S l t d R fSelected References(05. March 2015)
IMPORTANT to know
> This is a collection of (mostly) recent major projects in the MMM space
D i d t t i t i t t ti> Designed to create an impact in customer presentations> Scope of solution is correct> Volume of orders is close enough to use the data but not exact (for obvious reason)
> Use with CARE, there might be no customer approval.
Ambatovy Mining MadagascarEngineering: SNC-Lavalin Group Inc
Madagascar
End user: Sherritt International Corporation, Sumitomo Corporation & Korea Resources Corporation
Annual production: p60 000 t of nickel, 5 600 t of cobalt
Contract: EPC: Turnkey execution of the complete electrical distribution network
Global amount:55 M€
Execution:2007 20102007-2010
3
Ambatovy Mining MadagascarEngineering: SNC-Lavalin Group Inc
Madagascar
End user: Sherritt International Corporation, Sumitomo Corporation & Korea Resources Corporation
Annual production: p60 000 t of nickel, 5 600 t of cobalt
Contract: EPC: Turnkey execution of the complete electrical distribution network
Global amount:55 M€
Execution:2007 20102007-2010
Guelb IIMauritaniaMauritaniaProject:Construction of iron ore processing plant, extension of e isting G elb El Rhein iron ore mine and associatedexisting Guelb El Rhein iron ore mine and associated infrastructure
End user: SNIM, Société Nationale Industrielle et Minière, MauretaniaMauretania
EPC: SNC-Lavalin, Canada
Global amount:20 M€Execution: 2010 – 2014, Schneider Electric Project & Services
Guelb IIMauritaniaMauritaniaScope:Design studies, design, manufacture and supply, g g pp yoperator training installation, supervision and on-site commissioning.
Process Control:Plc and Scada systems about 9000 IOPlc and Scada systems, about 9000 IO, LV and MV drives, devices
Electrical Distribution: Ehouse , modular buildings, MV di t ib ti (11kV 5 5KV)MV power distribution (11kV, 5,5KV), LV PCC and MCC, Power Compensation and filtering, UPS, battery chargers, ...
Electrical studies• Load flow study • Short circuit calculations
Water Management System, swichboards, RTU, Scada • Protection discrimination• Harmonic for each voltage level• Dynamic network stability
Images and drawings for illustration purpose only
Roy Hill Iron Ore ProjectAustraliaAustraliaEngineering: Samsung, McConnell Dowell, Roy Hill
End user: Roy Hill
Scope:Switch Rooms & Equipmentq p
MV & LV Switch Gear, MV & LV VSDs, Uniflair HVAC, Transformers, UPS & DC Chargers, Power Management, etc
Resource-to-market simulation and optimization
Global amount: +30 M€Execution: Now
Roy Hill Iron Ore ProjectAustraliaAustraliaEngineering: Samsung, McConnell Dowell, Roy Hill
End user: Roy Hill
Scope:Switch Rooms & Equipmentq p
MV & LV Switch Gear, MV & LV VSDs, Uniflair HVAC, Transformers, UPS & DC Chargers, Power Management, etc
Resource-to-market simulation and optimization
Global amount: +30 M€
Roy Hill Remote Operation Centre
Execution: Now "We are utilising Schneider Electric's sophisticated APS modeling approach to help us
predict how each entity in the demand chain will operate (mine, plant, rail and port), not as discrete components, but as a single system that is operating with unified objectives and associated KPIs" says Roy Hill’s Mike Lomman.
Rio Tinto Iron Ore of CanadaCanadaEngineering: Many; multiple implementations at different times
End user: Rio Tinto IOC
Scope: Distributed Control and Electrical Distribution SystemyDowntime SolutionSupply Demand & Optimisation solution from Loading Pocket at the mine to Terminal at the portRemote monitoring and optimization from ProcessRemote monitoring and optimization from Process Excellence Center
Global amount: +20 M€
E ec tionExecution: DCS, Electrical Distribution System, Downtime: RunningSDO: Go-live August 2015
Rio Tinto Iron Ore of CanadaCanadaEngineering: Many; multiple implementations at different times
End user: Rio Tinto IOC
Scope: Distributed Control and Electrical Distribution SystemyDowntime SolutionSupply Demand & Optimisation solution from Loading Pocket at the mine to Terminal at the portRemote monitoring and optimization from ProcessRemote monitoring and optimization from Process Excellence Center,
Global amount: +20 M€
E ec tionExecution:DCS, Electrical Distribution System, Downtime: RunningSDO: Go-live August 2015
Schneider Electric is the leading subcontractor at the Rio Tinto Process Excellence Center (PEC)
Pilot in Brisbane, Australia, that harnesses data analytics in a bid to optimization yields and recovery rates from mine to metal on copper operations
ld idworldwide.
The prototype is seeking to answer the question - "Can a remote group of mineral processing experts, using advanced analytical tools and predictive models onadvanced analytical tools and predictive models on high quality real-time and historic data, work with operations personnel to significantly improve copper processing outcomes across RTC managed operations?"operations?
11
Schneider Electric as the supplier of the Production and Inventory Accounting component of the BHP Imine initiative
Imine is a group wide, multi country, across all assets initiative to optimize BHP Billiton’s supply chain
I-Mine InitiativeProduction and Inventory Accounting for the
Western Australia Iron Ore Assets
tors
n to
the
inve
st’s
pre
sent
atio
nB
HP
Bill
iton’
New seamless pipe mill, Bay City TexasBay City, TexasProject: Seamless pipe mill, 600,000 tpa, Estimated in estment of $1 5 billionEstimated investment of $1.5 billion, SOP in 2016
End user: Tenaris
Scope: Secondary substations, MV & LV Switchgear, MCCs, Transformers,Transformers, Process Control,
Global amount: +10 M€
TRACTION TRAIN IndonesiaIndonesiaEPC: Midroc Electro AB
End user: Freeport Indonesia
Scope: 2 units of E-Houses e/w:PiX17 MV Switch gearLV Switch gearRectifier TransformerAC/DC Rectifier (3rd party)AC/DC Rectifier (3rd party)
Global amount: +2 M$
Execution: 2015
TRACTION TRAIN Indonesia
Assembly
IndonesiaEPC: Midroc Electro AB
End user: Freeport Indonesia
Scope: 2 units of E-Houses e/w:
Transport
PiX17 MV Switch gearLV Switch gearRectifier TransformerAC/DC Rectifier (3rd party)AC/DC Rectifier (3rd party)
Global amount: +2 M$
Execution: 2015
Scope
Images and drawings for illustration purpose only
Rio TintoAustraliaAustraliaProject: Rio Tinto Cape Lambert Port, Western Australia. Largest B lk Terminal in the orld Operational control 1500 kmBulk Terminal in the world. Operational control 1500 km away in Perth.
End user: Rio Tinto
Scope: Operational Effectiveness
Integrated Operatiobal Center Perth (control room) on System Platform with Situational Awareness. Supply of PLC t d D f C t l h k t“PLCs etc, and Dynsym for „Control check out“
Global amount: + $5M
Execution: Live August 2013
Fully Automated Crane,Liège - BelgiumLiège - Belgium Project : Fully Automated Cold Rolled Steel Traveling Crane
User: ArcelorMittal
Scope: Turn key project : Supply of equipment EngineeringTurn-key project : Supply of equipment, Engineering, Installation and Commissioning- Premium and Safety PLCs (incl. closed loop Anti-sway system)
- HMIs with customised diagnostics screens- HMIs with customised diagnostics screens- Safety, Sensors, LV Cubicles, Switches, Wifi…
Global Amount :+2m€ (6 cranes overall)
Execution: 8 months (ending April 2015)
Power II UpgradeIndonesiaIndonesiaEnd user: HeidelbergCement (Indocement), T nggal PrakarsaTunggal Prakarsa
Scope:Supply & Installation
f2x 80 MVA Power Transformer150kV Switchyard, 11kV SwitchgearPower SCADA Systemy
Global amount: +9 M€
Execution:Execution: 2013 - 2014
P10 RecoveryIndonesiaIndonesiaEnd user: HeidelbergCement (Indocement), T nggal PrakarsaTunggal Prakarsa
Scope: Supply & Installation
MV Switchgear – PCC & MCC
Global amount:+6 M€
Execution: 2014 ( 60 DAYS )
Brownfield P14IndonesiaIndonesiaEPC: Sinoma TCDRI
End user: HeidelbergCement (Indocement),
Tunggal Prakarsa
Scope: p11kV Switchgear
PCC & MCC
LV Drives
Gl b l tGlobal amount:+10 M EuroExecution: 2013-2014
Brownfield P14IndonesiaIndonesiaEPC: Sinoma TCDRI
PCC & MCC
End user: HeidelbergCement (Indocement), Tunggal Prakarsa
Scope: 11kV Switchgear
PCC & MCC
LV Drives
Gl b l t
LV Drives
Global amount:+5 M EuroExecution: 2013-2014
Images and drawings for illustration purpose only
Grupo Mexico, ESDE IIIMexicoMexicoEnd user: Industrial Minera Mexico, Buenavista del Cobre , one of the largest copper deposits in the world
Scope: Supply & commisioning of 2 Power Houses (3 Rooms). Main Substation, 240 m2 , Electrical Room, 2 Shelters,Main Substation, 240 m2 , Electrical Room, 2 Shelters, Main Room 308m2 & UPS & Battery Room 66m2
LV / MV switch gearMCCDrivesUPS & battery chargersHVAC
Global amount:+12M Euro
Execution: 2013
ValeMalaysiaMalaysiaEnd user: Vale
Project $1.4bn port terminal in Malaysia
Scope: Turnkey supply of 5 Power Houses
LV / MV switch gear, transformer, MCCEnergy Management and Control SystemDrivesUPS & battery chargersHVAC
Global amount:+12M Euro+12M Euro
Execution: 2013
Images and drawings for illustration purpose only
TeckCanadaEnd user: World’s largest fully-integrated zinc and lead smelting and refining operations
Canada
lead smelting and refining operations
Challenges: Control systems – Many Old systemsPeople – Improve operator efficiencyPeople Improve operator efficiency Information Management – Multiple and Dissimilar historiansEnvironmental practices – Not automated / standardized SolutionsBusiness ConsultingBusiness Consulting DCS Migration from H, E and A to Foxboro IAHMI and Historian Migration: Standardized on WW SPAlarm & Loop Management, OTS Intelatrac for Environmental ManagementIntelatrac for Environmental ManagementEnergy Management, Network SecurityModicon PLCs, LV and MV
CodelcoChileEnd user: El Teniente Operations - 403,616 metric tons of copper per year / 5 617 metric tons of Molybdenum
Chile
per year / 5,617 metric tons of Molybdenum
Challenges: Integrate the field into one system and tie to SAP, document inspection rounds, ensuring jobs are done
Reduce temperature variability which will allow for higher yield, higher throughput, lower costs and longer asset life
Train operators more effectively
Test control systems before they are implemented
SolutionsIntelatrac and integration with SAP Si S i APCSimSci APC, DynSim / OTS
Cement productionChinaEnd users:CNBM, Lafarge, Jidong, Evergreen, CUCC, Sinoma,
China
, g , g, g , , ,Conch, Ghezouba, …
Projects: Cement Production Optimization for morethan 40 production lines since 2013than 40 production lines since 2013
Scope: Dedicated industry solution based on Ampla
Monitors and manages cement producers key concernsMonitors and manages cement producers key concerns- Energy- Downtime- Operator Efficiency
ExecutionExecutionSchneider Electric Projects and Services teams
Alumina refineryBrazilBrazilEPC: Hatch / Outotec
End user: Hydro / Alunorte, DRS2 Project Brazil, Barcarena
Scope: pServices & EquipmentMV & LV Switch Gear, MV & LV MCCS, LV Drives Transformers, UPS & DC Chargers, etcServices ( commissioning start up etc )Services ( commissioning, start up, etc )
Global amount: 5 MUSD
Execution: O G iOn Going
Images and drawings for illustration purpose only
Batisöke CementTurkeyTurkeyEnd user: Batı Söke Cement – Turkey
Project:Modernization and upgrade of process control system of existing production line, new roller press unit
Scope:Scope: Process Expert System (PES 4.0)MV & LV Switch Gear (McSet and Blokset)MV & LV VSDs, Transformer,
Global amount:2+ M€Execution:Execution: Now
Images and drawings for illustration purpose only
Ad Duwayhi Gravity-CIL Gold ProjectGold ProjectEPC: Hanwha Engineering and Construction
End user: MA’ADEN Gold and Base Metals co.Saudi Arabia
Scope: Switch Rooms & Equipment
MV & LV Switch Gear, MV & LV VSDs,Transformers,,
Global amount: 9+ MUSD
Execution: Commissioning stageCommissioning stage
Images and drawings for illustration purpose only
Umm Wu'al Phosphate Saudi ArabiaSaudi ArabiaEPC: SNC-Lavalin
End user: Ma’aden Phosphate business
Scope: Supply complete low voltage electrical distribution system for SAP and Power Plant for the Umm Wu‘alPhosphate Project
Blokset LV Switchgears and MCCLV BusductPower Factor CorrectionPower Factor Correction
Global amount:7 M€E tiExecution: February 2016
UPS
Images and drawings for illustration purpose only
Umm Wu'al Phosphate Saudi ArabiaSaudi ArabiaEPC: Hanhwa Engineering and Construction, Korea
End user: Saudi Arabian Mining Company – MaadenWu'al Phosphate Project- Phosphoric Acid Plant
Scope:Scope: Blokset LV Switchgears and MCC34.5 kV Power Factor Correction
Global amount: 8 MUSD8 MUSD
Execution: August 2015
Images and drawings for illustration purpose only
New cement linesBrazilBrazilEPC: FLSmidth
End user: Votorantim CimentosEdealina (5000tpd) and Primavera (3000tpd)
Scope:Scope: Switch Rooms & EquipmentMV & LV Switch Gear, MCCs, MV & LV VSDs, Soft Starterss, Dry Transformers, UPS & DC Chargers, E- Houses, etcP C t l M580 Vij Cit tProcess Control M580, Vijeo Citect
Global amount: 20+ MUSD
ExecutionExecution2015 / 2016
Images and drawings for illustration purpose only
CSN expansion planBrazilBrazilEPC: Loesche
End user: CSN Cimentos, Arcos – MGNew cement production and second clinker production line
Scope: Switch Rooms & Equipment
MV & LV Switch Gear, Transformers, UPS & DC ChUPS & DC Chargers,
Turnkey delivery
Global amount: 4+ MUSD
Execution2015 / 2016
Images and drawings for illustration purpose only
Cauê Itabiritos ProjectBrazilBrazilEPC: VALE S. A.
End user: VALE S. A, Processing plant, capacity: 24 Mtpy
Scope: 16 PLCs Panels (16 Modicon Quantum),
40 Remote Panels (7664 IO points and 54 PRMs),
95 DP/PA Panels,
226 Junction Box Switches226 Junction Box, Switches,
Servers and Workstations, several softwares licences
Global amount: 4+ M. Euro Construction of new facilities and revamp of the existing
Execution: now (startup in 2H/15)
plant in Cauê for the processing of compact Itabirite
Images and drawings for illustration purpose only
Glass manufacturing greenfield Brazilgreenfield, BrazilEPC: Minerbo-fuchs Engenharia S.A., BrazilIndústria Vidreira do Nordeste (IVN)Indústria Vidreira do Nordeste (IVN)
End user: Indústria Vidreira do Nordeste (IVN), Verallia Saint Gobain Vidros S.A
Scope: 1 Panel MVS / 3 Panels LVS / 2 Panels PNEM 3 Transformers 3 Panels BC ( capacitors bank) 3 DBs 9 (busway)3 DBs 9 (busway) 10 PDBs 23 MCCs
Global amount: 2 M Euro2 M Euro
Execution: now (2015)
Images and drawings for illustration purpose only