1
BUS STOP BUS STOP Tick et Ticket Ticket Tick et Tick et Entrance Car Park Access Site Entrance Existing Foot Bridge Future Pedestrian Foot Bridge Pedestrian Foot Bridge to Central Park Fire Exit Fire Exit New Bus Stop Existing Stairs 2000x600 Feeder Pillar Existing retaining wall partially demolished - path widened to 3 meters with dawrf wall built alongside with reused stone Refer to DRW 90030 Fire Appliance Point Location of plant within acoustic timber fenced enclosure Existing paving to be Retained Existing landscaping to be retained (area TBC by further site investigation) Maintenance Strip Maintenance Access Fire Tender and Service Access Only Fire Appliance Point Loading Bay Drop Off / Coach Replacement Planting Bed Crossing 800mm Maintenance Strip 800mm Maintenance Strip Area for detention basin and below ground cellular attenuation Tank Railing to edge of escape ramps Railing to edge of path 1:25 49050 48100 1:25 48250 1500mm PPC steel railings and gate to network rail expansion land Highways works by Darlington Borough Council Highways works by Darlington Borough Council Highways works by Darlington Borough Council Extent of works to this area in abeyance, existing parking surface to be retained 5 4 3 2 1 Retractable Security Bollards Area for below ground cellular attenuation Tank Open cycle storage 24x bikes Enclosed cycle storage 26x bikes Enclosed Bin Store Security Bollards Fire Exit Security Bollards Public Art (by others) on plinth integrated into raised planter Raised planter and vehicle protection Raised planter and vehicle protection Rotunda Entrance Drop Off Drop Off Planting Bed Planting Bed Planting Bed Planting Bed Planting Bed Primary Entrance 23 22 21 20 19 18 17 16 15 14 13 1 2 3 4 5 6 7 8 9 10 11 12 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 B7 D3 D2 D1 A4.1 Post mounted Special Assistance Call Point Fire escape Muster Point Planting to perimeter of detention basin Planting to perimeter of detention basin Site Plan Key Pre - cast Concrete Block Paving with feature banding Colour - Mix Tarmac access road surface to engineers spec Planting area/ Hedges Proposed Trees (type TBC) Species rich grass seed mix Red line indicates site boundary Lighting Column, TBC electrical engineers Litter bin Note: *** Levels, Falls and drainage TBC *** Orange line indicates site works under a seperate contract Blue line indicates location (TBC) of existing hard landscaping works to be retained Pavement Paving: Pressed Grey Concrete Flag Paving Slab to match existing pavements 800mm Maintenance Strip to endge of MSCP: Pressed Grey Concrete Flag Paving Green line indicates location of handrail to footpath Pink line indicates location of 1500 high pallisade fence to Network Rail specification Permeable pre - cast concrete block paving to drop off and loading bay laid in herringbone pattern Pre - Cast concrete raised planter Built up asphalt footpath to service areas, loading to support MEWP access External plant enclosure, surrounded by timber acoustic fencing with gated access Concrete plinth to external plant enclosure, loading to support plant equipment Pre - cast Concrete Block Paving contrasting stripes All dimensions to be checked on site. DO NOT SCALE FROM DRAWING. Discrepancies ambiguities and/or omissions between this drawing and information given elsewhere must be reported immediately to the architect before proceeding. THIS DRAWING IS COPYRIGHT. This drawing is to be read in conjunction with drawings:- Notes: OS Licence No: 100006354 Rev : Napper Architects Ltd 3 Waterloo Square Newcastle Upon Tyne NE1 4DR Tel: 0191 2610491 Date : Drawn : Scale : Client : Project : Job Number: NAPPER [email protected] www.napperarchitects.co.uk First Floor, 6 Bakers Yard London EC1R 3DD Tel: 0203 9066814 Originator: Zone: Level: Type: Role: Drawing Number: Drawing Number : Internal Project No : P6 27/05/2020 1 : 250 @ A0 _Landscape General Arrangement Darlington Station MSCP Willmott Dixon JT SGMSCP - NAP - Z0 - XX - DR - A - 90001 B2013 1 : 250 Landscape General Arrangement 0 12.50m 25.0m C R DATE N AMENDMENT JT AR 03/04/2020 P1 First Issue JT AR 09/04/2020 P2 Updated Access Road JT AR 17/04/2020 P3 Updated With Reduced Landscaping JT AR 17/03/2021 P4 Stage 3 Issue JT AR 09/04/2021 P5 Updated Stage 3 Issue JT AR 27/05/2020 P6 Final Stage 3 Issue

Site Plan Key

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

BUSSTOP

BUS STOP

Ticket

TicketTicket

Ticket TicketEntrance

Car Park Access

Site Entrance

Existing Foot Bridge

Future Pedestrian Foot Bridge

Pedestrian Foot Bridge to Central

Park

Fire Exit

Fire Exit

New Bus Stop

Existing Stairs

2000x600 Feeder Pillar

Existing retaining wall partially demolished-path widened to 3 meters with dawrf wall

built alongside with reused stoneRefer to DRW 90030

Fire Appliance

Point

Location of plant within acoustic timber fenced

enclosure

Existing paving to be Retained

Existing landscaping to be retained

(area TBC by further site investigation)

Maintenance Strip

Maintenance Access

Fire Tender and Service Access Only

Fire Appliance

Point

Loading Bay

Drop Off /

Coach Replacement

Planting Bed

Crossing

800mm

Maintenance Strip

800mm

Maintenance Strip

Area for detention basin and below ground cellular

attenuation Tank

Security Bollards

Railing to edge ofescape ramps

Railing to edge of path

1:2549050

48100 1:25 48250

1500mm PPC steelrailings and gate to network

rail expansion land

Highways works by Darlington Borough

Council

Highways works by Darlington Borough

Council

Highways works by Darlington Borough

Council

Extent of works to this area in abeyance,existing parking surface to be retained

5

43

21

Retractable Security Bollards

Area for below ground cellular

attenuation Tank

Open cycle storage24x bikes

Enclosed cycle storage26x bikes

Enclosed Bin Store

Security Bollards

Fire Exit

Security Bollards

Public Art (by others) on plinth integrated into raised planter

Raised planter and vehicle protection

Raised planter and vehicle protection

Rotunda Entrance

Drop Off

Drop Off

Planting Bed

Planting Bed

Planting Bed

Planting Bed

Planting Bed

Primary Entrance

23

22

21

20

19

18

17

16

15

14

13

1 2 3 4 5 6 7 8 9 10 11 12

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

B7

D3D2D1

A4.1

Post mounted Special Assistance Call Point

Fire escape Muster Point

Planting to perimeter of detention basin

Planting to perimeter of detention basin

Site Plan Key

Pre-cast Concrete Block Paving with feature bandingColour - Mix

Tarmac access road surface to engineers spec

Planting area/ Hedges

Proposed Trees (type TBC)

Species rich grass seed mix

Red line indicates site boundary

Lighting Column, TBC electrical engineers

Litter bin

Note:

*** Levels, Falls and drainage TBC ***

Orange line indicates site works under a seperate contract

Blue line indicates location (TBC) of existing hard landscaping works to be retained

Pavement Paving: Pressed Grey Concrete Flag Paving Slab to match existing pavements

800mm Maintenance Strip to endge of MSCP: Pressed Grey Concrete Flag Paving

Green line indicates location of handrail to footpath

Pink line indicates location of 1500 high pallisade fence to Network Rail specification

Permeable pre-cast concrete block paving to drop off and loading bay laid in herringbone pattern

Pre-Cast concrete raised planter

Built up asphalt footpath to service areas, loading to support MEWP access

External plant enclosure, surrounded by timber acoustic fencing with gated access

Concrete plinth to external plant enclosure, loading to support plant equipment

Pre-cast Concrete Block Paving contrasting stripes

All dimensions to be checked on site.

DO NOT SCALE FROM DRAWING.

Discrepancies ambiguities and/or omissions between this drawing and information given elsewhere must be reported immediately to the architect before proceeding.THIS DRAWING IS COPYRIGHT.

This drawing is to be read in conjunction with drawings:-

Notes:OS Licence No: 100006354

Rev :

Napper Architects Ltd3 Waterloo SquareNewcastle Upon TyneNE1 4DRTel: 0191 2610491

Date :

Drawn :

Scale :

Client :

Project :

Job Number:

[email protected] www.napperarchitects.co.uk

First Floor, 6 Bakers YardLondonEC1R 3DDTel: 0203 9066814

Originator: Zone: Level: Type: Role: Drawing Number:

Drawing Number :

Internal Project No :

P627/05/2020

1 : 250 @ A0_Landscape GeneralArrangement

Darlington Station MSCP

Willmott Dixon

JT

SGMSCP-NAP-Z0-XX-DR-A-90001

B2013

1 : 250

Landscape General Arrangement 0 12.50m 25.0m

C R DATE N AMENDMENTJT AR 03/04/2020 P1 First IssueJT AR 09/04/2020 P2 Updated Access RoadJT AR 17/04/2020 P3 Updated With Reduced LandscapingJT AR 17/03/2021 P4 Stage 3 IssueJT AR 09/04/2021 P5 Updated Stage 3 IssueJT AR 27/05/2020 P6 Final Stage 3 Issue