Siemens Cranes
Important Points in SIMOCRANE Engineering and Commissioning
Dr. Qing Chen
Product Management
page 2December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
Overview
Problem Problems:
1. Simotion CPU goes to Stop
2. frequent encoder error or TO-error
3. Invert-ready signal comes and goes
4. PLC-control does not work
5. Too long time for axis switchover
6. Trolley’s reaction is too slow
7. Project doesn’t work after copy and paste
8. Axis switchover takes too long time
V2.0 SP2 has default setting to
aviod problem 1&2
page 3December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
Task-Configuration Setting
Problem 1: CPU goes to stop
Solution:
- ‘Task configuration’ in ‘execution system’ should NOT be set at ‘error reaction with program error’ with
CPU in Stop but ExcutionFaultTask
- If the reason is task overflow, then ‘Task configuration’ in ‘execution system’ can be set at ‘number of level overflows in the loop clock’
max. 5
Solution
page 4December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Configuration setting (1)
Problem 2: frequent encoder error
Solution: expert listconfiguration data, set 'TypeOfAxis.NumberOfEncoders.Encoder_1.SensorControlConfig.tolerateSensorDefect’ to YES
Solution
page 5December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Configuration setting (2)
Problem 2: frequent TO-error
Solution: expert listconfiguration data, set
‘TypeOfAxis_DriveControlConfig_pulsesEnabled_bitNumber’ to 11
'TypeOfAxis_DriveControlConfig_pulsesEnabled_pzdNumber to 4
'TypeOfAxis_DriveControlConfig_releaseDisableMode to 7
Solution
page 6December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Configuration setting (3)
Problem 2: frequent TO error
Solution: expert listconfiguration data, set
'RestartCondition.restartAxisCondition’ to NO_CONSTAINTSSolution
page 7December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Configuration setting (4)
Problem 2: frequent TO error
Solution: expert listconfiguration data, set
'Restart.behaviorInvalidSysvarAccess’ to DEFAULT_VALUESolution
page 8December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Mechanics Setting
Problem 3: Invert-ready signal comes and goes
Solution: Setting
- Load gear / Measureing gear / Leadscrew pitchSolution
Leadscrw pitch = diameter of wheel / drum * π
page 9December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Monitoring Setting (1)
Problem 3: Invert-ready signal comes and goes
Solution:
- Following error
Deactivated at beginning Setting at the end of commissioning
Solution
page 10December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
TO-Monitoring Setting (2)
Problem 3: Invert-ready signal comes and goes Positioning and Standstill
Solution
page 11December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
PLC-program
Problem 4: PLC control does not work
Problem 5: Switchover takes too long time
Solution: Correct sequence (PLC) for activating of function
- refer to application examples of S7 control (Chapter 8.4)
- refer to S7-Program examples on CD (V2.0 SP2)
Efficient programming- Do not use unnecessary Timer or too long Timer
page 12December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
Setting of Jerk
Problem 6: Trolley starts up too slowly 6s (ramp-up=4s, V_max=4216.5mm/s, jerk=600mm/s^3)
Solution: increasing jerk (till V2.0 SP1) or reduce jerk-time (at V2.0 SP2)
Jerk = (maximum_speed/ramp uptime) / Jerk_time
High jerk (2000) shorter jerk_time (0.5s)
Solution
page 13December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
Project copy and paste
Problem 7: Copy old application project to use for new project, upgrading with new Crane Libraries, the same function doesn’t work.
Solution: remove the old connections, see attachment
Microsoft Word Document
User Application Project should be updated in certain time
interval by using the standard-application of Simocrane
Basic Technology
Solution
page 14December 2011 I DT MC CR© Siemens AG 2011
Solution
Problem
Axis Switchover
Problem 8: Axis switchover takes too long time
Solution: Optimizing PLC-Program Change setting of an internal parameter of Sinamics (only for Sinamics FW V2.6), please contact Siemens Cranes
Solution
Thank you