Trial license for testing purposes only Trial license for testing purposes only Slope Stability 1 Bishop's 1 1 [GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu] Slope stability analysis Input data Project Task : Part : Description : Date : Project ID : Project number : Slope Stability 1 Bishop's 1 Stability Check 1 5/12/2016 NA NA Settings Standard - safety factors Stability analysis Earthquake analysis : Verification methodology : Standard Safety factors (ASD) Safety factors Permanent design situation Safety factor : SF s = 1.50 [–] Interface No. Interface location Coordinates of interface points [m] x z x z x z 1 2 3 4 25.50 36.00 19.50 50.00 0.00 50.00 0.00 19.50 19.50 17.50 19.50 16.00 17.50 15.50 30.00 25.50 15.00 50.00 21.00 19.50 16.00 15.50 33.00 36.00 19.50 21.00 19.50 17.50

Slope Stability Check 1

Embed Size (px)

DESCRIPTION

Reference

Citation preview

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

1[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Slope stability analysisInput dataProjectTask :Part :Description :Date :Project ID :Project number :

Slope Stability 1 Bishop's1Stability Check 15/12/2016NANA

SettingsStandard - safety factorsStability analysisEarthquake analysis :Verification methodology :

StandardSafety factors (ASD)

Safety factorsPermanent design situation

Safety factor : SFs = 1.50 [–]

Interface

No. Interface location Coordinates of interface points [m]x z x z x z

1

2

3

4

25.5036.00

19.5050.00

0.0050.00

0.00

19.5019.50

17.5019.50

16.0017.50

15.50

30.00

25.50

15.00

50.00

21.00

19.50

16.00

15.50

33.00

36.00

19.50

21.00

19.50

17.50

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

2[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Interface location Coordinates of interface points [m]x z x z x z

5

6

7

8

9

10

0.00

0.00

0.00

0.00

0.00

0.00

13.50

11.50

9.50

7.50

5.50

3.50

50.00

50.00

50.00

50.00

50.00

50.00

13.50

11.50

9.50

7.50

5.50

3.50

Soil parameters - effective stress state

No. Name Patternjef[°]

cef

[kPa]g

[kN/m3]

1 Rock Fill 30.00 0.00 22.00

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

3[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Soil parameters - uplift

No. Name Patterngsat

[kN/m3]gs

[kN/m3]n

[–]

1 Rock Fill 22.00

Soil parameters - total stress state

No. Name Patterncu

[kPa]g

[kN/m3]

1

2

3

4

5

6

7

Weak Clay 2

Regular Clay 9

Regular Clay 8

Regular Clay 7

Regular Clay 6

Regular Clay 5

Regular Clay 3-4

8.00

17.00

15.00

13.00

11.00

9.00

8.00

5.50

5.50

5.50

5.50

5.50

5.50

5.50

Soil parametersWeak Clay 2Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

8.00

kN/m3

kPa Rock FillUnit weight :Stress-state :Angle of internal friction :Cohesion of soil :Saturated unit weight :

geffectivejefcefgsat

=

===

22.00

30.000.00

22.00

kN/m3

°kPakN/m3

Regular Clay 9Unit weight :Stress-state :

gtotal

= 5.50 kN/m3

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

4[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Cohesion of soil : cu = 17.00 kPa Regular Clay 8Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

15.00

kN/m3

kPa Regular Clay 7Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

13.00

kN/m3

kPa Regular Clay 6Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

11.00

kN/m3

kPa Regular Clay 5Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

9.00

kN/m3

kPa Regular Clay 3-4Unit weight :Stress-state :Cohesion of soil :

gtotalcu

=

=

5.50

8.00

kN/m3

kPa Assigning and surfaces

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

1

2

36.0030.00

50.0036.0019.50

19.5021.00

17.5019.5017.50

33.0025.50

50.0025.50

21.0019.50

19.5019.50

Rock Fill

Weak Clay 2

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

5[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

3

4

5

6

7

50.0019.500.00

50.000.00

50.000.00

50.000.00

50.000.00

15.5017.5016.00

13.5015.50

11.5013.50

9.5011.50

7.509.50

50.0015.000.00

50.000.00

50.000.00

50.000.00

50.000.00

17.5016.0015.50

15.5013.50

13.5011.50

11.509.50

9.507.50

Regular Clay 3-4

Regular Clay 3-4

Regular Clay 5

Regular Clay 6

Regular Clay 7

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

6[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

8

9

10

50.000.00

50.000.00

0.0050.00

5.507.50

3.505.50

3.50-31.50

50.000.00

50.000.00

0.0050.00

7.505.50

5.503.50

-31.503.50

Regular Clay 8

Regular Clay 9

Regular Clay 9

WaterWater type : No waterTensile crackTensile crack not inputted.EarthquakeEarthquake not included.Settings of the stage of constructionDesign situation : permanent

Results (Stage of construction 1)Analysis 1 (stage 1)Circular slip surface

Slip surface parameters

Center :x =z =

18.2730.60

[m][m]

Angles :a1 =a2 =

-22.3052.53

[°][°]

Analysis of the slip surface without optimization.

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

7[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Slip surface parametersRadius : R = 15.78 [m]

Analysis of the slip surface without optimization.Slope stability verification (Bishop)Sum of active forces :Sum of passive forces :Sliding moment :Resisting moment :

Fa =Fp =Ma =Mp =

94.43162.68

1490.082567.03

kN/mkN/mkNm/mkNm/m

Factor of safety = 1.72 > 1.50Slope stability ACCEPTABLE Input data (Stage of construction 2)Assigning and surfaces

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

1

2

3

36.0030.00

50.0036.0019.50

50.0019.500.00

19.5021.00

17.5019.5017.50

15.5017.5016.00

33.0025.50

50.0025.50

50.0015.000.00

21.0019.50

19.5019.50

17.5016.0015.50

Rock Fill

Weak Clay 2

Regular Clay 3-4

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

8[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

4

5

6

7

8

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

13.5015.50

11.5013.50

9.5011.50

7.509.50

5.507.50

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

15.5013.50

13.5011.50

11.509.50

9.507.50

7.505.50

Regular Clay 3-4

Regular Clay 5

Regular Clay 6

Regular Clay 7

Regular Clay 8

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

9[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

9

10

50.000.00

0.0050.00

3.505.50

3.50-31.50

50.000.00

0.0050.00

5.503.50

-31.503.50

Regular Clay 9

Regular Clay 9

WaterWater type : No waterTensile crackTensile crack not inputted.EarthquakeEarthquake not included.Settings of the stage of constructionDesign situation : permanent

Results (Stage of construction 2)Analysis 1 (stage 2)Circular slip surface

Slip surface parameters

Center :

Radius :

x =z =R =

18.2730.6015.78

[m][m][m]

Angles :a1 =a2 =

-22.3052.53

[°][°]

Specified slip surface.Slope stability verification (Janbu)Analysis has not been performed.Analysis 2 (stage 2)Polygonal slip surface

Coordinates of slip surface points [m]x z x z x z x z x z

12.28 16.00 14.74 15.22 17.28 14.85 19.85 14.90 22.38 15.37Specified slip surface.

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

10[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Coordinates of slip surface points [m]x z x z x z x z x z

24.81 16.24 27.05 17.49 29.07 19.09 30.79 21.00Specified slip surface.

Slope stability verification (Janbu)Analysis has not been performed.

Input data (Stage of construction 3)Assigning and surfaces

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

1

2

3

4

36.0030.00

50.0036.0019.50

50.0019.500.00

50.000.00

19.5021.00

17.5019.5017.50

15.5017.5016.00

13.5015.50

33.0025.50

50.0025.50

50.0015.000.00

50.000.00

21.0019.50

19.5019.50

17.5016.0015.50

15.5013.50

Rock Fill

Weak Clay 2

Regular Clay 3-4

Regular Clay 3-4

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

11[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

5

6

7

8

9

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

11.5013.50

9.5011.50

7.509.50

5.507.50

3.505.50

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

13.5011.50

11.509.50

9.507.50

7.505.50

5.503.50

Regular Clay 5

Regular Clay 6

Regular Clay 7

Regular Clay 8

Regular Clay 9

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

12[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

10

0.0050.00

3.50-31.50

0.0050.00

-31.503.50

Regular Clay 9

WaterWater type : No waterTensile crackTensile crack not inputted.EarthquakeEarthquake not included.Settings of the stage of constructionDesign situation : permanent

Results (Stage of construction 3)Analysis 1 (stage 3)Circular slip surface

Slip surface parameters

Center :

Radius :

x =z =R =

18.2730.6015.78

[m][m][m]

Angles :a1 =a2 =

-22.3052.53

[°][°]

Specified slip surface.Slope stability verification (Spencer)Analysis has not been performed.Analysis 2 (stage 3)Polygonal slip surface

Coordinates of slip surface points [m]x z x z x z x z x z

12.2824.81

16.0016.24

14.7427.05

15.2217.49

17.2829.07

14.8519.09

19.8530.79

14.9021.00

22.38 15.37

Specified slip surface.

Slope stability verification (Sarma)Analysis has not been performed.

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

13[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

Input data (Stage of construction 4)Assigning and surfaces

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

1

2

3

4

36.0030.00

50.0036.0019.50

50.0019.500.00

50.000.00

19.5021.00

17.5019.5017.50

15.5017.5016.00

13.5015.50

33.0025.50

50.0025.50

50.0015.000.00

50.000.00

21.0019.50

19.5019.50

17.5016.0015.50

15.5013.50

Rock Fill

Weak Clay 2

Regular Clay 3-4

Regular Clay 3-4

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

14[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

5

6

7

8

9

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

11.5013.50

9.5011.50

7.509.50

5.507.50

3.505.50

50.000.00

50.000.00

50.000.00

50.000.00

50.000.00

13.5011.50

11.509.50

9.507.50

7.505.50

5.503.50

Regular Clay 5

Regular Clay 6

Regular Clay 7

Regular Clay 8

Regular Clay 9

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Trial

licen

se fo

r tes

ting p

urpo

ses o

nly

Slope Stability 1 Bishop's1

15[GeoStructural Analysis - Slope Stability | version 5.18.4.0 | Copyright © 2014 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]

No. Surface position Coordinates of surface points [m]x z x z

Assignedsoil

10

0.0050.00

3.50-31.50

0.0050.00

-31.503.50

Regular Clay 9

WaterWater type : No waterTensile crackTensile crack not inputted.EarthquakeEarthquake not included.Settings of the stage of constructionDesign situation : permanent

Results (Stage of construction 4)Analysis 1 (stage 4)Circular slip surface

Slip surface parameters

Center :

Radius :

x =z =R =

18.8229.3414.64

[m][m][m]

Angles :a1 =a2 =

-24.3355.27

[°][°]

Analysis of the slip surface without optimization.Slope stability verification (all methods)Bishop :Fellenius / Petterson :Spencer :Janbu :Morgenstern-Price :

FS = 1.59 > 1.50FS = 1.54 > 1.50FS = 1.57 > 1.50FS = 1.57 > 1.50FS = 1.59 > 1.50

ACCEPTABLEACCEPTABLEACCEPTABLEACCEPTABLEACCEPTABLE