SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43
SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43
SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43
SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43

SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43

  • View
    213

  • Download
    0

Embed Size (px)

Text of SK180 Chamber Installation Guideline - .AASHTO M43 Designation N/A AASHTO M45 A-1, A-2, A-3 Or M43

  • SK180 Chamber Installation Guideline

    Uponarrivaltotheprojectsite,visuallyinspectthechamberstoensureaccuratequantities.Anydamagethatmayhaveoccurredduringtransportshouldalsobenotedatthistime.

    Forefficientshippingandtoalloweaseinhandlingandstorage,thechambersarestackedneatlyuponthemselvesandsecuredtoapallet.Unloadingisbestaccomplishedviaforklift.

    Chambersshouldbestoredinanareathatisflatandfreeofdebris.Toavoidthepotentialfordamage,thisstorageareashouldbeisolatedwellawayfromthetravelingpathsusedforconstructionvehicletraffic.

    Usingtheprojectplansandtheappropriatedetails,excavatethechambersystembedinamannertosufficientlyaccommodatethechambersandmanifolds.Toensureanadequatefit,andtoallowforastoneborder,anadditional12ofexcavationisrequiredbetweenthetrenchsidewallsandthechambersystem.

    Ifstandingwaterispresent,dewateringmeasuresshouldbeutilized.

    Ifasoft,unstablefoundationisencountered,itshouldbeoverexcavatedandreplacedwithasuitablematerialasdeterminedbytheprojectengineer.

    Uponthepreparedfoundation,placea4oz.nonwovenfabriconthebedbottomandupandalongthesidewalls.Maintaina24overlapoffabricatallseams.

    Usingtheprojectplansandappropriatedetails,providealevelbaseof-2cleancrushedangularstoneovertheentiretrenchbedbottom.Foundationstonedepthasindicatedontheprojectplans(minimum9).See Fig-ure 1.Usingavibratoryroller,compactthestonebasetoachieveaflatlevelsurface.

    Ifspecifiedontheprojectplans,theperimeterunderdrainpipingmaybelaidatthispoint.

    FoundationandBeddingPreparation

    HandlingandStorage

    2

    1

    Priortoinstallationofthechambersystem,adequateattentiontothefollowingguidelinesisrequired.Inaddition,thechambersupplier,chamberinstaller(sitecontractor)andthedesignengineermaymeetforapre-constructionmeetingtodiscussanyquestionsrelatingtotheinstallationprocess,andtheguidelinesherein.

    Fig

    ure

    1

    CHAMBER WIDTH + 24"

    3/4" - 2" CLEAN CRUSHED ANGULAR STONE 4oz. GEOTEXTILE WITH 24"

    SEAM OVERLAY

    9"

    EXCAVATE CHAMBERSYSTEM BED

    Refer to Table 2formaximumallowableconstructionvehicleloads.

    Material Location

    [D] Final Fill Material

    [C] Initial Fill

    [B] Embedment Zone

    Fill Depth above chambers

    in.36Compacted

    24 Compacted

    24 Dumped

    18

    12

    6

    Table

    2

    ConstructionLoading6

    Max Axle Loadfor Trucks

    lbs.32,000

    32,000

    24,000

    24,000

    Not Allowed

    Not Allowed

    Max Wheel Loadfor Loaders

    lbs.16,000

    16,000

    12,000

    12,000

    Not Allowed

    Not Allowed

    TrackWidth

    in.1218243036

    1218243036

    1218243036

    12182430

    12182430

    Not Allowed

    Max GroundPressure

    psf34202350185015101310

    24801770143012101070

    22451625132511351010

    2010148012201060

    1100715660580

    Not Allowed

    Max Drum WeightDynamic Force

    lbs.38,000

    20,000

    16,000

    5,000

    NotAllowed

    NotAllowed

    Max allowable roller loads

    Fill Material Location

    [D] Final Backfill -FillmaterialforLayerDstartsatthetopoftheClayertothebottomofthepavementortothefinishedgradeofanunpavedsurface.Thepavementsubbasemaybepartofthefinalbackfill.

    [C] Initial Backfill -MaterialforlayerCstartsatthetopoftheembedmentzone(layerB)andcontinuesto24abovethetopofthechamber.Thepavementsubbasemaybepartoftheinitialbackfilllayer

    [B] Embedment Stone -Embedmentstonewillsurroundthechambersandextendsfromthetopofthebeddingstone(layerA)tothebottomofthefabriclayer.

    [A] Bedding Stone -BeddingStoneextendsfromthesubgradetothefootofthechambers.

    Material Description

    Anybackfillwhichprovidesadequatesubgradefortheprojectpertheengineersplans.Plansshallindicatesubgraderequirements.

    Well graded granular material,

  • Usingtheprojectplansandappropriatedetails,fullyassemblethemanifoldsystem.

    Toalleviatethepotentialforscourattheinletlocations,laya15widestripofwovengeotextile,alongtheentirelengthofthemanifoldmainline,adequatelycarpetingthebeddingbeneaththeinletlocations.See Figure 2&3.

    Positionthefirstchamberandendcapofeachrowwiththeinletpipes.Atthedesignatedlocations,coreanopeningintheendcapandinserttheinletpipe.Theinletpipesshouldpenetrate12intotheendcap.Repeatthisprocessforeachrow.

    Maintainingan8minimumclearspacebetweeneachrowisrequired.Theassem-blyofeachrowisachievedbyovertoppingthelastriboftheinitialchamberwiththefirstribofthesucceedingchamber.Overlaplocationsarelabeledoneachchamber.Rowassemblyshouldnotexceedthereachofthebackfillplacementequipment.Thefinalchamberofeachrowshallalsobeequippedwithanendcap.

    Endcapsareplacedwiththeendcapoverlappingthetopofthereducedsizejoiningcorrugation.Theendcapshouldbeheldinplacebyscrewsduringbackfilloperations.

    ManifoldAssemblyandChamberPlacement3

    Fig

    ure

    3

    Eachchambercrownisequippedwithonecircularcutoutpointtoaccommodatetheverticalinspectionportriser.Usingtheprojectplans,identifywhichchambersshouldbefittedwithinspectionports.Usingareciprocatingsaw,cutoutthe4diameteropeningattheappropriatelocation.InsertaUni-Teeorequalintotheopening.

    Utilizing4PVCSch.40pipeandfittingsbuildtheinspectionportasshowninFigure 4.

    InspectionPortPlacement4

    Fig

    ure

    4

    ASSEMBLY DIRECTION

    Fig

    ure

    2

    SCOUR PROTECTION GEOTEXTILE

    15'-0" MIN. IN

    LET

    MAN

    IFOL

    D

    SCOUR PROTECTION - WOVEN GEOTEXTILE

    15'-0" MIN. WOVEN GEOTEXTILE2'-0"

    MIN.

    END CAPINLET MANIFOLD

    INSPECTION PORT

    SK180 Chamber InstallationGuideline

    4" PVC or Dual Wall HDPE

    4" SCHEDULE 40SCREW IN CAP

    CONCRETE RING REQUIREDFOR TRAFFIC LOADING

    TRAFFIC RATED BOX

    24"MIN.

    96"MAX

    4oz. NONWOVENGEOTEXTILE

    STORMKEEPERCHAMBER

    3/4" - 2" CLEAN CRUSHEDANGULAR STONE

    9"

    2

    FRATCO TAP TEE OR

    EQUIVALENT

    Backfillmaterialusedforembedment/anchoringandforsurroundingareaswillbe-2particlesize,clean,crushedangularstone.

    Placementofbackfillmaterialforembedmentandsurroundingareasisbestaccomplishedbyusingthelongreachofanexcavatororstoneshooter/conveyorsystem.No construction equipment shall be situated atop of the chamber system.

    Inordertopreventchambershiftingandtomaintainrowspacing,carefullydepositthestoneevenlyalongthecenterlineofthechamber,allowingthestonedepthbetweentherowstoriseequally.Duringthisphase,stoneheightbetweenrowsshouldnotdifferbymorethan12atanytime.

    Aftertheanchoringphaseiscomplete,stoneplacementmaycontinuetosurroundthechambersandaroundtheperimeter.Stoneshouldcoverthetopofthechambercrowntoaminimumheightof11.5.

    Smalllightweighttrackeddozerswithgroundpressurelessthan1100lbs/sfmaybeusedatthispointtofinalizethegradingofcoverstone.Stonemustbepushedparalleltorowsatalltimes.Wheel and Roller Loads Not Allowed.

    Covertheentiretopofthestonebedwithalayerof4oz.nonwovenfabric.Overlapallseams24.Utilizingexcavatorpositionedoffbed,placeinitialbackfill.Begincompactionat24.Rollertotravelparallelwithrows.Note: See Figure 5 and Table 1

    ChamberBackfillProcess5

    Figure 5

    45" CHAMBER

    4oz. NONWOVENGEOTEXTILE ALL AROUND

    PAVEMENT PERENGINEERS DRAWINGS

    9" MIN.

    45 1/2"

    11 1/2" MIN.

    24"MIN.

    8'MAX

    SUITABLE FOUNDATION

    BEDDINGA

    EMBEDMENT BACKFILLB

    INITIAL BACKFILLC

    FINAL BACKFILLD

    8" MIN. 78" 12" MIN.

    TheSK180canstore180cubicfeetperchamber.

    SK180 Chamber InstallationGuideline

    3

  • Usingtheprojectplansandappropriatedetails,fullyassemblethemanifoldsystem.

    Toalleviatethepotentialforscourattheinletlocations,laya15widestripofwovengeotextile,alongtheentirelengthofthemanifoldmainline,adequatelycarpetingthebeddingbeneaththeinletlocations.See Figure 2&3.

    Positionthefirstchamberandendcapofeachrowwiththeinletpipes.Atthedesignatedlocations,coreanopeningintheendcapandinserttheinletpipe.Theinletpipesshouldpenetrate12intotheendcap.Repeatthisprocessforeachrow.

    Maintainingan8minimumclearspacebetweeneachrowisrequired.Theassem-blyofeachrowisachievedbyovertoppingthelastriboftheinitialchamberwiththefirstribofthesucceedingchamber.Overlaplocationsarelabeledoneachchamber.Rowassemblyshouldnotexceedthereachofthebackfillplacementequipment.Thefinalchamberofeachrowshallalsobeequippedwithanendcap.

    Endcapsareplacedwiththeendcapoverlappingthetopofthereducedsizejoiningcorrugation.Theendcapshouldbeheldinplacebyscrewsduringbackfilloperations.

    ManifoldAssemblyandChamberPlacement3

    Fig

    ure

    3

    Eachchambercrownisequippedwithonecircularcutoutpointtoaccommodatetheverticalinspectionportriser.Usingtheprojectplans,identifywhichchambersshouldbefittedwithinspectionports.Usingareciprocatingsaw,cutoutthe4diameteropeningattheappropriatelocation.InsertaUni-Teeorequalintotheopening.

    Utilizing4PVCSch.40pipeandfittingsbuildtheinspectionportasshowninFigure 4.

    InspectionPortPlacement4

    Fig

    ure

    4

    ASSEMBLY DIRECTION

    Fig

    ure

    2

    SCOUR PROTECTION GEOTEXTILE

    15'-0" MIN.

    INLE

    T M

    ANIF

    OLD

    SCOUR PROTECTION - WOVEN GEOTEXTILE

    15'-0" MIN. WOVEN GEOTEXTILE2'-0"

    MIN.

    END CAPINLET MANIFOLD

    INSPECTION PORT

    SK180 Chamber InstallationGuideline

    4" PVC or Dual Wall HDPE

    4" SCHEDULE 40SCREW IN CAP

    CONCRETE RING REQUIREDFOR TRAFFIC LOADING

    TRAFFIC RATED BOX

    24"MIN.

    96"MAX

    4oz. NONWOVENGEOTEXTILE

    STORMKEEPERCHAMBER

    3/4" - 2" CLEAN CRUSHEDANGULAR STONE

    9"

    2

    FRATCO TAP TEE OR

    EQUIVALENT

    Backfillmaterialusedforembedment/anchoringandforsurroundingareaswillbe-2particlesize,clean,crushedangularstone.