Site Ocular Inspection Form_Red Planet Cubao 1.22.16

Embed Size (px)

DESCRIPTION

site inspection

Citation preview

  • ADM-002-0

    1

    OCULAR SITE INSPECTION CHECKLIST

    Job/Project Name: RED PLANET CUBAO Job No.Location: Aurora Blvd. Corner, Stanford Street., Cubao Quezon City Date of Inspection:Client / Owner: Red Planet Architect / Designer:

    THINGS NEEDEDYes No Yes No

    Site Dev't. Plan Camera Tape Measure Video Camera Level Hose Others : Transit

    LOT DESCRIPTIONYes No Notes

    Mojons properly identified No mojons in the area but there is already a perimeter fence that is set along the property line. For demolition/clearing:

    a) Trees / shrubs b) Structures - Light (wood, bamboo, etc.)

    - Heavy (concrete, adobe, etc.) Existing building was slready demolished except SOG and underground utilities which is subject for demolition - Others Also. To request as-built plan of previous structure for reference. We might consider siphoning of existing Septic Tank.

    Topography - Hilly n/a - Setback Sidewalk is about 1.4 m wide at right side and 3.0m at Front side. - Besides creek, river

    - Others Type of Soil

    - Clay

    - Silt

    - Mixture

    - Others To request RFI regarding existing soil report Subsoil Conditions

    - Existence of water table not visible unless deep excavation - Rocky

    UTILITIES (check availabilities)Yes No Notes

    (Provider's name, contact & tel / Other information)

    Electricity The site is surrounded with meralco post. We need to apply for a temporary power connection from meralco. Tapping point will be determined when the project is already awarded.

    Water Tapped to existing, to provide submeter

  • ADM-002-0

    2

    Telephone There is possible connection. Internet Thru Wi-fi connection Sewer

  • ADM-002-0

    3

    NEIGHBORS Yes No Notes

    Neighborhood exist - High end 5-Storey BDO Building at Left Side. - Medium end Residential Houses at Rear side. - Low end

    - Others Permits/Clearances

    for verification - Barangay Clearance - Workers for verification - Homeowners for verification - Building/EE/PP/FP for verification - Occupancy for verification - Contractor's Tax for verification - Business Permits for verification - Others for verification

    Community / Security - Friendly / accepting - Low security risk - Medium security risk - High security risk to BDO - Others

    Living Quarters/Bunks for Workers - Available within the lot limited space - No space inside the lot limited space - Lot rental available Maybe there are house for rent in pasay area. - House rental available Maybe there are lot for rent in cubao area. - Others

    DELIVERIESYes No Notes

    Ingress/Egress is spacious

    Delivery time is limited Accessible. We can deliver anytime Gate pass needed

    for verification Type of road

    - Concrete

    - Asphalt

    - Rough Road Traffic Condition

    - Light Traffic

    - Normal Traffic Normal traffic inside the vicinity. - Heavy Traffic Heavy traffic along EDSA and Aurora Blvd.

    - Barangay Clearance - AGA & Sons

    Delivery Entrance Fee (indicate amount)

  • ADM-002-0

    4

    GENERAL REMARKS:The site is situated at the right side of BDO Aurora CubaoProperty line is already identified because of the existing perimeter fence. (For confirmation by Red Planet)Also, safety nets, overhead canopy and overhead protection along Aurora blvd and stanford ave. are necessary. The site area has existing concrete pavement /S.O.G. and subject for demolition. For Staging Area is available within the lot.There is existing Concrete fence at rear side 3.4 mts high will be retained.

    Prepared by:Site Inspection conducted by:

    Engr. Joy PuraJerson Leynes Engr. Jerson Leynes

    Engr. Johnson SambranoEngr. John Philip Garcia

  • ADM-002-0

    5

    FORM NO. ES-003-0

    5622-Jan-16

    RMDA Architects

    Notes

    No mojons in the area but there is already a perimeter fence that is set along the property line.

    Existing building was slready demolished except SOG and underground utilities which is subject for demolitionAlso. To request as-built plan of previous structure for reference. We might consider siphoning of existing Septic Tank.

    Notes(Provider's name, contact & tel / Other information)

    The site is surrounded with meralco post. We need to apply for a temporary power connection from meralco. Tapping point will be determined when the project is already awarded.

  • ADM-002-0

    6

  • ADM-002-0

    7

    Notes

    Notes

  • ADM-002-0

    8

    The site is situated at the right side of BDO Aurora CubaoProperty line is already identified because of the existing perimeter fence. (For confirmation by Red Planet)Also, safety nets, overhead canopy and overhead protection along Aurora blvd and stanford ave. are necessary. The site area has existing concrete pavement /S.O.G. and subject for demolition. For Staging Area is available within the lot.There is existing Concrete fence at rear side 3.4 mts high will be retained.

    Engr. Johnson SambranoEngr. John Philip Garcia

    OSIC