Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

SIX MONTHLY COMPLIANCE

REPORT

JUNE- 2015

Group Housing Complex

“Mahagunpuram”

AT

VILLAGE – Mehrauli, Dasna, Ghaziabad, U.P.

Being developed by

M/s Mahagun Real Estate Pvt. Ltd.

B-66, First Floor, Vivek Vihar, Delhi-110049

Prepared by

M/s Perfact Services

(ISO9001:2008& ISO14001:2004 Certified)

501-507, 5th Floor, NN Mall,

Mangalam Palace, Sector 3 Rohini, New Delhi

Ph No. 47528467, Fax No. 47528434

Page 3: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

List of Annexure

Annexure Details

Annexure -I Copy of Granted Environmental Clearance

Annexure – II Copy of CTE

Annexure - III Monitoring reports of Air, Water , Soil, Noise & Stack

Annexure - IV Health Certificates of few workers engaged during

construction work

Annexure - V PUC certificates of few Vehicles Hired for Construction

Annexure - VI Copy of Height Clearance from AAI

Annexure - VII Site Photographs

Page 4: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

1. Introduction:-

The Group Housing Complex “Mahagunpuram” is located at Village Mehrauli, Dasna, Ghaziabad,

U.P. and being developed by M/s Mahagun Real Estate Pvt. Ltd.

Name of the project Group Housing Complex

“Mahagunpuram”

Site address Village Mehrauli, Dasna, Ghaziabad, U.P

Developed By M/s Mahagun Real Estate Pvt. Ltd.

Environment Clearance Letter No 228/ SEAC/ 333/ 2009/TA(J) dated 12 .02

2010.

Period of Compliance Six monthly compliance: Period October -

2014 to March - 2015, Submission due in

June-2015

Project Description Project involves the construction of Group

Housing Complex “Mahagunpuram” on a

plot area of 54630 Sqm. Built up area of the

project is 116511.74 Sqm.

Construction Status Construction of phase I Completed,

Construction of phase- II is under

construction.

Proposed Year of Commencement 2009

Proposed year of completion 2016

Page 5: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

1. Project Description

The Group Housing Complex “Mahagunpuram” will have the following salient features: -

Particular s Details

Total Plot Area 54630 m2

Built up Area

(FAR + Basement area )

116511.74 m2

FAR 90311.74 m2

Green Area 13494.86 m2

No. of Basement 1

No. of Floors G+ 14

No. of Blocks 11

Total Accommodation 5220 person

Height of Building 49.25 m

Parking space proposed 1326 ECS

Cost of the project Rs. 120 Crores

Page 6: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

3. Construction Progress Status:

S No.

Component Percentage of Work Done ( June-2015)

1 Civil Construction (Structural Work, Brick Work & Plaster Work)

Structural Work : 98%;

Brick Work: 92%

Plaster Work: 66%

2 Plumbing

66% work completed.

3 Electrical work

82% work completed.

4 Fire Fighting

47% work completed.

5 Sewage Treatment Plant

Completed

6 Rain Water Harvesting

60% work completed.

7 Sewerage, Drainage etc

40% work completed.

Page 7: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

4. Current Status of point – wise compliance of the stipulated environmental conditions/ safeguards.

CONSTRUCTION PHASE

S.No General Conditions Reply

1. It shall be ensured that all standards

related to ambient environmental

quality and the emission/ effluent

standards as prescribed by the MOEF

are strictly compiled with.

Standards related to ambient

environment quality & emission /

effluent standards prescribed by the

MOEF are being complied.

Test results are enclosed as Annexure

III.

2. A suitable plan for providing shelter,

light and fuel, water and waste disposal

for construction labour during the

construction phase shall be provided

along with the number of proposed

workers.

Local workers have been engaged. No

worker allowed to stay at project site

during night time. Necessary basic

facilities like temporary toilet, and

wash area have been provided

throughout the construction phase for

construction workers.

3. Obtain proper permission from

competent authorities regarding

enhanced traffic during and due to

construction and operation of project.

Necessary permission from competent

authorities shall be taken regarding

enhanced traffic during and due to

construction and operation of project,

if required.

Traffic circulation Plan in this regard

has already submitted.

4. Obtain necessary clearances from the

competent authority on the abstraction

and use of ground water during the

construction and operation phases.

We are not using ground water during

construction phase, hence clearance is

not required. Tanker supply water is

being used for construction work

purpose.

Page 8: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

5. Hazardous/inflammable/ Explosive

materials likely to be stored during the

construction and operation phases shall

be as per standard procedure as

prescribed under law, Necessary

clearances in this regards shall be

obtained.

Only hazardous waste generated

during construction phase is used oil

from D.G sets which is being stored in

leak proof containers and shall be

given to approved recycler.

6. Suitable rainwater harvesting systems

as per designs of groundwater

department shall be installed. Complete

proposals in this regard should be

submitted.

Rainwater harvesting & Ground water

recharging shall be done. Oil & Grease

trap to remove oil & Grease from the

surface runoff shall be provided.

7. The emissions and effluents etc. from

machines, Instruments and transport

during construction and operation

phases should be according to the

prescribed standards. Necessary plans

in this regard shall be submitted.

Necessary care is being taken to

control emissions & effluents etc from

machines instruments & transport

during construction phase & will be

taken during operation phase also.

Covered transportation of material is

being practiced.

8. Water sprinklers and other dust control

measures should be undertaken to take

care of dust generated during the

construction and operation phases.

Necessary plans in this regard shall be

submitted.

Dust control measures are being

adopted to take care of dust generated

during the construction phase. Water

sprinkling is being done on regular

basis.

Construction material stored at site is

being covered with the cloth/plastic

sheet to avoid the dust emission.

9. Suitable noise abatement measures shall

be adopted during the construction and

operation phases in order to ensure that

the noise emissions do not violate the

prescribed ambient noise standards.

Adequate noise abatement measures

are being adopted .The DG sets used

during construction phase are brought

acoustically enclosed according to

Central Pollution Control Board

Page 9: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

Necessary plans in this regard shall be

submitted.

norms. D.G sets during operation

phase will be also kept acoustically

enclosed.

10. Separate stockpiles shall be maintained

for excavated topsoil and the topsoil

should be utilized for preparation of

green belt.

Excavated soil has been excavated

during construction phase and same

has been stored separately under

tarpaulin cover & Excavated soil is

being used in the backfilling and top

fertile soil shall be used for

development of the horticulture/

landscape at site.

11. Sewage effluents shall be kept separate

from rainwater collection and storage

system and separately disposed. Other

effluents should not be allowed to mix

with domestic effluents.

Separate lines shall be laid down for

sewage effluents & carrying storm

water. No other effluent shall be

allowed to mix with Domestic effluent.

12. Hazardous/ Solid wastes generated

during construction and operation

phases should be disposed off as

prescribed under law. Necessary

clearances in this regard shall be

obtained.

No hazardous waste is being generated

during construction phase. Only lesser

amount of used oil from D.G Sets is

generated and same shall be disposed

off through approved recycler.

13. Pavements shall be so constructed as to

allow infiltration of surface run-off of

rain water. Fully impermeable

pavements shall not be constructed.

Construction of pavements around trees

shall be as per scientifically accepted

principles in order to provide suitable

watering, aeration and nutrition to the

tree.

Pavements shall be constructed so as

to allow infiltration of surface run off

of rainwater. All the necessary care

shall be taken.

14. Compliance with the safety procedures, We are complying with all safety

Page 10: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

norms and guidelines as outlined in

National Building Code 2005 shall be

compulsorily ensured.

procedures norms & and guidelines as

per National Building Code 2005.

Safety slogans and hoardings have

been provided at the site.

15. Ensure use of measures for reducing

water demand for landscaping and

using xeriscaping, efficient irrigation

equipments & controlled watering

systems.

Necessary measures have been taken

to reduce the water demand during

construction phase.

16. Educate citizens and other stake-holders

by putting up hoardings at different

places to create environmental

awareness.

Necessary hoardings have been

provided at different places to create

environmental awareness and workers

safety.

17. Traffic congestion near the entry and

exit points from the roads adjoining the

proposed project site must be avoided.

Parking should be fully internalized and

no public space should be utilized.

Proper measure like road width, entry

width etc has been taken care, so that

there is no Traffic congestion near the

entry and exit points from the roads

adjoining the project site. Parking

shall be fully internalized and no

public space shall be utilized.

Movement of vehicles is being carried

out during non peak hour.

18. Fly ash should be used as building

material in the construction as per the

provision of fly ash notification of

September, 1999 and amended as on

August, 2003 (The above condition is

applicable only if the project lies within

100 km of Thermal Power Station).

Fly ash blocks shall be used in the

construction of pathways and

boundary walls as per the provisions

of Fly ash Notification of September,

1999 and amended as on 27th August,

2003.

19. The DG sets to be used during

construction phase should use low

sulphur diesel type and should conform

Acoustically enclosed DG set of 1x30

KVA, 1x180 KVA & 1x125 KVA

capacity have been installed during

Page 11: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

to E.P. rules prescribed for air and noise

emission standards.

construction phase which use low

sulphur diesel and conforms to E.P.

rules prescribed for air and noise

emission standards.

20. The green belt design along the

periphery of the plot shall achieve

attenuation factor conforming to the day

and night noise standards prescribed for

residential land use. The open spaces

inside the plot should be suitably

landscaped and covered with vegetation

of indigenous variety.

Green area of 13494.86 m2 is under

development in and around the

complex. The open spaces inside the

plot shall be suitably landscaped and

covered with vegetation of indigenous

variety.

Landscape plan in this regard has

already submitted.

21. The construction of the building and the

consequent increased traffic load should

be such that the microclimate of the

area is not adversely affected.

All adequate measures have been

taken to ensure that microclimate of

the area is not adversely affected.

22. The building should be designed so as

to take sufficient safeguards regarding

seismic zone sensitivity.

Adequate measures have been taken

for structural stability of the building

for seismic zone sensitivity.

23. It is suggested that literacy program for

weaker sections of society/ women/

adults (including domestic help) and

under privileged children could be

provided in a formal way.

We shall have literacy program for

weaker section of society / Women

/adults & under privileged children in

a formal way.

24. Treated effluents shall be maximally

reused to aim for zero discharge. Where

ever not possible, a detailed

management plan for disposal should be

provided with quantities and quality of

waste water.

Treated effluents shall be maximally

reused to aim for zero discharge.

25. Construction activities including

movements of vehicles should be so

Necessary cares have been taken to

ensure that no disturbance is caused to

Page 12: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

managed so that no disturbance is

caused to nearby residents.

nearby residents.

26. Parking areas should be in accordance

with the norms of MOEF, Government

of India. Plans may be drawn up

accordingly and submitted.

Parking area to be provided is in

accordance with the norms of MOEF,

GOI.

27. The location of the STP should be such

that it is away from human habilitation

and does not cause problem of odor.

Odorless technology options should be

examined and a report submitted.

STP will be located in the basement of

the building isolated place away from

human habilitation, hence no odour

problem is expected.

28. The Environment Management plan

should also include the break up costs

on various activities and the

management issues also so that the

residents also participate in the

implementation of the environment

management plan.

Environment Management plan

including break up costs on various

activities has already submitted.

29. Detailed plans for safe disposal of STP

sludge shall be provided along with

ultimate disposal location, quantitative

estimates and measures proposed.

STP Sludge shall be used as manure

and rest of unused manure shall be

given to nursery.

30. Status of the project as on date shall be

submitted along with photographs from

North, South, West and East side facing

camera and adjoining areas should be

provided.

Photographs showing the status of the

construction and compliance is

enclosed as Annexure VII

31. The DG sets shall be so installed so as

to conform to prescribed stack heights

and regulations and also to the noise

standards as prescribed. Details should

be submitted.

Acoustically enclosed D.G Sets have

been installed with adequate stack

height as per norms for construction

purpose.

Page 13: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

32. Dispensary for first aid shall be

provided.

First aid facility has been provided

during construction phase.

Regular Health checkup of workers is

being done. Medical certificate of few

workers is enclosed as Annexure IV

33. Ground Water downstream of Rain

Water Harvesting pit nearest to STP

should be monitored for bacterial

contamination. Necessary Hand Pumps

should be provided for sampling. The

monitoring is to be done in pre and post

monsoon, seasons.

Necessary monitoring shall be done.

34. The green belt shall consist of 50%

trees, 25% shrubs and 25% grass as per

MOEF norms.

Proper Green area is being maintained

as per MoEF norms.

SPECIFIC CONDITIONS

1. The STP should be redesigned and

water balance should be submitted

based on 86 LPCD. Treated effluents

shall not be disposed into public sewer

or community STP. The treated water

should be 100% utilized for the

gardening.

Treated effluent shall be reused for

flushing, cooling and horticulture

purpose within the complex after its

operation.

2. Quantity of water required for flushing

HVAC/ DG sets, horticulture, washing

etc. within the project should only be

sent for treatment to STP i.e. to be

reused completely within the premises.

The surplus should be directed to public

sewer for treatment in the STP of the

Gaziabad Development Authority.

Permission of the Gaziabad

We will comply with the requirement.

Waste water shall be treated in Sewage

Treatment Plant and same recycled

water shall be reused within the

complex.

Page 14: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

Development Authority shall be taken

with reference to the quality and quality

of the sewage to be sent to public

sewage system for treatment.

3. Parking space should be calculated @

35, 30 and 25 sq. m per ECS for

basement, stilt and surface parking

respectively.

Noted. Parking space is calculated

accordingly

4. It shall be ensured that all street and

park lightening is 100% solar powered.

We will comply. Provision for Solar

lights shall be made

5. A separate escrow account shall be

opened for operation and maintenance

as per proposed EMP.

We will comply.

Page 15: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-I

COPY OF ENVIRONMENTAL CLEARANCE

Page 16: SIX MONTHLY COMPLANCE - Mahagun India
Page 17: SIX MONTHLY COMPLANCE - Mahagun India
Page 18: SIX MONTHLY COMPLANCE - Mahagun India
Page 19: SIX MONTHLY COMPLANCE - Mahagun India
Page 20: SIX MONTHLY COMPLANCE - Mahagun India
Page 21: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

Annexure – II

Copy of Consent to Establish

Page 22: SIX MONTHLY COMPLANCE - Mahagun India
Page 23: SIX MONTHLY COMPLANCE - Mahagun India
Page 24: SIX MONTHLY COMPLANCE - Mahagun India
Page 25: SIX MONTHLY COMPLANCE - Mahagun India
Page 26: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-III

MONITORING REPORTS OF AIR, WATER, SOIL, NOISE & STACK

Page 27: SIX MONTHLY COMPLANCE - Mahagun India
Page 28: SIX MONTHLY COMPLANCE - Mahagun India
Page 29: SIX MONTHLY COMPLANCE - Mahagun India
Page 30: SIX MONTHLY COMPLANCE - Mahagun India
Page 31: SIX MONTHLY COMPLANCE - Mahagun India
Page 32: SIX MONTHLY COMPLANCE - Mahagun India
Page 33: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-IV

HEALTH CERTIFICATES OF FEW WORKERS ENGAGED FOR CONSTRUCTION

Page 34: SIX MONTHLY COMPLANCE - Mahagun India
Page 35: SIX MONTHLY COMPLANCE - Mahagun India
Page 36: SIX MONTHLY COMPLANCE - Mahagun India
Page 37: SIX MONTHLY COMPLANCE - Mahagun India
Page 38: SIX MONTHLY COMPLANCE - Mahagun India
Page 39: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-V

PUC CERTIFICATES OF FEW VEHICLES HIRED FOR CONSTRUCTION

Page 40: SIX MONTHLY COMPLANCE - Mahagun India
Page 41: SIX MONTHLY COMPLANCE - Mahagun India
Page 42: SIX MONTHLY COMPLANCE - Mahagun India
Page 43: SIX MONTHLY COMPLANCE - Mahagun India
Page 44: SIX MONTHLY COMPLANCE - Mahagun India
Page 45: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-VI

COPY OF HEIGHT CLEARANCE FROM AAI

Page 46: SIX MONTHLY COMPLANCE - Mahagun India
Page 47: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

ANNEXURE-VII

Site photographs

Page 48: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd

Page 49: SIX MONTHLY COMPLANCE - Mahagun India

Six Monthly Compliance Report – June-2015 M/s Mahagun Real Estate Pvt. Ltd