33
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Embed Size (px)

Citation preview

Page 1: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Shreya Gadepalli Regional Director (India)August 2015

The BRT Standard

Bus Rapid Transit Best Practices

Page 2: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

PROMOTING SUSTAINABLE AND EQUITABLE

TRANSPORTATION WORLDWIDE

Page 3: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Aspiration ??

Page 4: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 5: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 6: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 7: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Cars don’t own our streets!

Page 8: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

TRANSPORTATION IS NOT A TECHNICAL PROBLEM

IT IS A MATTER OFPUBLIC POLICY

Page 9: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 10: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

City buses are essential

Bus62%

Rail38%

London

Bus86%

Rail14%

Mexico City

Bus79%

Rail21%

Chennai

Bus63%

Rail37%

Sao Paulo

Bus57%

Rail43%

Hong Kong

Bus61%

Rail39%

Singapore

Page 11: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 12: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 13: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 14: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

WHAT IS THIS ???

METRO with a BUS !

Page 15: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 16: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Quality, Capacity, Safety, with Speed

BRT systems that deliver world-class passenger experiences, economic benefits, and positive

environmental impacts....not an old bus running in a bus-lane!

Page 17: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Buses have their own wayNot stuck behind other vehicles.

Bypass traffic jams

1

THE BASICS

Page 18: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 19: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Buses on the fast lane In the centre, not on the sides

Continuous: not obstructed by slow moving vehicles, stationary vehicles, property

accesses, and side lanes

2

Page 20: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 21: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

All public transport users have to cross a road twice a day

Page 22: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

No barrier is too high for people to cross.It is our job to make crossings safe.

Page 23: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

3

Page 24: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices
Page 25: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Platform level boarding• Matching station and bus

levels• Station ledge for gap-less

docking• Wide automated doors• Passenger convenience:

Safe & easy access for passengers of all ages, genders & ability

• Higher system speed: Quick boarding & alighting (saves up to 80% dwell time)

Page 26: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

4

Page 27: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Off-boardfare collection

• Higher system speed• Convenience for

passengers• Prevents monetary

leakage• Automated ridership

data

Page 28: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Three left turns Left turn + U-turn Left turn + 2 right turns

2-phase, not 4-phase. Right turns prohibited

5

Page 29: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Station Design and Bus-Station

Interface

Branding andPassenger

Information

Service Planning

Infrastructure

Integration and Access

2

3

4

5BEYOND THE BASICS

1

Page 30: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

passengers/hour/direction

Buses operated as train

6000 15000

Bus Lane Tram / LRT Metro BRT

50000

Page 31: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

Passing lanes at stations

Page 32: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

“Build Metro with Buses!!!”

Page 33: Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

The BRT Standard: Ensuring quality