Smart_Rural_Grid FP7 project – Grant agreement nº. 619610 This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement no. 619610 Smart_Rural_Grid "Smart ICT-enabled Rural Grid innovating resilient electricity distribution infrastructures, services and business models" Deliverable nº: D4.6 Deliverable name: Final Wireless Transmission System Version: 1.0 Release date: 13/04/2017 Dissemination level: PU (PU, PP, RE, CO, Internal) Status: Final Author: XOC Contributors EYPESA, ZIV Communications Executive summary This deliverable includes the final design of the Wireless Transmission System, together with all the tests and certifications carried out since its installation as a prototype (in D4.3). As of the deployment of the prototype, the system has been improved with the developments carried out within the project. Thus, this deliverable includes the changes that have been implemented, together with a report on the performance and quality of service provided by the overall communications system.

Smart Rural Grid · 2017. 5. 12. · Smart_Rural_Grid FP7 project – Grant agreement nº. 619610 Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 2 of 26 Document

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under grant agreement no. 619610

    Smart_Rural_Grid

    "Smart ICT-enabled Rural Grid innovating resilient electricity distribution infrastructures, services and business models"

    Deliverable nº: D4.6

    Deliverable name: Final Wireless Transmission System

    Version: 1.0

    Release date: 13/04/2017

    Dissemination level: PU (PU, PP, RE, CO, Internal)

    Status: Final

    Author: XOC

    Contributors EYPESA, ZIV Communications

    Executive summary

    This deliverable includes the final design of the Wireless Transmission System, together with all the tests and certifications carried out since its installation as a prototype (in D4.3).

    As of the deployment of the prototype, the system has been improved with the developments carried out within the project. Thus, this deliverable includes the changes that have been implemented, together with a report on the performance and quality of service provided by the overall communications system.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 2 of 26

    Document history

    Version Date of issue Content and changes Edited by

    1.0 April 13th, 2017 First version

    Carlos Bock Jordi Tortosa

    Peer reviewed by:

    Partner Contributor

    EYPESA Ramon Gallart

    UPC Andreas Sumper /Daniel Heredero

    Deliverable beneficiaries

    WP / Task Responsible

    All Work Package Leaders

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 3 of 26

    Table of contents

    EXECUTIVE SUMMARY ................................................................................................... 6

    1. INTRODUCTION ...................................................................................................... 7

    2. DESCRIPTION OF THE FINAL WIRELESS TRANSMISSION SYSTEM ................. 8

    Wi-Fi access network .................................................................................................... 9

    Radio Backbone .......................................................................................................... 11

    Fibre Network backbone ............................................................................................. 13

    Optical interconnection ........................................................................................... 13

    Complete network ....................................................................................................... 15

    3. PERFORMANCE AND RESULTS .......................................................................... 17

    Network Throughput .................................................................................................... 17

    Access Network in Planallonga ............................................................................... 17

    Radio backbone ...................................................................................................... 17

    P2P Milany - Bellmunt............................................................................................. 17

    P2P Milany-Verger .................................................................................................. 17

    Fibre Network backbone ......................................................................................... 18

    Radio interconnection between Collsuspina and Bellmunt ...................................... 18

    Network availability ..................................................................................................... 19

    Access network ....................................................................................................... 19

    Radio backbone ...................................................................................................... 21

    Fibre backbone ....................................................................................................... 24

    4. CONCLUSIONS ..................................................................................................... 26

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 4 of 26

    Abbreviations and Acronyms

    Acronym Description

    ADC Analogue to Digital Converter

    ADSL Asymmetric Digital Subscriber Line

    AES Advanced Encryption Standard

    BER Bit Error Rate

    BPSK Binary Phase Shift Keying

    B8ZS Bipolar 8-Zero Substitution

    CO Dissemination Confidential, limited to project participants

    CSMA/CA Carrier Sense Multiple Access with Collision Avoidance

    DECT Digital European Cordless Telephone

    DMVPN Dynamic Multipoint Virtual Private Network

    DSO Distribution System Operator

    EC European Commission

    ED Energy Detection

    EDGE Enhanced Data rates for GSM Evolution

    EGSM Extended Global System for Mobile Communications

    EVPL Ethernet Virtual Private LAN

    FDD Frequency Division Duplexing

    FEC Forward Error Correction

    GSM Global System for Mobile Communications

    GPRS General Packet Radio Service

    HSDPA High Speed Downlink Packet Access

    HTTP HyperText Transfer Protocol

    HDB3 High Density Bipolar 3 zeros

    IDPR Intelligent Distribution Power Router

    IEEE Institute of Electrical and Electronics Engineers

    IP Internet Protocol

    IPSec Internet protocol with Security extensions

    ISDN Integrated Services Digital Network

    ISP Inter System Protocol

    JDS Jerarquía Digital Síncrona (Synchronous Digital Hierarchy)

    LAN Local Area Network

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 5 of 26

    Acronym Description

    LRWBS Low Rate Wide Band Services

    LV Low Voltage

    MAC Medium Access Control

    MTU Maximum Transfer Unit

    MV Medium Voltage

    NHRP Next Hop Resolution Protocol

    OSPF Open Shortest Path First

    PLC Power Line Carrier

    PLT Power Line Telecommunications

    PSK Phase Shift Keying

    QoS Quality of Service

    QPSK Quadrature Phase-Shift Keying

    RIP Routing Information Protocol

    RS Reed-Solomon

    RTD Round Trip Delay

    RTU Remote Terminal Unit

    S/I Signal to Interference Ratio

    S/N Signal to Noise Ratio

    SNMP Simple Network Management Protocol

    SS Spread Spectrum

    SSH Secure Shell protocol

    TCP Transmission Control Protocol

    ToC Table of Contents

    UDP User Datagram Protocol

    UMTS Universal Mobile Telecommunications System

    VLAN Virtual Local Area Network

    VRRP Virtual Router Redundancy Protocol

    WCDMA Wide Band Code Division Multiple Access

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 6 of 26

    EXECUTIVE SUMMARY

    This deliverable describes the final wireless transmission system that has been deployed to give connectivity to the Valfogona area, in Girona, which was selected within the Smart Rural Grid project to carry out the prototype of the Smart Rural Grid System. The document describes the final overall network architecture, both at physical, layer and network levels and the performance results that have been obtained during the verification process.

    The validator in Vallfogona was deployed to test the Smart Rural Grid wireless backup services. Network certifications after the trial show that the system fulfils the project design criteria and offers backup service to the PLC communications channel and a transport stream for data connectivity to the network operation centre.

    Performance measurements, such as bandwidth and availability, confirm that the system fulfils all the requirements that were defined in D4.1.

    The main conclusions are:

    The wireless communications network offers a reliable backup to communicate with the end subscribers

    Performance and latency fulfil the design parameters and allow to support high speed transmission services

    No configuration adjustments were required from the initial design described in D4.3

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 7 of 26

    1. INTRODUCTION

    This deliverable summarises the performance of the final wireless network deployed in the Vallfogona area, together with the backbone that interconnects this network with EYPESA interconnection point. This network, as originally described in D4.3, is composed of radio and fibre optic links.

    Minor changes were required from the initial design in D4.3.

    The results in terms of performance, latency and availability are successful and confirm that the network can be used to connect the end subscribers with EYPESA interconnection point at high data rates.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 8 of 26

    2. DESCRIPTION OF THE FINAL WIRELESS TRANSMISSION SYSTEM

    Figure 2, taken from D4.1, shows the complete network originally intended for the pilot area in Vallfogona and between Vallfogona and EYPESA interconnection point in Granollers.

    Vallfogona is a rural area of Ripollès county, located in the province of Girona, in the north of Catalonia, between the towns of Ripoll and Olot.

    Figure 1. Location of Vallfogona, Ripollès, Girona

    The wireless network was composed of the following subsystems:

    - A Wi-Fi access network to connect the final customers in Vallfogona area - A set of radio links to connect this WiFi area to a fibre backbone in Can Petafi - A backup radio link from Bellmunt to Centelles, to also connect to a fibre backbone

    Figure 2: Meshed network from Vallfogona area to EYPESA HQ in Granollers

    Milanyrepeater

    Bellmuntrepeater

    P.T.CanPetafi

    PLC Communications (trunk)

    Wireless Communications (trunk)

    Wireless Communications (access)

    Fiber optics connection

    GPRS connection

    MPLS network

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 9 of 26

    Wi-Fi access network

    The Wi-Fi access network covers four areas. Those are:

    Vallfogona

    Planallonga

    Piella

    Les Artigues

    All the houses are isolated and therefore, GPS coordinates are also included.

    Figure 3. Access Network in Vallfogona area

    Figure 4. Distribution Network in Les Artigues

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 10 of 26

    Figure 5. Distribution Network in Planallonga area

    Figure 6. Distribution Network in Piella

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 11 of 26

    Radio Backbone

    The following figure shows the design of the radio links from Verger to Milany, Bellmunt and Petafi. Both, Petafi and Bellmunt are connected to the fibre backbone using Xarxa Oberta de Catalunya (XOC) network.

    Figure 7. Radio backbone links

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 12 of 26

    The equipment used in the Verger-Planallonga-Piella radio link is the following:

    Cambium Canopy PMP 58430 AP and SM (5,8 GHz OFDM)

    These devices have configurable channel bandwidth: 5, 10 or 20MHz and configurable cyclic prefix (1/4, 1/8 or 1/16) with a maximum range for Access Point (AP) of 1 to 30 miles for 5 and 10MHz channel bandwidth and 1 to 24 miles for 20MHz channel bandwidth.

    The SM has Auto Transmit Power Control (TPC) with power set by the AP to provide power levelling for close-in SMs.

    Figure 8. PMP 58430 AP with antenna (left) and PMP 58430 SM (right)

    The equipment used in in Petafi-Bellmunt-Milany-Verger radio link is the following:

    Cambium Force 110 in PTP Modality

    Characteristics:

    Frequency availability: 5150 – 5970 MHz

    Throughput: 220 Mbps of real user data

    Channel Bandwidth: 5, 10, 20 and 40 MHz

    Security: 128-bit AES encryption (CCMP mode)

    Peak gain: 25 dBi antenna gain with 30 dBm of transmit power

    Ethernet Port: Gigabit Ethernet (802.3af compliant)

    Figure 9. ePMP Force 110 PTP

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 13 of 26

    Fibre Network backbone

    The fibre network backbone connects Vallfogona area with EYPESA NOC in Granollers.

    Two links have been designed to offer redundancy to the system:

    Fibre link directly from C-37 roadway to the Les Preses node

    Radio link from Bellmunt to Collsuspina / Centelles

    This second one was panned as a back-up of the direct fibre link in C-37.

    The following picture presents the geographical scope of the network backbone.

    Figure 10. Fibre connection backbone from Petafi and Collsuspina to EYPESA in Granollers

    Optical interconnection

    The Xarxa Oberta de Catalunya (XOC) optical fibre network connects EYPESA NOC in Granollers to Petafi substation.

    XOC provides an active 30Mbps Ethernet service in Petafi. This network runs alongside the C-37 road to the nearest node in Les Preses. This node acts as a Label Edge Router. The service is delivered at the Network Operation Center of EYPESA in Granollers.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 14 of 26

    Figure 11. Optical fibre connection from Petafi radio point to Les Preses

    The edge equipment is a:

    Cisco ME 3400G-2CS AC Ethernet Access Switch

    The specifications of the device are the following:

    Consumption: 15W (typical), 20W (maximum), 68 Btus per hour

    AC: 100 to 240 VAC, 0.5 to 0.25A, 50 to 60 Hz

    Figure 12. CPE CISCO ME-3400

    As a backup solution to direct fibre link, a radio link Bellmunt and Collsuspina (in Osona county) has been deployed.

    Figure 13. Bellmunt – Collsuspina elevation profile

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 15 of 26

    Figure 14. Backup radio link from Bellmunt to Collsuspina

    From Collsuspina to Centelles, a second radio has been deployed to connect to the XOC access node in Centelles. This node allocates a fibre termination point of XOC and provides access to XOC fibre backbone to interconnect with EYPESA NOC in Granollers.

    Complete network

    Figure 15 shows the overall communications network that has been currently deployed for the Smart Rural Grid project.

    Figure 15. Complete radio network for the Vallfogona prototype

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 16 of 26

    The prototype deployed in Vallfogona is connected through radio links to Bellmunt.

    Bellmunt is the routing point which selects the link to connect the prototype to EYPESA NOC in Granollers.

    Due to permit restrictions, the link C-37 has not been deployed yet (expected May 2017). Thus, the backup link was used as the main link during all the tests and certifications.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 17 of 26

    3. PERFORMANCE AND RESULTS

    Network Throughput

    When the systems were deployed, network throughput tests were carried out. The results were the following:

    Access Network in Planallonga

    The channel bandwidth of the access network was also selected to be 20MHz (encrypted) in the 5GHz band (Frequency: 5735 MHz)

    Verger

    RSSI: -56 dBm

    Downlink 20,51Mbps / Uplink 7,45 Mbps

    Nou Piella

    RSSI: -69 dBm

    Downlink 11,43 Mbps / Uplink 3,98 Mbps

    Radio backbone

    The radio backbone from the fibre optics network alongside the C-37 and Verger was configured with a channel bandwidth of 20MHz.

    P2P Milany - Bellmunt

    Downlink RSSI: -52 dBm

    Uplink RSSI: -50dBm

    Ping: 5-6ms

    Capacity: 64Mbps Downlink

    80Mb Uplink

    P2P Milany-Verger

    Downlink RSSI: -55dBm

    Uplink RSSI: -50dBm

    Ping: 1-2ms

    Capacity: 53.5Mb Downlink

    89.9Mb Uplink

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 18 of 26

    Fibre Network backbone

    The service was configured to provide 30Mbps, which was considered enough for the prototype, considering the different radio segments involved in the interconnection.

    The fibre link achieved a sustainable throughput during the tests:

    Figure 16. Fibre network throughput

    Radio interconnection between Collsuspina and Bellmunt

    The radio link between Collsuspina and Bellmunt was also tested to provide 30Mbps. The results were the following:

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 19 of 26

    Figure 17. 30Mbps Throughput radio link

    Network availability

    A network availability analysis has been carried out during the months that the prototype has been operational in order to verify its readiness for service.

    The network availability was analysed for the three systems:

    Access network

    Radio backbone

    Fibre interconnection

    Access network

    APs in Planallonga and Nou Piella were constantly monitored during the trial. Both performed well. Availability was mainly influenced by weather conditions (heavy rain, storms or snow).

    The following graph show the availability for AP Planallonga:

    Figure 18. Availability for AP in Planallonga

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 20 of 26

    Note that it was available at all time, with very short periods of time of data losses lower than 20%. The following graph shows the packet losses graph:

    Figure 19. Packet losses in AP in Planallonga

    The behaviour of the AP in Nou Piella was not that good and was down for a couple of days during the tests.

    The following graph shows the availability for AP Nou Piella:

    Figure 20. Availability for AP in Nou Piella

    As can be seen, it was down from 10th to 13th March, for maintenance reasons due to the deployment of new technology. During the rest of the time, it behaved similar to the AP in Planallonga, and losses were below 20% for any specific day.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 21 of 26

    Figure 21. Packet losses in AP in Nou Piella

    With these results, we conclude that the system is robust enough to be fully operational.

    Radio backbone

    The radio backbone, as described in section number 2, comprised three links:

    Verger

    Bellmunt

    Milany

    None of the three links suffered any relevant loss of signal period during the trial.

    The following graphs corroborate this statement:

    Figure 22. Availability of the link in Verger

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 22 of 26

    Figure 23. Availability of the link in Bellmunt

    Figure 24. Availability of the link in Milany

    Shortages were very limited and always due to weather conditions. The following graphs show packet losses for the three links of the radio backbone:

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 23 of 26

    Figure 25. Packet losses in Verger

    Figure 26. Packet losses in Bellmunt

    Figure 27. Packet losses in Milany

    The global radio system offered an availability >99%, which is an expected result for radio transmission systems.

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 24 of 26

    Fibre backbone

    Fibre backbone had no shortages during the trial period (Jan – March 2017).

    Thus, the availability during this period was of 100% for the fibre link.

    For the backup link from Collsuspina to Bellmunt, availability was of 99,21%.

    The following graphs show up and down times for this link.

    02/01/2017 – 08/01/2017

    09/01/2017 – 15/01/2017

    16/01/2017 – 22/01/2017

    23/01/2017 – 29/01/2017

    30/01/2017 – 05/02/2017

    06/02/2017 – 12/02/2017

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 25 of 26

    13/02/2017 – 19/02/2017

    20/02/2017 – 26/02/2017

    27/02/2017 – 05/03/2017

    06/03/2017 – 12/03/2017

    13/03/2017 – 19/03/2017

    20/03/2017 – 26/03/2017

  • Smart_Rural_Grid FP7 project – Grant agreement nº. 619610

    Deliverable D4.6 “Final Wireless Transmission System” v1.0 Page 26 of 26

    4. CONCLUSIONS

    The final wireless transmission system has been proven to be a robust telecom system to provide connectivity in the context of the Smart Rural Grid project.

    No changes have been carried out from the initial deployment presented in D4.3. However, due to permits limitations, the backup link has been used as the main connection, while the link along C-37 is under construction (expected to be completed in May 2017).

    The availability of the different systems is higher than 99%, except for the AP in Nou Piella, which due to maintenance reasons (due to the deployment of new technology) was down during several days in a row (10th to 13th March). The rest of the systems had limited shortages, all due to weather conditions (note that we are in a rural and elevated area, which means that heavy rain, storms and snow are usual in winter).

    Availability of the backbones was (both radio and fibre), in any case, higher than 99%, which is a good availability time if we additionally consider that this is a backup system in the scope of the project.

    In summary, we can conclude that the final wireless transmission network deployed in the context of the Smart Rural Grid project for the trial in Vallfogona area offers the required capacity, latency and availability and fulfils the design specifications included in D4.1. Minor incidents that prevented connectivity were mainly caused by weather conditions and are considered normal due to the orography of the area.

    EXECUTIVE SUMMARY1. INTRODUCTION2. DESCRIPTION OF THE FINAL WIRELESS TRANSMISSION SYSTEMWi-Fi access networkRadio BackboneFibre Network backboneOptical interconnection

    Complete network

    3. PERFORMANCE AND RESULTSNetwork ThroughputAccess Network in PlanallongaRadio backboneP2P Milany - BellmuntP2P Milany-VergerFibre Network backboneRadio interconnection between Collsuspina and Bellmunt

    Network availabilityAccess networkRadio backboneFibre backbone

    4. CONCLUSIONS