By: S.M.ASGHAR (PVT) LIMITED AN ISO 9001-2000 CERTIFIED COMPANY
PROUDLY AN ISO 9001:2000CERTIFIED COMPANY
COMPANIES PROFILE
FIRMS NAME : M/s S.M.Asghar (Pvt) Limited An ISO 9001:2000 Certified Company
COMPLETE ADDRESS : 908-910, 9th Floor, ChapalPlaza, Hasrat Mohani RoadOff I.I.Chundrigar RoadKarachi.
CORPORATE STATUS OF FIRM : PRIVATE LIMITED.
TELEPHONE NO : 00+ 92+21+32468091 -5
FAX NO : 00+92+21+2310410.
FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE OF REGISTRATION WITH : 30-03-1980.CUSTOMS
E- MAIL ADDRESS : [email protected]
E- MAIL ADDRESS : [email protected]
Web- Page : http://www.smasghar.com.pk
DATE OF ISSUE OF LICENCE : 30-03-1980.
NUMBER OF STAFF EMPLOYED : 20.
YEAR OF ESTABLISHMENT : 1980.
SYED KHALID JAMAL CHIEF EXECUTIVE
SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION
PEOPLE BEHIND THE COMPANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.
MOHD SALEEM : ASST PORT OPERATION.
MOHD JAVED : ASST PORT OPERATION.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
MOHAMMAD SALEEM : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY
SAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR)
SADDAM HUSSAIN : FIELD OFFICER.
MOHSIN KHAN : FIELD OFFICER
SULEMAN : OFFICE PEON.
USMAN GHANI : OFFICE PEON.
SECTION 1 : INTRODUCTION
SECTION 2 : SCOPE OF WORK
SECTION 3 : DOCUMENTATION REQUIREMENTS
SECTION 4 : PROJECT REFERENCES
SECTION 5 : PICUTRE GALLARY
We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more or less US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentioned below we have taken various Exemptions & benefits of various SRO’s from Customer to Customer & on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limitedhas successfully completed all the major & Prestigious Projects of National Importance as well as International Importance.
We on merit got the benefit of various Concessionary SRO’s & Exemptions to our valued Customer to their Entire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer prior to the start of the Project/Projects & developed systems and a general flexibility of approach tailored to our Clients most Complex of requirements.
We believe that our Professional approach to our Client is unparalleled by any competitors.
Few of the recent Projects & Customer References are given below, for whom we have claimed the various SRO’s & Exemptions to our valued Customer to their entire satisfaction.
TRANSASIA REFINERY LTD (Re-Location) (One of the Largest Private Sector Project US $ 700 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
INDUS REFINERY LTD (Re-Location)(Another Largest Private Sector Project US $ 650 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT” at DHA Karachi(Total Cost of the Project US $ 160 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at KarachiEXPANSION PROJECT & NEW GANTRY CRANE(Total Cost of the Project US $ 400 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT
(The Project Cost US $ 100 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 45 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II(The Project Cost US $ 20 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
PROGAS LPG STORAGE & HANDLING TERMIANAL(Private Sector Project US $ 50 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES(The Second Expansion Phase Project US $ 30 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTD QADIRPUR 600 MMSOFD EXPANSION PROJECT(The Project Cost US $ 6 Million Dollars)SRO: 678(I)/2004, DT: 07-08-2004
AL-TARIQ CONSTRUCTOR PRIVATE LIMITED
REFUEL HYDRANT SYSTEM PACKAGE 6, NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD
(The Project Cost US $ 14 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED
PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED
PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT PROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITED
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.(The Project Cost US $ 20 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.(The Project Cost US $ 50 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITED
ZHORLU WIND POWER ( Heavy Transformers)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU) (The Project Cost US $ 30 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
VARIOUS PORTS AT KARACHI
Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)
Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)
S.M.ASGHAR (PVT) LIMITED
908-910, 9th Floor, Chapal Plaza, Hasrat Mohani Road, Off I.I Chundrigar Road, KARACH I
We have a pleasure to give a brief introduction of our Company M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility, reliability & commitment in this part of world.
We are proudly an ISO 9001-2000 Certified Company.
We are among the few & pioneer company who got the ISO Certification in Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited has been able to developed systems and a general flexibility of approach tailored & personalized solutions to our Clients most Complex Requirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an International Network who can arrange the movement and supervision of cargo from Europe, and beyond, whilst they only instruct one control office. This International Strength and wealth of experience combined with a genuinely personal approach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak for themselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transform itself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistan’s Most Advanced & the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor for M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom Clearance & the Logistics Support in the form of Local Transportation to these Prestigious Projects.
Among The Prestigious Projects AtPort Bin Qasim Few Are Listed below
Engro Vopak Terminal Ltd (VCM Tank Farm)
Engro Vopak Terminal Ltd (MEG Tank Farm)
Engro Vopak Terminal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm)
(Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)
ENGRO ASAHI POLYEMR & CHEMICALS(Another One of the Largest Private Sector Project US $ 80 Million Dollars)
ICI PTA T-11 (The Largest Private Sector Project US $ 480 Million Dollars)
INDUS REFINERY LIMITED(Another Largest Private Sector Project US $ 750 Million Dollars)
TRANASIA REFINERY LIMITED(Another Largest Private Sector Project US $ 800 Million Dollars)
PROGAS LPG STORAGE & HANDLING TERMINAL(Private Sector Project US $ 50 Million Dollars)
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES(The Second Expansion Phase Project US $ 30 Million Dollars)
PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM(The Contractor for PARCO Project Cost US $ 300 Million Dollars)
CHINA HARBOR ENGINEERING (The Contractor for EVTL for the EVTL JETTY Private Sector Project US $ 4 Million Dollars)
FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid)
LPG BREAK BULK SHIPMENT(Handling of 100% of Pakistan Break Bulk LPG Shipments at EVTL)
VCM BREAK BULK SHIPMENT(Handling of 100% of Break Bulk VCM Shipments at EVTL)
ETHYLENE BREAK BULK SHIPMENT(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)
Karachi International Container Terminal Phase II Expansion Project
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi
(Total Cost of the Project US $ 400 Million Dollars)
Beside the Port Qasim & Karachi we now take a trip to the other side & rest of the Pakistan Major Prestigious & Project of National Importance.
The Government of Pakistan in the last 5 Years initiated the few Hydropower Power & Dam Projects to overcome the Power Break downCrisis.
Among these Projects of National Importance in Hydro Power Sector includes:-
MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
ALAI KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
Beside the Hydropower Projects, the Government also encourages the other areas such as the Sea to generate Electricity, beside the supply of quality water to the people. Among them the DHA Desalination & Power Project was the only to be setup by the Private Sector.
DHA DESALINATION & POWER PROJECT(Total Cost of the Project US $ 160 Million Dollars)
This is the first ever desalination plant in history of Pakistan. It has a capacity to Desal, 3 MIGD (Million Gallons per Day) of water, beside to produce & generate Electricity of a Capacity 95 MW
Beside the Hydro Power Project initiated by the Government also focused on the another very important Sector which was OIL & GAS and LPG (Liquid Petroleum Gas Project)
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 45 Million Dollars)
M/s. S.M.Asghar (Pvt) Limited was awarded by the President of Pakistan for successfully and timely performance in Clearance and Logistics of JJVL Phase I Project
The only Project in the LPG sector which was initiated by Jamshoro Joint Venture Limited (JJVL)
JJVL is Pakistan’s single largest producer of Liquefied Petroleum Gas. Situated in Dei Shah Bukhari, District
Hyderabad, JJVL’s Extraction Plant has a daily output of about 500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha. JJVL accounts for about one-third of the total local LPG production of the country.
JJVL processes about 200-220 million cubic feet of natural gas condensate per day piped from British Petroleum's Badin Gas Field through the Liquid Handling Facility of Sui Southern Gas Co Ltd at Jamshoro
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II(The Project Cost US $ 20 Million Dollars)
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling 02 chartered flights carrying main booster pumps weighing over 100 Tons by Air for PARCO White Oil Pipeline Project.
We also have a privilege of handling one of the Heaviest and Length Wise Piece in History of Pakistan which Weights 265 M/tons and Length Approx.76 Meters.
REQUIRED FOR CUSTOM CLEARANCE
SCOPE OF WORK
BENEFIT OF VAVARIOUS CONCESSIONARY
SRO’s & EXEMPTIONS
PREPARATION BEFORE ARRIVAL OF VESSEL
Upon receipt of the written instruction from the Importer / Representatives of the Importer, we will be in close contact with the shipping Company in order to ascertain the expected arrival date ( ETA ) of the Ocean going Vessel at the Un-loading Port of the Country.
CONFIRMATION OF THE ARRIVAL OF VESSEL:-
We shall inform the arrival and the berthing date of the vessel to the Importer / Representatives of the Importer in order to keep a close Loop for the berthing of the vessel.
CUSTOM CLEARANCE:
We shall collect in full advance all the necessary documents for the onward Custom Clearance from the Importer / Representatives of the Importer when intimated and will prepare GD and all the required documents and formalities to be submitted to the related Custom Authority and Will Complete the preparation of the GD (Goods Declaration) as per Invoice, Packing List & Bill Of Lading depending on weather the Vessel has arrived and also subject to the Lodging Of Manifestation of IGM (Import General Manifest) by the Shipping Company / Shipping Agent.
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent / Main Carrier Agent/ relevant Port Authority and will obtain the Delivery Order from the Shipping Company/ OR their Agent against the presentation/ submission of Original Bill of Lading.The delivery Order's are generally issued after filing of IGM in order to ascertain the goods have not been Transshipped.
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance and Consultancy Services Concerning Custom Clearance to the Importer / Representatives of the Importer.
AIR CARGOES:
We shall also perform the Works Related to the Air Cargo As per request of Importer / Representatives of the Importer…
DELIVERY AT / TO THE PLANT SITE
We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low Bed OR as per the requirement & Nature of Cargo to the Warehouse or the open storage area as per the instruction of Importer / Representatives of the Importer.
CUSTOM DUTIES TAXES SRO’s AND NECESSARY
PERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are imported into Pakistan shall be subject to Custom Duties and Taxes Prevailing at the time of Import.
The Duties and Taxes concerns with the Custom Authorities as per Pakistan Custom Tariff includes:-
Custom Duty/Duties From 5% Minimum To 25% Maximum
Sales Tax/Taxes 16 %
Income Tax/Taxes 5%
The Taxes Concerns with the Port Authorities:-
Port Wharfage
Port Demurrage
Weighment Charges (for Products like Iron/Steel/Coil-Bar)
For Containerized Cargo the various Yards/Ports are charging different Handling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking Charges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevant Port /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 0.81-0.85% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at the time of Import shall be Paid by the I m p o r t e r immediately before the Clearance of the Consignments from the Port.
Further the completion of GD’s (Bill of Entry) and other Custom formalities are subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List / Bill of Lading OR any other relevant documents submitted by the Importer, will may render in delay to clear the consignment.
SUBMITTAL OF SHIPPING GUARANTEEBOND IN ABSENCE OF ORIGINAL BILL OF LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a delay in getting the Goods/ Cargo release of the from the Port premises/Yard.
A Shipping Guarantee Letter/Bond for the said Bill of Lading would be therefore required by the shipping company in order to issue the Delivery Order.
It shall be discussed and settle before arrival of the vessel. We will provide all necessary assistance and advice for the Shipping Guarantee to the Importer / Representatives of the Importer.
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer, from
Place of Origin up to the Plant Site.
METHOD STATEMENT
At the present there are 02 procedures for Custom Clearance:-
1) Newly Implemented CARE SYSTEM
Under this newly implemented procedure if the Vessel is berthed at any of the below Ports & the Cargo is a FULL CONTANERIZED CARGO (Full Container Load), than the G.D (Goods Declaration) for Custom
Clearance is prepared on Line (Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with the declaration of the Importer. Thereafter the G.D (Goods Declaration) is submitted to the Custom for Assessment on Line.
* The amount of Duties & Taxes is also paid in advance as per the Importer declaration.
* If the assessment by the CARE is done as per the declaration of Importer, than the G.D is processed and the Importer can take the delivery of the goods, after the payment of all the necessary Port Dues & Excise Tax.
In case the goods have been processed under CARE SYSTEM does not accept the Importer Declaration, than the Importer may asked for additional Duties & Taxes or If the Importer wants to Contest with the views of the Customs than they can go for appeal & meet the Senior Custom Officials along with the relevant Documents & Proof to justify their claims.
The Custom Authorities may defer in three basic ways :
1) Disagreement in the PCT OR HS Code Classification.
2) Not extending the benefit of the claimed SRO.
3) Disagreement with the Valuation.
The Ports under the Care System are:-
Karachi International Container Terminal (KICTL)
Pakistan International Container Terminal (PICTL)
The Ports under the New WeBoc (Web Based One Custom)
Qasim International Container Terminal (QICTL Port Qasim)
2) NORMAL FILING OF GD (MANUAL SYSTEM)
Under this procedure the GD can be filed if the Cargo is the following nature:-
1) Break Bulk Shipment (Full Chartered Vessel)
2) LCL or Loose Cargo (Not A full Container Load)
3) FCL/LOOSE Cargo whose Vessel is not under the Care System (Vessel berthed other than the QICTL / KICTL / PICTL Terminals.)
* The GD is Prepared and filed Online (Via Electronic Filling) , as per declaration of the Importer.
* If Customs satisfy with all the 03 criteria’s mentioned above i.e. PCT / SRO / Valuation, than the GD is completed by the Concerned Group. The Importer has to than pay the Applicable Duties & Taxes after that the GD is forwarded to the Port side for Examination after which the
Importer can take the Delivery of the goods after the payment necessary Port Dues.
* If Customs do not satisfy with all the 03 Criteria’s mentioned above i.e.
PCTSROValuation
Than the GD is forwarded to the Port Side for Physical Examination to check the goods are in conformity to the declaration of the Importer & under the light of Examination Report GD will be completed by the concerned Group in the Custom House.
The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with value of the each individual item
II Detail Packing List showing complete Description, QuantityGross Wt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agencies if any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
Any other document that may be requested by the Custom to verify the declaration of Importer
The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Air Port.
I Original Invoice showing complete description of the goods with value of the each individual item
II Detail Packing List showing complete Description, Quantity, Numbers of Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter
III Original Airway Bill
IV Certificate of Origin
V Complete Catalogue/Drawing for Machinery & Equipment.
VI All Govt. Sanctions, Authorization from Government Agencies if any
VII Original Letter of Credit
Any other document that may be requested by the Custom to verify the declaration of Importer
Further to the above there may be delays in Clearance due to following reasons:-
I Non availability of the Original Documents, such as BL.
II Delay in meeting Custom Queries.
III Strikes / Weather, Act of God, Force Major Etc
IV Delays due to Non-availability of concerned officers.
V Delays in receipts of payments
VI Delays due to the Non-fulfillment of Shipping Companies
VII Delays due to Non-availability of Trucks / Trailer
PREVIOUSPROJECTSHANDLED
.
CLIENTS PROJECTS
* M/S ICI PAKISTAN LTD.C/o TRANSCAR PROJECTS LTD
ICI PTA PROJECT PORT QASIM
* M/S ENGRO PAKTANK TERMINAL.CHEMICAL STORAGE TERMINAL
* M/S NOEL LGA (GERMANY)LPG EXPANSION & MARKETING
* M/S ENGRO ASAHI POLYMER & CHEMICALS.
ENGRO PVC PLANT PROJECT
* M/s TEKSER INSAAT SAANAYI
CHASMA RIGHT BANK C-65
* M/S FMC. (MARINE LOADING ARM)
FOTCO OIL TERMINAL BIN QASIM
* M/S SECA PAKISTAN.
KHI - HYDERABAD BY PASS
* M/S TRANSCAR PROJECTS LTD.
DHABEJI PUMPING STATION W-19
* M/S TRANSCAR PROJECTS LTD.
NORTH EAST KARACHI STATION W-18
* M/S CHINA GUANGXI CORPORATION
PATFEEDER CANAL PROJECT
* M/S CHINA DONGFANG CORPORATION
SEWERAGE TREATMENT PROJECT
* M/S CHINA PETROLEUMKORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN CORPORATIONKPT JINNAH BRIDGE PHASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD POWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY FOR ENGRO PAKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR PROJECTS
* M/S LIFE LINE (Pvt) LTD.
DHURNAL LPG GAS EXPANSION PROJECT
* M/S ENGRO PAKTANK TERMINAL.
LPG TERMINAL AT BIN QASIM
* M/S ENGRO PAKTANK TERMINAL
VCM TERMINAL HANDLING PROJECT
* M/S HYUNDAI CORP KHI OFFICE.
K.E.S.C HIGH TENSION CABLE PROJ.
* M/S HYDERABAD DEVELOPMENT AUTHORITY.
MACHINERY UNDER SPANISH GRANT
* M/S CHINA YUNNAN CORPORATION.
MALDIVE SPARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG CORP.
SUB CONTRACTOR FOR DONGFANGS2 PROJECT
* ENGRO ASAHI TRADING (PVT) LTD
EXPORT OF PVC WORLD WIDE
* M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS
1) EPTL FOR LPG TERMINAL
2) EPTL FOR VCM PROJECT
3) EVTL FOR MEG PROJECT
4) FOR PARCO MID COUNTRY REFINERY
5) LASMO OIL BHIT GAS FIELD PROJECT US $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & PIPRI PROJECT FUNDED BY ADB£ 15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EXPORT OF HEAVY DREDGING MACHINERYUS $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MDF BOARD FIBRE BUILDING BOARD PLANT (LASSANI)
* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.
US $ 4.5 Million Dollars* M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINALUS $ 5.5 Million Dollars
* M/S SHV ENERGY PAKISTAN
GAS EXPANSION PROJECTUS & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL PROJECT C-65 US $ 260 Million Dollars
BREAK BULK LIQUID CHEMICALS &
PETROCHEMICALS HANDLINGPROJECTSIN HAND
* M/s. SHV ENERGY LIMITED
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* M/s. JAMSHORO JOINT VENTURE LIMITED
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* M/s. AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* M/s. CRESS LPG
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* M/s. RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* M/s. ENGRO POLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)IN BULK OF VARIOUS PARCELS
EDCIN BULK OF VARIOUS PARCELS
CAUSTIC SODAIN BULK OF VARIOUS PARCELS
ETHELYNEIN BULK OF VARIOUS PARCELS
UNDER GOING PROJECTSIN HAND
* M/S ENGRO FOODS LIMITED
1) LAUNCHING & SETTING UP A COMPLETE STATE OF AN ART OF O'MORE ICE CREAM PLANT
2) BRAND NEW STATE OF AN ART ENGRO RICE & PAR BOILING PLANT
3) EXPANSION OF EXISTING DAIRY MILK PLANT. (OLPER'S MILK)
* M/s. FFC ENERGY LIMITED
SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE
* M/S. PAK ARAB REFINERY LIMITED
SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT (ABU UNIT)
* ENGRO POLYMER TRADING LIMITED
EXPORT OF PVC RESIN (SABZ BRAND) WORLD WIDE APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH
* M/s. CIVIL AVIATION AUTHORITYSETTING UP A BRAND NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06 REFUEL HYDRANT SYSTEM.
* M/s. KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY TANKER
PROJECTSCURRENTLY
IN HAND/EDGE OF COMPLETION
* M/S CHINA SINOHYDRO CORPORATION
1) GOMAL ZAM DAM HYDRO POWER
2) DUBAR KHAWAR DAM HYDRO POWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS REFINERY LIMITED.
HI-TECH 100,000 BPSD OIL REFINERY ON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
LPG EXTRACTION PLANT
* M/S. PETROSIN RAVI ENGINEERING
OIL & GAS PROJECTS LTD.
* M/S. SHELL GAS LPG PAKISTAN LTD
LPG PROJECTS / LPG GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGE BOARD HUB & PIPRI PUMPING STATION PROJECT
* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)
1) SATPARA DAM PROJECT
2) MIRANI DAM PROJECT
3) MANGLA RAISING PROJECT
4) TUNSA BARRAGE PROJECT
5) HYDERABAD WATER TREATMENT PROJECT.
* M/S. FAUJI FERTILIZER BIN QASIM LTD
BREAK BULK HANDLING OF PHOSPHORIC ACID
* M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD.
V.C.M / MACHINERY & EQUIPMENT / EXPORT
* M/S. DHA COGEN LTD.
DESALINATION / POWER PROJECT
* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P ROJECT
RE-LOCATION OF PLANT & MACHINERY FOR PRE-FABRICATING HOUSING
* AREVA T&D PAKISTAN (PVT) LTD.
132 KV GRID STATION AT CREEK CITY, DHA
* KHALID RAUF & CO., (PVT) LTD.
INFRASTRUCTURE PROJECTS LAHORE RING ROAD
HYDROPOWER PROJECTS
From our background experience, strength & experiences from industrial development projects, S.M.Asghar (Pvt) Limitedhas rapidly established itself as a key player in infrastructure projects.
We successfully did the Custom Clearance & In-land Transportation jobs of large-scale projects like dams, barrages, highways and housing complexes.
We hold the distinction of being the first ever local company to do the 07 Major Hydropower Projects Simultaneously of National Importance in Pakistan
HYDROPOWER PROJECT.
Taunsa Barrage Rehabilitation and Modernization
Location: Taunsa Pakistan
Nature Of Job Custom Clearance & Inland Transportation.
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
HYDROPOWER PROJECT
MANGLA DAM RAISING PROJECT
LOCATION Mangla
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION
COST OF PROJECT
US $ 140 Million Dollars
Expected Completion Date:
September 20 2007
HYDROPOWER PROJECT.
SATPARA DAM HYDROPOWER PROJECT
LOCATION PAKISTAN
NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US $ 140 Million Dollars
Completion : March 2007
Project Name Kachhi Canal Project – Contract # KC-03
Location: Taunsa Barrage – Kot Addu
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US $ 65 MILLION DOLLARS
Completion: January 2009
Project Name GOMAL ZAM HYDROPOWER PROJECT
CLIENT CHINA SIOHYDRO CORPORATION
NATURE OF JOB
CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US $ 220 MILLION DOLLARS
Completion: 4 YEARS
Project Name Duber Khwar
Location:
The project located on river Duber Khwar, right bank tributary of Indus river near Patan in NWFP at a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US$ 109 million
Completion: 4 YEARS
Location: The project is located on Allai Khwar river, left tributary of River Indus near Besham in NWFP, 245 km from Islamabad
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OFPROJECT
US$ 110 million
Completion: 4 YEARS
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km) West of Turbat Town in Makran Div of Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US$ 120 million
Completion: 4 YEARS
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km) West of Turbat Town in Makran Div of Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US$ 120 million
Completion: 4 YEARS
LPG Storage & Handling Facilities
Project Name ENGRO PAKTANK LPG TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT
US$ 10 million
CAPACITY 4,500 METRIC TONES OF LPG
LPG BULLETS 10 LPG bullets
Completion: 1997 -98
Integrated Bulk Liquid ChemicalTerminal Storage & Handling Facilities
Project Name ENGRO PAKTANK VCM TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 41,000 CUBIC METER STORAGE FACILITY
SPHERICAL TANK 2 SPHERICAL TANK
Completion: 1997 -98
In the first phase EPTL constructed facilities for the integrated bulk liquid Chemical and Storage Terminal the first phase comprised construction of 41,000 cubic meter of storage facility the cost of first phase of the Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.
PARAXYLENE
ACETIC ACID
PHOSPHORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
ACRYLONITRILE
LIQUEFIED PETROLEUM GAS
MONO ETHYLENE GLYCOL
Project Name ENGRO ASAHI POLYMER & CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (TPA) PVC MANUFACTURING PLANT
CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD
Completion: 1999-2000
Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint
Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EAPCL is the only PVC manufacturer in Pakistan with a Capacity
Of 100,000tons per annum (TPA) and its operations are located at Port Qasim Karachi. Its plant was commissioned in November 14, 1999.
Engro Asahi Polymer & Chemicals Limited
ICI T11 PTA Plant
Project Name ICI PTA T11 PLANT
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK
Completion: 1998
PARCO Mid Country Refinery (100, 000 BPD)
Project Name PAK ARAB REFINERY COMPANY
Location: MULTAN, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
JAMSHORO JOINT VENTURE LIMITEDSINGLE LARGEST LPG EXTRACTION PLANT
Project Name JAMSHORO JOINT VENTURE LIMITED
Location: JAMSHORO, SINDH
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT ASSOCIATED GROUP
Completion: 2005
-------
INDUS REFINERY LIMITEDPAKISTAN SECOND LARGEST REFINERY
Project Name IRL is a 100,000 bpd or 4.95 million metric tons per annum complex fuels refinery. It will be the sixth petroleum refinery in Pakistan and the country’s largest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT INDUS REFINERY LIMITED
Completion: UNDER CONSTRUCTION
RELOCATION OF 100,000 BARRELS CAPACITY REFINERYPETRO CANADA REFINERY TO PAKISTAN PORT QASIM
FAUJI FERTILIZER ENERGY COMPNAY LIMITED (FFCEL) 49.5 MW WIND ENERGY PROJECT AT JHAMPIR, KARACHI
Project Name FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5 MW
Location: JHAMPIR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: UNDER FINAL STAGES OF COMPLETION
HEAVY & SUPER HEAVY LIFT TRANSPORTATION EXPERIENCE
WE CALLED THIS AS ABNORMAL LOADS
Project Name 49.5 MW FFCEL FIRST WIND POWER PROJECT
Location: JHAMPIR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 Million
Completion: 25TH DECEMBER 2012
Project Name ASPHALT BUILT UNIT PROJECT (ABU)FOR PARCO
Location: PARCO MID COUNTRY REFINERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
DHA DESALINATION PLANT 3 MIGD & 94 MW POWER PLANT KARACHI
Project Name DHA DESALINATION & POWER PLANTPAKISTAN FIRST EVER SEA DESALINATION & POWER PLANT
Location: DHA, PHASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 million
CLIENT DHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
TOTAL VALUE OF L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
KARACHI INTERNATIONAL CONTAINER TERMINAL (KICTL) KARACHI
Project Name KARACHI INTERNATIONAL CONTAINER TERMINAL (KICTL)PHASE III EXPANSION PROJECT
Location: WEST WHARF ROAD, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 400 million
CLIENT KICTL PAKISTAN
Completion: UNDER CONSTRUCTION
BAHRIA TOWN (PVT) LIMITEDRAWALPINDI
Project Name BAHRIA TOWN (Pvt) LIMITEDAWAMI VILLAS PROJECT. TOTAL # OF VILLAS 8000
Location: RAWALPINDI, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN (Pvt) LIMITED
Completion: UNDER CONSTRUCTION/ PROGRESS
HEALTH, SAFETY AND ENVIRONMENT
S.M.Asghar (Pvt) Limited believes that
ACCIDENTS DON’T JUST happen, they’re caused, and it is the duty of the Company to remove and minimize all possible causes of Accidents.
We at S.M.Asghar (Pvt) Limited takes preliminary guide to the recognition of potential hazards to the following.
M O S T - S A F E - P L A C E S
M MACHINERY : Sources of Mechanical Power
O OPENINGS : Pits, Sumps, Ducts & Drains
S STACKS : Stores Materials, Raw & Process.
T TOOLS : All type of Tools.
S A F E - P L A C E S
S STRUCTURE : Floors, Walls, Ceilings, Road
A ATMOSPHERE : Dust, gases, fumes & Spray.
F FIRE : Fire Points & Fire Exits.
E ELECTRICITY : Wires, Cables, Switches.
P PRESSURE VESSEL : Boilers & Compressors
L LADDERS : Steps, trestles & Scaffolds
A ATTIRE : Protective Clothing, Helmets
C CRANES : Hoist, Derricks & Ropes / Hooks
E EXPLOSIVES : Flammable Liquids, LPG, Radioactive.
S For SIGNALS : Warning Light, Telephone Buzzers.
As a Company Policy we take care of our Employee to the best Standards because Employees are Our Assets.
We provide following safety Equipments to our Port staff such as :
Safety Belts : They are provided to the Staff who Works On the Ship /Vessel (VCM/LPG)
Emergency Lights : In case of Night Delivery at the PortPremise/ Highways
Safety Helmets : At time of delivery at the Port Area During Loading/ UnloadingHeavy Machineries/ Hazardous Cargo
Safety Boots : At the Ship Derricks & the Port Premises
Safety Glasses : They are provided to the Staff who Work on the Ship /Vessel.