
SUTT 150 kV SFKADAU - SINTANG KECAMATAN SEKADAU HILIR, KABUPATEN SEKADAU
(DESA BOKAK SEBUMBUN)
Pada hari mi Selasa Tanggal Sebelas Bulan April Tahun Dua Ribu Tujuh Belas (Ii —04 —2017) kami
masing - masing yang bertanda tangan dibawah mi:
1. Hermanto S.Sos, M.Si : Camat Sekadau Hilir
2. Minaryarti S.Sos : Sekcam Sekadau Hilir
3. Indra F. Chaniago : Danramil Sekadau
4. Zainudin
5. Budi
6. Martinus Pen, S. Sos
7. Ricko
8. Afditia Azhari
9. Gebyar Lintang Ndadari
10.Faisol Adi Fahlefi
11.Andi Eko Saputro
12. llham Riza
13. Aulia Rachman Maulana
14. Nur Cahyani
Wakapolsek Sekadau
Badan Intelejen Negara
Kepala Desa Bokak Sebumbun
Ketua Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Sekretaris Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW FT PLN IJPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Anggota Tim Pengadaan Tanah dan ROW PT PLN UPP KITRING KBB 2
Bersama - sama telah melakukan konsultasi publik atau sosialisasi pembangunan tower SUIT 150 kV
Sekadau - Sintang di Kantor Desa Bokak Sebumbun.
I. Sosialisasi dilakukan dengan berpedoman kepada
1. UU No.2 tahun 2012 tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan Untuk
Kepentingan Umum.
2. Perpres No. 40 tahun 2014 tentang Perubahan atas Peraturan Presiden No. 71 tahun 2012
tentang Penyelenggaraan Pengadaan Tanah Bagi Pembangunan untuk Kepentingan
Umum.
3. Peraturan Kepala Badan Pertanahan Nasional Republik Indonesia No. 05 tahun 2012
tentang Pengadaan Tanah bagi Pelaksanaan Pembangunan Untuk Kepentingan Umum.
4. Keputusan Direksi PT PLN (Persero) No. 0289.KJDIR/201 3 dan Perdir 0344.P/DIRJ2O 16
tentang Pengadaan Tanah Untuk Kepentingan Penyediaan Tenaga Listrik, Biaya
Operasional Pengadaan Tanah dan Biaya Operasional Kompensasi di Lingkup PT PLN
(Persero).
5. Rekomendasi Gubernur Kepala Daerah Tingkat I Kalimantan Barat No. 671.1 / 1167 /
DPE-C3 tanggal 29 April 2009 tentang Pembangunan Sarana Ketenagalistrikan di
Kalimantan Barat.
6. Keputusan Bupati Sekadau 671.32/133 /UMUM/ 2016 tanggal I Maret 2016 Tentang
Penetapan Lokasi pembangunan Gardu Induk 150 kV dan Tower Saluran Udara
Tegangan Tinggi 150kV di Wilayah Kecamatan Sekadau Hilir Desa Gonis Tekam, Peniti,
Sungai Ringin, Mungguk, Gonis Tekam, Tapang Semadak Kabupaten Sekadau.
7. Dicapai kesepakatan lokasi Pembangunan Tanah tapak tower sesuai hasil pendataan
inventarisasi di lapangan.
II. Sosialisasi dihadiri oleh Camat Sekadau Hilir, Danramil, Kapolsek. Pihak aparat desa,
Perwakilan Pemilik Tanah, Tokoh Masyarakat, dan Tim Pengadaan Tanah dan ROW PT PLN
UPP KITRING KBB 2.
III. Pembangunan SUTT 150 kV Sekadau - Sintang mencakup:
a. Panjang Jalur ±60 km.
b. Jumlah titik tower ± 195 tower.
IV. Daerah yang dilalui jalur SUTT 150 kV Sekadau —Sintang di Kecamatan Sekadau Hilir adalah:
a. Desa Mungguk
b. Desa Bokak
C.
d. Desa Gonis Teka
e. m
f. Desa Tapang Semadak
V. Ruang Bebas:
Adalab ruang yang dibatasi oleh bidang vertikal dan horizontal di sekeliling dan di sepanjang
saluran udara dimana tidak boleh ada benda di dalamnya demi keselamatan manusia, makhluk
hidup dan benda Iainnya serta keamanan operasi.
VI. Pengadaan Lahan:
a. Tanah tapak tower, dibebaskan dengan ganti rugi.
b. Luas tanah untuk tapak tower:
1. 15x I5m2 untuktowerlurus.
2. 20 x 20 m2 untuk tower sudut.
VII. Pembebasan tanam tumbuh:
a. Tan am tmbuh yang dibebaskan adaah tanaman / tumbuhan keras dan dibudidayakan yang
tingginya mencapai 4 meter, misalnya durian, karet, kelapa, sawit, cempedak,jati, dli.
b. Nilai ganti rugi berdasarkan ketentuan tarif yang berlaku di daerah setempat.
VIII. Induksi Medan Magnet dan Medan Listrik berdasarkan standar WHO, SNI dan Depkes untuk
SUTET adalah:
a. Medan Magnet = 0,1 mT
b. Medan Listrik = 5 kV/m
IX. Hasil pengukuran medan magnet dan medan listrik pada SUTT dan SUTET:
a. Medan Magnet = 0,001 - 0,0032 Mt
b. Medan Listrik = 1,32 - 2,4 Ky/rn
Sedangkan hasil pengukuran medan magnet pada handphone adalah 0,6 - 1,3 Mt. Lebih besar
jika dibandingkan dengan medan magnet pada SUTT maupun SUTET.
X. Tanya Jawab:
No Nama Saran/ Pertanyaan Tanggapan
1. Bagaimana untuk penggantian Untuk tanaman yang berada di bawah Manu tanaman yang berada di bawah kabel akan dikompensasi lewat
jalur? proses ROW dengan lebar 20 m sepanjang jarak antar tower.
2. Iskandar Bagaimana untuk tanah yang Untuk harga tanah pasti berbeda pak, letaknya di pinggir jalan apakah karena penentuan harga
sama harganya dengan yang di menggunakan banyak factor baik dalamhutan? jaKak ,ja1an,Iokasidsb
3. Sapar Bagaimana untuk pembangunan Untuk pennohonan mudas nanti kita tower kyang berada di Tanah bisa penuhi pak, mohon nanti untuk Adat yang didalarnnya terdapat persyaratan dan data-data lembaga makam ma? Kita meminta untuk adatnya dikumpulkan juga pak diadakan MUDAS.
Tim Pengadaan Tanah dan ROW PT PLN UPP KITR1NG KBB 2
1. Ricko Ketua
2. AfditiaAzhari Sekretaris
3. Gebyar Lintang Ndadari Anggota
4. Faisol Adi Fahiefi Anggota
5. Andi Eko Saputro Anggota
6. IthamRiza Anggota
7. Aulia Rachman Maulana Anggota
8. Nur Cahyani Anggota
Demikian Berita Acara Konsultasi Publik atau Sosialisasi Pembangunan mi dibuat sesuai
dengan keadaan yang sebenarnya.
1. Hermanto S.Sos, M.Si Camat Sekadau Hilir
2. Minaryarti S.Sos . Sekcam Sekadau Hilir
r.-
3. Martinus Pen, S. Sos Kepala Desa Bokak Sebumbun
4. P. Asnie Kartono Sekretaris Desa Bokak Sebumbun
. . 5. Indra F. Chaniago &—I--, ....... Danramil Sekadau Hilir
6. Zainudin ........... Wakapolsek Sekadau
7. Budi Badan Intelejen Negara
Attachment 4
The list of vulnerable AP living within the ROW
corridor of the 275 kV
Bengkayang - Jagoibabang TL
Status of Age Sex
Affected AP in In In Other Total
People (th) M/F Project Location Area
(AP) Household Area
Lumar Lamolda
1 Amoi widow 56 F 0 Yes No Yes Yes 20000 144 10000 30000 9
Cannot work any more, livelihood supported
by her children. Prefer to get cash as income
restoration.
Sudah tidak bekerja, Biaya sehari hari di berikan dari
anak anaknya, Jika di berikan bantuan program income
restoration lebih menyukai mendapatkan uang kas
Vulnerable
Sanggau Ledo Bange
2 Surai widow 75 F Farmer 550,000 Yes Yes Yes Yes 10000 2600 2500 12500 1
Cannot work any more, livelihood supported
by her children. Prefer to get fertilizer and
seed as income restoration.
Sudah tidak bekerja, Biaya sehari hari di berikan dari
anak anaknya, Jika di berikan bantuan program income
restoration lebih menyukai mendapatkan pupuk dan
bibit
Vulnerable
Seluas Mayak
3 Batu householder 70 M farmer 150,000 Yes Yes No Yes 40000 40000 6
He is 80 years old, he work as rock breaker
and sell the rock. His income is less than Rp.
250,000/month, Eventhough he has 1 Ha of
land but he cannot work on his farm as he's
very old. He involved in every process of land
acquisition but unfortunatly compensation
was taken away by his son.
Pak Batu sudah berumur 80 tahun dan tidak lagi
berladang, saat ini pekerjaannya adalah memecah batu
dan menjualnya. Penghasilannya adalah Rp. 250,000/
bulan. Pada saat proses pemebebasan ROW ikut aktif
menghadiri sosialisasi. Pak Batu tidak bisa
memanfaatkan uang kompensasinya karena telah di
ambil oleh anaknya
Vulnerable
Jagoi Babang Jagoi Babang
4 Akon household 80 M farmer 693,333 Yes Yes No Yes 40000 40000 10
work as farmer, his house is far away from
village, so PIC only can meet his son. His
income is less than Rp. 1,000,000/ month.
Mr. akon also join in farmer group which
each group receive corn seeds from
Agriculture agency
Bekerja sebagai petani, karena rumahnya jauh dari
desa maka PIC hanya bisa menemui anaknya. Mr.
akon termasuk dalam kelompok tani yang menerima
bantuan bibit jagung dari dinas pertanian bengkayang.
Pendapatannnya kurang dari Rp. 1,000,000/bulan
Vulnerable
5Nyawop /
Anyenhousehold 78 M farmer 100,000 Yes Yes No Yes 113
Land belongs to his son Mr, Anyen. Work as
motor bike taxi and his income is Rp.
500,000,- as additional income he plant
pepper and get Rp. 5,600,000 /year. He
expect to get fertilizer for pepper tree as
income restoration
Lahan yang terkena adalah milik anaknya : Bp. Anyen
yang bekerja sebagai ojek dengan penghasilan Rp.
500,000/bulan. Sebagai tambahan pendapatannya Bp.
Anyen menanam sahang dengan tambahan
penghasilan Rp. 5,600,000/bulan. Mengharapkan
mendapatkan bantuan berupa pupuk untuk sahang
Vulnerable
Jumlah Vulnerable 0
Survey Result by PIC/ Hasil Survey PIC
KECAMATAN DESA
KECAMATAN DESA
KECAMATAN DESA
KECAMATAN DESA
Photos
AP Affected by the ROW of 275 kV
No Occupation
Status / Vulnerability Field Surveky result by PIC / Survey Lapangan oleh PIC
VulnerabilityIncome/
MonthStatus
IncomeUsage
Status
Aged
Status
Gender
Vulnerabl
e Propose
Affected
Trees
Tower Name Of
Affected People
Number (AP)
KECAMATAN : Seluas DESA : Seluas
T.160 Kartini Melayu F 25,000 625 2.5Private,
farmer600,000 Yes Yes No Yes
Cannot work as she's
already old and her right
leg was fracture, daily
cost is supproted by her
brother and sister.
Sudah tidak mampu lagi bekerja
karena sudah tua dan kakinya
patah. Biaya sehari hari di
tanggung oleh saudaranya.
Vulnerabl
e Propose%
Occupatio
n
Income
/month
Income
Status
Gender
Status
Ethnic
Status
AP Affected by the Tower Foundation of 275 kV
Ethnic
GroupGender
Landho
lding
(m2)
Affected LandSTATUS
m
Field Surveky result by PIC / Survey Lapangan oleh PIC
Survey Result by PIC/ Hasil Survey PIC Photos
Attachment 5
Corporate Social Responsibility Implementation
Report of the 275 kV
Bengkayang - Jagoibabang TL
LAPORAN PROGRAM CSR
PEMBERIAN BANTUAN BIBIT SAHANG DAN
PELATIHAN BUDIDAYA SAHANG
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 2017
Merupakan bentuk kepedulian PLN pada kemajuan perekonomian masyarakat yang berada
di sekitar pembangunan proyek ketenagalistrikan, Saluran Udara Tegangan Ekstra Tinggi
(SUTET) 275 kV Bengkayang-Jagoibabang, Provinsi Kalimantan Barat
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 1
1. PENDAHULUAN
1.1 LATAR BELAKANG
Setiap perusahaan di Indonesia melakukan berbagai kegiatan terencana untuk mencapai visi
maupun misi yang telah ditentukan. Kegiatan-kegiatan yang direncanakan oleh perusahaan
umumnya akan melibatkan berbagai macam pihak, baik dari dalam perusahaan itu sendiri
maupun pihak luar seperti pemerintah, masyarakat, dan sebagainya. Kerja sama antarpihak ini
dilakukan untuk mencapai kepentingan perusahaan, yaitu agar perusahaan tetap menjaga
eksistensinya. Untuk itu, setiap perusahaan, dalam hal ini PLN, harus dapat menjaga
keseimbangan hubungan dengan pihak lain yang dapat mempengaruhi eksistensinya.
Keseimbangan ini dapat dijaga salah satunya dengan cara melakukan Corporate Sosial
Responsibility (CSR). Penerapan CSR merupakan komitmen PLN untuk beroperasi secara legal
dan berkontribusi untuk peningkatan ekonomi, bersamaan dengan peningkatan kualitas hidup
karyawan sekaligus juga peningkatan masyarakat secara luas.
Program CSR yang diterapkan PLN pada saat ini memiliki kriteria yaitu mengembangkan potensi
alam dan bersifat membina warga setempat dengan suatu keterampilan sehingga dapat
meningkatkan perekonomian warga setempat. Salah satu program pengembangan
perekonomian untuk memandirikan masyarakat yang ditawarkan PLN adalah melalui program
pelatihan budidaya tanaman sahang
1.2 NAMA PROGRAM
Pemberian Bantuan Bibit Sahang dan Pelatihan Budidaya Sahang
1.3 TUJUAN
- Meningkatkan kapasitas dan pengetahuan bagi masyarakat dan petani di sekitar proyek
untuk melakukan budidaya tanaman sahang;
- Memajukan perekonomian warga, terutama bagi waga yang sudah terdaftar untuk mereima
bantuan program ini dari ADB;
- Meningkatkan kepedulian masyarakat terhadap proyek pembangunan ketenagalistrikan PLN
dan ikut serta menjaga aset tersebut.
1.4 TARGET SASARAN
- Sasaran dari kegiatan ini:
o Warga desa yang terdaftar sebagai penerima manfaat (vulnerable)
1.5 MANFAAT
1.5.1 MANFAAT BAGI PLN
o Mencegah terjadinya benturan kepentingan antara perusahaan dengan
lingkungannya/masyarakat dengan menjalin hubungan baik antara keduanya;
o Sebagai bentuk pemenuhan kewajiban PLN sebagai penerima loan dari ADB;
o Mencegah terjadinya social cost yang tinggi, yang pada akhirnya akan mengganggu
kelangsungan hidup perusahaan;
o Menciptakan citra PLN yang lebih baik yaitu peduli kepada masyarakat dan
lingkungan di sekitar wilayah pembangunan ketenagalistrikan.
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 2
1.5.2 MANFAAT TARGET PENERIMA MANFAAT
o Meningkatkan kapasitas dan pengetahuan bagi warga penerima manfaat dalam
budidaya sahang;
o Memajukan perekonomian warga penerima manfaat;
2. PELAKSANAAN AKSI PROGRAM
2.1 AKSI YANG DILAKUKAN
Nama : Pemberian Bantuan Bibit Sahang dan Pelatihan Budidaya Sahang
Acara : Dilaksanakan di Aula Kecamatan Sanggau Leddo pada 5 Oktober 2017
Rencana Aksi :
o Pemberian pelatihan budidaya tanaman sahang;
o Pemberian bantuan peralatan bercocok tanam dan pupuk;
o Pemberian bantuan bibit tanaman sahang.
2.2 PELAKSANAAN KEGIATAN
2.2.1 Daftar Penerima Manfaat
Sesuai dengan hasil survey dari Trectabel, penerima manfaat yang masuk dalam
kategori severely affected untuk paket 1 & 2 (SUTET 275 kV Bengkayang-
Jagoibabang) berjumlah 2 orang dan vulnerable berjumlah 6 orang.
Sebelum pelaksanaan kegiatan, Tim CSR PLN UPP Kitring KBB 3 melakukan survey
ulang dan memperoleh persetujuan/klarifikasi untuk menerima ataupun menolak
bantuan pelatihan dan bantuan bibit sahang sebagai penerima manfaat dengan
daftar sebagai berikut:
NO NAMA ASAL KETERANGAN
1. Akon Dusun Risau, Desa Jagoi
2. Noyih Noek Dusun Si Take, Desa Jagoi
3. Jondeh Dusun Jagoi Babang, Desa Jagoi
4. Nyaub Dusun Jagoi Babang, Desa Jagoi
5. Benyamin Y.B Dusun Sejajah, Desa Bange Merupakan Penerima Kuasa dari
Surai
6. Dayat Dusun Sepinggan, Desa Bang
7. Paskalia Dusun Sejajah, Desa Bange
8. Heri Dusun Baremada, Desa Lamolda
9. Apin Dusun Barelamat, Desa Lamolda
10. David Napi Desa Mayak Merupakan Penerima Kuasa dari
Batu
11. Amoi Desa Lamolda Tidak bersedia menerima bantuan
sahang karena kondisi fisik yang
tidak lagi memungkinkan, sehingga
bantuan dialihkan dengan
penyambungan listrik daya 900 VA
(sesuai permintaan penerima
manfaat)
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 3
2.2.2 Jadwal Pelaksanaan Kegiatan
NO WAKTU KEGIATAN
1. 09.30 – 09.40 Pembukaan
2. 09.40 – 09.50 Simbolis serah terima bantuan alat bercocok tanam
3. 09.50 – 12.00 Pelatihan oleh Dinas Pangan, Pertanian, dan Perikanan
Kabupaten Bengkayang
4. 12.00 – 13.00 Penutupan dan Makan Siang
2.3 REALISASI ANGGARAN BIAYA
Adapun rincian realisasi penggunaan anggaran biaya untuk kegiatan ini ialah sebagai berikut:
NO DESKRIPSI QTY UNIT TOTAL (Rp)
1 Sarana Produksi & Pelatihan
a. Benih Sahang 1 LS 20.000.000
b. Pupuk Organik dan Kimia 1 LS 41.000.000
c. Peralatan Berkebun 1 LS 11.239.000
d. Pembersihan Lahan 1 LS 5.500.000
2 Pelatihan
a. Transportasi aparat 1 LS 9.250.000
3 Biaya Pendukung
a. Kaos 1 LS 3.050.000
b. Spanduk + Mockup 1 LS 231.000
c. Sticker 1 LS 180.000
d. Konsumsi dan Snack 1 LS 2.400.000
e. Penggunaan Gedung 1 LS 2.000.000
TOTAL 94.850.000
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 4
3. DOKUMEN PENDUKUNG LAINNYA
3.1 FOTO DOKUMENTASI
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 5
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 6
3.2 PUBLIKASI
Publikasi dilakukan ke media-media online utama di Kalimantan Barat antara lain:
a. Antara Kalbar (online)
<https://kalbar.antaranews.com/berita/352345/pln-uip-kalbagbar-salurkan-2000-bibit-lada>
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 7
b. Pontianak Post (Online)
<http://www.pontianakpost.co.id/salurkan-bantuan-csr-2000-bibit-sahang>
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 8
c. Website Desa Jagoi
<http://jagoi.desa.id/2017/10/04/bantuan-pln-peduli-kepada-petani-sahang-untuk-4-orang/>
PT PLN (PERSERO) UIP KALIMANTAN BAGIAN BARAT 9
3.3 TESTIMONI
- Ali Akbar (Camat Sanggau Ledo)
Ka i berharap agar elalui ba tua i i, para warga dapat lebih baik lagi dala membudidayakan tanaman sahang termasuk untuk mengantisipasi dan mengendalikan
hama dalam penyakit-pe yakit ta a a lada lai ya
- Akon (Penerima Bantuan, Desa Jagoi)
Teri a kasih banyak PLN, semoga melalui bantuan ini dapat kami pergunakan untuk
memperbaiki perekonomian kami dan menjadi alternatif pendapatan utama bagi ka i.
- Benyamin Y.B. (Penerima Bantuan, Desa Lamonda)
Kami sangat menghargai dan berterima kasih atas bantuan dari PLN ini, karena sebagai
petani kami juga perlu dukungan dan bantuan untuk meningkatkan perekonomian
kami.
Attachment 6
The list of vulnerable and severely AP living
within the ROW corridor of
The 150 kV Ngabang – Tayan TL
APENDIX: Vulnerable Househods
Poor /
Miskin
Women
headed
HH /KK
wanita
Elderly
headed
HH /
Renta
PhotosVulnerabilit
y
1 2 3 4 5 6 7 8 9 10 11 12 14 15
1 Transmission Noren HH 62 M Laborer / Buruh 6 500,000 V
affected of ROW, involved in socialization
and inventory process. Livelihood as
rubber and paddy farmer. Income per
month is Rp. 500,000. Pepper seedlings is
expected
Lahannya terkena ROW, pekerjaan
sebagai petani padi dan karet. Aktif dalam
mengikuti sosialisasi proses pembebasan
ROW. Pendapatan perbulan adalah Rp.
500,000. Menerima bila ada bantuan bibit
sahang
Vulnerable
2
T.02 Nyonya Sarum HH 50 F Laborer / Buruh 4 1,300,000 V
Mrs. Sarum is not woman headed, she's
married since 2001. has 1 Ha of rubber
tree. She has 2 children have marreid, as
her income is under Minimum regional
wage, this family is vulnerabe
Nyonya Sarum telah menikah kembali
tahun 2001. memiliki 2 anak, lahan
terkena tapak tower dan jalur. Total lahan
yang dimiliki adalah 1 Ha Meskipun bukan
ukan termasuk kepala keluarga wanita.
Tetapi termasuk keluarga miskin
Vulnerable
2. Village: Mak Awing
3 T.26 Sarsa HH 50 MEnterpreneur /
swasta6 700,000 V
He works as rubber and paddy farmer,
involve in socialization process and his
land affected of tower and transmission.
Land compensation has been used for
surgery cost of his wife. Income is Rp.
20,000/ day
Sarsa bekerja sebagi petani karet dan
padi, aktif ikut serta dalam sosialisasi
pembebasan lahan. Lahan terkena tower
and jalur. Kompensasi ganti rugi untuk
tower di gunakan untuk biaya berobat dan
bedah istrinya. Pendapatannya Rp.
20,000/day
Vulnerable
4 T.27 Annius Bebe HH 51 M Farmer 3 500,000 V
Anius Bebe works as rubber and paddy
farmer and stll has 1 son not married yet.
Land affected tower and ROW. Involve in
socialization and inventory. Own 1 Ha of
land. Income/ month is Rp, 1,000,000.
Expect to get fetilizer (NPK & urea) aid
Anius Bebe saat masih memiliki
tanggungan 1 orang anak. Lahan terkena
tower dan jalur, ikut serta dalam kegiatan
sosialisasi dan inventaris pembebasan
lahan. Luas lahan yang dimiliki adalah 1
Ha, pendapatn perbulan : Rp, 1,000,000,
Mengharapkan bantuan dalam bentuk
pupuk NPK dan Urea
Vulnerable
3. Village: Temiang Mali
5 T.35 Anggek HH 55 F Farmer / Petani 3 400,000 V
Live with her brother and work as rubber
farmer. Land affected to tower and ROW.
Land compensation of tower has been
received and was used to renovate
cemetary of her family. Her income is Rp.
400.000/month. Pepper seedlings is
expected
Tinggal hanya bersama saudara laki
lakinya, bekerja sebagai petani karet.
Lahannya terken tower dan jalur.
Kompensasi ganti rugi lahan tower di
gunakan untuk renovasi kuburan
keluarganya. Pendapatan perbulannya Rp.
400,000
Vulnerable
6 T.35 L. Nadir HH 74 M Farmer / Petani 8 1,500,000 V
Work as rubber and paddy farmer with
income Rp. 500,000/month. His land
affected by Tower and ROW. Land
compensation for tower has been received
and saved in credit union. He get paddy
seedlings and fertilizer from government.
He prefer to have "SEMBAKO" as income
Rehabilitation
Bekerja sebagai petani karet dan padi
dengan pendapatan per bulan Rp.
500,000. Tanahnya terkena tower dan
ROW. Sudah mendapatkan bantuan
pemerintah untuk bibit padi dan pupuk.
Uang ganti rugi lahan tower di simpan di
credit union. Harapan bantuan
mendapatkan SEMBAKO sebagai
peningkatan pendapatan.
Vulnerable
Field survey result by PIC / Survey Lapangan oleh PIC
survey result by PIC / Hasil Survey PIC
No Tower Name (Nama)
Status in
the HH /
Status KK
Age /
Umur
Sex /
Jenis
Kelamin
13
SANGGAU REGENCY
1. Village: Cempedak
Occupation /
Pekerjaan
Number of
HH member
/ Jumlah
anggota KK
HH
income/per
month (IDR /
pendapatan
perbulan)
Vulnerability / Kerentanan
7 T.37 Anyi HH 64 M Farmer / Petani 6 1,500,000 V
He works as rubber farmer, all children
have married and help him to work in
rubber and paddy field. He has 2 Ha of
land. His income is Rp.1.500.000/month.
His land affected of tower and ROW. Land
compensation of tower has been received
and was shared to his son. Pepper
seedlings is expected
Bekerja sebagai petani karet, tidak ada
tanggungan anak karena sudah menikah
semua. Memiliki lahan 2 Ha.
Pendapatannya Rp. 1,500,000/bulan.
Tanahnya terken tower dan ROW. Ganti
rugi lahan tower telah di bagi bagikan
kepada anak anaknya
Vulnerable
8 T.40 Buncang HH 50 M Farmer / Petani 4 2,000,000 V
Buncang is sick and cannot work any
more, He has land <1Ha, Land affected to
tower and ROW. His income is Rp.
450,000/month. His wife work as rubber
/paddy farmer. Expect to get SEMBAKO as
income rehabilitation
Buncang sudah tidak mampu lagi bekerja,
sakit-sakitan. Memiliki lahan <1 Ha, lahan
terkena tower dan ROW. Pendapatannya
perbulan : Rp. 450,000. Pekerjaannya
petani karet dan padi. Mengharapkan
mendaatkan bantuan SEMBAKO sebagai
income rehabilitation
Vulnerable
4. Village: Tae
9 T.39 Darius Acos HH 71 M Farmer / Petani 3 2,000,000 V
PIC cannot meet the land owner as he
came back from rubber / paddy field in the
evening. Mr. Darius Acos lives only with
his wife.
PIC tidak dapat bertemu dengan Pak
Darius karena pergi keladang dan kembali
pada malam hari. Darius Acos tinggal
hanya bersama istri nya
Vulnerable
5. Village: Padi Kaye
10 T.48 Eneng HH 51 F Laborer / Buruh 2 1,000,000 V
Can not met the land owner as he always
work in rubber field. And go back in
evening
PIC tidak dapat bertemu dengan ibu
Eneng karena masih bertani karet dan
baru kembali malam hari. Ibu Eneng
hanya hidup sendiri
Vulnerable
6. Village : Angan
11 T.62 Iyus HH 52 M Farmer / Petani 4 700,000 V
work as rubber farmer and own land
25,000 M2. involve in process of land
acquisition. Land affected by tower and
ROW. Compensation of tower has been
received and was used to renovate house.
Expect to get palm seeds for income
rehabilitation
Bekerja sebagai petani karet memiliki
lahan 25,000M2. Ikut serta dalam
konsultasi / sosialisasi proses
pembebasan lahan. Compensasi ganti
rugi tower di gunakan untuk renovasi
rumah. Mengharapkan bantuan bibit sawit
sebagai income rehabiitation
Vulnerable
12 T.67 Diru HH 45 F Farmer / Petani 3 1,250,000 V
Work as farmer of paddy and rubber,
income : Rp. 50,000/day and total of land
is 2 Ha. Active involving in process of land
acquistion. Compensation of tower has
been received and is used for daily cost. In
Angan village still do not have electricity.
Do not have palm tree as palm seed is
expensive.
Bekerja sebagai petani karet dan padi
dengan pendapatan per hari Rp. 50,000
dan lahan yang di miliki adalah 2 Ha.
Kompensasi ganti rugi tower di gunakan
untuk biaya hidup sehari hari.
Mengharapkan bantuan bibit sawit
sebagai income rehabilitation
Vulnerable
13 T.62 - T.63 Juliana Acek HH 45 F Farmer / Petani 4 1,500,000 V
Information from her nephew that Juliana
work as rubber farmer, still have 1 child on
school.
Informasi dari keponakannya bahwa
Juliana bekerja sebagai petani karet,
memiliki 1 orang anak yang masih
sekolah, 3 orang anak lainnya telah
berkeluarga sendiri
Vulnerable `1
14 T.67 - T.68 Jolo HH 60 M Farmer / Petani 7 600,000 V
Work as rubber farmer and income is Rp.
600,000/month. involve in process of
inventory. Angan village still do not have
electricity.
Bekerja sebagi petani dan pendapatannya
adalah Rp. 600,000/ bulan. Mengharapkan
dapat bantuan listrik ke desa nya
Vulnerable
7. Village : Tubang Raeng
15 T.102 Tengkel HH 41 M Farmer / Petani 5 1,200,000 V
own land 2,5 Ha (paddy and rubber), has 3
children. Income Rp. 50,000-60,000/day.
His land is affected for tower and ROW.
Compensation of tower has been received
and is used to buy Television. Seedling aid
expected
Memiliki lahan 2,5 Ha (padi dan karet)
memiliki 3 orang anak. Pendapatan : Rp.
50,000-60,000/ hari. Lahannya terkena
tower dan ROW. Compensasi ganti rugi
tower di gunakan untuk membeli Televisi
dan antena parabola. Mengharapkan
bantuan bibit
Vulnerable
16 T.107 Apek Parman HH 42 M Farmer / Petani 6 1,200,000 V
work as rubber farmer with income Rp.
1,500,000, compensation for tower has
been received and used for renovate
house.Expect to get rubber / palm seedling
for income rehabilitation
Bekerja sebagai petani karet dengan
pendapatan Rp. 1,500,000/bulan. Ganti
rugi tower telah di gunakan untuk renovasi
rumah. Mengharapkan mendapatkan
bantuan bibit karet atau sawit
Vulnerable
17 T.102 - T.101 Aby HH 62 M Farmer / Petani 7 1,500,000 V
Work as rubber farmer with income Rp,
1,000,000 / month. Not join in socialization
as no invitation yet. Land affected to ROW.
Compensation isnot yet paid. Expected for
any seedling
Bekerja sebagi petani karet dengan
pendapatan perbulan Rp. 1,000,000. Tidak
mengikuti sosialiasi karena belum ada
undangan. Memiliki 4 orang anak ( 3
sudah berkeluarga, 1 masih sekolah)
belum terima ganti rugi. Menerima
bantuan segala macam bentuk bibit.
Vulnerable
18 T.104 - T.105 Anun HH 39 M Farmer / Petani 4 1,600,000 V
own land 3 Ha, has 2 children, work as
farmer of rubber with income Rp.
50,000/day. Involved in inventory of tree
Bekerja sebagai petani karet dengan
pendapatan Rp.50,000/ hari. Telah
mengikuti proses inventaris. Belum terima
ganti rugi ROW. Memiliki lahan 3 Ha.
Vulnerable
8. Village : Tebedak
19 T.112 Acok HH 82 M Laborer / Buruh 4 750,000 V
Do not work any more as she's already
old. Live with his son, has land 1 Ha.
Compensation of tower is used for daily
cost. Involve in socialization process of
land acquisition.
Tidak bekerja karena sudah tidak mampu,
tinggal bersama anaknya dan memiliki
lahan 1 Ha. Ganti rugi tower di gunakan
untuk kebutuhan sehari hari. Ikut dalam
proses sosialisasi pembebasan lahan.
Vulnerable
20 T.122 & 125 Murtinah HH 56 F Farmer / Petani 5 1,500,000 V
own land >5 Ha planted rubber and palm,
Rp. 1,000,000-1,500,000/month,
compensation was used to buy palm trees
Memiliki lahan >5 Ha di tanami karet dan
sawit, pendapatannya per bulan Rp.
1,000,000 - 1,500,000. Kompensasi di
gunakan untuk membeli pohon sawit di
tanam di ladangnya
Vulnerable
21 T.124 Ngaeng HH >50 M Laborer / Buruh 10 950,000 V
own land 6 Ha planted rubber, earn
Rp1,500,000 month, compensation was
used for livelihood cost. Expect electricity
distribution to village
Memiliki lahan 6 Ha, petani karet,
Pendapatan sebesar Rp. 1,500,000/bulan.
Kompnesasi ganti rugi tower di gunakan
untuk kebutuhan hidup sehari hari.
Mengharapkan listrik bisa masuk desanya
Vulnerable
22 T.124 Atta HH 50 M Farmer / Petani 5 1,000,000 V
land owned 1 Ha, compensation was used
for buying 1 Ha land planted with rubber,
earn Rp,1,500,000/month
Memiliki lahan 1 ha, kompensasi di
gunakan untuk membeli 1 Ha lahan untuk
di tanami karet. Pendapatan perbulan
adalah Rp. 1,500,000
Vulnerable
23 Transmission Anjong HH 51 F Farmer / Petani 3 500,000 V VCannot met the AP as she still work in
rubber field
Tidak dapat bertemu dengan bu Anjong
karena masih bekerja noreh karet sampai
sore hari
Vulnerable
24 Transmission Antonius Atang HH 73 M Farmer / Petani 3 750,000 V
Work as rubber farmer, involved in
inventory of plants. Ever failed in planting
pepper fo 50 trees. Expect to get paddy
seedlings as income rehabilitation
Bekerja sebagai petani karet, padi. Ikut
serta dalam kegiatan inventory tanaman.
Pernah tanam sahang tapi gagal sekitar
50 batang. Mengharapkan dapat bantuan
bibit padi
Vulnerable
9. Village : Amboyo Inti
25 T.119 Thamrin HH 61 M Laborer / Buruh 4 430,000 V
Has 4 son have been married. Mr. Thamrin
retired from PTPN and his income from
pension is Rp. 431,000. Now he is sick
cannot work as farmer. Expect to get
pepper seedlings and electricity
distribution to Tebedak village (location of
his rubber field affected to ROW)
Memiliki 4 orang anak yang sudah
menikah semua. Pendapatannya dari
pensiun PTPN adalah Rp. 430,000,- Saat
ini tidak bekerja karena sakit sakitan.
Mengharpakan mendapatkan bantuan bibit
sahang dan pengaliran listrik di desa
teubedak (lokasi kebun karetnya yang
terkena ROW)
Vulnerable
Total 25 14 7 5
Note:
All HouseHolds (HH) interviewed do not have any cattle. Their livelihood only as farmer. Give appropriate seeds can be usefull to expand their agriculture field.
No No. Tower Name
Land
holding/
pemilikan
lahan (m2)
Land
affected /
lahan yang
terkena(m2
)
Land
Remaining/
sisa lahan
(m2)
Affected in % /
Persentase
dampak
Penjelasan Photo Severely affected
1 34 (Dharma Bakti Village) Mrs Bancek 20,000 219 19,781 1%
Informasi dari anak laki lakinya bahwa bu
Bancek berumur 62 tahun, bekerja sebagai
petani karet, padi. Lahannya terkena tapak
tower dan ROW,
N/A
Not severely but identified as
vulnerable, and asked electricity
to Klampe village
2 substation Juwarso 40,500 20,000 20,500 49%
Bengkayang Severely
Number of severly AP's 150 kV Transmission Line
Bengkayang - Ngabang Transmission line
Woman headed households, 62 years old, as farmer of rubber and
pady. Land affected to tower and transmission. (information from
her son)
Description
Kompensasi ganti rugi lahan di gunakan untuk
membeli lahan dekat substation dan
membangun rumah kos di samping rumahnya.
Memiliki lahan 3 Ha di tanami sawit. Tidak
merasa puas dengan ganti rugi yang di terima
karena adanya intimidasi sebagai orang
pendatang. Lahan yang terkena dampak adalah
28% . Mata pencahariannya sehari hari adalah
pembuat tempe
Compensation was used to buy new land near the substation and
total ownership of land at other area is 3 ha, planted with oil
palms; compensation also was used to build rooms for rent
besides his house. He also works as a trader. He does not feel
satisfied with the process of land acquisition; he claims that there
was intimidation as he comes from outside Kalimantan. affected
land 28%. He produce Tempe as daily livelihod.
Number of severely APs BENGKAYANG SUBSTATION
Attachment 7
Corporate Social Responsibility APs in 150 kV
Bengkayang – Ngabang – Tayan TL
Attachment 8
Decree Letter of Bupati Sekadau about Location
Assignment Permissions for 150 kV Sekadau
substations
BUPATI SEKADAU
PROVINSI KALIMANTAN BARAT
KEPUTUSAN BUPATI SEKADAU
NoMoR : 67 |
,.321 133 /UMUM/ 2016
TENTANG
PENETAPAN LOKASI PEMBANGUNAN GARDU INDUK 150 KV DAN TOWERSALURAN UDARA TEGANGAN TINGGI 150 KV DI WILAYAH KECAMATAN
SEKADAU HILIR DESA SUNGAI KUNYIT, PENITI, SUNGAI RINGIN,MUNGGUK, GONIS TEKAM, TAPANG SEMADAK KABUPATEN SEKADAU
BUPATI SEKADAU,
bahwa dalam upaya percepatan pembangunansarana kelistrikan di wilayah Kalimantan Baratkhususnya di Kabupaten Sekadau, dipandang perludibangun Gardu Induk 150 kV dan Tower SaluranUdara Tegangan Tinggr {SUTT} 150 kV yanglokasinya tersebar di wilayah Kabupaten Sekadau;
bahwa dengan adanya pembangunan Gardu Induk150 kV dan Tower Saluran Udara Tegangan Tinggi
{SUTT) 150 kV di lrilayah Kabupaten Sekadaudiharapkan dapat meningkatkan pelayananPemerintah dibidang kelistrikan khususnya kepadamasyarakat di Kabupaten Sekadau dan secaraumum kepada masyarakat di Frovinsi KalimantanBarat;
bahwa berdasarkan pertimbangan sebagaimanadimaksud dalam huruf a dan huruf b, perluditetapkan Lokasi Pembangunan Gardu Induk 150kV dan Tower Saluran Udara Tegangan Tinggi(SUTT) 150 kV di wilayah Kabupaten Sekadaudipandang perlu ditetapkan dengan KeputusanBupati;
Undang-Undang Nomor 5 Tahun 1960 tentangPeraturan Dasar Pokok-Pokok Agraria (LembaranNegara Republik Indonesia Tahun 1960 Nomor 104,Tambahan lembaran Negara Republik IndonesiaNomor 2013);
Undang-Undang Nomor 20 Tahun 1961 tentangPencabutan Hak-Hak Ata.s Tanah dan Benda-BendaYang Ada Di Atasnya (Lembaran Negara RepublikIndonesia Tahun 1961 Nomor 288, TambahanLembaran Negara Republik Indonesia Nomor 232a1;
Undang-Undang Nomor 34 Tahun 2003 tentangPembentukan Kabupaten Sekadau dan Kabupaten
Menimbang . d..
Mengingat : 1.
b.
c.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
t2.
Undang-Undang Nomor 26 Tahun 2OA7 tentangPenataan Ruang (Lembaran Negara RepublikIndonesia Tahun 2AOT Nomor 68, TambahanLembaran Negara Republik Indonesia Nomor 47251;
Undang-Undang Nomor t2 Tahun 201 1 tentangPembentukan Peraturan Perundang-undangan(Lembaran Negara Republik Indonesia Tahun ?OLLNomor 82, Tambahan Lembaran Negara RepublikIndonesia Nomor 523ab
Undang-Undang Nomor 2 Tahun 2Ol2 tentangPengadaan Tanah Bagr Pembangunan UntukKepentingan Umum {Lembaran Negara RepublikIndonesia Tahun 2OL2 Nomor 22, TambahanLembaran Negara Republik Indonesia Nomor 5280);
Undang-Undang Nomor 23 Tahun 2OL4 tentangPemerintahan Daerah (l,embaran Negara RepublikIndonesia Tahun 2Ot4 Nomor 2+4, TambahanLembaran Negara Republik Indonesia Nomor 5587),sebagaimana telah diubah beberapa kali, terakhirdengan Undang-Undang Nomor 9 Tahun 2015tentang Perubahan Kedua Atas Undang-UndangNomor 23 Tahun 2AL4 tentang PemerintahanDaerah (Lembaran Negara Republik IndonesiaTahun 2015 Nomor 58, Tambahan LembaranNegara Republik Indonesia Nomor 5679);
Peraturan Pemerintah Nomor I Tahun 1953tentang Penguasaan Tanah-Tanah Negara
{Lembaran Negara Republik Indonesia Tahun 1953Nomor 14, Tambahan Lembaran Negara RepublikIndonesia Nomor 3621;
Peraturan Pemerintah Pengganti Undang-UndangNomor 51 Tahun 1960 tentang LaranganPemakaian Tanpa Izin Yang Berhak Atau Kuasanya(Lembaran Negara Republik Indonesia Tahun 1960Nomor 158, Tambahan Lembaran Negara RepublikIndonesia Nomor 2tAQ;
Peraturan Pemerintah Nomor 24 Tahun 1997tentang Pendaftaran Tanah (kmbaran NegaraRepublik Indonesia Tahun 1997 Nomor 59,Tambahan lembaran Negara Republik IndonesiaNomor 3696);
Peraturan Pemerintah Nomor 38 Tahun 2OOT
tentang Pembagran Urusan Pemerintahan AntaraPemerintah, Pemerintahan Daerah Provinsi, danPemerintahan Daerah Kabupaten/Kota (LembaranNegara Republik Indonesia Tahun 2AA7 Nomor 82,Tambahan Lembaran Negara Republik IndonesiaNomor a7371;
Peraturan Presiden Nomor 99 Tahun 2014 tentangPerubahan Kedua Atas Peraturan Presiden Nomor71 Tahun 2Ol2 tentang PenyelenggaraallPengadaan Tanah Bagr Pembangunan Untuktr{enanfincrqn TTr"nrrrn lT;"rnharan l\Ieoarn Fetrrrhlilz
Menetapkan
KESATU
KEDUA
KETIGA
KEEMPAT
$allahu sesual dengan asllnYa
I{EPATABAGIAI{ HIII$M DAI{ IIAtrI'
Y**-SUBHAN
BUPATI SEKADAU,
TTD
RUPINUS
13. Keputusan Presiden Nomor 34 Tahun 2003 tentangKebijakan Nasional di Bidang Pertanahan(Lembaran Negara Republik Indonesia Tahun 2003Nomor 60);
14. Peraturan Menteri Dalam Negeri Nomor B0 Tahun2015 tentang Pembentukan Prod.uk HukumDaerah.
MEMUTUSKAN :
Menetapkan Lokasi Pembangunan Gardu Induk 150 kVdan Tower Saluran Udara Tegangan Tinggi (SUTT) 150
kV Di Wilayah Kecamatan Sekadau Hilir Desa SungaiKunyit, Peniti, Sungai Ringin, Mungguk, Gonis Tekam,Tapang Semadak Kabupaten Sekadau.
Lokasi Pembangunan Gardu Induk 150 kV dan Torner
Saluran Udara Tegangan Tinggi (SUTT) 150 kV, beradadi lokasi sebagai berikut :
A. Lokasi Pembangunan Tower SUTT 150 kV di wilayahKecamatan Sekadau Hilir terletak di :
1. Desa Sungai Kunyit sebanyak B Lokasi;2. Desa Peniti sebanyak 31 Lokasi;3. Desa Sungai Ringin sebanyak 16 Lokasi;4. Desa Mungguk sebanyak 19 Lokasi;5. Desa Gonis Tekam sebanyak 38 Lokasi; dan6. Desa Tapang Semadak sebanyak 23 Lokasi
B. Untuk rincian detail letak iokasi pembangunanGardu induk 150 kV dan Tower SUTT 150 kV diwilayah Kabupaten Sekadau dapat dilihat padadaftar table Tower Schedule Transmisi 150 kV danpeta lokasi sebagaimana tercantum dalam LampiranKeputusan ini.
Kebutuhan tanah yang diperlukan bagi pembangunanGardu Induk 150 kV di '*r,'ilayah Kecamatan SekadauHilir sebagaimana dimaksud Diktum KESATU tersebutmemerlukan luas tanah t 3 Ha.
Keputusan Bupati ini mulai berlaku pada tanggalditetapkan.
Ditetapkan di Sekadaupada tanggal 1 Maret 2016
' .NIP. 19?50426 199412 I 001
Attachment 9
Decree Letter of Bupati Sanggau about Location
Assignment Permissions for 150 kV Sanggau
substations
Attachment 10
Decree Letter of Bupati Sanggau for 150 kV
Tayan – Sanggau – Sekadau TL
Attachment 11
Permit from Territory Hall of Forest Area
KEMENTERIAN KEHUTANAN DIREKTORAT JENDERAL PLANOLOGI KEHUTANAN
BALAI PEMANTAPAN KAWASAN HUTAN WILAYAR ifi Jalan Jenderal Achmad Yani No. 121 Pontianak 78124 4 Tetepori (0561) 736502, 743373, Faksimile (0561) 734283
Website:http:J/bpkh3.dephut.go.id
Nomor S. M/BPKH.III-2/2015 /3 Mel 2015
Lampiran : 1 (satu) lembar peta
Hal : HasH Telaah Tekr,is Fungsi Kawasan Hutan
Terhadap Lokasi Saluran Udara Tegangan
Tinggi (SUTr), Provinsi Kalimantan Barat.
Yth. Manager PT. PLN (Persero) Unit Pelaksana
Konstruksi Jaringari Kalimantan I
di -
Pontianak
Sehubungan dengan surat Saudara Nomor 148/KON.02,02/UPK RING KAL 1/2015
tanggal 20 April 2015 perihal Permohonan Peta Kawasan Hutan SUiT 150 kV Tayan -
Sanggau - Sekadau - Sintang, bersama ml kami sampaikan sebagai berikut:
1. Letak areal yang dimohon mengacu pada lampiran surat berupa data koordinat Tower
SUTI Tayan - Sanggau - Sekadau - Sintang, berada di 3 (tiga) Kabupaten yaltu
Kabupaten Sanggau, Kabupaten Sekadau dan Kabupaten Smntang, Provinsi Kalimantan Barat sejumlah 541 titik.
2. Mengacu pada Peraturan Menteri Kehutanan Nomor : P. 62/Menhut-11/2013 tanggal 15
November 2013 tentang Perubahan Atas Peraturan Menteri Kehutanan Nomor
P44/Menhut-II/2012 tanggal 11 Desember 2012 tentang Pengukuhan Kawasan Hutan
Pasal 58 Ayat 1, maka berdasarkan Peta Kawasan Hutan dan Perairan Provinsi
Kalimantan Barat skala 1 : 250.000 (Lampiran Keputusan Menteri Kehutanan dan
Perkebunan Nomor : SK. 259/Kpts-II/2000 tanggal 23 Agustus 2000), Keputusan Menteri
Kehutanan Nomor : SK. 936/Merihut-II/2013 tanggal 20 Desember 2013 tentang
Perubahan Peruntukan Kawasan Hutan Menjadi Bukan Kawasari Hutan, Perubahan
Fungsi Kawasan Hutan serta Penunjukan Bukan Kawasan Hutan Menjadi Kawasan Hutan
serta Keputusan Menteri Kehutanan Nomor : 5K. 733/Menhut-II/2014 tanggal 2
September 2014 tentang Peta Kawasan Hutan dan Konservasi Perairan Provinsi
Kalimantan Barat menunjukan bahwa Lokasi Rencana Saluran Udara Tegangan Tinggi
(SUTT) seluruhnya berada pada Areal Penggunaan Lain (APL).
3. Berdasarkan data dan informasi pemanfaatan kawasan hutan, lokasi yang dimohon
tidak tumpang tindih dengan perizinan sektor kehutarian lamnnya.
4. Berdasarkan Penetapan Peta Indikatif Penundaan Pemberian Ijin Baru Pemanfaatan
Hutan, Penggunaan Kawasan Hutan dan Perubahan Peruntukan Kawasan Hutan dan
Areal Penggunaan Lain (Revisi VII) sebagaimana lampiran Keputusan Menteri Kehutanan
Nomor : SK. 6.982/Menhut-VII/IPSDH/2014 tanggal 13 Nopember 2014, Lokasi Rencana
Saluran Udara Tegangan Tinggi (SUTT) ada yang terindikasi berada pada lahan gambut
sebanyak 14 titik, yaltu titik T8, T9, T10, T11, T12, T91, T92, T93 T94, T96, T97, T98, T99, dan T100.
5. Dalam hal terdapat indikasi perbedaan antara peta indikatif penundaan pemberian izin
baru dengan kondisi fisik dilapangan maka untuk lahan gambut dapat dilakukan survei
oleh Balal Besar Penelitian clan Pengembangan Sumber Daya Lahan Pertanian,
Kementerian Pertanian.
6. Hasil telaahari hariya merupakan telaahan awal diatas peta clan data sekunder lainnya,
untuk mengetahui kepastian tentang letak clan luas wilayah Lokasi Rencana Saluran
Udara Tegangan Tinggi (SUTT) terhadap batas kawasan yang pasti perlu dilakukan
pengukuran di lapangan.
7. Diharapkan
7. Dharapkan kepada pihak yang terkait untuk tidak melakukan kegiatan - kegiatan yang
bertentangan dengan peraturan perundangan clan kebijakan teknis lainnya yang berlaku
sebelum ijin resmi diperoleh.
Demikian disampaikan, atas perhatiannya diucapkan terima kasih.
Kepala Bala
Ir. 4e,Z-PO199'403
NIP. 1962 1 002
Tembusan
1. Direktur Jenderal Planologi Kehutanan (sebagal taporan)
2. Gubernur Kalimantan Barat
3. Direktur Penggunaan Kawasan Hutan
4. Kepala Dinas Kehutanan Provinsi Kalimantan Barat
5. Kepala Kantor Wilayah Badan Pertanahan Nasional Provinsi Kalimantan Barat
6. Bupati Sanggau
7. Bupati Sekadau
S. Bupati Sintang
9. <epala Dinas Kehutanan clan Perkebunan Kabupaten Sanggau
10, Kepala Dinas Kehutanan dan Perkebunan Kabupaten Sekadau
11. Kepala Dinas Kehutanan clan Perkebunan Kabupaten Sintang
Attachment 12
150 kV Tayan – Sanggau - Sekadau TL Land
Acquisition Monitoring Up to December 2017
TAYAN - SANGGAU
1 M. Yunus 400
400
2 Samsul Kamar 400
3 H Muhammad Yusuf 225
4 Darius 400
5 Dwina Sejum 225
6 Supiana Rosmiati 116
7 Yulita Lidia 400
8 Sarum 225
9 Yeyen 225
10 Siti Nurliana 112.5
11 Akiang 112.5
12 Jaher 225
13 Jihon 225
14 Bambang Twinarto 225
15 Ciok 225
16 Gebe 225
17 Alimin 225
18 Awi 225
19 Edi Gunawan 225
20 Herman E 400
21 Ibrahim Sulaiman 225
22 Songli 225
23 Salpinus Sangkiat 225
5316
24 Namsun 225
25 Dini Handayani Arianti 225
26 Deron 225
27 Epianus 225
28 Uka 225
29 Valeria Moi 400
30 Yosafat Sami 225
31 Lusius Ong 225
32 Silvanus Acom 225
33 Ambos 225
34 Martinus Secin 225
35 Kasianus Tutin 225
2875
36 Salim 225
37 Toni 225
38 Sikim 225
39 Selipang 225
40 Betalonius 400
41 Romanus Roma 225
42 Antonius Andi 225
43 Ummi Salamah 225
1975
44 Tinus Anem 400
45 Toran 225
46 Matius Pauji 225
47 Kuncit 225
48 Martinus Jabot 225
49 Jinus 225
50 Marselus Pangki 225
1750
51 Toni Adi Saputro 400
52 Kecik 225
53 Aris Satrianto 400
1025
54 Adi Darmawan 225
55 Adi Darmawan 225
56 Moses 225
57 Leonardus 225
58 Pael 225
59 Kristina Serimi 225
60 Maria Mina 225
61 GH Gueng 225
62 Antonius Jati 225
63 Anarias Atek 225
64 Antonius Minar Tulai 225
65 Yohanes James 400
66 Rupinus Tului 225
67 Leonardus Apoi 225
68 Leonardus Apoi 225
69 Edvardus Kuncang 225
70 Karem 225
71 Sabinus Kancung 225
72 Petrus Amak 225
4450
Ownership StatusWidth (m2)TowerSub -districtVillage
Kawat Tayan Hilir 01A
LAND ACQUISITION MONITORING OF 150 kV TAYAN- SANGGAU - SEKADAU TRANSMISSION LINE UP TO DECEMBER 2017
Rp14,700,000.00
Cempedak Tayan Hilir 05A SPT 19-Nov-17 Rp26,620,000.00
Cempedak Tayan Hilir 04A SPT 18-Nov-17
Rp30,443,000.00
Cempedak Tayan Hilir 02A SPT 17-Nov-17 Rp20,500,000.00
SPT 17-Nov-17
Rp30,443,000.00
Rp45,460,000.00
Cempedak Tayan Hilir 02 SKT No. 593.3/82/VIII/2016 12-Mar-16 Rp15,330,000.00
Cempedak Tayan Hilir 08A SPT 22-Nov-17
Rp23,630,000.00
Cempedak Tayan Hilir 07A SPT 21-Nov-17 Rp10,340,000.00
Cempedak Tayan Hilir 06A SPT 20-Nov-17
Rp9,135,000.00
Cempedak Tayan Hilir 05 SKT No. 593.3/52/IV/2015
11-Mar-16
Rp22,488,000.00
Cempedak Tayan Hilir 04 SKT No. 593.3/104/X/2015 12-Mar-16
Rp16,332,000.00
Cempedak Tayan Hilir 04 SKT No. 593.3/10/II/2015 20-Oct-16 Rp12,280,000.00
Cempedak Tayan Hilir 03 SKT No. 593.3/82/VIII/2016 13-Mar-16
Rp16,833,000.00
Cempedak Tayan Hilir 09 SKT No. 593.3/63/V/2015
11-Mar-16
Rp22,746,000.00
Cempedak Tayan Hilir 08 SKT No. 593.3/105/X/2015
12-Mar-16
Rp17,186,000.00
Cempedak Tayan Hilir 07 SKT No. 593.3/57/III/2013
20-Oct-16
Rp35,688,000.00
Cempedak Tayan Hilir 06 SKT No. 593.3/217/XII/2009
14-Feb-17
Rp26,675,000.00
Cempedak Tayan Hilir 13 SKT No. 593.3/53/VII/2012 20-Oct-16 Rp24,007,500.00
Cempedak Tayan Hilir 12
Rp14,043,000.00
Cempedak Tayan Hilir 11 SKT No. 593.3/127/XII/2015
14-Jun-17
Rp14,385,000.00
Cempedak Tayan Hilir 10 SKT No. 593.3/126/XII/2015
10-Mar-16
Rp18,772,000.00
Tebang Benua Tayan Hilir 17 SKT No. 140/216/Pem 3-Oct-16 Rp16,510,000.00
Cempedak Tayan Hilir 16 SKT No. 593.3/78/VIII/2015
Rp22,533,000.00
Cempedak Tayan Hilir 15 SKT No. 593.3/81/VIII/2016 3-Oct-16 Rp22,546,000.00
Cempedak Tayan Hilir 14 SKT No. 593.3/81/VIII/2017
Rp452,229,500.00
Rp21,352,000.00
Tebang Benua Tayan Hilir 21 SKT No. 140/222/Pem 3-Oct-16 Rp31,988,000.00
Tebang Benua Tayan Hilir 20 SKT No. 140/210/Pem 3-Oct-16
Rp20,072,000.00
Tebang Benua Tayan Hilir 19 SKT No. 140/227/Pem 20-Oct-16 Rp21,492,000.00
Tebang Benua Tayan Hilir 18 SKT No. 140/217/Pem 20-Oct-16
Rp25,004,000.00
Tebang Benua Tayan Hilir 25 SKT No. 140/256/Pem 3-Oct-16 Rp21,068,000.00
Tebang Benua Tayan Hilir 24 SKT No. 140/219/Pem 3-Oct-16
Rp30,867,000.00
Tebang Benua Tayan Hilir 23 SKT No. 140/229/Pem 3-Oct-16 Rp13,507,500.00
Tebang Benua Tayan Hilir 22 SKT No. 140/257/Pem 20-Oct-16
Rp21,552,000.00
Mak Kawing Balai 29 SPT Rp24,192,000.00
Tebang Benua Tayan Hilir 28 SKT No. 140/221/Pem 20-Oct-16
Rp13,500,000.00
Tebang Benua Tayan Hilir 27 SKT No. 140/218/Pem 20-Oct-16 Rp18,717,000.00
Tebang Benua Tayan Hilir 26 SKT No. 140/206/Pem 3-Oct-16
Rp255,629,500.00
Rp22,310,000.00
Mak Kawing Balai 33 SPT Rp37,824,000.00
Mak Kawing Balai 32 SPT
Rp24,139,000.00
Mak Kawing Balai 31 SPT Rp28,508,000.00
Mak Kawing Balai 30 SPT
Rp29,075,000.00
12-Mar-16
20-Oct-16
3-Oct-16
Temiang Mali Balai 38 SPT
Rp19,982,000.00
Temiang Mali Balai 37 SPT Rp41,513,000.00
Mak Kawing Balai 36 SPT
Rp24,267,000.00
Mak Kawing Balai 35 SPT Rp37,342,000.00
Mak Kawing Balai 34 SPT
Temiang Mali Balai 41 SPT
Rp26,266,000.00
Temiang Mali Balai 40 SPT Rp21,900,000.00
Temiang Mali Balai 39 SPT
Rp21,462,000.00
Kebadu Balai 60 SPT Rp16,882,500.00
Kebadu Balai 61
Temiang Mali Balai 43 SPT
Rp20,635,000.00Temiang Mali Balai 42 SPT
Rp17,120,000.00
Rp16,875,000.00
Hilir Balai 46 SPT Rp40,296,000.00
Hilir Balai 45 SPT
Hilir Balai 44 SPT Rp44,183,000.00
Rp18,906,000.00
Kebadu Balai 50 SPT Rp16,882,500.00
Kebadu Balai 49 SPT
Rp21,858,000.00
Kebadu Balai 48 SHM Rp19,965,000.00
Kebadu Balai 47 SHM
Kebadu Balai 54 SHM Rp18,000,000.00
Kebadu Balai 53 SPT
Rp18,007,500.00
Kebadu Balai 52 SPT Rp16,875,000.00
Kebadu Balai 51 SHM
Kebadu Balai 59 SPT Rp24,022,000.00
Rp23,358,000.00
Kebadu Balai 58 SPT Rp35,651,000.00
Kebadu Balai 57 SPT
Rp22,395,000.00
Kebadu Balai 56 SHM Rp18,000,000.00
Kebadu Balai 55 SPT
Rp19,451,000.00
Rp19,843,000.00
Kebadu Balai 64 SPT Rp19,045,000.00
Kebadu Balai 63 SPT
SPT Rp16,875,000.00
Kebadu Balai 62 SPT Rp19,616,000.00
Rp19,035,000.00Kebadu Balai 65 SPT
NameNo Compensation AmountPayment Date
Rp177,971,000.00
Rp218,564,000.00
Rp101,354,000.00
Rp384,667,500.00
Ownership StatusWidth (m2)TowerSub -districtVillageNameNo Compensation AmountPayment Date
73 Suhardi Cici 225
74 Simpa 225
75 Anton 400
76 Nyaen 180
77 Herkulanus Luku 45
78 Ahmad Sahli 34.37
79 Rupinus Rangkeng 190.63
80 Kanisius Jaher 225
81 Stefanus Kenen 225
82 Bambang Irawan 225
83 Sukimin 400
84 A'On 225
85 Firmanus Siong 225
86 Lantang 225
87 Romanus Kusa 225
88 Petrus Acan 225
3500
89 Darto Sukanyangko 225
90 Yohanes Ase 225
91 Gunik 225
92 Herkulanus Uji 202.5
93 Andrianus Yayuk 22.5
94 Andrianus Yayuk 400
95 Pius Pianto Jawi 225
96 Rigu 225
97 Yulius 225
98 Alisius Enyer 400
99 Sukardi 225
100 Ciniyus 200
101 Yakobus Acon 200
3000
102 Basuki 225
103 Seleng 225
104 Kalistus Landong 225
105 Suriadi Litu 225
106 Suriadi Litu 225
107 Nimrot Simanungkutkalit 225
108 Nimrot Simanungkutkalit 225
109 Laten 225
110 Abin 225
111 Stiyo Budi 400
112 Ling Lisman 225
113 Anes 225
114 Simson 225
115 Anes 225
116 Ajimin 225
117 Tono 225
118 Stepanus Apuk 400
4175
119 PT Efita Agro Lestari 225
120 PT Efita Agro Lestari 225
121 PT Efita Agro Lestari 225
122 Dedy Candra Alengsius 225
123 Aseng 400
124 Nikodemus Juin 225
125 Lindung Parulian 225
126 Kit Sen 225
127 Jau Jan Sen 400
128 Hiu On Kim 225
129 Stepanaus Martadi 225
130 Ya'sabirin 400
131 Tam Misbar 225
132 Tanah Pemda 225
133 Rusmayadi 225
134 Rosdiana 62.25
135 Maria Sepvilana 162.75
4125
Rp16,890,000.00
Senyabang Balai 68 SPT Rp35,902,000.00
Senyabang Balai 67 SPT
Senyabang Balai 66 SPT Rp16,890,000.00
Rp3,672,750.00
Senyabang Balai 70B SPT Rp18,638,250.00
Senyabang Balai 70A SPT
Rp19,716,000.00
Senyabang Balai 69B SPT Rp5,810,000.00
Senyabang Balai 69A SPT
Rp29,936,000.00
Senyabang Balai 74 SPT Rp30,709,000.00
Senyabang Balai 73 SPT
Rp20,480,000.00
Senyabang Balai 72 SPT Rp16,890,000.00
Senyabang Balai 71 SPT
Rp22,372,000.00
Senyabang Balai 78 SPT Rp19,194,000.00
Senyabang Balai 77 SPT
Rp20,997,000.00
Senyabang Balai 76 SPT Rp18,957,000.00
Senyabang Balai 75 SPT
SPT
Rp30,095,000.00
Temiang Taba Balai 82 SPT Rp24,701,000.00
Temiang Taba Balai 81 SPT
Rp16,890,000.00
Temiang Taba Balai 80 SPT Rp25,449,000.00
Senyabang Balai 79 SPT
Rp17,903,000.00
Temiang Taba Balai 86 SPT Rp22,854,000.00
Temiang Taba Balai 85 SPT
Temiang Taba Balai 84 SPT Rp32,237,000.00
Rp25,098,500.00
Temiang Taba Balai 83B SPT Rp5,407,500.00
Temiang Taba Balai 83A
Rp19,506,000.00
Temiang Taba Balai 90A SPT Rp20,469,000.00
Temiang Taba Balai 89 SPT
Rp28,995,000.00
Temiang Taba Balai 88 SPT Rp35,349,000.00
Temiang Taba Balai 87 SPT
Rp20,345,000.00
Menyabo Tayan Hulu 93 SPT Rp18,025,000.00
Menyabo Tayan Hulu 92 SPT
Rp20,553,000.00
Menyabo Tayan Hulu 91 SPT Rp21,039,000.00
Temiang Taba Balai 90B SPT
Rp21,039,000.00
Menyabo Tayan Hulu
97 SPT Rp16,875,000.00Tayan HuluMenyabo
Menyabo Tayan Hulu 96 SPT
Rp18,159,000.00
Menyabo Tayan Hulu 95 SPT Rp25,195,000.00
Menyabo Tayan Hulu 94 SPT
Rp44,896,000.00
101 SPT Rp16,890,000.00
Menyabo Tayan Hulu 100 SPT
Rp18,375,000.00
99 SPT Rp20,707,000.00
98 SPT
Rp18,825,000.00
105 SPT Rp24,943,000.00
Menyabo Tayan Hulu 104 SPT
Rp20,279,000.00
103 SPT Rp20,345,000.00
Menyabo Tayan Hulu 102 SPT
Rp25,634,000.00
Sosok Tayan Hulu 109 HGU Rp25,634,000.00
Sosok Tayan Hulu 108 HGU
Rp19,651,000.00
107 SPT Rp34,048,000.00
Menyabo Tayan Hulu 106 SPT
Rp41,208,000.00
Sosok Tayan Hulu 113 SPT Rp16,890,000.00
Sosok Tayan Hulu 112 SPT
Rp20,082,000.00
Sosok Tayan Hulu 111 SPT Rp21,545,000.00
Sosok Tayan Hulu 110 HGU
Rp32,447,000.00
Sosok Tayan Hulu 117 SPT Rp24,929,000.00
Sosok Tayan Hulu 116 SPT
Rp17,766,000.00
Sosok Tayan Hulu 115 SPT Rp26,580,000.00
Sosok Tayan Hulu 114 SPT
Rp23,395,000.00
Sosok Tayan Hulu 121 Pinjam Pakai
Sosok Tayan Hulu 120 SPT
Rp23,552,000.00
Sosok Tayan Hulu 119 SPT Rp38,160,000.00
Sosok Tayan Hulu 118 SPT
Rp14,408,000.00Sosok Tayan Hulu 123B SHM
Rp20,776,000.00
Sosok Tayan Hulu 123A SHM Rp7,409,000.00
Sosok Tayan Hulu 122 SHM
Menyabo
Menyabo
Menyabo
Menyabo
Menyabo
Tayan Hulu
Tayan Hulu
Tayan Hulu
Tayan Hulu
Tayan Hulu
Rp313,944,000.00
Rp308,617,000.00
Rp379,636,000.00
Rp380,415,000.00
Ownership StatusWidth (m2)TowerSub -districtVillageNameNo Compensation AmountPayment Date
136 Jamian 155.25
137 Zulkifli 69.75
138 Adrianus Pekmeng 225
139 Yohanes Enggo 112.5
140 M. B Gining 112.5
141 Situng 204
142 Timon 21
143 Sulah 225
144 Rupinatal 400
145 Suratno 225
146 Ahui 225
147 Martha Lina 225
148 Martinus Sindeng 225
149 Paulus Sanding 225
150 Cahaya 120.6
151 Astarius Sarimin 104.4
152 Petrus Dani 225
153 Vinsesius Sokin 225
154 Yohanes Anes 225
155 PT PPKS 225
156 PT PPKS 225
4000
157 Budi 225
158 Stefanus Anyam 225
159 Stanilaus Atui 225
160 Tui 225
161 Kalista Nik 225
162 Matius Agu 225
163 Stanilaus Atui 225
164 Bruno 400
165 Yulia Widyawati 225
166 Yulia Widyawati 225
167 Elisabet Nila 225
168 Elisabet Nila 225
169 Elisabet Elis 225
170 Rose 225
171 Lusia 225
3550
172 Jhon Bernadus Bungkui 225
173 Paris Aris 225
174 Herkulanus Moses 225
175 Petrus Pulen 400
176 Bernadus Koput 225
177 Bernadus Koput 225
178 Sabinus Ahi 225
179 Rita Rosanti 225
180 Marta 225
181 Adryanus Sudi 225
182 Simplisianus 400
183 Nikolaus Mardius Ucok 225
184 Dominikus 225
185 Darwin Lukas 225
186 Donatus Dony 225
187 Cion Alexander 225
188 Musa Berkah 225
4175
189 Ignasius 225
190 Veronika 225
191 Seratima Simah 225
192 Roymundus Rony 200
193 Simon 200
194 R. Ams. Asiu Ks 400
195 Theresia Arol 400
196 Thomas Tinjau 33
197 Yulia Siat Tju 192
198 Sabinus Sudin 112.5
199 Julianus Paul 112.5
200 Serenus 225
201 Yakobus 225
202 Hiyasintus Injin 225
203 Marselanus Rubin 225
204 Yulius, S.sos 225
205 Daniel Bungsu 225
206 Frans Welli Guntur 225
207 Apriyanto Yulianus 225
208 Budi Mulyadi 225
4350
209 Petronila 225
210 Kurbinus Prasela 225
211 Deni Siswanto 225
212 Petrus Sunar 225
213 Agus Pe 225
214 Stephanus Atang 225
215 Sabinus Bung 225
216 Bambang 225
217 Budi Mulyadi 225
218 Yulianus Anus 225
2250
Binjai Tayan Hulu 124A SHM Rp19,251,000.00
Rp11,911,500.00
Binjai Tayan Hulu 126B SPT Rp9,943,500.00
Binjai Tayan Hulu 126A SPT
Rp7,946,000.00
Binjai Tayan Hulu 125 SPT Rp20,535,000.00
Binjai Tayan Hulu 124B SHM
Rp25,683,000.00
Binjai Tayan Hulu 129 SPT Rp36,672,000.00
Binjai Tayan Hulu 128 SPT
Rp15,774,000.00
Binjai Tayan Hulu 127B SPT Rp3,245,000.00
Binjai Tayan Hulu 127A SPT
Rp18,875,000.00
Binjai Tayan Hulu 133 SPT Rp19,347,000.00
Binjai Tayan Hulu 132 SPT
Rp19,081,000.00
Binjai Tayan Hulu 131 SPT Rp19,855,000.00
Binjai Tayan Hulu 130 SPT
Rp7,845,000.00
Binjai Tayan Hulu 136 SPT Rp18,375,000.00
Binjai Tayan Hulu 135B SPT
Rp18,957,000.00
Binjai Tayan Hulu 135A SPT Rp19,694,000.00
Binjai Tayan Hulu 134 SPT
Binjai Tayan Hulu 140 Pinjam Pakai
Binjai Tayan Hulu 139 Pinjam Pakai
Rp18,725,000.00
Binjai Tayan Hulu 138 SPT Rp23,863,000.00
Binjai Tayan Hulu 137 SPT
SPT
Rp20,477,000.00
Suka Gerundi Parindu 144 SPT Rp18,524,000.00
Suka Gerundi Parindu 143 SHM
Rp23,289,000.00
Suka Gerundi Parindu 142 SPT Rp22,164,000.00
Suka Gerundi Parindu 141 SHM
Rp18,000,000.00
Suka Gerundi Parindu 148 SHM Rp40,846,000.00
Suka Gerundi Parindu 147 SPT
Rp20,633,000.00
Suka Gerundi Parindu 146 SHM Rp23,289,000.00
Suka Gerundi Parindu 145
Rp18,863,000.00
Suka Gerundi Parindu 152 SPT Rp20,205,000.00
Suka Gerundi Parindu 151 SPT
Rp20,776,000.00
Suka Gerundi Parindu 150 SHM Rp19,757,000.00
Suka Gerundi Parindu 149 SPT
Rp22,595,000.00
Palem Jaya Parindu 156 SPT Rp19,900,000.00
Suka Gerundi Parindu 155 SHM
Rp18,183,000.00
Suka Gerundi Parindu 154 SHM Rp19,125,000.00
Suka Gerundi Parindu 153 SPT
Rp32,524,000.00
Palem Jaya Parindu 160 SPT Rp19,000,000.00
Palem Jaya Parindu 159 SPT
Rp23,652,000.00
Palem Jaya Parindu 158 SPT Rp18,630,000.00
Palem Jaya Parindu 157 SPT
Palem Jaya Parindu 163 SPT
Rp19,864,000.00
Palem Jaya Parindu 162 SPT Rp20,370,000.00
Palem Jaya Parindu 161 SPT
Rp21,312,000.00
Palem Jaya Parindu 168 SPT Rp18,000,000.00
Palem Jaya Parindu 167 SPT
Rp19,125,000.00
Palem Jaya Parindu 166 SHM Rp37,470,000.00
Palem Jaya Parindu 165 SHM
Rp18,299,000.00
Palem Jaya Parindu 164 SPT Rp18,000,000.00
Rp23,289,000.00
Palem Jaya Parindu 172 SPT Rp34,777,000.00
Palem Jaya Parindu 171 SPT
Rp18,015,000.00
Palem Jaya Parindu 170 SPT Rp25,371,000.00
Palem Jaya Parindu 169 SPT
Rp21,901,000.00
Pusat Damai Parindu 176A SHM Rp18,519,000.00
Pusat Damai Parindu 175 SHM
Rp20,341,000.00
Pusat Damai Parindu 174 SHM Rp21,901,000.00
Pusat Damai Parindu 173 SPT
Rp37,470,000.00
Pusat Damai Parindu 179A SPT Rp3,533,000.00
Pusat Damai Parindu 178 SHM
Rp19,776,000.00
Pusat Damai Parindu 177 SHM Rp37,470,000.00
Pusat Damai Parindu 176B SHM
Rp12,207,000.00
Pusat Damai Parindu 181 SPT Rp18,277,000.00
Pusat Damai Parindu 180B SPT
Rp19,346,000.00
Pusat Damai Parindu 180A SHM Rp11,644,500.00
Pusat Damai Parindu 179B SPT
Rp21,489,000.00
Pusat Damai Parindu 185 SPT Rp18,024,000.00
Pusat Damai Parindu 184 SPT
Rp33,106,000.00
Pusat Damai Parindu 183 SHM Rp22,581,000.00
Pusat Damai Parindu 182 SHM
Rp25,934,000.00
Pusat Damai Parindu 189 SHM Rp22,595,000.00
Pusat Damai Parindu 188 SPT
Rp37,470,000.00
Pusat Damai Parindu 187 SPT Rp22,164,000.00
Pusat Damai Parindu 186 SPT
Rp20,450,000.00
Sebarra Parindu 193 SPT Rp21,920,000.00
Sebarra Parindu 192 SPT
Rp21,470,000.00
Sebarra Parindu 191 SPT Rp23,603,000.00
Sebarra Parindu 190
Rp22,858,000.00
Sebarra Parindu 197 SHM Rp22,595,000.00
Sebarra Parindu 196 SPT
Rp21,680,000.00
Sebarra Parindu 195 SPT Rp21,623,000.00
Sebarra Parindu 194 SPT
Rp20,776,000.00
Sebarra Parindu 199 SPT Rp18,275,000.00
Sebarra Parindu 198 SHM
Rp335,578,000.00
Rp326,726,000.00
Rp387,598,000.00
Rp445,748,500.00
Rp215,250,000.00
Ownership StatusWidth (m2)TowerSub -districtVillageNameNo Compensation AmountPayment Date
219 Tanah Adat (a.n Amon) 400
220 Tanah Adat (a.n Amon) 225
221 Anastasia Saje 225
222 Yohanes Lion CB 225
223 Paula Dolen 225
224 Gadus 400
225 Sofia Lilis 225
226 Lusia 225
227 Robin Sianturi 225
228 Koperasi Produsen 225
229 Sabradus Idus 225
230 Markus 225
231 PT Agrisentra Lestari 225
232 Hermanus Heri 225
233 Susana Neti 225
234 H Basir Achmad
235 PT Agrisentra Lestari
236 Koperasi Produsen
4125
237 Basir Achmad 225
238 Aki 400
239 Erliana Maria 225
240 Petrus Simon 225
241 Subardi 225
242 Nasarius Yus 225
243 Fuktono Tjahaya 225
244 Ami 400
2150
245 Kotijan 225
246 Laudis Laus 225
247 Mariel Marbun 225
248 Alisius 400
249 Lidia Leni 400
1475
TOTAL TAYAN - SANGGAU58666
SANGGAU - SEKADAU
250 Rachmad Hadi Siswanto 400
251 Solismin 182
252 Tonel 218
253 Rusandi Jang 225
254 Dison 225
255 S. Sukamto 225
256 Karono 225
257 Antymus Nasir 225
258 Suryansyah 225
259 Samuel Marwan 225
260 Atmah 225
261 Sosimus 225
262 Sameon Mardy 400
3225
263 Lukas Gunawan 225
264 Welem Suherman 225
265 M. Saidi 225
266 Ariestonnedy 225
267 Bong Khung Song 400
268 Bong Khung Song 225
269 Kaderi 225
270 Jubaidah 225
271 herman 112.5
272 Ahmad Dapid 112.5
273 Budi 225
274 Budi 225
275 Achyar 225
2875
276 Deni 225
277 Lukas Gunawan 225
278 Lukas Gunawan 400
279 Lukas Gunawan 225
280 Misli 225
1300
Rp33,672,000.00
Lape Kapuas 201 SPT Rp16,890,000.00
Lape Kapuas 200 SPT
Rp24,218,000.00
Lape Kapuas 205 SPT Rp42,113,000.00
Lape Kapuas 204 SPT
Rp24,624,000.00
Lape Kapuas 203 SHM Rp25,360,000.00
Lape Kapuas 202 SHM
Rp16,899,700.00
Lape Kapuas
209
Rp3,668,300.00
Lape Kapuas
Rp18,000,000.00
Lape Kapuas 207 SPT Rp21,372,000.00
Lape Kapuas 206
208 SHM
Rp21,470,000.00
Lape Kapuas 212 SPT Rp24,709,000.00
Lape Kapuas 211 SHM
Rp21,647,000.00
Lape Kapuas 210 SPT Rp20,172,000.00
Lape Kapuas SPT
Rp4,488,000.00
Lape Kapuas Rp1,956,090.00
Lape Kapuas
Rp25,209,000.00
Lape Kapuas Rp30,043,910.00
Lape Kapuas 213 SHM
214 400 SHM
Sei Mawang Kapuas 6 SPT
Rp24,375,000.00
Sei Mawang Kapuas 5 SPT
Rp18,388,000.00
Sei Mawang Kapuas 216 SPT Rp39,698,000.00
Sei Mawang Kapuas 215 SHM
10
Sei Mawang Kapuas 9
SPT
Rp20,110,000.00
Rp36,456,000.00
Sei Mawang Kapuas 8
SHM
Rp17,975,000.00
Sei Mawang Kapuas 7
Rp33,950,000.00
Bunut Kapuas 14AR SPT
Rp27,375,000.00
Rp26,850,000.00
Bunut Kapuas 13 SPT
Bunut Kapuas 12 SPT
Bunut Kapuas 11
SPT
Rp40,000,000.00
Sei Mawang Kapuas
Rp36,480,000.00
Bunut Kapuas SHM Rp17,489,500.00
Bunut Kapuas 14R SPT
Bunut Kapuas 15 SPT Rp45,020,000.00
Rp16,875,000.00
Rp144,245,000.00
Rp5,454,987,500.00
Rp19,875,000.00
Bunut Kapuas 18 SPT Rp16,875,000.00
Bunut Kapuas 17 SPT
Rp21,630,500.00
Bunut Kapuas 16 SHM Rp24,800,000.00
Bunut Kapuas SHM
Rp16,875,000.00
Bunut Kapuas 22 SHM Rp18,000,000.00
Bunut Kapuas 21 SPT
Rp25,500,000.00
Bunut Kapuas 20 SPT Rp16,875,000.00
Bunut Kapuas 19 SHM
SPT Rp24,094,000.00
Bunut Kapuas 25 SPT
Rp18,450,000.00
Bunut Kapuas 24 Rp25,485,000.00
Bunut Kapuas 23
Rp21,262,500.00
SPT
Beringin Kapuas 30 SPT Rp30,905,000.00
16AR
Rp17,032,500.00
Beringin Kapuas 29 HGU
Rp21,647,000.00
Beringin Kapuas 28 SPT Rp32,175,000.00
Beringin Kapuas 27
Rp30,500,000.00
Beringin Kapuas 26
Kapuas
35
SPT
Rp19,375,000.00
Beringin Kapuas 34A SPT Rp11,937,500.00
Beringin Kapuas 33 SPT
Rp19,144,000.00
Beringin Kapuas 32 SPT Rp23,825,000.00
Beringin Kapuas 31 SPT
Rp22,500,000.00
Tanjung Kapuas Kapuas 39 SHM Rp22,500,000.00
Tanjung Kapuas Kapuas 38 SHM
Rp11,937,500.00
Beringin Kapuas 37 SPT
Rp16,875,000.00
Rp17,875,000.00
Rp19,875,000.00
34B
Beringin Kapuas 36 SPT
Beringin Kapuas SPT
Beringin
Rp22,500,000.00Tanjung Kapuas Kapuas 42 SHM
Rp36,500,000.00
Tanjung Kapuas Kapuas 41 SHM Rp24,000,000.00
Tanjung Kapuas Kapuas 40 SHM
Rp128,000,000.00
Rp376,512,000.00
Rp219,859,500.00
Rp288,835,000.00
Rp270,927,500.00
Ownership StatusWidth (m2)TowerSub -districtVillageNameNo Compensation AmountPayment Date
281 Aliman Lorina 225
282 Aliyas 225
283 Budi 225
284 Paujan 225
285 Ratena 225
286 Hasbar 112.5
287 Samsiah 112.5
288 Bahtiar 225
289 Zainudin 225
290 Cinta 225
291 Abang Tiya 400
292 Aceng Mustolih 225
293 Zulkarnain 225
294 Aminah 225
295 Rajeli 225
296 Jaenudin 225
297 Lim Lina 225
298 Susanto 225
299 Dekon Prisnadi 225
300 Muhjizin 225
301 Sahbri 400
4850
302 Joni 225
303 Supriyadi 225
304 Agusyanto 225
305 Anong 225
306 Ayup 225
307 Suprayetno 225
308 Ayup 225
309 Lili Suraiaini 225
310 Aban Sunarto 225
311 Prayitno 400
312 Jawi 225
313 PT MPE 225
2875
314 PT MPE 225
315 PT MPE 225
316 PT MPE 225
317 Rupina Ina 400
318 Antonius Anyiu Hardi 225
319 Antonius Anyiu Hardi 225
320 Maro Lukas Simo 225
321 Kristina Suyah 225
322 Mikael Ahen 225
323 Apui Y 225
324 Alausius Asip 225
325 Rupina Na 225
2875
326 Abang Japar 225
327 Rapeah 400
328 Dayang Sa'adah 225
329 Ab. Ramsyah 225
330 Wahab 225
331 Ab. Sabran 225
332 Abang Ahmadi 225
333 Federika Fenny 225
334 Herman Saleh 400
335 Abang Ayandi 225
336 Apuk 225
337 Apuk 225
338 Horas Parningotan 225
339 Horas Parningotan 225
340 Jahra 225
341 Syaidi 225
342 petrus Ajiu 225
343 Sahsubarman 225
344 Abang Romli 400
345 Abang Romli 225
5025
Penyeladi Kapuas 43 SHM Rp22,500,000.00
Rp22,300,000.00
Penyeladi Kapuas 47 SHM Rp24,600,000.00
Penyeladi Kapuas 46 SHM
Rp22,500,000.00
Penyeladi Kapuas 45 SPT Rp21,375,000.00
Penyeladi Kapuas 44 SHM
Rp20,336,400.00
Penyeladi Kapuas 50 SPT Rp20,075,000.00
Penyeladi Kapuas 49 SPT
Rp12,000,000.00
Penyeladi Kapuas 48B SPT Rp13,937,500.00
Penyeladi Kapuas 48A SHM
Rp24,000,000.00
Penyeladi Kapuas 54 SPT Rp23,775,000.00
Penyeladi Kapuas 53 SHM
Rp21,000,000.00
Penyeladi Kapuas 52 SHM Rp37,000,000.00
Penyeladi Kapuas 51 SHM
Rp17,875,000.00
Penyeladi Kapuas 58 SHM Rp20,900,000.00
Penyeladi Kapuas 57 SHM
Rp19,425,000.00
Penyeladi Kapuas 56 SPT Rp27,625,000.00
Penyeladi Kapuas 55 SPT
Rp19,875,000.00
Penyeladi Kapuas 62 Rp27,347,500.00
Penyeladi Kapuas 61 SPT
Rp20,450,000.00
Penyeladi Kapuas 60 SPT Rp16,875,000.00
Penyeladi Kapuas 59 SHM
Rp26,460,400.00
Semuntai Mukok 66 SPT Rp17,849,000.00
Semuntai Mukok 65 SPT
Rp10,125,000.00
Semuntai Mukok 64 SPT Rp12,754,000.00
Semuntai Mukok 63 SPT
Rp15,675,000.00
Semuntai Mukok 70 SPT Rp14,068,000.00
Semuntai Mukok 69 SPT
Rp14,825,000.00
Semuntai Mukok 68 SHM Rp29,500,000.00
Semuntai Mukok 67 SPT
Rp18,925,000.00
Semuntai Mukok 74 SHM Rp7,500,000.00
Semuntai Mukok 73 SPT
Rp18,375,000.00
Semuntai Mukok 72 SPT Rp14,775,000.00
Semuntai Mukok 71 SHM
Rp10,500,000.00
Sei Kunyit Sekadau Hilir 78 SPT Rp34,000,000.00
Sei Kunyit Sekadau Hilir 77 HGU
Rp9,000,000.00
Sei Kunyit Sekadau Hilir 76 HGU Rp9,000,000.00
Sei Kunyit Sekadau Hilir 75 HGU
Rp26,625,000.00
Sei Kunyit Sekadau Hilir 82 SPT Rp22,385,000.00
Sei Kunyit Sekadau Hilir 81 SPT
Rp25,237,000.00
Sei Kunyit Sekadau Hilir 80 SPT Rp19,125,000.00
Sei Kunyit Sekadau Hilir 79 SPT
Rp21,375,000.00
Sei Kunyit Sekadau Hilir 86 SPT Rp19,125,000.00
Sei Kunyit Sekadau Hilir 85 SPT
Rp29,625,000.00
Sei Kunyit Sekadau Hilir 84 SPT Rp20,730,000.00
Sei Kunyit Sekadau Hilir 83 SPT
Rp26,825,000.00
Peniti Sekadau Hilir 90 SHM Rp24,975,000.00
Peniti Sekadau Hilir 89 SPT
Rp19,125,000.00
Peniti Sekadau Hilir 88 SPT Rp41,200,000.00
Peniti Sekadau Hilir 87 SPT
Rp24,675,000.00
Peniti Sekadau Hilir 94 SHM Rp22,725,000.00
Peniti Sekadau Hilir 93 SHM
Rp19,250,000.00
Peniti Sekadau Hilir 92 SPT Rp19,125,000.00
Peniti Sekadau Hilir 91 SPT
Rp26,625,000.00
Peniti Sekadau Hilir 98 SHM Rp30,375,000.00
Peniti Sekadau Hilir 97 SHM
Rp38,705,000.00
Peniti Sekadau Hilir 96 SHM Rp30,825,000.00
Peniti Sekadau Hilir 95 SPT
Peniti Sekadau Hilir 102 SPT Rp19,125,000.00
Peniti Sekadau Hilir 101 SPT
Rp26,625,000.00
Peniti Sekadau Hilir 100 SPT Rp26,625,000.00
Peniti Sekadau Hilir 99 SPT
Peniti Sekadau Hilir 106 Rp21,440,000.00
Peniti Sekadau Hilir 105
Rp21,375,000.00
Peniti Sekadau Hilir 104 SPT Rp22,825,000.00
Peniti Sekadau Hilir 103 SHM
Rp455,771,400.00
Rp200,831,400.00
Rp246,727,000.00
Rp519,570,000.00
Rp34,000,000.00
Rp23,125,000.00
Ownership StatusWidth (m2)TowerSub -districtVillageNameNo Compensation AmountPayment Date
346 Agustinus Alak 225
347 Vincensius Dedi 225
348 Fx Marsudi 225
349 Didimus 225
350 Sanusi M. tarmo 225
351 Tjin Min On 93
352 Antonius 307
353 Yustinus Liten 225
354 Lucia Gabriela 225
355 Petrus Akep 225
356 Agustinus Dolar 225
2425
357 AB Bahtiar 225
358 Junaidi 225
359 Epensius Jelio 225
360 Sanusi M. Tarmo 225
361 Sanusi M. tarmo 225
362 Kristina Kamelia 225
363 Abang Arifin 225
364 Massood 225
365 Akup 400
2200
366 Intan 225
367 Thomasdi 225
368 Ramli 174
369 Sani 51
370 H Masran 400
371 Dayang Rosmini 225
1300
TOTAL SANGGAU - SEKADAU 28950
87,616
Ensalang Sekadau Hilir 110 SHM Rp21,975,000.00
Ensalang Sekadau Hilir 109 SPT
Rp19,125,000.00
Ensalang Sekadau Hilir 108 SPT Rp29,125,000.00
Ensalang Sekadau Hilir 107 SPT
Ensalang Sekadau Hilir 113 SPT Rp29,125,000.00
Ensalang Sekadau Hilir 112B SHM
Rp32,175,000.00
Ensalang Sekadau Hilir 112A SHM Rp12,475,000.00
Ensalang Sekadau Hilir 111 SHM
Sei Ringin Sekadau Hilir 117 Rp20,525,000.00
Ensalang Sekadau Hilir 116 SPT
Rp24,725,000.00
Ensalang Sekadau Hilir 115 SHM Rp33,375,000.00
Ensalang Sekadau Hilir 114 SPT
Sei Ringin Sekadau Hilir 121 Rp21,575,000.00
Sei Ringin Sekadau Hilir 120
Rp25,875,000.00
Sei Ringin Sekadau Hilir 119 Rp22,625,000.00
Sei Ringin Sekadau Hilir 118
Sei Ringin Sekadau Hilir 141 Rp49,901,000.00
Sei Ringin Sekadau Hilir 138
Rp31,355,000.00
Sei Ringin Sekadau Hilir 135 Rp27,377,000.00
Sei Ringin Sekadau Hilir 133
Mungguk Sekadau Hilir 144R Rp25,100,000.00
Mungguk Sekadau Hilir 143RB
Rp36,762,000.00
Mungguk Sekadau Hilir 143RA Rp20,173,000.00
Mungguk Sekadau Hilir 142R
Rp8,271,472,800.00TOTAL
Rp55,869,000.00
Mungguk Sekadau Hilir 146R Rp26,765,000.00
Mungguk Sekadau Hilir 145R
Rp2,816,485,300.00
Rp280,315,000.00
Rp250,908,000.00
Rp174,600,000.00
Rp9,931,000.00
Rp24,300,000.00
Rp27,375,000.00
Rp19,525,000.00
Rp29,565,000.00
Rp29,125,000.00
Attachment 13
150 kV Bengkayang – Ngabang - Tayan TL
socialization plant, building, and land/ROW
compensation
Attachment 14
Monitoring progress ROW for Package 3 150 kV
Bengakayan - Ngabang – Tayan TL
No Jalur SUTT/ SUTET KJPPJumlah
Tower/ Span
Panjang
ROWData Nominatif
Penetapan Besaran
kompensasiProgress Pelaksanaan
1
SUTT 150 kV
Bengkayang-
Ngabang
KJPP Dwi
Haryantono
Agustinus
Tamba
279 Tower/
278 Span 95,6 km - Tanah/ Sosialisasi (September 2016
Rp 10,608,316,800 69,124,002,971Rp Inventarisasi (Maret 2016)
- Bangunan/ Penilaian & penetapan besaran (September 2016)
Rp 330,990,001 Pembayaran:
- Tanaman/ - Tanah/ Rp 10,608,316,800
Rp 58,184,696,170 - Bangunan/ Rp 3330,990,001
- Tanaman/ Rp 58,184,696,170
- Progress Pembayaran (100%)
2
SUTT 150 kV
Tayan-Ngabang
KJPP Dwi
Haryantono
Agustinus
Tamba
128 Tower/
127 Span 46,8 km - Tanah/ Rp 40,972,230,363 Sosialisasi (November 2016)
Rp 5,442,465,000 Inventarisasi (Juni 2016)
- Bangunan/ Penilaian & penetapan besaran (November 2016)
Rp 3,315,000 Pembayaran:
- Tanaman/ - Tanah/ Rp 5.442.465.000
Rp 35,526,450,363 - Bangunan/ Rp 3.315.000
- Tanaman/ Rp 35.526.450.363
- Progress Pembayaran (100%)
FORMAT LAPORAN BERKALA
PELAKSANAAN KOMPENSASI ATAS TANAH, BANGUNAN DAN TANAMAN
DI BAWAH RUANG BEBAS SUTT/SUTET
NOLOKASI (DESA /
KELURAHAN)KECAMATAN JUMLAH TOWER
TANAH BEBAS
(TAPAK TOWER)ROW BEBAS (SPAN)
JADWAL SOSIALISASI
PHABA PEMBAYARAN Inventarisasi
1 Magmagan LUMAR T 1A - 4 7 7 7 13-Dec-16 21-Dec-16 September 2016
2 Sebalo T 5 - 21 17 17 17 8-Dec-16 20-Dec-16 Juni 2016
3 Bani Amas T 22 - 26 6 6 6 6-Dec-16 16-Dec-16 Mei 2016
4 Sebetung Menyala T 27 - 33 7 7 7 7-Dec-16 20-Dec-16 Maret 2016
5 Dharma Bakti T 34 - 38 5 5 5 21-Oct-16 17-Nov-16 Maret 2016
6 Sebente T 39 - 46 8 8 8 3-Nov-16 9-Dec-16 Maret 2016
7 Bangun Sari T 47 - 55 9 9 9 23-Sep-16 2-Nov-16 April 2016
8 Lulang T 56 - 57 2 2 2 22-Sep-16 25-Nov-16 April 2016
9 Setia Jaya T 58 - 67 10 10 10 22-Sep-16 14-Oct-16 April 2016
10 Untang T 68 - 78 11 11 11 19-Sep-16 13-Oct-16 Mei 2016
11 Kampet T 79 - 85 7 7 7 20-Sep-16 13-Oct-16 April 2016
12 Padang Pio T 86 - 95 10 10 10 16-Sep-16 7-Oct-16 April 2016
13 Ringo Lojok T 96 - 108 13 13 13 28-Sep-16 14-Dec-16 Mei 2016
14 Angkaras T 109 - 119 11 11 11 31-Oct-16 29-Dec-16 Mei 2016
15 Ansang T 120 - 123 4 4 4 2-Nov-16 24-Nov-16 Mei 2016
16 Darit T 124 - 129 6 6 6 14-Dec-16 27-Dec-16 Mei 2016
17 Mamek T 130 - 149 20 20 20 5-Oct-16 15-Dec-16 Mei 2016
18 Bagak T 150 - 156 7 7 7 6-Oct-16 9-Dec-16 Mei 2016
19 Anik Dinggir T 157 - 167 10 10 10 30-Sep-16 19-Oct-16 April 2016
20 Antan Raya T 168 - 190 23 23 23 6-Sep-16 27-Sep-16 April 2016
21 Penyaho Dangku T 191 - 207 17 17 17 7-Sep-16 28-Sep-16 April 2016
22 Amboyo Utara T 208 - 230 23 23 23 16-Dec-16 23-Dec-16 Mei 2016
23 Sungai Kelik T 231 - 235 5 5 5 24-Nov-16 7-Dec-16 Mei 2016
24 Munggu T 236 - 245 10 10 10 16-Nov-16 30-Nov-16 Agustus 2016
25 Raja T 246 - 254 9 9 9 17-Nov-16 2-Dec-16 Agustus 2016
26 Ambarang T 255 - 260 6 6 6 15-Nov-16 1-Dec-16 Agustus 2016
T 261 - 263 2 2 2
T 127 - 117 11 11 11
T 116 - 116 B 3 3 3
279 279 278
Agustus 2016
MENYUKE
NGABANG
27 Tebedak 11-Nov-16 7-Dec-16
BANYUKE HULU
ROW MONITORING PROGRESS
PACKAGE 3 SUTT 150 KV BENGKAYANG - NGABANG - TAYAN (SECTION 1 BENGKAYANG - NGABANG)
SPAN TOWER
BENGKAYANG
TERIAK
NOLOKASI (DESA /
KELURAHAN)KECAMATAN
JUMLAH
TOWER
TANAH BEBAS
(TAPAK TOWER)
ROW BEBAS
(SPAN)
JADWAL SOSIALISASI
PHABA PEMBAYARAN Inventarisasi
1 Kawat T 1d/0 * - 1 1 1 1 Maret 2017
2 Cempedak T 1 - 1G 9 9 9
3 Cempedak T 2 - 13 13 13 13
4 Tebang Benua T 14 - 25 12 12 12 6-Jun-17 15-Jun-17 Juni 2016
5 Mak Kawing T 26 - 31 6 6 6 26-Apr-17 17-May-17 Juni 2016
6 Temiang Mali T 32 - 42 10 10 10 20-Apr-17 10-May-17 September 2016
7 Tae T 43 - 46 5 5 5 21-Apr-17 19-May-17 Juni 2016
8 Padi Kaye T 47 - 60 14 14 14 19-Apr-17 18-May-17 September 2016
9 Angan T 61 - 79 19 19 19 6-Apr-17 28-Apr-17 Juni 2016
10 Kayu Ara T 80 - 87 9 9 9 5-Apr-17 21-Apr-17 Juni 2016
11 Jelimpo T 88 - 99 12 12 12 31-Mar-17 28-Apr-17 Juni 2016
12 Tubang Raeng T 100 - 110 11 11 11 30-Mar-17 20-Apr-17 Juni 2016
13 Tebedak T 111 - 114 4 4 4
14 Tebedak T 114A - 114C 3 3 3
128 128 127
September 2016
BALAI
JELIMPO
NGABANG 11-Nov-16 7-Dec-16 Agustus 2016
ROW MONITORING PROGRESS
PACKAGE 3 SUTT 150 KV BENGKAYANG - NGABANG - TAYAN (SECTION 2 NGABANG - TAYAN)
SPAN TOWER
TAYAN HILIR 7/28/2017 11-Aug-17
NO DESA/KELURAHAN LUAS TANAH
(M2) KOMPENSASI TANAH (RP)
LUAS
BANGUNAN (M2)
KOMPENSASI BANGUNAN
(RP)
KOMPENSASI
TANAMAN (RP)
SUB TOTAL
KOMPENSASI (RP)
1 MAGMAGAN KARYA 39,884 269,700,000Rp 214 39,600,000Rp 1,338,071,300Rp 1,647,371,300Rp
2 SEBALO 90,346 531,400,000Rp - -Rp 3,150,798,110Rp 3,682,198,110Rp
3 BANI AMAS 43,578 260,475,000Rp - -Rp 1,147,948,750Rp 1,408,423,750Rp
4 SEBETUNG MENYALA 41,332 243,480,000Rp 174 22,125,000Rp 746,712,270Rp 1,012,317,270Rp
5 DHARMA BAKTI 32,047 205,245,000Rp - -Rp 985,016,800Rp 1,190,261,800Rp
6 SEBENTE 52,415 337,020,000Rp 6 105,000Rp 2,310,247,445Rp 2,647,372,445Rp
7 BANGUNSARI 62,849 379,815,000Rp - -Rp 3,700,744,285Rp 4,080,559,285Rp
8 LULANG 11,943 99,495,000Rp 18 480,000Rp 1,033,883,555Rp 1,133,858,555Rp
9 SETIA JAYA 68,102 427,920,000Rp 15 975,000Rp 3,069,665,960Rp 3,498,560,960Rp
10 UNTANG 62,102 390,855,000Rp - -Rp 2,816,650,720Rp 3,207,505,720Rp
11 KAMPET 45,453 354,000,000Rp 390 51,390,000Rp 911,265,205Rp 1,316,655,205Rp
12 PADANGPIO 69,977 449,325,000Rp 187 19,920,000Rp 1,385,038,600Rp 1,854,283,600Rp
13 RINGOLOJOK 89,391 563,415,000Rp 822 150,885,001Rp 3,143,578,460Rp 3,857,878,461Rp
14 ANGKARAS 48,029 272,010,000Rp 16 270,000Rp 2,194,878,850Rp 2,467,158,850Rp
15 ANSANG 26,086 153,120,000Rp - -Rp 957,434,300Rp 1,110,554,300Rp
16 DARIT 32,315 190,215,000Rp - -Rp 1,538,061,865Rp 1,728,276,865Rp
17 MAMEK 135,038 843,840,000Rp - -Rp 3,370,541,000Rp 4,214,381,000Rp
18 BAGAK 51,182 317,220,000Rp 80 4,665,000Rp 922,629,020Rp 1,244,514,020Rp
19 ANIK DINGIR 70,460 439,350,000Rp - -Rp 2,764,915,710Rp 3,204,265,710Rp
20 ANTAN RAYAN 144,318 979,578,000Rp 101 11,850,000Rp 4,440,198,810Rp 5,431,626,810Rp
21 PENYAHO DANGKU 124,572 666,243,800Rp - -Rp 3,282,727,980Rp 3,948,971,780Rp
22 AMBOYO UTARA 161,545 752,195,000Rp 52 1,800,000Rp 5,116,358,900Rp 5,870,353,900Rp
23 SUNGAI KELIK 31,708 129,800,000Rp - -Rp 1,837,610,255Rp 1,967,410,255Rp
24 MUNGGUK 57,149 249,000,000Rp 30 1,815,000Rp 2,957,725,600Rp 3,208,540,600Rp
25 RAJA 53,574 237,400,000Rp - -Rp 1,215,081,800Rp 1,452,481,800Rp
26 AMBARANG 35,868 243,400,000Rp 8 1,095,000Rp 422,838,355Rp 667,333,355Rp
27 TEBEDAK SECTION 1 102,483 622,800,000Rp 83 24,015,000Rp 1,424,072,265Rp 2,070,887,265Rp
TOTAL 1,783,747 10,608,316,800 2,196 330,990,001 58,184,696,170 69,124,002,971
SECTION 1 SUTT 150 KV BENGKAYANG- NGABANG
NO DESA/KELURAHAN LUAS TANAH
(M2)
KOMPENSASI
TANAH (RP)
LUAS
BANGUNAN
(M2)
KOMPENSASI
BANGUNAN
(RP)
KOMPENSASI
TANAMAN (RP)
TOTAL
KOMPENSASI (RP)
1 TEBEDAK 21500.1 136,410,000Rp - -Rp 273,049,000Rp 409,459,000Rp
2 TUBANG RAENG 90081.17 508,770,000Rp - -Rp 3,120,757,100Rp 3,629,527,100Rp
3 JELIMPO 93214.66 544,455,000Rp - -Rp 2,926,411,700Rp 3,470,866,700Rp
4 KAYUARA 49503.49 298,800,000Rp 2.25 30,000Rp 1,210,871,000Rp 1,509,701,000Rp
5 ANGAN TEMBAWANG 126847.14 731,070,000Rp 28.29 1,065,000Rp 7,026,324,550Rp 7,758,459,550Rp
6 PADI KAYE 111740.91 552,180,000Rp - -Rp 3,227,835,705Rp 3,780,015,705Rp
7 TAE 39345.56 195,285,000Rp 12 75,000Rp 1,506,648,700Rp 1,702,008,700Rp
8 MAK KAWING 54414.76 389,355,000Rp - -Rp 2,911,549,365Rp 3,300,904,365Rp
9 TEMIANG MALI 71065.97 470,010,000Rp 10.85 1,545,000Rp 2,441,325,400Rp 2,912,880,400Rp
10 TEBANG BENUA 72730.74 511,185,000Rp 22.25 600,000Rp 3,613,185,803Rp 4,124,970,803Rp
11 CEMPEDAK 143845.61 1,067,100,000Rp - -Rp 7,116,639,640Rp 8,183,739,640Rp
12 KAWAT 4760.3 37,845,000Rp - -Rp 151,852,400Rp 189,697,400Rp
TOTAL 879050.41 5,442,465,000Rp 76 3,315,000Rp 35,526,450,363Rp 40,972,230,363Rp
SECTION 2 SUTT 150 KV NGABANG-TAYAN
Attachment 15
Implementation of Capacity Building for 150 kV
Tayan – Sanggau – Sekadau TL
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 1 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
MINUTES OF MEETING
CAPACITY BUILDING WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT
Revision : 0 Meeting No. : No. Contract :Page 1 of 10
Date : November 2017
Participant : As Attached Place : Hotel Orchard Gajah Mada PontianakMeeting Room Rafflesia 2Jl. Gajah Mada No. 99, Benua MelayuDarat, Pontianak Selatan, Pontianak, WestKalimantan
Time : 09.00 WIT
Agenda :
1. Capacity Building West Kalimantan Power Grid Strengthening Project
- Environmental Safeguard
- Social Issues
List Participant Meeting :1. PT PLN (Persero) Kantor Pusat DIVRKO
2. PT PLN (Persero) Kantor Pusat DIVK3L
3. PT PLN (Persero) UIP Kalbagbar
4. PT PLN (Persero) UPP Kalbagbar 1
5. PT PLN (Persero) UPP Kalbagbar 2
6. PT PLN (Persero) UPP Kalbagbar 3
7. PT PLN (Persero) UPP Kalbagbar 4
8. PT PLN (Persero) Pusmankon Kantor Induk
9. PT PLN (Persero) Pusmankon UMK II
10. PT PLN (Persero) Pusmankon TSK NTB
11. PT PLN (Persero) Pusmankon TSK NTT
12. PT PLN (Persero) Pusmankon TSK Bali
13. PT PLN (Persero) Pusmankon TMK ADB Project
14. Consortium KEC and Mistubishi Corporation
15. PT Siemens Indonesia
16. Consortium PT Krakatau Engineering and PT Citramas Heavy Industries
Attachment :
1. List of Attendees
MINUTES REVIEWED AND AGREED
PT PLN (Persero)Unit Induk Pembangunan VIII
……………………………..
PT PLN (Persero)Pusat Manajemen Konstruksi
…………………………………
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 2 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 2 of 10
Date : 15 November 2017
No. Item Diskusi Information
1.
2.
3.
4.
5.
Opening Ceremonial
Safety Briefing
National Anthem Indonesia Raya, Hymn PLN, March PLN
Speech Manager UMK 2
Session 1: Environmental Safe Guard
• Environmental Safe Guard ADB
− Each ADB-funded project should conduct an
assessment (an effort to identify the effect of the
activity on the surrounding environment).
− Environmental Safe Guard identification according to
ADB, such as:
1. Environmental Assessment
2. Environmental Planning and Management
3. Information Disclosure
4. Consultation and Participation
5. Grievanca Redress Mechanism
6. Monitoring and Reporting
7. Unanticipated Environmental Impacts
8. Biodiversity Conservation and Sustainable
Natural Resource Management
9. Pollution Prevention and Abatement
10. Health and Safety
11. Physical Cultural Resources
• Enviromental Planning and Management
− Environmental management during the construction
period as per the IEE document is the responsibility of
contractor.
− In accordance with IEE documents there are 13
important points in Construction Phase:
PLN PUSMANKON
Hotel Management
PLN PUSMANKON
PLN PUSMANKON
ADB Consultant
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 3 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 3 of 10
Date : 15 November 2017
No. Item Diskusi Information
6.
a) Vegetation Clearing
b) Soil Erosion
c) Drainage
d) Water Quality Impact
e) Air Quality Impact
f) Construction Waste Management
g) Domestic Waste Management
h) Roads and Infrastructure Impact
i) Encroachment into Production Forests, Wood
Collection
j) Impact on Cultural Heritage Sites
k) Occupational Health and Safety
l) Community Health and Safety
m) Employment opportunities
n) Physical Cultural Resources
• Enviromental Reporting
− Report made by PIC
− PIC conducts assessments using Mitigation
Compliance Inspection Monitoring Form related to
the contractor’s ability to maintain a qualitatively
evaluated environment.
Session 2: Social Issues
• Resettlement Framework
Implementation of social problem solving based on ADB
Policy and Government of Indonesia has little difference.
In this West Kalimantan Project, there are several things
to adjust the differences such as:
1. Basis of building compensation is calculated based on
replacement cost, if any depreciation will be returned
ADB Consultant
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 4 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 4 of 10
Date : 15 November 2017
No. Item Diskusi Information
in the form of solatium cost.
2. Compensation for tenants for non land asset.
3. Vulnerable and seriously affected groups are given
livelihood restoration programs, integrated into CSR.
4. Disclosure submitted to Inventory of Losses and the
results submitted to Affected Household. RCCP
approved to Affected Household and other
stakeholders. Implementation monitoring should be
disclosed and posted on the ADB website.
• Social Safeguard Document
Explain the types of documents used in the preparation
of Social Report, such as:
1. Resettlement Customary Communities Plan (if the
project is in a customary land location and indigenous
people are affected);
2. Resettlement Plan (no affected indigenous people)
3. Customary Communities Development Plan (The
project directly or indirectly influences the culture of
indigenous people);
4. Due Diligence Reports (Land procurement process
completed before the project starts)
• Purpose and scope of Social Protection Document
Screening Guidance on West Kalimantan Project
1. RCCP WK Power Grid-Project Principle
Minimize the impact on assets/livelihoods of local
people.
2. RCCP WK Power Grid-Sought
Indemnification received from the land user.
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 5 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 5 of 10
Date : 15 November 2017
No. Item Diskusi Information
• Income Recovery Program (IRP)
To assist vulnerable and severely groups so that life does
not get worse than before the project.
WK Power Grid-IRP
- Focus on increasing affected household capacity,
majority as farmers.
- Providing vulnerable groups to work on project
(unskilled worker).
• Monitoring
− Monitoring of land acquisition is carried out
periodically starting from the preparation stage to the
process of land procurement.
− Monitoring-WK Power Grid is done with internal and
external monitoring with indicators:
1. Consultation and grievances
2. Communication and participation
3. Delivery of Entitlements
4. Livelihood restoration
Question and Answer Session for Session 1 & 2:
1. What if the residents who have been restored back to
the place of origin?
- Held a review with the local government
- Made an announcement of out off date of the
destruction of the building on the decision of the
Regent. If the citizens return, PLN is entitled to
use the land
2. What is the amount or value of emotional cost?
10-30% of the total value of land procurement
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 6 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 6 of 10
Date : 16 November 2017
No. Item Diskusi Information
1.
2.
Opening Ceremonial Day 2
Session 3: Contractual Matters
• Fèdèration International Des Ingènierus-Conseils
− FIDIC’s type of contract specified:
a) Conditions of Contract for Construction (Red
Book)
b) Conditions of Contract for Plant and Design Build
(Yellow Book)
c) Conditions of Contract of EPC Turnkey Project
(Silver Book)
− The ADB contract uses Silver Book because the
contractor is at the fore font such as providing an
engineer and supply , while the project owner
provides a company representative to help oversee
the construction of the project
• EPC/Turnkey Projects’s General Terms of Contract
− The general requirements of EPC contracts are divided
into 3 clauses:
a) Clauses relating to service user responsibility
b) Clauses relating to the responsibility of the
contractor/service provider
c) Other clauses related to the parties
− The above clause discusses the important articles that
need to be observed in the West Kalimantan Power
Grid Project Loan ADB & AFD contract
• Potential and Mitigation of claims
• Extension of Task Delivery Time
− Additional time, excluding the original schedule of
construction implementation, required to complete
PLN PUSMANKON
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 7 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 7 of 10
Date : 16 November 2017
No. Item Diskusi Information
the construction work due to something that is
beyond the responsibility of the executor
• Delays, Takeovers & Termination Jobs
Question and Answer Session for Session 3:
1. The level of difficulty of the project that is
disconnected/extend but not running smoothly?
Implementing Amicable Settlement that both parties hold
deliberations to solve the problem, if not find a way out
should the project be taken over
2. a) In the FIDIC guide there are 3 types of contract, what is
the yellow book for?
Yellow book is more to the design, this guide is rarely used
in PLN projects
b) Is the PIC arranged in the silver book?
PIC is set in silver book, but not leading, assists only,
responsible only employer, if UIP is capable then there is
no need to use consultant
3. What is the role of consultant discussed in the silver book?
If in red book consultant function as consultant leading
while in silver book consultant as consultant assist,
employer leading
4. What if the contactor does not reach on time in project
work?
This include in the cost of remedial defect, if the project is
not completed due to PLN error, or the project can be
taken over by PLN as long as it is not contractor’s fault
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 8 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 8 of 10
Date : 16 November 2017
No. Item Diskusi Information
3. Session 4: Occupational Safety and Health
The OSH guidance have to be implemented in the construction
phase:
• OSH Personnel
− Specially trained technical personnel, designated by
the Minister of Labor, to supervise OSH
• OSH Plan
− An OSH plan is a plan to ensure that the safety and
health of all employees and property on the projects,
without accidents and prevent or reduce accidents
• OSH Committee
− An organization that helps to provide suggestions and
considerations, whether requested or not
• Safety Induction
− Occupational Safety and Health Policy
− Evacuation Procedure
− Observe all safety signs
− Maintain all safety marks in place
− Housekeeping
− Permit of Work Safety
− LOTO (Log Out Tag Out)
− APD (Personal Protection Equipment)
− Report of all hazards
− Report immediately dangerous
− No smoking at work
− No drinking alcoholic beverages or illegal drugs
PLN PUSMANKON
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 9 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 9 of 10
Date : 16 November 2017
No. Item Diskusi Information
• Work Permit System
− It functions as a permit to enter into a limited place,
such as tank, pressure vessel
• HIRARC
− An attempt made to recognize and estimate of the
existence of a hazard to a system
• Tool Box Meeting
A brief meeting with the workers before the work
− begins, led by the supervisor
• Safety Talk and Gymnastic
− Weekly meetings attended by all project employees,
conducted in an open space , discussing OSH issues
• Personal Protective Equipment
− An equipment that serves to protect workers from
exposure to external sources of energy that can lead
to an accident
• Safety Line
− Used to be marked the construction are
• Safety Signs
− Warning boards placed in dangerous places as an
early warning of a hazard
• Report (Daily/Weekly/Monthly)
− Summarizes the impact of public health and safety
during the construction of transmission line and
electricity distributions
PT PLN (Persero) PUSAT MANAJEMEN KONSTRUKSI No. Dokumen :
CAPACITY BUILDINGWEST KALIMANTAN POWER GRID
STRENGTHENING PROJECT
Tgl. Berlaku : 16 Juni 2017
Edisi /Revisi : 01/00
Halaman : 10 dari 10
DOKUMEN TERKENDALIApabila Dokumen ini diunduh/didownload/dicetak akanmenjadi DOKUMEN TIDAK TERKENDALI
Revisi : 0 Meeting No. : No. Contract :Page 10 of 10
Date : 16 November 2017
No. Item Diskusi Information
Question and Answer Session for Session 4:
1. Who is assigned to provide PPE for package 6 and 7
projects, there is also an incident of the time of review to
the location where there is no supervisor of OSH and PPE?
Each part of the project should completed the worker with
PPE even though contractor, PLN UIP and PLN
PUSMANKON as the construction supervisor .
2. In OSH supervision for contractors such as for transmission
line, does every point have to have OSH supervisors?
There should be an OSH supervisor in every work related
to OSH. Essentially there should be a supervisor, and the
supervisor is not a worker
Agreed and Reviewed,
PTL TMK ADB Project
CHANDRA SWESTY
Notulis,
Attachment 16
List of village for the electricity distribution
program under the Grant
Measures
No Area of PLN Subvillage Village Sub district District Tower No Total HH Description Photo
1 Singkawang Tengkurap Puteng Teriak Bengkayang
2 Singkawang Punti Puteng Teriak Bengkayang
3 Singkawang Bana Puteng Teriak Bengkayang 102
4 Pontianak Kemayo Kampet Banyuke Hilir Landak 117
5 Pontianak Baban Kampet Banyuke Hilir Landak 54
6 Pontianak Napal Mamek Menyuke Landak 146 - 149 33
Electricity distribution completed on January 2017. Income of
people is 1,300,000 - 2,000,000/ Month, works as palm and
rubber farmer. Every house should pay Rp. 2,800,000 for 1 kWh
meter, and 1 socket.
7 Pontianak Labur Papung Jelimpo Landak
7 km from
project
location
83
The people do not know whether they have to pay or not to
electrify the house but the head of subvillage assured they have
to pay the same as Mandor Kiru subvillage Rp. 4.389,300,-. Their
Livelihod as rubber farmer with income Rp. 50,000,-/day
8 Pontianak Mandar Kiru Mandor Kiru Jelimpo Landak
5 km from
project
location
106
Completed electrified. According to village secretary, the
households should pay Rp. 4,389,500 for kWh meter (1300
Watt), 3 lamps and 1 electric socket. Most people are rubber
farmer with income Rp. 50,000-75,000/day. According to
information from village secretary 8 households gave collateral
(certificate of land) to bank to get credit for payment of the cost
of connection of their houses.
9 Pontianak Selandak Tebang Benua Batang Tarang Sanggau 14-25 73
Completed electrified.. According to head of village, the
households should pay Rp. 4,000,000 for KWH meter (1300 watt,
downpayment Rp. 2,000,000), 4 lamps and 1 electric socket. 8
HH have already paid for downpayment of electric kits. The cost
of electric kit for 2 churches and 1 clinic village will be paid by
village cash. Most of the people are rubber farmer with income
Rp. 50,000-75,000/day. Selandak sub village location is
surounded by Adat forest (Tembawang) and managed by villager
for their livelihood. To Electrify the houses, the people use 2
generator machines for 26 houses before PLN distribute
electricity.
CONNECTION TO PLN GRID THROUGH GRANT MEASURES
Location is far
from the
project area
71 to 95
151Electricity distribution completed by end of 2016. According to
head of village, the households should pay Rp. 3,500,000 for
kWh meter, 3 lamps and 2 electric sockets. Most people are
rubber farmer with income Rp. 50,000/day.
Electricity distribution completed by end of 2016. . According to
head of village, the households should pay Rp. 4,200,000 (1300
Watt, paid in 3 instalments) for kWh meter, 3 lamps and 2
electric socket. Baban's people work as rubber farmer with
income Rp. 40,000-50,000/day. Kemayo's people work as
plantation worker with income Rp. 75,000 / day
Page 1 of 3
No Area of PLN Subvillage Village Sub district District Tower No Total HH Description Photo
10 Sanggau Semontol Makawing Batang Tarang Sanggau 26-31 34 HH
Completed electrified.According to head of village, the
households should pay Rp. 4,345,000 for kWh meter (1300 Watt,
paid in 6 instalments), 6 lamps and 1 electric socket. Most people
are rubber farmer with income Rp. 50,000-75,000/day. Electric
kit for the house will be installed in June/July. Semontol sub
village location is surounded by Adat forest (Tembawang) and
managed by villager for their livelihood. Neighbour subvillage is
Sebual subvillage which has 70 HH in corridor of electric poles.
11 Sanggau Penyekat42 HH (36
houses)
Completed electrified. According to head of subvillage, each
house should pay Rp. 4,300,000 (paid in 2 terms) for kWh meter
(1300 Watt), 4 lamps and 1 electric socket and for 7 HH who
have Indonesia prosperous card can get electricity with 900 Watt
with cost installation is Rp. 3,900,000,-/ house. Most people are
rubber and palm farmer with income Rp. 110,000 /day. Before
the connection by PLN the households used diesel generators.
To electrify 1 church, village will paid Rp. 2,000,000.
12 Sei Andong79 HH (50
houses)
Completed electrified, According to head of subvillage, all houses
should paid Rp. 4,345,000 (paid in 2 term) for installation of
electric kits and it's already installed to 50 houses on March
2016. Most of the people are rubber and palm farmer with
income Rp. 50,000 /day for rubber and Rp, 2,000,000 / month
for palm. Before households used diesel generator to electrify
their houses.
13 Terentang 128 HH
Completed electrified. According to head of subvillage, all houses
got CSR from PT DEMPEK (Bauxite industry) for installation of
electric kits which were already installed to all houses in March
2016. As the CSR only give Rp. 3,000,000/ each houses, so the
remaining cost still need to be paid by HH about Rp. 1,000,000.
Most people are rubber and palm farmer with income Rp.
110,000 /day.
14 Sanggau Melugai Emberas Tayan Hilir SanggauFar away from
the project-
Completed electrified.. To reach the village the river has to be
crossed by boat.
15 Sanggau Jeramun Sejotang Tayan Hilir Sanggau
Same village
with the area
of tower
Pontianak -
Tayan (about
4 km from
tower)
74 (65
houses)
Completed electrified.. According to head of subvillage, each
houses should pay Rp. 4,345,000 (10 HH have already paid) for
kWh meter (1300 Watt), 4 lamps and 1 electric socket. Most
people are rubber farmer with income Rp. 50,000 /day. The
village is surrounded by Tembawang (Adat Forest). Before the
supply by PLN the houses used diesel generators.
Subah Tayan Hilir Sanggau
Adjacent to
National Road
(Trans
Kalimantan
road)
Page 2 of 3
No Area of PLN Subvillage Village Sub district District Tower No Total HH Description Photo
16 Sanggau Batu Besi Batu Besi subvillage was electrified a long time ago.
17 Sanggau Yongkok108 (97
houses)
Completed electrified. According to head of subvillage, each
house should pay Rp. 4,000,000 (24 HH have paid) for kWh
meter (1300 Watt), 4 lamps and 1 electric socket. Most people
are palm farmer with income Rp. 60,000 - 72,000/day. Before
connection to PLN supply 50 households used. There are 1
church and village hall as public property. The cost of electicity
for public property will be paid by village community.
18 Sanggau Pulau Legoh95 (70
houses)
According to head of subvillage, every house should pay Rp.
4,345,000 (down payment Rp. 2,000,000) for kWh meter (1300
Watt), 3 lamps and 1 electric socket. Most people are palm
farmer with income Rp.72,000/day. Before the electrification
through PLN this sub village used 2 diesel generators. Each
generator supplied 23 houses and pay Rp. 20,000/week for cost
of gasoline. Even though this village is surounded by water there
is lack of clean water.
Total HH 1,279
Note: Cutting trees along the corridor of electric poles with span 5 m to 7 m was conducted by villager volunteers without compensation for trees.
The people who have KIS (Indonesia prosperous card) can get electricity up to 900 Watt at much cheaper cost.
All the people are ready to pay for the expensive electric kit as the eletricity is special need for them and they have already expected to get electricity for a long time.
Almost all villages use clean water from river and mountain water streamed to their village except Subah Village (no 11-13) which use artesian well.
Artesian well is more expensive as they have to use a water pump.
Sejotang Tayan Hilir Sanggau
Near the
tower of
Pontianak -
Tayan
transmission
line
Page 3 of 3
Attachment 17
Documentation of Indigenous People Customary
Activities (Ngudas)
Documentation of Indigenous People Customary Activities (Ngudas Ceremony)
A. Sanggau District
Makkawing Village
Kebadu Village
Cempedak Village
Tebang Benua Village
Sei Mawang Village
Menyabo Village
Senyabang Village
Sosok Village
Sebara Village
Temiang Taba Village
Lape Village
Pusat Damai Village
Suka Gerundi Village
B. Sekadau District
Ensalang Village
Peniti Village
Attachment 18
BKPM Decree No 6/1/IPPKH/ PMDN:
Permit Use of Forestry area for
SUTET 275 kV and 150 kV on behalf PT PLN (Persero)
64,42 Ha at Restricted production forest and
permanent production forest at
Bengkayang Regency, Landak Regency and Sanggau
Regency, West Kalimantan
BADAN KOORDINASI PENANAMAN MODAL
XEPUTUSAN KEPALA BAI'AN KOORDINASI PENANAMAN MODALNoMoR: 6/l ltP?fH / ?au ltorl
TEI{TANG
IZIN PINJAM PAKAI I(AWASAI{ HUTAN UNTUK PEMBANGUNAN SUTET 275 I<IIBENGKAYANG - JAGOI BABANG DAN SUTT 15O KV SINGKAWANG -BENGKAYANG, BENGKAYANG - NGABANG, NGABANG - TAYAN ATAS NAMAPT. PLN (PERSERO) SELUAS 64,62 (ENAM PULUH EMPAT DAN ENAM PULUHDUA PERSERATUSI HEKTAR PADA KAWASAN HUTAN PRODUKSI TERBATASDAN HUTAN PRODUKSI TETAP DI I(ABUPATEN BENGKAYANG, KABUPATENLANDAK DAN KABUPATEN SANGGAU, PROVINSI I(ALIMANTAN BARAT
KEPALA BN)AN KOORDINASI PENANAMAT{ MODAL,
Menimbang : a. bahwa sesuai Keputusan Menteri Energi dan Sumber DayaMineral Nomor 634-12/20l600.3l2011 tanggal 30 September2011 sebagaimana telah diperpanjang dengan KeputusanKepala Badan Koordinasi Penanaman Modal atas namaMenteri Energi dan Sumber Daya Mineral Nornor25 I I I IIUPIL-T/ PMDN/ 20 I 6 tanggal 27 September 20 16, Yt.PLN (Persero) mendapat Izin Usaha Penyediaan TenagaListrik, berlaku selama 30 (tiga puluh) tahun sampai dengantanggal 27 September 2046;
b. bahwa berdasarkan surat Menteri Kehutanan Nomor
S.100/Menhut-Vlll2Ol4 tanggal 20 Februari 2014, PT' PLN
(Persero) mendapat persetujuan prinsip penggunaan kawasan
hutan untuk pembangunan SUTET 275 kV Bengkayang -Jagoi Babang dan SUTT 150 kV Singkawang - Bengkayang,
Bengkayang - Ngabang dan Ngabang - Tayan pada kawasan
Hutan Produksi Terbatas dan Hutan Produksi Tetap seluas
x77,7O Hektar (panjang t 38.852 m dan lebar t 20 m) di
Kabupaten Bengkayang, Kabupaten Landak dan Kabupaten
Sanggau, Provinsi Kalimantan Barat;
c. bahia Pf' PLN (Persero) telah memenuhi kewajiban
sebagaimana dalam persetujuan prinsip tersebut huruf b'
Yaitu:c.l.melaksanakantatabatasterhadapkawasanhutanyang
disetujui dengan supervisi Balai Pemantapan Kawasan
irtu" Wilayah III Pontianak sesuai Berita Acara
p.""t""" Batas Areal Persetujuan Prinsip Pinjam Pakai
Kawasan Hutan untuk Pembangunan SUTET 275 kY
;;;s6;il - .laeoi Babang dan sUrr lso kv
tBKPM Pengurusan Perizinan dan Nonperizinan di PISP-Pusat BKPM tidak dikenakan biaya
-2-
Singkawang - Bengkayang, Bengkayang - Ngabang,Ngabang - Tayan pada Kawasan Hutan Produksiferbatas (HPT) dan Hutan Produksi Tetap (HP) a.n. PT.
PLN (Persero) di Kabupaten Bengkayang, Kabupatenl,andak dan Kabupaten Sanggau, Provinsi KalimantanBarat tanggal 24 Desember 2014, dengan realisasiseluas 64,62 Hektar;
c 2 s::Jff.'.";:?l il:i ::ffi:?'3it J:r$ l:ffi5:,'3;Simon Lefran, S.H bahwa perseroan sanggup:c.2.1 melaksanakan reklamasi dan revegetasi pada
kawasan hutan yang sudah tidak dipergunakantanpa menunggu selesainya jangka waktu izinpinjam pakai kawasan hutan;
c.2.2 melaksanakan perlindungan hutan sesuaiperaturan perundang-undangan yang berlaku;
c.2.3 memberikan kemudahan bagi aparat kehutananbaik pusat maupun daerah pada saatmelakukan monitoring dan evaluasi di lapangan;
c.2.4 memenuhi kewajiban keuangan sesuaiperaturan perundang-undangan, yaitu meliputi:1) membayar penggantian nilai tegakan,
Provisi Sumber Daya Hutan (PSDH), danDana Reboisasi (DR);
2l membayar Penerimaan Negara Bukan Pajak
Penggunaan Kawasan Hutan;3) membayar Penggantian Nilai Tegakan
kepada Pemerintah apabila areal yang
dimohon merupakan areal reboisasi;
4l kewajiban keuangan lainnya akibatditerbitkannya izin pinjam pakai kawasan
hutan;c.2.5 melakukan Penanarn.rn dalam rangka
rehabilitasi Daerah Aliran Sungai;
c.2.6 melakukan pemberdayaan masyarakat sekitar
areal izin pinjam pakai kawasan hutan;
c.2.7 mengganti - biaya investasi pengelolaan/
pemiifaatan hutan kepada PT' Nitiyasa Idola
ian PI. Sinar Kalbar Raya sesuai peraturan
Perundang-undangan;c.2.8 me-b"yJiu.^n iinyang telah dib-ayarkan oleh
fT . Uitiy""" Idola dan PT' Sinar Kalbar Raya'
sesuai peraturan perundang-undangan;
c.3. menyampaikan baseline penggunlar-I kawasan hutan;
c.4. menyampaikan rencana iekl-inasi dan revegetasi pada
kawasan hutan yang dimohon izin pinjam pakai
kawasan hutan;
c.5. t"l"l"'d kooidinasi instansi kehutanan setempat;
c'6.melakukanrevisirencanakerjapenggunaankawasanhutan sesuai hasil tata batas;
affi, ,"rr**".n Perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
d.
-3-
bahwa Direktur Pengadaan t/f. PLN (Persero) dengan surat
Nomor 0 106/ KON.O2.O 1 /DITDAN/20 16 tanggal 1 Februari
2016, mengajukan permohonan Izin Pinjam Pakai Kawasan
Hutan untuk Pembangunan SUTET 275 kY Bengkayang -Jagoi Babang dan SUTT 150 kV Singkawang - Bengkayang,
Bengkayang - Ngabang, Ngabang - Tayan pada kawasan
Hutan -produksi
Terbatas dan Hutan Produksi Tetap di
Kabupaten Bengkayang, Kabupaten Landak dan Kabupaten
Sanggau, Provinsi Kalimantan Barat;bahwa sesuai Pasal 48 huruf b Peraturan Menteri Lingkungan
Hidup dan Kehutanan Nomor
P.50/Menlhk/Setjen/Kum.ll6l2016 tentang Pedoman
Pinjam Pakai Kawasan Hutan, persetujuan prinsip
p..rggr.r"rn kawasan yang telah diberikan oleh Menteri
sebehrm berlakunya Peraturan Menteri ini dan belum
memenuhi sebagian atau seluruh kewajiban dalam
persetujuan prinsip dapat mengajukan izin pinjam pakai
i."*""rt hutan dan dikenakan kewajiban sesuai dengan
Peraturan Menteri ini;bahwa sesuai surat Direktur Jenderal Planologi Kehutananf.
Mengingat
dan Tata Lingkungan Nomor S.1316/PKTL
/REN/PLA.O/ 12l2016 tanggal 1 Desember 2016,
permohonan izin pinjam pakai kawasan hutan untukpembangunan SUTET 275 kV Bengkayang - Jagoi Babang
ian SUTT 150 kV Singkawang - Bengkayang, Bengkayang -Ngabang, Ngabang - i"y"., pada kawasan--Hutan Produksi
te-Oatas dan Hutan Produksi Tetap a'n' PT' PLN (Persero)
sebagaimana hasil tata batas seluas 64,62 Hektar sudah
sesuai ketentuan teknis;g. bahwa berdasarkan pertimbangan huruf a sampai dengan- huruf f, perlu menetapkan Keputusan. Kepala Badan
Koordinasi - Penanaman ilodal tentang Izin Pinjam Pakai
Kawasan Hutan untuk Pembangunan SUTET 275 kV
g.t gt"y"t g - Jagoi Babang dan SUTT -150
kV Singkawang -ne.ritayang, nengkayang - ug"u1!9,-Ngab18 - Tayan atas
.ru--. PT. nln leeisertl silu"s 6+,62 (Enam Puluh Empat dan
Enam Puluh dua Perseratus) Hektar Pada Kawasan Hutan
ptoarrt"i Terbatas dan Hutan Produksi Tetap di Kabupaten
gl"gt"y"t g, Kabupaten L'andak dan Kabupaten Sanggau'
Provinsi Kalimantan Barat;
:1. Undang-Undang Nomor 5 Tahun 1990 tentang Konservasi
Sumbeidaya Alam Hayati dan Ekosistemnya;
Z. Unaa"g-U"dang Nombr 41 Tahun 1999 tentang Kehutanan'
""t.g"i-."" teiatr diuban aengan Undang-Undang Nomor 19
Tahun 2004;S. Unaang-Undang Nomor 26 Tahun 2007 tentang Penataan
Ruang;+. U"a"ig-Undang Nomor 18 Tahun 2013 tentang Pencegahan
dan Pemberantasan Perusakan Hutan;
ff* ,".r*-".n perizinan dan Nonperizinan di prsp-pusat BKpM tidak dikenakan biaya
7.
8.
q
10.
11.
-4-
5. Undang-Undang Nomor 23 Tahun 2Ol4 tentang
Pemerintahan Daerah, sebagaimana telah beberapa kalidiubah terakhir dengan Undang-Undang Nomor 9 Tahun
2015;6. Peraturan Pemerintah Nomor 44 Tahun 2004 tentang
Perencanaan Kehutanan;Peraturan Pemerintah Nomor 45 Tahun 20O4 tentang
Perlindungan Hutan, sebagaimana telah diubah dengan
Peraturan Pemerintah Nomor 60 Tahun 2009;
Peraturan Pemerintah Nomor 6 Tahun 2007 tentang Tata
Hutan dan Penyusunan Rencana Pengelolaan Hutan Serta
Pemanfaatan Hutan, sebagaimana telah diubah dengan
Peraturan Pemerintah Nomor 3 Tahun 2008;
Peraturan Pemerintah Nomor 26 Tahun 20O8 tentang
Rencana Tata Ruang Wilayah Nasional;
Peraturan Pemerintah Nomor 76 Tahun 2008 tentang
Rehabilitasi dan Reklamasi Hutan;Peraturan Pemerintah Nomor 24 Tahun 2010 tentang
Penggunaan Kawasan Hutan, sebagaimana telah beberapa
kali diubah terakhir dengan Peraturan Pemerintah Nomor
105 Tahun 2015;12. Peraturan Pemerintah Nomor 12 Tahun 2014 tentang Jenis
dan Tarif Atas Jenis Penerimaan Negara Bukan Pajak Yang
Berlaku Pada Kementerian Kehutanan;13. Peraturan Pemerintah Nomor 33 Tahun 2014 tentang Jenis
dan Tarif Atas Jenis Penerimaan Negara Bukan Pajak Yang
Berasal Dari Penggunaan Kawasan Hutan UntukKepentingan Pembangunan di Luar Kegiatan Kehutanan
Yang Berlaku Pada Kementerian Kehutanan;14. Peraturan Pemerintah Nomor 104 Tahun 2015 tentang Tata
Cara Perubahan Peruntukan dan Fungsi Kawasan Hutan;
15. Peraturan Presiden Nomor 165 Tahun 2014 tentang Penataan
T\rgas dan Fungsi Kabinet Ke{a;16. Peraturan Presiden Nomor 7 Tahun 2015 tentang Organisasi
Kementerian Negara;17. Peraturan Presiden Nomor 16 Tahun 2015 tentang
Kementerian Lingkungan Hidup dan Kehutanan;
18. Peraturan Presiden Nomor 3 Tahun 2016 tentang Percepatan
Pelaksanaan Froyek Strategis Nasional;
19. Peraturan Presiden Nomor 44 Tahun 2016 tentang Daftar
Bidang Usaha Yang Tertutup dan Bidang Usaha Yang
Terbuka Dengan Persyaratan di Bidang Penanaman Modal;
20. Instruksi Presiden Nomor 8 Tahun 2015 tentang Penundaan
Pemberian Izin Baru dan Penyempurnaan Tata Kelola Hutan
Alam Primer dan Gambut;21. Peraturan Menteri Kehutanan Nomor P.60/Menhut-ll l2OO9
tentang Pedoman Penilaian Keberhasilan Reklamasi Hutan;
tBl6M p"rrgr*""n perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
-5-
22. Peraturan Menteri Kehutanan Nomor P.44/M entrut-ll I 2Ol2tentang Pengukuhan Kawasan Hutan, sebagaimana telahdiubah dengan Peraturan Menteri kehutanan NomorP.62lMenhut-ll l2OL3;
23. Peraturan Menteri Kehutanan Nomor P.25/ Menhut-ll l2ol4tentang Panitia Tata Batas Kawasan Hutan;
24. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP.7/ Menlhk-ll l2ol5 tentang Petunjuk Teknis PemberianPerizinan dan Non Perizinan di Bidang Lingkungan Hidup danKehutanan dalam Penyelenggara€rn Pelayanan Terpadu SatuPintu;
25. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP. 18/ Menlhk-ll l20l5 tentang Organisasi dan Tata KerjaKementerian Lingkungan Hidup dan Kehutanan;
26. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP. 62 / MenLHK-Setjen / 20 I 5 tentang Izin Pemanfaatan Kayu;
27. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP.29l Menlhk/ Setjen/ PHPL.3 I 2 / 2016 tentang PembatalanPengenaan, Pemungutan dan Penyetoran Penggantian NilaiTegakan;
28. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP.50/Menlhk/Setjen/Kum.l/6l2016 tentang PedomanPinjam Pakai Kawasan Hutan;
29. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP.71lMenLHK/Setjen/HPL.3l8/2OL6 tentang Tata CaraPengenaan, Pemungutan, dan Penyetoran Provisi SumberDaya Hutan dan Dana Reboisasi, Ganti Rugi Tegakan, DendaPelanggaran Eksploitasi Hutan dan Iuran Izin UsahaPemanfaatan Hutan;
30. Peraturan Menteri Lingkungan Hidup dan Kehutanan NomorP.89/Menlhk/Setjen/Kum.ll Ll l2016 tentang PedomanPenanaman Bagi Pemegang Izin Pinjam Pakai Kawasan HutanDalam Rangka Rehabilitasi Daerah Aliran Sungai;
3 1. Keputusan Menteri Lingkungan Hidup dan Kehutanan NomorSK.6347lMenLHK-PKTL/IPSDH/PLA.1/ I I l2Ot6 tanggd 21
November 2O16 tentang Penetapan Peta Indikatif PenundaanPemberian Izin Baru Pemanfaatan Hutan, PenggunaanKawasan Hutan dan Perubahan Peruntukan Kawasan Hutandan Areal Penggunaan La.in (Revisi XI);
Memperhatikan: l. Surat Badan Lingkungan Hidup Daerah Provinsi KalimantanBarat Nomor 660.ll206IBLHD-A tanggal l1 Maret 2010 halRekomendasi UKL dan UPL kegiatan SUTI 150 kV jalurNgabang-Tayan oleh PT. PLN (Persero) PIKITRING Kalimantandi Kabupaten Landak dan Sanggau Provinsi KalimantanBarat;
t'BKPfvl p6ng5ss6n Perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
-6-
Surat Badan Lingkungan Hidup Daerah Provinsi KalimantanBarat Nomor 660.ll2O7 IBLHD-A tanggal 11 Maret 2010 halRekomendasi UKL dan UPL kegiatan SUTT 150 kV jalurSingkawang-Bengkayang oleh PT. PLN (Persero) PIKITRING
Kalimantan di Kota Singkawang dan Kabupaten BengkayangProvinsi Kalimantan Barat;Surat Badan Lingkungan Hidup Daerah Provinsi KalimantanBarat Nomor 660.ll2O9IBLHD-A tanggal 11 Maret 2O10 halRekomendasi UKL dan UPL kegiatan SUt't 150 kV jalurBengkayang-Ngabang oleh PT. PLN (Persero) PIKITRINGKalimantan di Kabupaten Bengkayang dan KabupatenLandak Provinsi Kalimantan Barat;
4. Keputusan Gubernur Kalimantan Barat Nomor
24O|BLHD|2010 tanggal 3 Mei 2010 tentang Kelayakan
Lingkungan Kegiatan Pembangunan Saluran Udara Tegangan
Ekstra Tinggi (SUTETI 275 kV GI Jalur Bengkayang-Perbatasan Sarawak (Panjang 1 81,434 I(m) oleh P/f . PLN
(Persero) Proyek Induk Pembangkit dan Jaringan (Pikitirng)Kalimantan di Kecamatan Bengkayang, Lumar, kdo,Sanggau l,edo, Seluas dan Jagoi Babang KabupatenBengkayang Provinsi Kalimantan Barat;
5. Surat Gubernur Kalimantan Barat Nomor522/l996lBkbang.B tanggal 6 Juli 2Ol2 mengenaiRekomendasi Izin Pinjam Pakai Kawasan Hutan untukKegiatan Pembangunan SUTT 150 kV Singkawang-Bengkayang, Bengkayang-Ngabang, Ngabang-Tayan sertaSUTET 275 kV Bengkayang-Jagoi Babang seluas 109,28Hektar a.n. PI. PLN (Persero);
MEMUTUSKAN:
Menetapkan : KEPUTUSAN KEPALA BADAN KOORDINASI PENANAIUANMODAL TENTANG IZIN PINJAM PAI(AI KAWASAN HUTANUNTUK PEMBANGUNAN SUTET 275 I<V BENGI{AYANG - JAGOIBABANG DAN SUTT 15O KlI SINGKAWANG - BENGKAYANG,BENGKAYAI{G - NGABANG, NGABANG - TAYAN ATAS NAMA PT.PLN (PERSEROI SELUAS 64,62 (ENAM PULUH EMPAT DANEilAM PULT'H DUA PERSERATUSI HEKTAR PADA KAWASANHUTAN PRODT'KSI TERBATAS DAN HUTAN PRODUKSI TETAPDI I(ABUPATEI{ BENGI(AYANG, KABUPATEN LANDAK DANKABUPATEN SANGGAU, PROVINSI I(ALIMANTAT{ BARAT.
tBKPlvl Pengurusan Perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
2.
KESATU
KEDUA
KBTIGA
KEEMPAT
KELIMA
KEENAM
-7 -
Memberikan lzin Pinjam Pakai Kawasan Hutan dengankompensasi membayar Penerimaan Negara Bukan PajakPenggunaan Kawasan Hutan dan melakukan penanaman dalamrangka rehabilitasi Daerah Aliran Sungai, untuk pembangunanSUTET 275 kV Bengkayang - Jagoi Babang dan SUTT 150 kVSingkawang - Bengkayang, Bengkayang - Ngabang, Ngabang -Tayan pada kawasan Hutan Produksi Terbatas dan HutanProduksi Tetap atas nama PT. PLN (Persero) di KabupatenBengkayang, Kabupaten Landak dan Kabupaten Sanggau, ProvinsiKalimantan Barat seluas 64,62 (enarr. puluh empat dan enampuluh dua perseratus) Hektar, sebagaimana peta lampiranKeputusan ini.Pemberian izin sebagaimana dimaksud dalam amar KESATUadalah untuk pembangunan SUTET 275 kY Bengkayang - JagoiBabang dan SUTT 150 kV Singkawang - Bengkayang, Bengkayang
- Ngabang, Ngabang - Tayan, bukan untuk kegiatan lain sertaarealnya tetap berstatus sebagai kawasan hutan.PT. PLN (Persero) berhak:a. berada, menempati dan mengelola serta melakukan kegiatan-
kegiatan yang meliputi rencana pembangunan SUTET 275 kVBengkayang - Jagoi Babang dan SUTT 150 kV Singkawang -Bengkayang, Bengkayang - Ngabang, Ngabang - Tayan, sertamelakukan kegiatan-kegiatan lainnya yang berhubungandengan kegiatan tersebut dalam kawasan hutan yang dipinjampakai;
b. memanfaatkan hasil kegiatan yang dilakukan sehubungandengan rencana pembangunan SUTET 275 kV Bengkayang -Jagoi Babang dan SUTT 150 kV Singkawang - Bengkayang,Bengkayang - Ngabang, Ngabang - Tayan dalam kawasanhutan yang dipinjam pakai;
c. melakukan penebangan pohon dalam rangka pembukaanlahan yang tidak dapat dielakan dengan membayar ProvisiSumber Daya Hutan (PSDH) dan/ atau Dana Reboisasi (DR)
sesuai dengan ketentuan Peraturan Perundang-Undangan.Dalam jangka waktu paling lama 1 (satu) tahun setelah terbit IzinPinjam Pakai Kawasan Hutan ini, PI. PLN (Persero) wajibmenyampaikan peta lokasi rencana penanaman dalam rangkarehabilitasi Daerah Aliran Sungai.Dalam hal PT. PLN (Persero) tidak memenuhi kewajibansebagaimana dimaksud pada Amar KEEMPAT, Izin Pinjam PakaiKawasan Hutan menjadi batal dan dinyatakan tidak berlaku.Penetapan areal kerja Izin Pinjam Pakai Kawasan Hutan olehDirektur Jenderal Planologi Kehutanan dan Tata Lingkungan atasnama Menteri Lingkungan Hidup dan Kehutanan, dilaksanakandengan ketentuan:a. pemegang izin pinjam pakai kawasan hutan menyampaikan
permohonan penetapan areal kerja berdasarkan hasil tatabatas areal izin pinjam pakai kawasan hutan kepada DirekturJenderal Planologi Kehutanan dan Tata Lingkungan.
fBKPU psngurusan Perizinan dan Nonperizinan di prsp-pusat BKpM tidak dikenakan biaya
-8-
b. permohonan penetapan areal kerja sebagaimana dimaksudpada huruf a, dilampiri dengan bukti pemenuhan kewajibansebagaimana dimaksud Amar KEEMPAT.
KETUJUH : Selain kewajiban dimaksud Amar KEEMPAT, PT. PLN (Persero)
wajib:a. membuat rencana dan melalsanakan reklamasi dan revegetasi
pada kawasan hutan yang sudah tidak dipergunakan tanpamenlrnggu selesainya jangka waktu izin pinjam pakai kawasanhutan;
b. melakukan penanaman dalam rangka rehabilitasi DaerahAliran Sungai dan dilaksanakan paling lambat I (satu) tahunsebelum berakhirnya izin pinjam pakai kawasan hutan;
c. membayar PNBP Penggunaan Kawasan Hutan sesuai denganketentuan peraturan perundang-undangan;
d. melaksanakan inventarisasi tegakan sesuai dengan rencanakerja penggunaan kawasan hutan tahunan;
e. membayar Provisi Sumber Daya Hutan (PSDH) dan/ atau DanaReboisasi (DR) sesuai dengan ketentuan peraturan perundang-undangan;
f. membayar ganti rugi nilai tegakan kepada pemerintah apabilaareal yang dimohon merupakan hutan tanaman hasilrehabilitasi;
g. mengganti biaya investasi pengelolaan/ pemanfaatan hutankepada pengelola/pemegang 'rzin usaha pemanfaatan hasilhutan sesuai ketentuan peraturan perundang-undangan;
h. melakukal pemeliharaan batas areal izin pinjam pakaikawasan hutan;
i. melaksanakan perlindungan hutan atas areal izin pinjam pakaikawasan hutan sesuai dengan ketentuan peraturanperundang-undangan;
j. mengamankan kawasan Hutan Konservasi dan Hutan Lindungdalam hal areal pinjam pakai kawasan hutan berbatasandengan kawasan hutan konservasi dan Hutan Lindung sesuaidengan peraturan perundang-undangan;
k. memberikan kemudahan bagi aparat lingkungan hidup dankehutanan baik pusat maupun daerah pada saat melakukanmonitoring dan evaluasi di lapangan;
l. mengkoordinasikan kegiatan kepada instansi lingkunganhidup dan kehutanan setempat dan/ atau kepada pemegangizin pemanfaatan hutan atau pengelola hutan;
m. melakukan pemberdayaan masyarakat sekitar area) izinpinjam pakai kawasan hutan;
n. membuat laporan secara berkala setiap 6 (enam) bulan sekalikepada Menteri Lingkungan Hidup dan Kehutanan mengenaipenggunaan kawasan hutan yang dipinjam pakai dengantembusan: Direktur Jenderal Planologi Kehutanan dan TataLingkungan, Direktur Jenderal Pengelolaan Hutan Produksikstari, Direktur Jenderal Konservasi Sumber Daya Alam danEkosistem, Direktur Jenderal Pengendalian Daerah AliranSungai dan Hutan Lindung, Kepala Dinas Kehutanan Provinsi
fBKPlvl psngurvsan Perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
-9 -
Kalimantan Barat, Kepala Balai Pemantapan Kawasan HutanWilayah III Pontianak, Kepala Balai Pengelolaan Daerah AliranSungai dan Hutan Lindung Kapuas;
o. laporan tersebut huruf n, memuat:o.1. rencana dan realisasi penggunaan kawasan hutan;o.2. rencana dan realisasi reklamasi dan revegetasi;
o.3. pemenuhan kewajiban membayar PNBP PenggunaanKawasan Hutan;
o.4. rencana dan realisasi penanarnan dalam rangkarehabilitasi daerah aliran sungai;
o.5. pemenuhan kewajiban lainnya sesuai izin pinjam pakai
kawasan hutan;KEDELAPAN: PT. PLN (Persero), dilarang:
a. memindahtangankan Izin Pinjam Pakai Kawasan Hutankepada pihak lain atau perubahan narna Pemegang izin pinjampakai tanpa persetujuan Menteri Lingkungan Hidup dan
Kehutanan;b. menjaminkaa atau mengagunkan areal Izin Pinjam Pakai
Kawasan Hutan kepada Pihak lain;c. melakukan kegiatan lainnya yang dilarang sesuai peraturan
perundang-undangan.KESEMBILAN: Menyelesaikan hak-hak pihak ketiga, apabila terdapat hak-hak
pihak ketiga di dalam areal pinjam pakai kawasan hutan denganmeminta bimbingan dan fasilitasi Pemerintah Daerah setempat.
KESEPULUH : Izin Pinjam Pakai Kawasan Hutan ini dicabut dan pemegang izindikenakan sanksi sesuai peraturan Perundang-undangan, apabilapemegang izin tidak memenuhi kewajiban dan/atau melakukanpelanggaran atas ketentuan-ketentuan sebagaimana dimaksuddalam izin ini.
KESEBELAS: Izin Pinjam Pakai Kawasan Hutan ini berlaku juga sebagai IzinPemanfaatan Kayu, serta Izin Pemasukan dan PenggunaanPeralatan.
KEDUABELAS: Perpanjangan Izin Pinjam Pakai Kawasan Hutan diberikanberdasarkan hasil evaluasi terhadap pemenuhan kewajiban IzinPinjam Pakai Kawasan Hutan dan diajukan oleh pemegang izindalam jangka waktu paling lambat 2 (dua) bulan sebelumberakhirnya izin.
fBKPIVI Pengurusan Perizinan dan Nonperizinan di PTSP-Pusat BKPM tidak dikenakan biaya
KESEMBILAN
KESEPULUH
KESEBELAS
Salinan sesuai dengan aslinyaKEPALA BIRO PERATURANPERUNDANG-UNDANGAN,
-7 -
apabila melakukan pelanggaran atas ketentuan dalam izinpinjam pakai kawasan hutan ini.Izin Pinjam Pakai Kawasan Hutan ini berlaku dan melekatsebagai izin pemanfaatan kayu, serta izin pemasukan danpenggunaan peralatan.Perpanjangan Izin Pinj am Pakai Kawasan Hutan diberikanberdasarkan hasil evaluasi terhadap pemenuhan kewajibanIzin Pinjam Pakai Kawasan Hutan dan diajukan olehpemegang izin dalam jangka waktu paling lambat 2 (dua)bulan sebelum berakhirnya izin.Keputusan ini mulai berlaku pada tanggal ditetapkan untukjangka waktu paling lama sampai dengan tanggal 26 Apnl2025, kecuali apabila dicabut oleh Menteri Lingkungan Hidupdan Kehutanan.
Ditetapkan dipada tanggal
USAHA
Tembusan:1. Menteri Lingkungan Hidup dan Kehutanan;2. Sekretaris Jenderal Kementerian Lingkungan Hidup dan Kehutanan;3. Direktur Jenderal Planologi Kehutanan dan Tata Lingkungan;4. Direktur Jenderal Pengelolaan Hutan Produksi l,estari;5. Direktur Jenderal Pengendalian Daerah Aliran Sungai dan Hutan Lindung;6. Direktur Jenderal Konservasi Sumber Daya AIam dan Ekosistem;7. Direktur Jenderal Penegakan Hukum Lingkungan Hidup dan Kehutanan;8. Gubernur Kalimantan Timur;9. Bupati Berau;10. Kepala Dinas Kehutanan Provinsi Kalimantan Timur;11. Kepala Balai Pemantapan Kawasan Hutan Wilayah IV Samarinda;12. Kepala Balai Pengelolaan Hutan Produksi Wilayah XI Samarinda;13. Kepala Balai Pengelolaan Daerah Aliran Sungai dan Hutan Lindung Mahakam
Berau;14. Direktur PI. Berau Coal.
Jakarta
r6 JAti 2017
A.n. MENTERI LINGKUNGAN HIDUP DANKEHUTANAN REPUBLIK INDONESIA,KEPALA BN)AN KOORDINASIPENANAMAN MODAL,
TTD
THOMAS TRIKASIH LEMBONG
fBKPM Pengurusan Penzinan dan Nonperizinan di prsp-pusat BKpM tidak dikenakan biava
_ 10-
KBTIGABELAS:Keputusan ini mulai berlaku pada tanggal ditetapkan untukjangka waktu paling lama sampai dengan tanggal 27 September2Q46, dan dapat diperpanjang berdasarkan hasil evaluasi sertaberakhir dengan sendirinya apabila tidak diperpanjang.
Salinan sesuai dengan aslinyaKEPALA BIRO PERATURANPERUNDANG-UNDANGAN,
Ditetapkan di Jakarta,pada tanggal I A, , JAN 2017
A.n. MENTERI LINGKUNGAN HIDUP DANKEHUTANAN REPUBLIK INDONESIA,KEPALA BADAN KOORDINASIPENANAMAN MODAL,
TTD
THOMAS TRIKASIH LEMBONG
AN TATA USAHA
SPASARI
. Menteri Lingkungan Hidup dan Kehutanan;2. Menteri Energi dan Sumber Daya Mineral;3. Sekretaris Jenderal Kementerian Lingkungan Hidup dan Kehutanan;4. Direktur Jenderal Planologi Kehutanan dan Tata Lingkungan;5. Direktur Jenderal Pengelolaan Hutan Produksi Lestari;6. Direktur Jenderal Konservasi Sumber Daya AIam dan Ekosistem;7. Direktur Jenderal Pengendalian Daerah Aliran Sungai dan Hutan Lindung;8. Direktur Jenderal Ketenagalistrikan;9. Gubernur Kalimantan Barat;10. Bupati Bengkayang;11. Bupati Landak;12. Bupati Sanggau;13. Kepala Balai Pemantapan Kawasan Hutan Wilayah III Pontianak;14. Kepala Balai Pengelolaan Daerah Aliran Sungai dan Hutan Lindung Kapuas;15. Kepala Balai Pengelolaan Hutan Produksi Wilayah VIII Pontianak;16. Direktur Pengadaan PT. PLN (Persero).
fBKPlvl pgngumssn PerDinan dan Nonperizinan di prsp-pusat BKPM tidak dikenakan biaya
PT PLN( PERSERO)
」al an Trunol oyo B10k M 1/135 KebayOran Baru‐ J akana 12160Tel p : ( 021) 7261875, 7261122, 7262234
( 021) 7251234, 7250550Kot ak Pos : 4322/KBB Faxi mi e l ( 021) 7221330 A amat KaWat l PLNPST
NomorSi f atLampi ranPe‖ hal
: 0106/KON 02 01/DI TDAN/2016
: Sat u seti Pemohonan l zi n Pi nl am Pakal Kawasan Hut anPembangunan SUTET 275 kV Bengkayang―」agoi babang dan SuT「 150 kV Si ngkawang―Bengkayang, Bengkayang― Ngabang, Ngabang―Tayan di Kal i mant an Barat
01 Februari 2016
Kepada
Kementerian Lingkungan Hidup danKehutanan RlPerizinan Terpadu Satu Pintu (PTSP) pusat
Gedung lsmail Saleh Lt. DasarBadan Koordinasi Penanaman Modal (BKpM)Jln. Gatot Subroto No. 44Jakarta - 12190
u.p. Yth. : Menbri Lingkungan Hidup dan Kehutanan
Menunjuk surat Menteri Kehutanan Republik lndonesia No. s.1oo/Menhut-vlu2o14 tanggal
20 Februari 2014 petihal Persetujuan Prinsip Penggunaan Kawasan Hutan a.n. pr pLN (persero)
untuk Pembangunan SUTET 275 kV Bengkayang - Jagoi Babang dan SUTT 150 kV Singkawang -
Bengkayang, Bengkayang - Ngabang, Ngabang - Tayan di Kabupaten Bengkayang, Kabupaten
Landak dan Kabupaten sanggau, Provinsi Kalimantan Barat dan mengacu pada peraturan
Menteri Kehutanan Republik lndonesia No. P.16/Menhut-ll/2014 tentang pedoman pinjam pakai
Kawasan Hutan pasal 25 ayal (1), yang berbunyi " Berdasarkan pemenuhan kewajiban dalam
persetuiuan prinsip penggunaan kawasan hutan sebagaimana dimaksud dalam pasal 20,
pemegang persetujuan prinsip penggunaan kawasan hutan mengaiukan permohonan izinpinjam pakai kawasan hutan kepada Mentert', bersama ini kami pT pLN (persero)
mengajukan Permohonan lzin Pinjam Pakai Kawasan Hutan untuk pembangunan SUTET 275 kV
Bengkayang - Jagoi Babang dan SUTT 150 kV Singkawang - Bengkayang, Bengkayang -
Ngabang, Ngabang - Tayan di Kabupaten Bengkayang, Kabupaten Landak dan Kabupaten
Sanggau, Provinsi Kalimantan Barat.
Sebagai bahan pertimbangan terlampir kami sampaikan 1 (satu) berkas dokumen untuk
melengkapi permohonan dimaksud yang terdiri dari :
1. Copy Surat Menteri Kehutanan Republik lndonesia No. S. 10o/Menhut-Vll/2014 tanggat
20 Februari 2014 perihal Persetujuan Prinsip Penggunaan Kawasan Hutan a.n. pT pLN
(Persero) untuk Pembangunan SUTET 275 kV Bengkayang - Jagoi Babang dan SUTT 150 kV
Singkawang -Bengkayang, Bengkayang - Ngabang, Ngabang - Tayan di Kabupaten
Bengkayang, Kabupaten Landak dan Kabupaten Sanggau, Provinsi Kalimantan Barat;
2. Laporan hasil penataan batas dari Balai Pemantapan Kawasan Hutan Wilayah lll;
3. Baseline Penggunaan Kawasan Hutan;
MODEL1001
4. Copy...
PT PLN( PERSERO) : l wNol ょ“ ` ぃ
くo)ぬ tわ耐がTanggJ : Ot 10い。熱 い ヽ
4. Copy Akta Notariil Pernyataan Asli dari Notaris Johny Simon Lefran, SH Tanggal
29 Desember 2015i
5. Melakukan penanaman dalam rangka rehabilitasi daerah aliran sungai.
Demikian kami sampaikan, atas perhatian dan bantuannya diucapkan terima kasih.
Tembusan:- GM PT PLN (Persero) UIP X 騨
MODEL1004
20 Februari 20L4Nomor : S. 100/Menhu r.-VII/2014Lampiran : Satu lembar peta
Hal : Persetujuan Prinsip Penggunaan Kawasan Hutan a.n. PT. PLN (Persero)
untuk Pembangunan SUTET 275 Kv Bengkayang-Jagoi Babang dan SUTT
150 Kv Singkawang-Bengkayang, Bengkayang-Ngabang, Ngabang-Tayan
di Kabupaten Bengkayang, Kabupaten Landak dan Kabupaten Sanggau,Provinsi Kalimantan Barat.
Yth. Direktur Utama PT. PLN (Persero)
di
Jakarta
Sehubungan dengan surat Saudara No. 0491/131/DIRUT/2013 tanggal 17 Mei 2013dan No. t407lt3LlDlRUTi2013 tanggal 16 Agustus 2013, sesuai dengan :
a, Undang-Undang No. 41 Tahun 1999 sebagaimana telah diubah dengan Undang-UndangNomor 19 Tahun 20O4;
b. Peraturan Pemerintah No. 2 Tahun 2008 tanggal 4 Februari 2008;
c. Peraturan Pemerintah No. 24 Tahun 2010 tanggal 1 Februari 2010 sebagaimana telahdiubah dengan Peraturan Pemerintah No. 61 Tahun 2012 tanggal 6 Juli 2012;
d. Instruksi Presiden Republik Indonesia Nomor 6 Tahun 2013 tanggal 13 Mei 2013;
e. Keputusan Menteri Kehutanan No. SK.6018/MenhuI-VII/IPSDH/2013 tanggal13 November 2013;
f. Keputusan Menteri Kehutanan No. SK.936/Menhut-II12013 tanggal 20 Desember 20L3;
g. Peraturan Menteri Kehutanan No. P. 14lMenhut-Illz}Ll tanggal 10 Maret 2011
sebagaimana telah diubah dengan No. P. 20/Menhut-Il/2013 tanggal 17 April 2013;
h. Peraturan Menteri Kehutanan No. P. 18/Menhut-IU201L tanggal 30 Maret 2011
sebagaimana telah beberapa kali diubah terakhir dengan Peraturan Menteri Kehutanan
Nomor P. 14lMenhut-Il/2013 tanggal 20 Februari 2013;
i. Peraturan Menteri Kehutanan No. P. 63/Menhut-Il/2011 tanggal 5 September 2011;
j. Keputusan Gubernur Kalimantan Barat No. 240lBLHDl2010 tanggal 3 Mei 2010;
k. Surat Gubernur Kalimantan Barat Nomor :522ll996lEkbang.B tanggal 6 Juli 2012;
l. Rekomendasi UKL UPL oleh Badan Lingkungan Hidup Daerah Provinsi Kalimantan Barat
No, 660.1/206/BLHD-A tanggal 11 Maret 2010;
m. Rekomendasi UKL UPL oleh Badan Lingkungan Hidup Daerah Provinsi Kalimantan Barat
No. 660.1/207/BLHD-A tanggal 11 Maret 2010;
n. Rekomendasi UKL UPL oleh Badan Lingkungan Hidup Daerah Provinsi Kalimantan Barat
No. 660.U209IBLHD-A tanggal 11 Maret 2010;
o. Surat Direktur Jenderal Bina Usaha Kehutanan No. S. 24IVI-BRPUK/2014 tanggal B
Januari 2014;
p. Akta Pernyataan No. 05 tanggal 4 Januari 2013 dihadapan Notaris Amriyati Amin
Supriyadi, SH., M.Hum.
/dengan '..
-?-
dengan ini disampaikan bahwa pada prinsipnya kami dapat menyetujui penggunaan
kawasan hutan untuk pembangunan SUTET 275 Kv B€ngkayang-Jagoi Babang dan SUTT 150
Kv Slngkawang-Bengkayang, Bengkayang-Ngabang, Ngabang-Tayan a.n. PT. PLN (Persero)
5sltJv5 r 77,70 Ha (tujuh puluh tujuh dan tujuh puluh perseratus hektar) melalui prosedur
pinjam pakai kawasan hutan dengan kompensasi membayar dana Penerimaan Negara Bukan
Pajak (PNBP) Penggunaan Kawasan Hutan dan melakukan penanaman dalam rangka
rehabilitasi Daerah Aliran Sungai (DAS) dengan ratio 1 : 1 ditambah dengan luas rencana
areal terganggu dengan kategori lj,.
Areal tersebut berada dalam kawasan Hutan Produksi Terbatas (HPT) seluas * 4,28 Ha dan
Hutan ?roduksi Tetap (HP) seluas * 73,42 Ha serta telah dibebani IUPHHK-HT PT. Nitiyasa
Idola seluas t 37,47 Ha dan IUPHHK-HT PT. Snar Kalbar Raya seluas + 2,15 Ha
sebagaimana peta terlampir.
Persetujuan prinsip ini diberikan dengan ketentuan sebagai berikut:
1. Persetujuan prinsip penggunaan kawasan hutan ini hanya diberikan dalam rangkapemberian izin pinjam pakai kawasan hutan untuk pembangunan SUTET 275 Kv
Bengkayang-Jagoi Babang dan SUTT 150 Kv Singkawang-Bengkayang, Bengkayang-Ngabang, Ngabang-Tayan, bukan untuk kepentingan lain dan arealnya tetap mempunyai
status sebagai kawasan hutan seluas + 77,70 Ha (panjang r 38.852 m dan lebar+ 20 m).
2. Persetujuan prinsip penggunaan kawasan hutan jni bukan merupakan lzin Pinjam Pakai
Kawasan Hutan sehingga kegiatan di lapangan baru dapat dilaksanakan setelah Izin
Pinjam Pakai Kawasan Hutan diterbitkan oleh Menteri Kehutanan.
3. PT. PLN (Persero) dibebani kewajiban-kewajiban sebagai berikut :
a. Melaksanakan tata batas terhadap kawasan hutan yang disetujui, dengan supervisi
dari Balai Pemantapan Kawasan Hutan Wilayah III Pontianak;
b. Melakukan inventarisasi tegakan dengan supervisi dari Pengawas Tenaga Teknis
Perencanaan Hutan dengan pembinaan Balai Pemantauan Pemanfaatan Hutan
Produksi (BP2HP) Wilayah x Pontianak;
c. Membuat pemyataan dalam bentuk akta notarlil yang memuat kesanggupan :
1) Melaksanakan reklamasi dan revegetasi pada kawasan hutan yang sudah tidakdipergunakan tanpa menunggu selesainya jangka waktu pinjam pakai kawasanhutan;
2) l'lelaksanakan perlindungan hutan sesuai peraturan perundang-undangan;
3) Memberikan kemudahan bagi aparat kehutanan baik pusat maupun daerahpada saat melakukan monitoring dan evaluasi di lapangan;
4) Memenuhi kewajiban keuangan sesuai peraturan perundang-undangan,
meliputi :
a) Membayar penggantian nilai tegakan, Provisi Sumber Daya Hutan (PSDH),
Dana Reboisasi (DR);
b) Membayar Penerimaan Negara Bukan Pajak Penggunaan Kawasan Hutan;
c) Membayar ganti rugi nilai tegakan kepada pemerintah apabila areal yang
dlmohon merupakan areal reboisasi; dan
d) Kewajiban keuangan lainnya akibat diterbitkannya izin pinjam pakai
kawasan hutan;
5) Melakukan penanaman dalam rangka rehabilitasi daerah aliran sungai;
6) Melakukan pemberdayaan n)asyarakat sekitar areal izin pinjam pakai kawasan
hutan;
Membuat pernyataan dalam bentuk akta notariil yang memuat kesanggupan :
/1) Mengganti ...
-3-
1) Mengganti biaya investasi pengelolaan/pemanfaatan hutan kepada PT. Nitiyasa
Idola dan PT. Sinar Kalbar Raya, sesuai peraturan perundang-undangan;
2) Membayar iuran izln yang telah dibayarkan oleh PT. Nitiyasa Idola dan PT.
Sinar Kalbar Raya berdasarkan luas areal yang digunakan sesuai peraturan
perundang-undangan.
e. Menyampaikan baseline penggunaan kawasan hutan;
f. Menyampaikan rencrna reklamasi dan revegetasi pada kawasan hutan yang
dimohon izin pinjam pakai kawasan hutan;
g. Melakukan koordinasi dengan instansi kehutanan setempat;
h. Melakukan revisi rencana keia penggunaan kawasan hutan sesuai hasil tata batas;
i. Menyampalkan laporan secara periodik setiap 12 (dua belas) bulan sekali atas
kemajuan pemenuhan kewajiban-kewajiban dalam persetujuan prinsip penggunaan
kawasan hutan kepada Menteri Kehutanan.
4, Letak dan luas secara pasti kawasan hutan yang dipinjam pakai tersebut ditentukan
berdasarkan hasil penataan batas di lapangan yang dilaksanakan PT. PLN (Persero)
dengan supervisi oleh Balai Pemantapan Kawasan Hutan Wilayah IU Pontianak dengan
mengikutsertakan Dinas Kehutanan Provinsi Kalimantan Barat dan Dinas Kehutanan
Kabupaten Bengkayang, Dinas Kehutanan Kabupaten Landak dan Dinas Kehutanan
Kabupaten Sanggau.
5. Pelaksanaan inventarisasi tegakan dilaksanakan PT. PLN (Persero) dengan supervisi dari
Pengawas Tenaga Teknis Perencanaan Hutan Dinas Kehutanan Provinsi Kalimantan
Barat, Dinas Kehutanan Kabupaten Bengkayang, Dinas Kehutanan Kabupaten Landak
dan Dinas Kehutanan Kabupaten Sanggau.
6. Pemanfaatan kayu s€bagai akibat adanya pinjam pakai kawasan hutan untukpembangunan SUTET 275 Kv Bengkayang-Jagoi Babang dan SUTT 150 Kv Singkawang-
Bengkayang, Bengkayang-Ngabang, Ngabang-Tayan dilaksanakan secara bertahap
sesuai rencana kerja penggunaan kawasan hutan a.n. PT. PLN (Persero) dan
dilaksanakan setelah memperoleh Izin Pinjam Pakai Kawasan Hutan.
7. Apabila di dalam kawasan hutan yang dipinjam pakai terdapat hak-hak pihak ketiga,
penyelesaiannya menjadi tanggung jawab ff. PLN (Persero) yang dikoordinasikan oleh
pemerintah daerah setempat.
8. Apabila pemohon tidak melaksanakan ketentuan-ketentuan tersebut di atas atau terjadipenyimpangan, maka persetujuan prinsip ini menjadi batal dan PT. PLN (Persero)
dikenakan $nksi sesuai Undang-Undang No.41 tahun 1999 tentang Kehutanan.
9. Persetujuan prinsip penggunaan kawasan hutan ini berlaku selama 2 (dua) tahun
terhitung sejak ditandatangani.
10. Apabila dikemudian hari ternyata terdapat kekeliruan atau kekurangan informasi dalam
persetujuan ini, maka akan dilakukan perbaikan sebagaimana mestinya.
Demikian untuk menjadi maklum.
Tembusan :
1. Gubernur Kalimantan Barat (tanpa
Zulkifli Hasan, S.E, M,M,
2. Bupati Bengkayang (tanpa lamplran);
/3. Bupati ...
-4-
3. Bupati Landak (tanpa lamplran);
4. Bupati Sanggau (tanpa lampiran);
5. Sekretaris Jenderal Kemente.ian Kehutanan (tanpa lampiran);
6. Direktur Jenderal Planologi Kehutanan;
7. Direktur Jenderal Bina Usaha Kehutanan;
8. Direktur Jenderal Perlindungan Hutan dan Konservasi Alam;
9, Direktur Jenderal Bina Pengelolaan Daerah Aliran Sungai dan Perhutanan Sosial;
10. Kepala Dinas Kehutanan Provinsi Kalimantan Barat;
11. Kepala Dinas Kehutanan Kabupaten Bengkayang;
12. Kepala Dinas Kehutanan Kabupaten Landak;
13. Kepala Dinas Kehutanan Kabupaten Sanggau;
14. Kepala Balai Pemantapan Kawasan Hutan Wilayah III Pontianak;
15. Kepala Balai Pengelolaan Daerah Aliran Sungai Kapuas;
16. Kepala Balai Pemantauan Pemanfaatan Hutan Produksi Wilayah x Pontianak;
17. Direktur Utama PT. Nitiyasa ldola;18. Direktur Utama PT, Sinar Kalbar Raya.
Lampi ran‐ 3 : Formu: i r PN8P‐ 3
PERHrFuNGAN BESARNYAPENERIMAAN NECARA BUKAN P"AK( PNBP)PENCCuNAAN KAWASAN HurANTAHUN■
1 l DEN: ■ : AS PERuSAHAANl Nama Perusahaan
a Nomor Perset ul uan Pt t nsi pb Tan99alc Luas beradasar Hasi l Tat a bat asd Peぃ。gunaan
2 LokaЫa Kabupat enb Provi nsi
3 Al amat
I I . PERHHUNGAN KEWAl l I BAN PEMBAYARAN
J ul ni ah KewaJ i ban pembavaran
PT. PLN( PerserO)S100/Menhut VI 1/201420 Peb口」an 201464′ 62 HaPembangunan Su rET 275 kV Bengkayang‐ J agoi Babang danpembangunan St rrT 150 kV Si ngkawang‐ Bengkayang′Bengkayan9- Ngabang′ Ngabang‐ Tayan
Bengkayang Kab Landak dan Kab SanggauKal i mant an Barat
No xelompok Jenis Rp
Jumlah KeteranganPenggunaan Kawaian Hutan Luas (Ha) Tari f
1 5 6
1. Pembangunan SUTET 275 kV 1 R● 1′ 600′ 00000 Rp 3■ 160′ OD0 00
2. Pembangunan SUTT 150 kV 432フ 1 ゆ 1′ 600′ 00000 Rp 69′ 232′ 00000
Tot al L■ 6462 1 RP 1, 600, 00000 Rp ■03′ 392′ 00000
Tot al L2 000 4 Rp 1′ 600′ 00000 Rp 000
Tot al L3 00● 2 X Rp 1′ 600. 00000 Rp 0. 00】uMLAH PNBP( 1+11■ 111) Rp ■03′ 392, 00000
J uMLAH TERHυ TANG Ro ■03. 392′ 00000
Disusun,
PT. PLN (Persero)
l*II",LXARNAINdfr:nt r,rrtrcrn
t
″ a′ ‐ ′
1111: |: : : |: : |: : : ||: |: : 11: : 11: : : : : : :
: 1111:
'.,III.
Lampi ran‐ 3 : Fonnu: i r PNBP‐ 3
REKAPrTUl 』sI PERHrrUNGAN BESARNYAPENERIMAAN NECARA BUKAN PA3AK( PNBP)
PENCGUNAAN KAWASAN HUTAN
I. IDENTTTASPERUSAHAAN
1. Nama Perusahaan : PT. PLil (Persero)a. Nomor Persetujuan Prinsip : S.100/Menhut-VII/2014b. Tanggal : 20 Pebruari 2014
c. Luas : &,62 Ha
d. Penggunaan : Pembangunan SUTET 275 kV Bengkayang-Jagoi Babang danpembangunan SUTT 150 kV Singkawang-Bengkayang,
Bengkayang-Ngabang, Ngabang - Tayan
2. Lokasi
a. Kabupaten : Kabupaten B€ngkayang, Kab. Landak dan Kab. Sanggau
b. Provinsi : Kalimantan Barat
3. Alamat
II. PERHITUNGAI{ KEWA]IBAN PEMBAYARAN
,umlah Kewaiiban Pembayaran
NO. TAHUN KEWA31BAN 〕UMLAH( RP)2
Tahun ke- 1 103, 392′ 00000TOTAL
/R
ゆ AC
DiSuSun′亜2̈
1
■03. 392. 00300
Lampi ran‐ 1: Formu: i r PNBP‐ 1
MATRI K BASELINE RENCANA PENGGUNAANノ PINJ AM PAKAI KAWASAN HUTAN SESUAI KATECORI L■ ′ Lt t L3BERDASARKAN KONDI SI AWAL PENUTUPAN LAHAN
Nama perusahaan/Pengguna KawasanNomor/Tanggal perset uJ uan P"nsi pLuas Berdasat t n Ha, I Tat a Bat asJ e面s peng9unaan RnJ am pakai
Lokag Rn9am pakai Kawasan Kawasan Hut ana Pmpl n,b Kabupat en/Kot ac Kecamat an
PT. PLN (Pererc)S.100/Menhut-VlU2o14 tangqal 20 Pebruari 2014
A,52haPembangunan SUTET 275 kV Bengkayang-Jaqoi Babang dan
pembangunan SUTT 150 kV SngkawarE-Benqkayang, Bengkafang-Ngabang,
Ngabang - Tafan
Kalimanbn Barat
Bengkayang. Kab. Landak dan Kab. SangqEu
D susun,
No. Area‐
¨■ru/EL
Luas Izin Tl ( 2014) T2( 20■ 5) T3( 20■ 6)
L■ 64. 62 64. 62 0. 00 0. 001 Pembanounan SUTET 275 kV SUTET =1 213〔 SurET 0 0α
pembanounan SUTT 150 kV qtTTr = I aa)',
0. 00 0. 00 0, 00 0. 000. 00
NOTARI SJ OHNY SIMON LEFRAN, SHSK. MENTERi KEHAK: MAN DAN HAK ASAS: MANUSi A
REPUBLi K INDONESI ANOMOREC‐ 1139, H■ 03. 01‐ Th. 2002
Tanggal :
INomor i
Akt a
」1. Prona I I I (卜CarSma R I swahyudi ) NO. 58R■ 19Sepht t gan Bal i i cpapan― Kal l nant an T量 nur
Tbl p. 085101645820- ( 0542) 771658
口 iヽ l ■ 1し ■ l l a■ 1
‐ 11● 11: ‐ | ‐ i
一̈一一一
一 一、̈
一̈一^ 一一
一̈一一^ ̈ 一
■■ヨ一 ・
L` : Ft t I ■ r ,
ニゴ ー■ 三一
i そ ニニ=
一
た■ 」■ ■ ■ 二F t t t二 塁言三F
=t l ■」11■ 1: : i t i t : ∵i Lt」 : 二」患 r三 二J
Fu■ ■ l l l [三 t i l i j 二 l l i : 3毛「
u■ i : L ∵ 曇 ■ ■ ■ : l i 曇=■
垂 彗 二 ■ 1: モ ■ , こ 星 : = ― 一 ― 一 ‐‐ ‐
塾モI三塁di 勢曇■ 二重11ぎ a l l =毛丁こF f曇菫奎ビ 菫=H曇
重 Lt t Ft t i 里 F 主二重』ユ墨■ t t T夏ギ■ ‐
11■ t ar■ 墓 讐■ 己i ■ ■ ■, こ■こ垂F Pモ ■彗ht t di ■ 丁曇■曹 i 菫曇r l i t t i 量し■l i bせ I t t ■ l l ■
■ ■ 二F 雪モ i l =ニ ユ 三二L曇毬l r■ 晏星[ =■ ―暮三=3■ 7~曇 : l f ■ i l l こ 11・Ft t i =[Ⅲl ■ ■ ■ t i l l i t i
せ暑1曇 I t t i l l i ご 暑I二曇 二 i ~■
―一 T Li ニュ 互彗ユ三r」繁菫」亀二重′ Fi ご 響三 員t ■ ■ [ i I : 1■ ■ ■モニニ=′
一一・ 一■一
〓一一 (‘,
一̈】・̈ ・一・.・
一一一一一一一一
,一
一一・
一二一一一
一一一
一一「一一
・一一
一一「一一
『́一一
一“一一
一一]̈一
・上
一出一 r■
一一議〓一・ 一̈̈一一
〓,ら一 一■一
一一一一一一
・一
一一〓一一
・一
”一 ・ 一
二一一一一 一一一,ヽ
一一、
・
〓一ヽ一
【〓一一
一■一
‘̈,,一象
,
一.一一
・■一一一 ・‘
費一 一■ヽ
・―二 一”“
一一一一一 壼一一一
一〕・ 一一一
一一一一
■一 ■
員一 二一
一二 一〓響
一】一
一r一一
一一J 一∵
一[一 一[一一
一■・ 一”・一一一
一一〔摯一一一
・̈エ.一一「一一
」一」一〕一一
,,‘‘一
「,一 一【一
・一 ″【一■
「一
月,
「組
ュ
■「 ・二
〓一 ̈ デ〓
聾登I i 3t二 響二F i 三二曇 =二 ■ま籠曇■ 春ヨーl _ l i ― l 警 馨薔
■ ■■1■ . F=| =L■ ■1=r t , 3F
Iモ ニ1_l ゴ 豊員三■ ゴuri f t t T■ 3÷ ′
■=■
■l i l =「 量=■
■奮=二
■ l l . ■ l i t i : l l 」 三二■ 亀 l l l I : _
E電=曇
二 i l _■ ■ } : 響 曇i 二丁=i l . I I I i 二 墓量■ l 二 1■ 11■ 1
F」 ■ ■ 二: l i ■ 1■ 1. : i T■ ■奮曇I F「 モニt誓 曇■琴 I t t I 1l i l i 三 ■ ■ ■ ] ■ ■■1l l 薔 ut
t l r t l 二 i 〕 二喜巻春番=曇
F r t t i l 警 =量 I t ■ : i 二 」二 ■ ■二 ]垂 」■ ■ ■ ■ 1
曇三二■ i ■ ■ 1]三 員
: ∵ : t i I I : 」 ■ ■ t i t =二 ■ 習i l l l l l f i ■ i ■ 三二 ■ 三二 二■ ■ ■ t r i ■ rLi 二 : = こ二■ i ■ l
■ t rdi ■ 曇ゴ=象
■ : 1モ むLi i t i 喜 三■ 二' 二
I ■ ■ 三i t ―
一 一
一一・一一
=三i l = l . 11: I i 3二 ごi ] こ i 三 ■
=二■ ■ i l l i t t f i =三 I I三
l 二 1二 . I , 事 1■ ,
コニI ■ ■ ■二 FT̀
1. 1111: I i 「 二i l l
一一一一一一
〕・l i l ■ i モ I t t i t i
■ i :
一 ´ ~
■ ■ ■ ■
■ 1: ご ユ|=
〓「〓 一一「一一
一一・
一一一一
一一一一一
一一一̈一・
”一 一一颯
一●一 事1
¨一ヽ一
■ 1: ■
二T誓「 =] l i . 書i . i ‐ i 三 : :
≡=■
暮二i 士 三三 二桑■ ■ ■ ■ ■ ■ Fr」 ■ L: I I二
ヽ二 i 二 塁
‐11_t t t t t「=邑
重 =■ ・_t i t i ご=■
i t l ‐ ■ ■ ■ ■ 奮i l 二=一
春ニー重幸l l
t ■ i ■ ■=」
姜i 」 百 二== I t t LLl ■ i ■ i 喜モ■ i 言 I F ニニI三 二i ■ i 二重i l
“■ 十■ 員二 上 i 」 unt ut ご曇n i 三 三二 I Li ■ ■ Pt r奏 モ」
=ままI Tモ 」
. ■ ■ =i ■ ―
I : T. F t t ru暮二■曇■■ L二三二」二= Ⅱモ曹三」曇 : 重 曇r菫七ゴ■
― Ft ■ 華hi 」曇, 瑾i ■ 曇鳳 Ft二 ■ dut i ■ t t rt t t b暮 ■ ■1篭 二重r曇 ■誓I t t i l i t l ] ■ i bi : 1
二曇i l ■ i l 11 ■ 二h三二塁I ■ ■ 薯i丁曇F I =i t t r二 =´ha■ ―■曇■ 三モ壬最曹曇二 i t r i ■ t : = こ ^
呈こ: vf a pこ二邑 pri n3二 重ュvこ I二三二 」■ ■ ■ ■
■ こ■i 墨 碁an h■ ■ 曇■ 種露i LL pt ==こ 11ぎ 三ヽ1曇 Iセ 暮 I T i t i l =: =晏∵曇t l 曹 ~‐
I二奮=二 Bこbう 二警 毬羞二 三¥TT l 三 警 I∵ 喜二El t t I三百三r l 警 一三t i l i t t t i l l =F
碁差■苦ヒニ丁曇11菫 ―誠奮毛b三 ■曹F H曹 曇bt t i l ま ―=ri l 「■ ■ 曇. : 1. FT, ] Li l i l ■ 1. ■ 七[ [ |:
芸モl u塁塁 士 TTFT拳 百三 i t ui 彗 三 ■ ■ 11: L i ui u■ i 二 ■ i ■ l l ■ 1l i [ ‐ 11■ ■ : 1 -― ^
, t r i t rat ut t Lモ kt i r i ■ 量ユニ■ i i t t I I i t t t ur 重二11] =工 ■ i I三二 =こ冒こ菫i ■
こ垂■ _l i ■ 打● 聾「
せ二墓曇ゴニ 三登I I t t T二 」 ゼ曇二桑 ] t i ‐ t r■ 三二塁二 : =電 モ=i ■
‐■ ―
塾■ ■ 曇■ P曇 1こ I i PI t t Pi ■ モ■誓ヨ■ ■ ■曇■ ■曇l l ・■=三
二 I ■ t i l l di ■ ――
■ t i t i ■ ■ ■ ■ ■ モ■ 二■ i Hi t l di ■ i i l l t r手 : l 琴 諄三 I t h三 し i ■ t t i =三 二 ■ ■ ■ ■ ■ i l
三二. し r i ■ ■ ■ ■ 誓ヨ■
二Li 圭墓 ri 二 ■ 三■ 菫 裏r垂 菫上 l _モ 」事二■ 雪子11 ■ t i l 琴 二重 =こ t t r i ■ ■ L」 喜 .
Ari i l i t r曇 量Lut Lモ=こ
■ 二 」i l 二 1■ [曇∵二曇二■ ■ 1: t i l l F」 =二1: ■ 三二
)一・̈・o
一一一
一一一一一一
一一【一一
一】一
「ヽ
籠一 一[〕
t =■ 11■ ■
〓一̈
可”.̈^一
: t i ニ ュ
i t二 讐塁=
一一〓一̈一一〓.・一一
o一一一一
一)̈一
【土一一■
〕: ■ ■二∵=三三 二■ ■ ■曇
I三二」曇」 ■ i t t i― ― _
l i , 電 T : だ 二 量曇l l I ¥」 I I I=量
二■ ■ I 圭
善量上」■ i 二一一一一
一一一一一一一
一一一一ヽ
■‐寸―――‐,―――‐―‐
|
|
|
|
t i 」 三二■ ■ 11: [三 I :
i t i t t L=■ ■ ■ ■ ■ 二三ri i t i t l i ユ l i t i ■ =モ喜三事二■ l l l ■ ■ 三
I t ■ Tt t i t t I彙 ■ 三二豊i 二 桑■ i l l i 三 丁二, Iモ ■ 二」二喜 ■ ■ ■
t t r善 モし■l i Li ■ ―t l t t l =■ Li f三 二 喜量=二
三■1■ 1
Fi l i l l ―一一――一――‐―
■ ■「 i [ t i l t t h曇 二曇I 二こ■ , 事 J = 二 i ■ i l sう ■ ■ [曇 二 『
I t t Lr i 饗 量 i ■ 毒■ ■ 二」= =塁下 三き i j l ― ´~
nt i 二 [三 ■ ■ ■ 打三■ ヨモ Iユ ニ正三芸■ 手■ ■
Li t i n Yこ ■黎 =l l ニニ三 二二こ■■ 曇二重義I t t Lユニ三■ ■ ■曇■「
二 1■ ■ 11■ l l i 奮 曹11 ~~
3モ l 量 =象二重■ i j 曇 ■ 蓄f t t i f i =■ ■ ■ 三二■ , ■ ■ 1曇 I
「曇
=1■■ 豪 三雲■ ■ ~ ~~
ht : ■ 曇i l F ――~~~
: [ モ ■二==二
■ こ■ ■ ■ ■ t」 三二i 二 1■ ■子■ ■ hut i ■ =■ i ■ ■■ ■ 七ゴi t =ご 菫」L ~~̂~~
警竜■■ ■ ■ 豪■ 警~11■ ■ ニユ1=■ 「
: =モ ■■ t i ■ 二ri bi 二 _I 11■ 聾■ ■ ~
■ ■ ■ ■ t i ■ i r l = i 二 =二 ¨ ~ ~
t ■ ' ■ ■ ■ ■ 3二 ' ■ ■ ■ 曇, こ ■ _l i ■ : ~~~~~
j . ■1‐ 11■ ■ 」11■ ~ ~ ~
: |■ ■ ■ i 」 l l i 一 ‐一 ~~
墨 菫 E事 二―
=二
菫 墓 二 ― ‐
一
一〓.一 ・́
”一一,一
・,一
三七二i t r二 費i l l i モ ■ ■l di i ■ ■ 曇曇彗■ i r i f i ■ ‐
■ ■ ■ , ■ 」1 ■ 三t =i l l 「 三]三 ■ i ai l t l 三 だし=二
■
」i t ■ 1モ ニ■ 11 =モ∵=i 二」三■ ■ t ■ l ま■彗■■
「t r■ ■■ ■ ■ 1- ■ l i 二 ■ ■
=三二 I t ■ ■■ 1: I ■
i t i t壁 Ib晨∵ こ I「 三二暮 I ■ ■ ■ ■ ■ ■ ■ i ■ こ■ t t警 手=■
■ , rr■・F二=二
_ ■ t i r」 t i せ 」―
■ i ∵ i I ■=三
■ 1『 彗番I I F ■ i nt t ■ t讐=二
菫三三二 1番■ i ξ
をし l i き 二」こTi r ■量■■ I ■ ■1■ 曇■ H量 ま三ゴ= 垂uf三■ Fi ユ ニf Ft i 警 讐Li ここ■
■=二 l I二=三
i H」 t =員 :
: : 量 ■ bi vi r , そ ■ 11■ ■ ■ ■ こ■ ■ ■ l i 三 ニモ奪三三曇二 青t ' 二 ■ ■ ―――~‐ ~~~~
三I t i = ∵三■ f i ■ ■ i ■ i ■ ■ i ■ 七1■ ■ ■ F曇 ■ ‐ ~~
ニモ■ ■: 三 二 番モ=曇
i t l r二 ■ ―――~… …~~
|三
|=ゴt i t f l ■ ■
' i ■「
i l l i ■ i
■ 」竜=二
=t i =二 葺i ■ ■ , ■
' |● : ■ |: ■
‐|1111‐ 11: : ||: I I I =: 11 ● :
: ■ ■ ● : ● : ■ 二1‐ 二: =
一一一・
」i t t ■ i ・F三 二: ぞ■ i =l ■ i ■ i ti t l i : ■ |■ 」三i i t i ■ ■ 1■ : l
|三 二…
■ ■ I ‐=■
1‐ 「i 三 ■ ‐ ■ ‐ 「
I i t ■ a■ ■ [ ■ ■ ■ ■ ■ ■ ■ 三二■ ■ ■ ■ ■ 三二 」三二==二
1■ r i 二 」■ 主主 1曇 i ■ 」二垂 I t t i
i l 二 ご二■ ■「■■ l al _f ―――
} i ■ 1. ■ =I =二i l , t i i t r i 曇 丁三■ ■ l i ■ 二丁二I二
=二I t二 =モ i ■ i ■ 」 i I . t i ‐ 1
R三 丁 象 F =壱 =1_: i ■ ■ t」 三 i J 」 毛 二 千 モ I ■ ■ 二 ■ ■ 奪
一■ ■ ■ ■ ■=三
二 F~… … ‐ ~~~~… … ‐ ―
|こ =Ht t t i T=二 =ニ ユ ‐ ■ 事 事 i モ 1こhi 讐 二丁=裏 ■ nt i 一 ―一 ――
I FT= I二 =i Fi 婁 三 二壬■ ■曇 」=i t t T. 三ニユニI Iこ l Li 」 ■義∫ 事 一…――――――~
|
I Lt rdi 菫象」
=■■ 1■ ■ i a」モ三二 Ti l l 誓 三二f■ ■ 三
=曇r l i tヨ l l 三二
・t r i l ■ 」i l l
l
l F毒」 ■ l ■ ■ 二 ■
誓
一 ■ ■ ■ 三 ■誓
■ ■ 二 ~~~~~~‐
~~一 ― 一~~― 一
~~~― ― 一 ― 一 一 一 ― ― … … … ― ―
― 二七■ i ■ i l i I二∵三 : l i 三 二I 三二1三二三千三ニ ニニ丁i ´ I ==二 」二J 」 i rL ■ i =ニ ユー喜量=i ■
i モ I =t i l l i Fi ■ i i 二 :
l . T=圭 ■ ■ 曇三釘ゴ J 苦塾雪≡彗肇l 彗= ゴ=重三二 百議二夢讐≒ 垂 . 三 ‐ ∵i f =i l 饉 モ彗二r i ―― 一――
1■ ■ 巻 i l 生 事二■ ‐ l i : 11」 二■ H七 二塁二F ■ 曇二■ i 曇 : L菫 多i l 春■ ~l i - 11暑 ‐1 1■ 曇曇…
I I壼モニ] t r i t r i 曇 ■ 3モニしi l t t l l r i t uF t ■ 三■ ■■■■1 ■ut ul l i 「
i 豊 」∵ i Tt t l l i ∵ 曇百三手 i =量 」i t ■ ■ ■= =l i l =奮
三二 三二 ■ [ i t i ■ ■ f t I I F f t t・ 曇」: ―
■ i 膏 曇 l i rF ■ ■ ■I = l 手 11 ■ 唾■ ■ ■ T量 ■ 曇 : l ==ニ モ讐二「 ■ 11三手J i l i f二 I l i t l i l . ・
i [ モ ■ , r i i 三 二 ■ i ■ ■ 二 [ : 曇 三二 F テ・i ‐ 1二 ■' I t t i l l i . ==ニ
ユ=r i i ■
1_i t t t i ` を , I I t i i
■ i l ■ t蓄 曇: 11 ■ l i =■ 1: 1: 曇 三ニニ ー ` 一―‐■ ■ ヨ=」 F r」 ■■ 1■
' 二 =暮 1「= ■ ■ 」曇
=,
三二=l i l l i 二 l l t t I碁 手暑墓´ ] : ' こ ■ 」 芸モ■l i l l I =l i i ■ i ′ l i _
■ ■ ■ ュ 舌二■ i ■ 二 : l i f i ■ i 象■ i 三 ■ ■
I七 ■ 嘔=圭
■ i l _ 」二i f i ■ ■ 丁t i ■ i i ■
i I ■ ■ ■ ξ モ■ ■瑾三 FT= 正三二二fこ菫三
ゴ: 1_1=二 r l 「
予t i 奪 モl i l i 二 ■ . I Pt ■ ■ ■ =i ■■ i f l 一~~
■ i i ■ i 二■ ■ I rJ = ■■ ■ i i ■ t t i bな 」 ~
一一
一
・‘一
一̈一一一
ヽ
一
「一一一一
一一一一一
一̈一一一̈
一一一̈一一
■ゴt i l ■ u■ ■ =
i t r三二曇 f二 i ■ ■ ■ ■ i l =
■ ■ . 11■ 」f i ■ l : t f i l i ■ 1■ ‐■ l i
ニニ: l i t i 三二 墓■ ■ ■ ■三i 響 , ■ =ごi t i ■ 要奮三二 三二―l l ‐ 11三 曇 : こui
i t r二 」」 こt ■ l i ■ l 二 ■ ri ■ u= 上i ■ l i =: 」 」_1■ ■ 苺t二三′上上 t i l l
I t t t i l l ‐ こ二_ ■ モ響i 」 二 三二I二 1, 二i 二i l i ■ ■ ■ , 三 i l .一■二〓」
一.
一一一一一一^
一̈”一̈・
一r一一一一“一 一一〓
・,一 i〓
一L・ 一一一
一一”〓
一一^ 一一一一一
一̈一一一一」一一・ ・・
一彗一 一‐〓
畿■・ ・ケ一
一‘一 一廿
一一一一 一,,一
一ヽ一一 一一彗
「電」■ ■ ■ ■ 三モ■
Ti t i 三 ■=奪
三 i 善 巻
三i ■ 二二七i l ■ i I i l l t t F L] : . ■ ■
■ i ■ u r i l i t t i l ■■1■ 嘘■葺 ■ i t l 暑 奮ニニ= Ht t ■ i l ■ i t i l l ― ―‐
■ i 二三 二三二ぎ要三二 l 言 ―÷ l ― l 壬 三T : 二 t i ■ ■ ■■ 」t i ´ 曇き
ご=三
二塁 i t ■ ■ , 曇 ■「
u■ i n t ul ■ : ■
Lモ I I t聾■ ■ ■ 二i l l 蓄 黎■ 1 」二 夏● 二曇 ヨモ舌■=F i t三
]二
二i l i ■ ■ ■ ■ 塁: 1 薯モl 曇 三曇■ . . I t曇 3a■ i 貨■ こ重曇l l F ' 量 ■ 垂響ニユぎ 三塁r■ u
■ ■ ■■ ■ P■ ■■ _i t t u登‐ l l =ェ● 」 i t t l l 幸 尋, 三 二1三 二螢. 警 薔拳童. ― ――一―一―――――
T l i ニ ュ ニT蔓ビミ 亜三二Fi 菫 ]∴■ 喜¥菫i t t i l f曇 ]奮 三 Ht =手 r i l l i d■ ■ 宝喜二■ ‐
■ i l l i ■ i ■ : : モ =二■ ,
■ 曇■ ■: 二 」■ 三菱」■ Lt i
■ i r l Ft t l 「曇■ ■ U] : ] : F
■ ■ i ■ ヨ{「 : i l , ■ L碁■ ■ ■ モ1: こ ■=奮
曇 春 i l F t t u: 子 J : 1
∵塁=雪
曇 春[ : 三 F I t l l : rt t i l 曇 墨 =二 三二I ul 丁 曇F I t i 三 二三i 桑 1l Ci l 薔 ■ ■ ■ f ′ ' 1■ =ニ
I t吾 ■ 1「 . I ] ■・‐ 1「こ 曇二 I三 ■ . 卜i =亜t r i 垂 蓄 三曇[ ■ 1_1 l i l l こ ま ――
「七■ ■ J i t i = l l ■ ■ ■ r 三二T̀ 警 こ l i t t l i Tモ : 曇 [ i l ′ 丁 墨垂事 ニモl l l t I I塁 1' ■ ■ ■ ■
二i t r i t t i 三二 塁塁1_■ 竜■ 曇, 曇 ■ .
l l i t i l ∵ 二■ ■=■
■ ■ 七■ 1: ■ ■ ■ i ■ ■i t ■ i 三二二■ 三=■
■ ■ t l t i t t r i f t―
■ i t i t i _t i 菫 =二 ご三 電: ■ : l 曇 = 3モ ニu二二 L‐ こ■■ こ Iモ ■ 1モ ■二l ∵i 111 -
」七r i i l l 華 奮Lt t l ■ 1義l f i ■ ―一
■ i _ l i l l ■ t i l l l ∵ 曇 =: i r i ■ ■ i `l i : =
■曇一一一一一一■■一■
I t i l ' F三「]二 I三 ■
̈一
モニ■.一■
一
―――トーー
3t ■ ■ ■ ■ i l i t F‐ 「i t i l 書 ニt i l : ■: 二 ■ ■: 二
て■ ■ ' こ ■ 曇 喜曇
1l t : ` : 事 t r i ■ i =二 主■i■〓ユ一^】一一一
■一 一 十一一̈一 一
1■ ● :
■ ■ 雲t i t墓 三二 t i l l =二
i 三 : l i 二 =モ Li 彗 三二三塁■ i
二七■ 奮ニユ
■ 二塁¥Ψ
[ : 二 : : l l : I l l t l 三 =■ i ■ ■Ti I : : I
I量 」=t i ' ■ , こ二三 L三警上二j L こl F■ 」_ ■ 三 r i _
ニぎ.一一一一一一
■三i■i三静〓三一一一一一一・■一”F墨一一F一三■■,ュ一一一一一一
一〓〓
■二l l 要 琴三二 : 三二
1‐ t i ニユ誓響二 f F
ニュL二 貞で曇, 二 ■
I丁春■∵■ F誓 [亘
三二■ i _ l i r■ i ■ t i :
襲 ビ馨〕I = . ‐ ■ I丁こ∵三■
塾i ■ i I「 i ■ i n′ =三 ■ i ■ 1モ , I I } : = 二幸F rl ■ ■ 1_1■
I t ■ l i ■ 曇員 曇 ■ ■ ■ r i n響 ご=こ
員 藝 F ■ t i 菫 1■ ■ ■ 二 ■
t : L_二 r i ‐ 三 I Iニ ユ ニ 三二 i r i t t ■ 曇 ■ F ' ■ i t :
■ i 三ユI ■ F I i r∵ =∵■ ■ : : ■ ■■ゴニ≡F 」t・ t t t ■ ■ ■ こ‐ ~
I二 : l 曹 習 =上 毬 三 二 i l ■ 辱 三 千 三 二 F _L t t rumt t hこ ■ 吾E■ I F
・二=[ I . : f I I =}」
` 一
モ: 4, ■1: 尋ヽ . _ ■ t i ■ ■警暫三 Ti F ■・ 尋・・ l f i r奮義 二重′ H七 1■ 1] ■ 11■ ■ ―一―‐ ―
: i l i l l ■ l ■ 雪 ユニ1■ 奮二三F 」. 量 ■ i ■ ■ ■ ■ ■ 聾菫■ 二■ 三F■ ■ i t l i t t t i 「 I ■ ■ I t ‐ ――
ニニ三二[千三「
二■・~
一 I t二 J i 一 二」曇l l 丁= 言t毎 =l f i ■ =二 ■ ■ =r ■ ■ ■ 豊]二 3′ Lt r i t i ■ i t
i 二 ■奮≡i l 二ニ ニi ■ 二■■ ■ ■ 二■ F ニモ」こ誓曇」_ ≡二=二
二 .
■ I I i ■ i l i ■ 宝ニモ■ t t L 事曇丁三F : : i t i 」 ニヨ 讐i ca与 阜■ i t ■ 曇二■ ■ ■ r i
[ t i l ■ |■ 二 i ■ t t ■ i l ■ i r i 3二=■
i F ■ 三=曇
i t i t l _二=三
二 t u l l i 琴 ニ ーー ーーーーー ーーー
三二三■■■ 手t i ■ 奮i nl _ ■ 1■ ■ ■ ■ゴニ Ft i t t hi t t i 舌 = Fニゴニ 姜二=31 ■柱: 1 晏■l F毛 ´ ~~
1l i l l i 」 二==
| 二二̈] t i 二 l i ニモ■夢曇11 ■ニユI = 三塁蔓]こ L豪 二=
I二 重■ こ 曹ニユ三二曇11 ■ ■ ■ 11手 l l ■ 三 ~~
l i 」 t i t i ユ [ 1. ~~~` ~~~~~― ― ― ― ― ― 一 一 一 ― ― ― ― ― ― 一 ― 一 ― 一 一 一 一 一 ― ― 一 ― ― 一 ― ― 一
~― ― ― 一 ― ― ―
1: i . : 千 . ‐ ‐ ニ
|
|
=t i =嚢 三二 喜曇■■ ■ こ■ 丁i l l 誓 ≡三二曇 ■ u■ T■ ■Ti ・ ~~~
一̈̈.一一