S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

Embed Size (px)

Citation preview

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    1/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    2/134

      ROUDLY AN ISO 9001:2000

    CERTIFIED COM ANY

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    3/134

    COM ANIES ROFILE

    COM ANY NAME : M/s S.M.Asghar ( vt) Limited

     

    n ISO 9001:2000 Certified Company

    COM LETE ADDRESS : 908-910, 9

    th

    Floor, Chapal

      laza, Hasrat Mohani Road

    Off I.I.Chundrigar Road

    Karachi.

    COR ORATE STATUS OF FIRM : RIVATE LIMITED.

    TELE HONE NO : 00+ 92+213-2468091 -5

    FAX NO : 00+92+213-2468096.

    FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).

    DATE OF REGISTRATION WITH : 30-03-1980.

    CUSTOMS

    E- MAIL ADDRESS : [email protected]

    E- MAIL ADDRESS : [email protected]

    Web- age : http://www.smasghar.com.pk

    DATE OF ISSUE OF LICENCE : 30-03-1980.

    NUMBER OF STAFF EM LOYED : 20.

    YEAR OF ESTABLISHMENT : 1980.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    4/134

    SYED KHALID JAMAL CHIEF EXECUTIVE

    SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION

    SYED MOHAMMAD ALI KHALID GENNERAL MANAGER

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    5/134

      EO LE BEHIND THE COM ANY

    SYED KHALID JAMAL : CHIEF EXECUTIVE.

    SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV

    SYED MOHAMMAD ALI KHALID : GENERAL MANAGER

    MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.

    MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION

    MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.

    S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.

    MOHD SALEEM : ASST PORT OPERATION.

    MOHD JAVED : ASST PORT OPERATION.

    QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.

    SALEEM NOOR : ASST. AIRPORT OPERATIONS

    AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY

    SAEED KHAN : HEAD OF COMPUTER DIVISION

    DILSHAD A. SIDDIQUI. : MANAGER FINANCE

    ASIF KHAN : ASST. MANAGER FINANCE

    ATIA FASIAL : ASST. OFFICE CO-ORDINATOR

    SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR)

    ASAD ABBAS : ASST.BILLINGS & ACCOUNTS

    MOHSIN KHAN : FIELD OFFICER.

    SADDAM HUSSAIN : FIELD OFFICER.

    SULEMAN : OFFICE PEON.

    USMAN GHANI : OFFICE PEON.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    6/134

    SECTION 1 : INTRODUCTION

    SECTION 2 : SCO E OF WORK

    SECTION 3 : DOCUMENTATION

    REQUIREMENTS

    SECTION 4 : ROJECT REFERENCES

    SECTION 5 : ICUTRE GALLARY

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    7/134

    We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars.

    You will appreciates that in all of the Projects mentionedbelow we have taken various Exemptions & benefits ofvarious SRO’s from Customer to Customer& on Project to Project Basis.

    With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & PrestigiousProjects of National Importance as well asInternational Importance.

    We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.

    Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.

    We believe that our Professional approach to ourClient is unparalleled by any competitors.

    Few of the recent Projects & Customer Referencesare given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    8/134

    MOL MAKORI GAS FIELD

    SRO: 678(I)/2004, DT: 07-08-2004

    Petrosin Ravi 

    SRO: 678(I)/2004, DT: 07-08-2004

    SHELL GAS 

    SRO: 678(I)/2004, DT: 07-08-2004

    SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture

    SRO: 678(I)/2004, DT: 07-08-2004

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    9/134

    Expansion of Plant: RAVI GAS 

    SRO: 678(I)/2004, DT: 07-08-2004

    WEATHERFORD DRILLING 

    SRO: 678(I)/2004, DT: 07-08-2004

    Petrosin Engineering (One of the Largest Private Sector Project US $ 700 Million Dollars) 

    SRO: 678(I)/2004, DT: 07-08-2004

    TRANSASIA REFINERY LTD (Re-Location)(One of the Largest Private Sector Project US $ 700 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    10/134

    INDUS REFINERY LTD (Re-Location)(Another Largest Private Sector Project US $ 650 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006 

    DESALINATION & POWER PROJECT” at DHA Karachi

    (Total Cost of the Project US $ 160 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006 

    KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi

    EXPANSION PROJECT & NEW GANTRY CRANE

    (Total Cost of the Project US $ 400 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006 

    MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006 

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    11/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    12/134

    DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

    KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    13/134

    PROGAS LPG STORAGE & HANDLING TERMIANAL

    (Private Sector Project US $ 50 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

    FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006 

    PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT 

    (The Project Cost US $ 6 Million Dollars) SRO: 678(I)/2004, DT: 07-08-2004

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    14/134

    CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIRBHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENTPROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

     ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)

    SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.(The Project Cost US $ 20 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    15/134

     ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

    SRO: 575(I)/2006, DT: 05-06-2006

    FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.( The Project Cost US $ 50 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1

    (The Project Cost US $ 130 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    16/134

    DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2 

    (The Project Cost US $ 130 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)

    (The Project Cost US $ 30 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    17/134

    S.M.ASGHAR ( VT) LIMITED

    908-910, 9

    th

    Floor, Chapal laza, Hasrat Mohani

    Road, Off I.I Chundrigar Road, KARACH I

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    18/134

    We have a pleasure to give a brief introduction of our Company

    M/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,reliability  & commitment in this part of world.

    We are proudly an ISO 9001-2000 Certified Company.

    We are among the few & pioneer company who got theISO Certification in Custom Clearance in Pakistan.

    With our background experience, M/s. S.M.Asghar (Pvt) Limited  

    has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.

    Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personal

    approach we feel makes us a formidable contender.

    Our Credentials our Enthusiasm and our Track Record speak forthemselves.

    For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited  have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.

    If one can give a brief look at the Pakistan’s Most Advanced

    & the Important Industrial Estate PORT BIN QASIM,  by the Grace Of All Mighty Allah it is an Honor for

    M/s. S.M.Asghar (Pvt) Limited  to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation tothese Prestigious Projects.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    19/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    20/134

    ENGRO ASAHI POLYEMR & CHEMICALS (Another One of the Largest Private Sector Project US $ 80 Million Dollars)

    FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid)

    LPG BREAK BULK SHIPMENT (Handling of 100% of Pakistan Break Bulk LPG Shipments at EVTL)

    VCM BREAK BULK SHIPMENT (Handling of 100% of Break Bulk VCM Shipments at EVTL)

    ETHYLENE BREAK BULK SHIPMENT (Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)

    K  ARACHI I NTERNATIONAL C ONTAINER T ERMINAL (KICT) P HASE II E  XPANSION P ROJECT (Total Cost of the Project US $ 400 Million Dollars)

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    21/134

    Beside the Port Qasim & Karachi we now take a trip to the otherside & rest of the Pakistan Major Prestigious & Project of National

    Importance.

    The Government of Pakistan in the last 5 Years initiated the fewHydropower Power & Dam Projects to overcome the Power Break downCrisis.

    Hydro Power Sector 

     Among these Projects of National Importance includes:-

    MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

    SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)

    MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

    GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars )

    DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

    KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

     ALAI KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)Beside the Hydropower Projects, the Government also encourages theother areas such as the Sea to generate Electricity, beside the supply

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    22/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    23/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    24/134

    SCOPE OF WORK 

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    25/134

    BENEFIT OF VAVARIOUS

    CONCESSIONARY

    SRO’s & EXEM TIONS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    26/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    27/134

    CUSTOM CLEARANCE:

    We shall collect in full advance all the necessarydocuments for the onward Custom Clearance fromthe Importer / Representatives of the Importer when intimated and will prepare GD and all therequired documents and formalities to be submittedto the related Custom Authority and Will Completethe preparation of the GD (Goods Declaration) asper Invoice, Packing List & Bill Of Ladingdepending on weather the Vessel has arrived and

    also subject to the Lodging Of Manifestation ofIGM (Import General Manifest) by the Shipping Company / Shipping Agent.

      OBTAINING THE DELIVERY ORDER:

    We shall complete all the formalities required by the relative Shipping Agent /

    Main Carrier Agent/ relevant Port Authority and will obtain the DeliveryOrder  from the Shipping Company/ OR their Agent against thepresentation/ submission of Original Bill of Lading.The delivery Order's are generally issued after filing of IGM in order to

    ascertain the goods have not been Transshipped.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    28/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    29/134

    DELIVERY AT / TO THE LANT SITE

    We shall safely Transport the Cargo by theTrucks, Trailers, Multi Axle, Low Bed OR asper the requirement & Nature of Cargo to theWarehouse or the open storage area as perthe instruction of Importer / Representatives of the Importer.

      CUSTOM DUTIES TAXES

      SRO’s AND NECESSARY

      ERMITS

     All the Plant, Machinery, Equipment and Parts/Spares which are importedinto Pakistan shall be subject to Custom Duties and Taxes Prevailing at thetime of Import.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    30/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    31/134

    2) WEST WHARF:

    a) Karachi International Container Terminal Ltd (KICT)

    b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25

    c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.

    For Containerized Cargo the various Yards/Ports are charging different

    Handling Charges/Lifting Charges/Examination Charges/RD/Seal BreakingCharges/Yard Storage Charges.

    Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.

    Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing atthe time of Import shall be Paid by the I m p o r t e r  immediately before

    the Clearance of the Consignments from the Port.

    Further the completion of GD’s (Bill of Entry) and other Custom formalitiesare subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.

     Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /Bill of Lading OR any other relevant documents submitted by theImporter ,will may render in delay to clear the consignment.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    32/134

    SUBMITTAL OF SHI ING GUARANTEE

    BOND IN ABSENCE OF ORIGINAL BILL OF LADING

    If there is a delay in the arrival of the Original Bill of Lading, can cause a

    delay in getting the Goods/ Cargo release of the from the Portpremises/Yard.

     A Shipping Guarantee Letter/Bond for the said Bill of Lading would betherefore required by the shipping company in order to issue the DeliveryOrder.

    It shall be discussed and settle before arrival of the vessel. We will provideall necessary assistance and advice for the Shipping Guarantee to theImporter / Representatives of the Importer .

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    33/134

    During the Unloading of the Break Bulk/ loose Cargo from the vessel

    There are chances of getting the goods Damage OR in case we find any

    Loss of Goods and or the Goods already Damage on or after its receiving

    We shall report to the Importer / Representatives of the Importer or

     Arrange a joint survey as soon as possible. Marine/Transit insurance

    Shall be arranged by Importer / Representatives of the Importer , from

    Place of Origin up to the Plant Site.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    34/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    35/134

    The G.D (Goods Declaration) is prepared in accordance with the

    declaration of the Importer and the documents provided by the Importeri.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter theG.D (Goods Declaration) is submitted to the Custom for Assessment onLine.

    * The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.

    * If the assessment by the WeBOC is done as per the declaration of

    Importer, than the G.D is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues& Excise Tax.

    In case the goods have been processed under WeBOC SYSTEM  does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.

    The Custom Authorities may defer in three basic ways :

    1) Disagreement in the PCT OR HS Code Classification.

    2) Not extending the benefit of the claimed SRO.

    3) Disagreement with the Valuation.

    If Customs satisfy with all the 03 criteria’s mentioned above i.e.

    PCTSROValuation

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    36/134

    The GD is than completed by the Concerned Group. The Importer has

    to than pay the Applicable Duties & Taxes after that the GD isforwarded to the Port side for Examination after which the Importer cantake the Delivery of the goods after the payment necessary PortDues.

    * If Customs do not satisfy with all the 03 Criteria’s mentioned abovei.e.

    PCT

    SROValuation

    Than the GD is forwarded to thePort Side for Physical Examination tocheck the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    37/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    38/134

    The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Sea Port.

    I Original Invoice showing complete description of the goods with valueof the each individual item

    II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.

    III Original Bill of Lading duly endorsed at the backside in our Favor.

    IV Certificate of Origin

    V All Govt. Sanctions, Authorization from Government Agenciesif any

    VII Original Letter of Credit

    VIII Sales Tax Registration Certificate

    IX Import Registration

    X National Tax No Certificate Copy

    Any other document that may be requested by the Custom to verify thedeclaration of Importer 

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    39/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    40/134

    Further to the above there may be delays in Clearance due to followingreasons:-

    I Non availability of the Original Documents, such as BL

    II Delay in meeting Custom Queries.

    III Strikes / Weather, Act of God, Force Major Etc

    IV Delays due to Non-availability of concerned officers.

    V Delays in receipts of payments

    VI Delays due to the Non-fulfillment of Shipping Companies

    VII Delays due to Non-availability of Trucks / Trailer 

      OSSBLE

    DELAYS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    41/134

    PREVIOUSPROJECTS

    HANDLED

    .

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    42/134

    CLIENTS ROJECTS

    * M/S ICI AKISTAN LTD.

    C/o TRANSCAR ROJECTS LTD

    ICI TA ROJECT ORT QASIM

    * M/S ENGRO AKTANK TERMINAL.

    CHEMICAL STORAGE TERMINAL

    * M/S NOEL LGA (GERMANY)

    L G EX ANSION & MARKETING

    * M/S ENGRO ASAHI OLYMER & CHEMICALS.

    ENGRO VC LANT ROJECT

    * M/s TEKSER INSAAT SAANAYI

    CHASMA RIGHT BANK C-65

    * M/S FMC. (MARINE LOADING ARM)

    FOTCO OIL TERMINAL BIN QASIM

    * M/S SECA AKISTAN.

    KHI - HYDERABAD BY ASS

    * M/S TRANSCAR ROJECTS LTD.

    DHABEJI UM ING STATION W-19

    * M/S TRANSCAR ROJECTS LTD.

    NORTH EAST KARACHI STATION W-18

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    43/134

    * M/S CHINA GUANGXI COR ORATION

      ATFEEDER CANAL ROJECT

    * M/S CHINA DONGFANG COR ORATION

    SEWERAGE TREATMENT ROJECT

    * M/S CHINA ETROLEUM

    KORANGI SEWERAGE TREATMENT

    * M/S CHINA YUNNAN COR ORATION

    K T JINNAH BRIDGE HASE II

    * M/S CHINA NATIONAL ELECTRIC WIRE & CABLES

    QUEENS ROAD OWER STATION

    * M/S CHINA HARBOR ENGINEERING

    JETTY FOR ENGRO AKTANK

    * M/S IJM / IGI JOINT VENTURE.

    LBOD SANGHAR ROJECTS

    * M/S LIFE LINE ( vt) LTD.

    DHURNAL L G GAS EX ANSION

    ROJECT

    * M/S ENGRO AKTANK TERMINAL.

    L G TERMINAL AT BIN QASIM

    * M/S ENGRO AKTANK TERMINAL

    VCM TERMINAL HANDLING ROJECT

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    44/134

    * M/S HYUNDAI COR KHI OFFICE.

    K.E.S.C HIGH TENSION CABLE ROJ.

    * M/S HYDERABAD DEVELO MENT AUTHORITY.

    MACHINERY UNDER S ANISH GRANT

    * M/S CHINA YUNNAN COR ORATION.

    MALDIVE S ARLIAMENT BUILDING

    * M/S CHINA NATIONAL CHEM ENGG COR .

    SUB CONTRACTOR FOR DONGFANG

    S2 ROJECT

    * ENGRO ASAHI TRADING ( VT) LTD

    EX ORT OF VC WORLD WIDE

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    45/134

    * M/S DESCON ENGINEERING WORKED FOR NUMBER OF ROJECTS

    1) E TL FOR L G TERMINAL

    2) E TL FOR VCM ROJECT

    3) EVTL FOR MEG ROJECT

    4) FOR ARCO MID COUNTRY REFINERY

    5) LASMO OIL BHIT GAS FIELD ROJECT

    US $ 6.5 Million Dollars

    * M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD

    HUB & I RI ROJECT FUNDED BY ADB

    £ 15.8 Million Sterling

    * M/S HYUNDAI HIDCO HAKAS JV

    EX ORT OF HEAVY DREDGING MACHINERY

    US $ 2.5 Million Dollars

    * M/S AL - NOOR SUGAR MILLS LTD

    MDF BOARD FIBRE BUILDING BOARD LANT

    (LASSANI)

    * ROCTER & GAMMBLE AKISTAN SOA CA ACITY EX ANSION LANT.

    US $ 4.5 Million Dollars

    * M/S ENGRO AKTANK TERMINAL.

    CHEMICAL STORAGE TERMINAL

    US $ 5.5 Million Dollars

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    46/134

    * M/S SHV ENERGY AKISTAN

    GAS EX ANSION ROJECT

    US & 1.5 Million Dollars

    * M/S TEKSER INSAAT SANAYI VE TICCARRET

    CHASMA RIGHT BANK CANNAL ROJECT C-

    65 US $ 260 Million Dollars

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    47/134

    BREAK BULK

    LIQUID CHEMICALS &

    PETROCHEMICALS HANDLING

    PROJECTS IN HAND

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    48/134

    * M/s. SHV ENERGY LIMITED

    LIQUIFIED ETROLEUM GAS (L G)

    IN BULK OF VARIOUS ARCELS

    * M/s. JAMSHORO JOINT VENTURE LIMITED

    LIQUIFIED ETROLEUM GAS (L G)

    IN BULK OF VARIOUS ARCELS

    * M/s. AFTAB TRADERS

    LIQUIFIED ETROLEUM GAS (L G)

    IN BULK OF VARIOUS ARCELS

    * M/s. CRESS L G

    LIQUIFIED ETROLEUM GAS (L G)

    IN BULK OF VARIOUS ARCELS

    * M/s. RELIANCE CONSULTANCY

    LIQUIFIED ETROLEUM GAS (L G)

    IN BULK OF VARIOUS ARCELS

    * M/s. ENGRO OLYMER & CHEMICAL LIMITED

    VINYL CHLORIDE (VCM)

    IN BULK OF VARIOUS ARCELS

    EDC

    IN BULK OF VARIOUS ARCELS

    CAUSTIC SODA

    IN BULK OF VARIOUS ARCELS

    ETHELYNE

    IN BULK OF VARIOUS ARCELS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    49/134

    UNDER GOING

    PROJECTS

    IN HAND

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    50/134

    * M/S ENGRO FOODS LIMITED

    1) LAUNCHING & SETTING U A COM LETE

    STATE OF AN ART OF O'MORE ICE

    CREAM LANT

    2) BRAND NEW STATE OF AN ART ENGRO

    RICE & AR BOILING LANT

    3) EX ANSION OF EXISTING DAIRY MILK

    LANT. (OL ER'S MILK)

    * M/s. FOUNDATION ENERGY LIMITED-1

    SETTING U A STATE OF AN ART WIND

    OWER ROJECT OF A CA ACITY 49.50

    MW AT JHAM IR, SINDH ROVINCE

    * M/s. FOUNDATION ENERGY LIMITED-II

    SETTING U A STATE OF AN ART WIND

    OWER ROJECT OF A CA ACITY 49.50

    MW AT JHAM IR, SINDH ROVINCE

    * M/S. AK ARAB REFINERY LIMITED

    SETTING U A COM LETE BRAND NEW

    AS HALT BUILT UNIT (ABU UNIT)

    * ENGRO OLYMER TRADING LIMITED

    EX ORT OF VC RESIN (SABZ BRAND)

    WORLD WIDE A ROXIMATE EX ORT IN

    M/TONS 2500 ER MONTH

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    51/134

    * M/s. CIVIL AVIATION AUTHORITY

    SETTING U A BRAND NEW BENAZIR

    BHUTTO INTERNATIONAL AIR ORT,

    ISLAMABAD, and ACKAGE 06 REFUEL

    HYDRANT SYSTEM.

    * M/s. KARKEY AKISTAN

      OWER SHI & OIL SU LY TANKER

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    52/134

    VARIOUS OTHER PROJECTS

    OF NATIONAL IMPORTANCE

    INCLUDING HYDRO, SEWERAGE

    WATER TREATMENT, DAMS

    CHEMICAL INDUSTRY

    OIL & GAS SECTOR

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    53/134

    * M/S CHINA SINOHYDRO COR ORATION

    1) GOMAL ZAM DAM HYDRO OWER

    2) DUBAR KHAWAR DAM HYDRO OWER

    3) KHAN KHAWAR DAM

    4) KWSB K-III

    * M/S. INDUS REFINERY LIMITED.

    HI-TECH 100,000 B SD OIL REFINERY

    ON RELOCATION BASIS

    * M/S. JAMSHORO JOINT VENTURE

    L G EXTRACTION LANT

    * M/S. ETROSIN RAVI ENGINEERING

    OIL & GAS ROJECTS LTD.

    * M/S. SHELL GAS L G AKISTAN LTD

    L G ROJECTS / L G GAS

    * M/S. BI-WATER INTERNATIONAL

    KARACHI WATER & SEWERAGE

    BOARD HUB & I RI UM ING

    STATION ROJECT

    * M/S. DESCON ENGINEERING LTD (HYDRO OWER ROJECTS)

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    54/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    55/134

    * AREVA T&D AKISTAN ( VT) LTD.

    132 KV GRID STATION AT

    CREEK CITY, DHA

    * KHALID RAUF & CO., ( VT) LTD.

    INFRASTRUCTURE ROJECTS

    LAHORE RING ROAD

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    56/134

    HYDRO OWER ROJECTS

    From our background experience, strength & experiences from

    industrial development projects, S.M.Asgh ar ( vt) L imited

    has rapidly established itself as a key player in infrastructure

    projects.

    We successfully did the Custom Clearance & In-land

    Transportation jobs of large-scale projects like dams, barrages,

    highways and housing complexes.

    We hold the distinction of being the first ever local company to

    do the 07 Major Hydropower Projects Simultaneously of National

    Importance in Pakistan

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    57/134

    HYDROPOWER

    PROJECT.

    Taunsa Barrage Rehabilitation and Modernization

    Location: Taunsa Pakistan

    Nature Of Job Custom Clearance & Inland Transportation.

    Year Of Project March 2006-2007

    Cost Of Project US $ 140 Million Dollars

    Completion : May 2008

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    58/134

    HYDROPOWER

    PROJECT

    MANGLA DAM RAISING PROJECT

    LOCATION Mangla

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION

    COST OF

    PROJECT

    US $ 140 Million Dollars

    Expected

    Completion

    Date:

    September 20 2007

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    59/134

    HYDROPOWER

    PROJECT.

    SATPARA DAM HYDROPOWER PROJECT

    LOCATION PAKISTAN

    NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.

    COST OF

    PROJECT

    US $ 140 Million Dollars

    Completion : March 2007

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    60/134

      roject Name Kachhi Canal roject – Contract # KC-03

    Location: Taunsa Barrage – Kot Addu

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANS ORTATION.

    COST OF

    ROJECT

    US $ 65 MILLION DOLLARS

    Completion: January 2009

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    61/134

    Project NameGOMAL ZAM HYDRO OWER ROJECT

    CLIENT CHINA SIOHYDRO COR ORATION

    NATURE OF

    JOB

    CUSTOM CLEARANCE & INLAND

    TRANS ORTATION.

    COST OF

    ROJECT

    US $ 220 MILLION DOLLARS

    Completion: 4 YEARS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    62/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    63/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    64/134

    Project NameDuber Khwar

    Location:

    The project located on river Duber Khwar, right

    bank tributary of Indus river near atan in NWF

    at a distance 265 Km from Islamabad.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF PROJECT US$ 109 million

    Completion: 4 YEARS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    65/134

    Location: The project is located on Allai Khwar river, left

    tributary of River Indus near Besham in NWF , 245

    km from Islamabad

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OFPROJECT

    US$ 110 million

    Completion: 4 YEARS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    66/134

    Project Name MIRANI DAM

    Location: In the Dasht River Basin about 30 miles (48 km)

    West of Turbat Town in Makran Div of

    Baluchistan.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF

    PROJECT

    US$ 120 million

    Completion: 4 YEARS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    67/134

    Project Name MIRANI DAM

    Location: In the Dasht River Basin about 30 miles (48 km)

    West of Turbat Town in Makran Div of

    Baluchistan.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF

    PROJECT

    US$ 120 million

    Completion: 4 YEARS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    68/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    69/134

    L G Storage & Handling Facilities

    Project Name ENGRO AKTANK L G TERMINAL

    Location: EASTERN INDUSTRIAL ESTATE ORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF

    PROJECT

    US$ 10 million

    CAPACITY 4,500 METRIC TONES OF LPG

    LPG BULLETS 10 LPG bullets

    Completion: 1997 -98

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    70/134

    Integrated Bulk Liquid Chemical

    Terminal Storage & Handling Facilities

    Project Name ENGRO AKTANK VCM TERMINAL

    Location: EASTERN INDUSTRIAL ESTATE ORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF PROJECT US$ 80 million

    CAPACITY 41,000 CUBIC METER STORAGE FACILITY

    SPHERICAL TANK 2 SPHERICAL TANK

    Completion: 1997 -98

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    71/134

    In the first phase E TL constructed facilities for the integrated

    bulk liquid Chemical and Storage Terminal the first phase comprised construction

    of 41,000 cubic meter of storage facility the cost of first phase of the roject was

    US $ 60 million the tank farm is situated on reclaimed land in the QA.

     ARAXYLENE

    ACETIC ACID

     HOS HORIC ACID (HANDLING ONLY)

    VINYL CHLORIDE MONOMER

    ACRYLONITRILE

    LIQUEFIED ETROLEUM GAS

    MONO ETHYLENE GLYCOL

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    72/134

    Project Name ENGRO ASAHI OLYMER & CHEMICALS LIMITED

    Location: EASTERN INDUSTRIAL ESTATE ORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 80 million

    CAPACITY 100,000 (T A) VC MANUFACTURING LANT

    CLIENT ENGRO ASAHI OLYMER & CHEMICALS LTD

    Completion: 1999-2000

    Engro Asahi olymer & Chemicals Limited (EA CL or the company) is a joint

    Venture between Engro Chemical akistan Ltd. (EC L) and Mitsubishi

    Corporation (Japan), each with an 80% and 20% shareholding, respectively

    EA CL is the only VC manufacturer in akistan with a Capacity

    Of 100,000tons per annum (T A) and its operations are located at ort Qasim

    Karachi. Its plant was commissioned in November 14, 1999.

    Engro Asahi olymer & Chemicals Limited

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    73/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    74/134

    ICI T11 TA lant

    Project Name ICI TA T11 LANT

    Location: EASTERN INDUSTRIAL ESTATE ORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 480 million

    CLIENT TRANSCAR ROJECTS UK/ FOOSTER WHEELER UK

    Completion: 1998

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    75/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    76/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    77/134

      ARCO Mid Country Refinery (100, 000 B D)

    Project Name   AK ARAB REFINERY COM ANY

    Location:MULTAN, AKISTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 80 million

    CLIENT DESCON ENGINEERING

    Completion: 1998

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    78/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    79/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    80/134

    -------

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    81/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    82/134

    INDUS REFINERY LIMITED

      AKISTAN SECOND LARGEST REFINERY

    Project Name IRL is a 100,000 bpd or 4.95 million metric tons per

    annum complex fuels refinery. It will be the sixth

    petroleum refinery in akistan and the country’s

    largest refinery.

    Location: ORT QASIM INDUSTRIAL ESTATE

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 700 million

    CLIENT INDUS REFINERY LIMITED

    Completion: UNDER CONSTRUCTION

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    83/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    84/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    85/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    86/134

    RELOCATION OF 100,000 BARRELS CA ACITY REFINERY

      ETRO CANADA REFINERY TO AKISTAN ORT QASIM

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    87/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    88/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    89/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    90/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    91/134

    TRANSASIA REFINERY LIMITED

      AKISTAN SECOND LARGEST REFINERY

    Project Name TRL is a 100,000 bpd or 4.00 million metric tons per

    annum complex fuels refinery. It will be the state of an

    Art petroleum refinery in akistan and will be one of

    the country’s largest refinery.

    Location: ORT QASIM INDUSTRIAL ESTATE

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 700 million

    CLIENT TRANSASIA REFINERY LIMITED

    Completion: UNDER CONSTRUCTION

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    92/134

    TRANASIA REFINERY LIMITED

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    93/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    94/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    95/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    96/134

    FAUJI FERTILIZER ENERGY COM NAY

    LIMITED (FFCEL) 49.5 MW WIND ENERGY

    ROJECT AT JHAM IR, KARACHI

    Project Name FFCEL WIND ENERGY ROJECT OF CA ACITY 49.5

    MW

    Location: JHAM IR, NEAR THATTA

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 110 million

    CLIENT DESCON ENGINEERING LIMITED

    Completion: UNDER FINAL STAGES OF COM LETION

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    97/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    98/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    99/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    100/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    101/134

    DHA DESALINATION LANT 3 MIGD

    & 94 MW OWER LANT KARACHI

    Project Name DHA DESALINATION & OWER LANT

      AKISTAN FIRST EVER SEA DESALINATION

    & OWER LANT

    Location: DHA, HASE VIII. KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 130 million

    CLIENT DHA COGEN LIMITED (DCL)

    Completion: UNDER CONSTRUCTION

    TOTAL VALUE OF L/C ESTABLISHED:

    Siemens AG Germany $ 41,400,000 $ 33,120,000

    Siemens AG Germany € 6,550,000 € 5,240,000

    Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241

    Lincas Electro Vertibas € 295,500 € 236,390

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    102/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    103/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    104/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    105/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    106/134

    KARACHI INTERNATIONAL CONTAINER

    TERMINAL (KICTL) KARACHI

    Project Name KARACHI INTERNATIONAL CONTAINER

    TERMINAL (KICTL)

      HASE III EX ANSION ROJECT

    Location: WEST WHARF ROAD, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 400 million

    CLIENT KICTL AKISTAN

    Completion: UNDER CONSTRUCTION

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    107/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    108/134

    BAHRIA TOWN ( VT) LIMITED

    RAWAL INDI

    Project Name BAHRIA TOWN ( vt) LIMITED

    AWAMI VILLAS ROJECT.

    TOTAL # OF VILLAS 8000

    Location: RAWAL INDI, AKISTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 120 million

    CLIENT BAHRIA TOWN ( vt) LIMITED

    Completion: UNDER CONSTRUCTION/ ROGRESS

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    109/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    110/134

    Project Name 49.5 MW FFCEL FIRST WIND OWER ROJECT

    Location: JHAM IR, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 130 Million

    Completion: 25TH

    DECEMBER 2012

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    111/134

    Project Name AS HALT BUILT UNIT ROJECT (ABU)

    FOR ARCO

    Location: ARCO MID COUNTRY REFINERY, MULTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 30 Million

    Completion: DECEMBER 2012

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    112/134

    Project Name 49.5 MW FOUNDATION WIND ENERGY-1 ROJECT

    Location: JHAM IR, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 130 Million

    Completion: SE TEMBER 2014

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    113/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    114/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    115/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    116/134

    Project Name 49.5 MW FOUNDATION WIND ENERGY-II ( vt) Ltd.

    ROJECT

    Location: JHAM IR, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 130 Million

    Completion: SE TEMBER 2014

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    117/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    118/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    119/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    120/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    121/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    122/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    123/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    124/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    125/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    126/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    127/134

    Project Name METRO HABIB CASH & CARRY AKISTAN ( VT) LTD

    Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.

    COST OF PROJECT US$ 3.4

    Completion:STILL UNDERGOING

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    128/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    129/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    130/134

    S.M.Asghar ( vt) Limited believes that

    A

    CCIDENTS DON

    T JUST

    happen, they’re caused, and it is the dutyof the Company to remove and minimize all possible causes ofAccidents.

    We at S.M.Asghar ( vt) Limited takes preliminary guide to the

    recognition of potential hazards to the following.

    M O S T - S A F E - L A C E S

    M MACHINERY : Sources of Mechanical ower

    O O ENINGS : its, Sumps, Ducts & Drains

    S STACKS : Stores Materials, Raw & rocess.

    T TOOLS : All type of Tools.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    131/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    132/134

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    133/134

    Safety Boots : At the Ship Derricks & the ort   remises

     

    Safety Glasses : They are provided to the Staff who

    Work on the Ship /Vessel.

  • 8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014

    134/134

    HEAVY & SUPER HEAVY LIFT

    TRANSPORTATION EXPERIENCEWE CALLED THIS ASABNORMAL LOADS