38
“The Global Leader in Plant Engineering and Material Supply” SEWOONG PLANT CO., LTD.

SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

“The Global Leader in Plant Engineering and Material Supply”

SEWOONG PLANT CO., LTD.

Page 2: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

OVERVIEW……………………………………………………….……………………………………………………………...…………………….………………...1

MISSION & PHILOSOPHY…………………………………………………………………………….…………………………………………….………………..2

ORGANIZATION …………….……………………………………………………………………………………………………..………….…………………………3

LOCATION……………………………………………………………………………………………………………………………………………..…………………...4

HISTORY……………………………………………………….………………………………………………………………………………………………..………....5

BUSINESS FEATURES………………………………………………………………………………………………………………...…………………………………6

MAIN CLIENTS..…………………………………………………………………………..…………………………………………………………….…………………7

TRANSFORMER SUPPLY……………………………………………………………………………………………………………………..……………………….9

MOTOR SUPPLY………………………………………………………………………………….…………………………………………………….………………13

MECHANICAL & INSTRUMENTS SUPPLY…………………………………………………………………………..…………………………………….…17

HHI TURBO AIR COMPRESSOR……….………………………………………………………………………....……………………………………………....31

HYDRAULIC SYSTEM….………………….………………………………………………………………………....……………………………………………....33

CONTACT………………….………………………………...……………………………………………………....……………………………………………........35

CONTENTS

Page 3: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

“The Global Leader in Providing Advanced Technology & Service”

Sewoong Plant Co., Ltd., established in 1991, is a global engineering and trading company exporting and importing various products for industrial plants. 

We are professionally specialized in supplying complete equipment & spare parts in areas of electrical, mechanical, instrumentation & automation and especially in replacement of obsolete equipment for demands of construction, operation & maintenance of industrial plants. 

Over the past 20 years, our highly qualified engineers have acquired valuable experiences throughout unique and complex industrial fields. Moreover, we not only improve our technology, but also practice transparent management so as to ultimately provide customers with good quality products and services. 

As a result, we have obtained advanced designing, engineering and global sourcing capabilities which make us fully capable of satisfying demands coming from various customers of different fields. 

1 OVERVIEW

Page 4: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

1. Business Diversification & Stabilization

Explore new Business Opportunities

Improvement of Client Satisfaction

2. Steady Growth & High Return

Market Expansion throughout the Globe

3. Win‐Win Strategy

Mutual Satisfaction between Clients & Sewoong Plant

Mission

Philosophy

1. Devote to providing the best Quality Product & Service

2. Stay in Sewoong Spirit

Positive Attitude

Determined Attitude

Pioneering Attitude

Professional Attitude 

2MISSION & PHILOSOPHY

Page 5: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Corporate PlanningSales

Mechanical Sales

Electrical Sales

Mechanical Sales

Electrical Sales

R&D Laboratory 

Project Execution

Mechanical Engineering

Electrical Engineering

Engineering

Sales

Middle East Branch inU.A.E

Overseas Sales

Domestic Sales

Sales Site Technicians Workshop

Joint Venture in

Saudi Arabia

Finance & Accounting PurchasingPlanning & 

Management

SEWOONG PLANT CO., LTD.

3 ORGANIZATION

Page 6: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

FACTORY HEAD  OFFICE

■ Add

■ Tel■ Fax■ E‐mail

: #1001 ~ 1004, Seoul Forest Kolon Digital Tower, 25, Seongsuillo 4‐gil, Seongdong‐gu, Seoul, Korea (PO: 133‐827): +82.2.467.2141: +82.2.467.2170: [email protected]

■ Add

■ Tel■ Fax■ E‐mail

: 14, Bodojin‐ro 18beon‐gil, Seo‐gu, Incheon, Korea (PO: 404‐811)

: +82.32.571.5512~3: +82.32.571.5515: [email protected]

4LOCATION

Page 7: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

2010EnteredKuwait Market

1997EnteredLibyan Market

1991Establishment

1994EnteredSaudi Arabia Market

2003EnteredU.A.E. Market

2011EnteredPakistan & Bahrain Market

2012EnteredSingapore, Philippines, Indonesia, Oman, Qatar, Peru & Chile Market

2004Expansion ofHydraulic System Factory

2013EnteredThailand & Bangladesh Market

2006Awarded first High Voltage TransformerTurnkey Project

2008EstablishedJoint Venture withLocal Partner in K.S.A.

2005EstablishedPartnership withLocal Company in K.S.A.

1992InitiatedBusiness Transaction in the Middle East

EstablishedMiddle East Branch

2013

5 HISTORY

Page 8: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Hydraulic Business

Procurement Service Specialist in procuring equipments for plant construction and O & M Procure various industrial equipments and its spare parts Able to perform Technical & Commercial evaluation and analysis Competitive Price & Guarantee High QualityOn‐time Delivery Strict Quality Control Assurance

Material Supply Electrical & Mechanical Equipments Instruments Spare Parts

Strong & intimate Business Relationship with Korean & Global Makers. (ex: HYUNDAI, DOOSAN, DAELIM, SAMSUNG, ABB, SIEMENS, EMERSON, HONEYWELL, YAMATAKE etc.) Capable of Sourcing Korean OEM (Especially the items which were brought through   DOOSAN Heavy Industries)

Authorized Supplier‐ ILJIN & POWERMAX Transformers‐ TECO Westinghouse & HYUNDAI Motors‐ CW‐Hydro Pumps‐ KUMWOO, SEJIN, S&S, ASAN V&P, DONGYANG Valves‐ LHE Heat Exchangers‐ HYUNDAI Turbo Compressors  

MAKER RELATIONSHIP

Highly experienced Engineers participate in:‐ Designing ‐ Engineering‐ Installation‐ Testing & Commissioning

Evaluate & Analyze makers’ design to satisfy the clients’ inquiries and requestsAble to offer Alternative Items that are high in Quality, Competitive in Price, and 100% Interchangeable

PROCUREMENT & SUPPLY REPLACEMENT PROJECTS

ENGINEERING COMPETENCY

O&M Projects Registered Vendor / Supplier for various International End Users.  Guarantee complete Interchangeability Replace various complete equipments and its   spare parts by Original & Alternative Makers

Turnkey Projects Ensure complete interchangeability of newly installed equipment to the existing old line; same in fit, form, and function.Minimize End Users’ Risk of installing the equipment. Safe and prompt operational resumption of clients’ production line Complete installation, testing, commissioning & training.

6BUSINESS FEATURES

Page 9: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

SEWOONG PLANT CO., LTD.

SWCC ‐ K.S.A.Saline Water Conversion Corp.

SEC ‐ K.S.A.Saudi Electricity Co.

MARAFIQ ‐ K.S.A.Power & Water Utility Co.For Jubail & Y

KNPC  ‐ KuwaitKuwait National Petroleum Co.

SEMBCORP ‐ U.A.E.Fujairah Water & Power Plant

S‐Chem ‐ K.S.A.Saudi Chevron Phillips Co.

Sahara Petrochemicals ‐ K.S.ASahara Petrochemical Co.

RGPC ‐ QatarRas Girtas Power Co.

RLPC ‐ QatarRas Laffan Power Co.

Qatalum ‐ QatarQatar Aluminum Ltd.

Q‐Chem ‐ QatarQatar Chemical  Co.

MA’ADEN ALUMINIUM ‐ K.S.A.Ma’aden Aluminium Co.

Advanced ‐ K.S.A.Advanced Petrochemical Co.

Aminat ‐ K.S.A.Arabian Amines Co.

DHURUMA ‐ K.S.A.DHURUMA O & M Co.

SATORP ‐ K.S.A.Saudi AramcoTotal Refining & Petrochemical Co.

SMC ‐ OmanSalalah Methanol Co.

STOMO ‐ OmanSohar Operation & Maintenance Co.

DEWA  ‐ U.A.E.Dubai Electricity & Water Auth.

SCIPCO ‐ U.A.E  Shuweihat CMS Int. Power Co.

ADWEA  ‐ U.A.E.Abu Dhabi Water & Electricity Auth.

International Power GDF SUEZ ‐ K.S.ATihama  Power Generation Co.

Qatar Petroleum ‐ QatarQatar Petroleum

JOMEL ‐ K.S.A.Jubail O & M Co.

MEW ‐ KuwaitMinistry of Electricity & Water

Qatar Power ‐ QatarQatar Power Co.

ITM ‐ U.A.E.ITM O & M Co. ‐ Umm Al Nar Plant

S2 ‐ U.A.E.Shuweihat S2 Power Plant

EMAL ‐ U.A.E.Emirates Aluminum Co.

TTE ‐ U.A.E.Gulf Total Tractebel Power Co.

CEGCO ‐ JordanCentral Electricity Generating Co.

AES Jordan PSC ‐ JordanAmman East Power Plant

7 MAIN CLIENTS

Page 10: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

KEPCO ‐ Philippines & PakistanKEPCO Plant Service & Engineering

AES Gener ‐ ChileAES Operation & Maintenance

Glow GDF SUEZ ‐ ThailandGlow GDF SUEZ

PETRON ‐ PhilippinesPetron Corporation

JGSP ‐ PhilippinesJG Summit Petrochemical Corp.

YTL Power Seraya ‐ SingaporeYTL Power Seraya Energy Co.

EGAT ‐ ThailandElectricity Generating Authority

PT Cirebon ‐ IndonesiaPT Cirebon Power Services

AMBATOVY ‐MadagascarDynatec  Madagascar SA

HMC Polymers ‐ ThailandHMC Polymers Co.

Kallpa Generacion SA ‐ PeruKallpa Generacion SA

EnerSur GDF SUEZ ‐ PeruChilca Uno Power Plant

BST ‐ ThailandBangkok Synthetics Co.

PM3 ‐ VietnamPhu My 3 Power Plant

SIEMENS ‐ PhilippinesSIMENS Operation & Maintenance

STEAG State Power ‐ PhilippinesSTEAG State Power Inc.

TAQA ‐MoroccoJorf Lasfar Energy Co.

Chevron Phillips Chemical ‐ SingaporeChevron Phillips Chemical Co. LP

TPC ‐ SingaporeThe Polyolefin Co. Pte. Ltd.

PT TJB POWER SERVICES ‐ IndonesiaTanjung Jati B Coal Fired Power Plant

IRPC ‐ ThailandIRPC Public Co. Ltd.

PTTGC ‐ ThailandPTT Global Chemical  Public Co. Ltd.

RATCH (RGCO) ‐ ThailandRatchaburi Electricity Generating  Co.

SEWOONG PLANT CO., LTD.

GE ENERGY ‐ Kuwait, Pakistan, ThailandGE Operation & Maintenance

SPC Power – PhilippinesSalcon Power Co. (Malaya & Cebu Plant)

TATA ‐ IndiaTATA Power

Uch II Power Private Ltd. ‐ PakistanUch Power Station

SONATRACH ‐ AlgeriaSONATRACH

LISCO  ‐ LibyaLibyan Iron & Steel Co.

GECOL ‐ LibyaGeneral Electricity Co.

JAC – SingaporeJurong Aromatic Corp

POWERTEK Energy ‐ BangladeshMeghnaghat & Haripur Power Plant

8MAIN CLIENTS

Page 11: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

TRANSFORMER Supply

9

Page 12: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

10TRANSFORMER Supply

SPECIFICATION Q'TY PROJECT YEAR REMARKS

 89.25MVA, 382/13.8kV High Voltage Transformer 1 Yanbu, KSA 2013 Turnkey

 10MVA, 13.8/4.3kV High Voltage Transformer 1 Yanbu, KSA 2013 Turnkey

 25MVA, 13.8/4.3kV High Voltage Transformer 1 Yanbu, KSA 2013 Turnkey

 45MVA, 230/13.8kV High Voltage Transformer 1 RWTS, KSA 2012 Turnkey

 31.5MVA, 13.8/7.2kV High Voltage Transformer 1 Jubail, KSA 2012 Turnkey

 3215kVA, 13.8kV/600V/600V Transformer 2 RWTS, KSA 2012 Ex‐Works

 3850kVA, 18.3kV/600V/600V Transformer 2 RWTS, KSA 2012 Ex‐Works

 89.25MVA, 382/13.8kV High Voltage Transformer 1 Yanbu, KSA 2011 Turnkey

 10MVA, 13.8/4.3kV High Voltage Transformer 1 Yanbu, KSA 2011 Turnkey

 15MVA, 13.8/4.3kV High Voltage Transformer 1 Yanbu, KSA 2011 Turnkey

 37.5MVA, 132/6.9/6.9kV High Voltage Transformer 1 Assir, KSA 2011 Turnkey

 25/31.5MVA, 13.8/7.2kV High Voltage Transformer 5 Jubail, KSA 2010 Turnkey

 60.5MVA, 230/7.2kV High Voltage Transformer 1 Jubail, KSA 2010 Turnkey

 60MVA, 230/7.2kV High Voltage Transformer 1 Jubail, KSA 2010 Turnkey

 60.5MVA, 230/7.2kV High Voltage Transformer 1 Jubail, KSA 2010 Turnkey

 60MVA, 230/7.2kV High Voltage Transformer 1 Jubail, KSA 2009 Turnkey

 31.5MVA, 13.8/7.2kV High Voltage Transformer 4 Jubail, KSA 2009 Turnkey

 30/20/20MVA, 15.75/6.9/6.9kV High Voltage Transformer 1 Jubail, KSA 2009 Turnkey

 75MVA, 229.94/13.8kV High Voltage Transformer 1 RWTS, KSA 2009 Ex‐Works

 67MVA, 34.55/13.8kV High Voltage Transformer 1 RWTS, KSA 2009 Ex‐Works

 500kVA HV Transformer, DYN11, 7.2kV 460/265V 1 Dammam, KSA 2009 Ex‐Works

 500kVA HV Transformer, OLTC, 4.16kV 220/127V 1 Jubail, KSA 2008 Ex‐Works

 75/84MVA, 230kV/13.2kV High Voltage Transformer 2 Jubail, KSA 2006 Turnkey

Page 13: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Project TypeProject Location

Capacity

Original ReplacementAl‐Jubail, KSA (HV Transformer)74/85 MVA 230/13.3kV, 2 sets, TURNKEY Project, Dec 2006

11 TRANSFORMER Supply

Page 14: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Project TypeProject Location

Capacity

Alternative ReplacementYanbu, KSA (HV Transformer)89.25MVA, 382/13.8kV, 3 sets, TURNKEY Project, Jan 2009

12TRANSFORMER Supply

Page 15: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

MOTOR Supply

13

Page 16: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

14MOTOR Supply

SPECIFICATION Q'TY PROJECT YEAR

 132kW Electric Motor with Terminal Box, 14P, 60Hz, 3Ph, 460V, Current: 252.9A, RPM : 499 RPM (ACC. Equip : Space heater : 1PH, 277V, 200W)

1 Jeddah, KSA 2012

 Fuel Oil P/L ‐ Pump Motor, 220kw, 2P, 3300V, 50Hz 1 Jeddah, KSA 2012 6.6kv Motor for Low Pressure Feed water Pump, Type: TIE‐F, 240kw, 50Hz,3Ph, 6.6kv, F Class, 2,970rpm, IP55

1E' Station, ph‐IJebel Ali, UAE

2012

 6.6kv Motor for Sea Water Cooling Pump, Type: TIE‐FV, 330kw, 50Hz, 3Ph, 6600V, F Class, 1,470rpm,  IP55

1E' Station, ph‐IJebel Ali, UAE

2012

 Squirrel cage induction Motor, 3PH, 10600kw, 4P, 13.8kV 1 Yanbu, KSA 2012 Squirrel cage induction Motor, 3PH, 1800kw, 4P, 13.8kV 1 Yanbu, KSA 2012 Squirrel cage induction Motor, 3PH, 8850kw, 4P, 13.8kV 1 Yanbu, KSA 2012 Electric Motor, 280M, 120kW‐4P‐380V‐60Hz 1 Alshoqiq, KSA 2012 MV motor for Cooling Tower Fan, 200kw, 6.6kv, Class F, 4P,  50Hz, IP55 1 Pakistan 2011 3,200kW Electric Motor, AC, HV, Industrial, 3Phase 4 Shoaiba, KSA 2011 2,950kW Electric Motor, AC, HV, Industrial, 3Phase 2 Shoaiba, KSA 2011 4500kW Squirrel Cage Motor, 6900V, 3‐Phase 1  Jubail, KSA 2011 640KW, Electric Motor, Horizontal, 6.6KV, 3Ph, 50Hz, 2P 2 Jebel Ali, UAE 2011 1,800KW Electric Motor, AC, HV, Industrial, 3Phase 1 Yanbu, KSA 2010 8,850KW Electric Motor, AC, HV, Industrial, 3Phase 1 Yanbu, KSA 2010 10,600kW Electric Moor, AC, HV, Industrial, 3Phase 1 Yanbu, KSA 2010 3,050KW Squirrel Cage Motor, 6600V, 3‐Phase 1 Shoaiba, KSA 2009 2,950kW Electric Motor, AC, HV, Industrial, 3Phase 2 Shoaiba, KSA 2009 2800kW Squirrel Cage Motor, 2P, 6600V 5 Al‐Khobar, KSA 2008 1420kW Squirrel Cage Motor 5 Jubail, KSA 2008 865KW Squirrel Cage Motor 1 Shoaiba, KSA 2007 160, 170, 540 & 3,050KW Electrical Motors, Squirrel Cage  (5 Items) 5 Shoaiba, KSA 2005 400KW Electrical Motor, 900 RPM, 6600VAC, 60HZ, 8P, F, IP54 1 Shoaiba, KSA 2005

Page 17: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Project TypeProject Location

Capacity

Original ReplacementAl‐Jubail, KSA (Electric Motor)4,500KW, AC Squirrel Cage Induction Type, 2 set, EX‐WORKS, Mar 2009

15 MOTOR Supply

Page 18: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

Project TypeProject Location

Capacity

Alternative ReplacementShoaiba, KSA (Electric Motor)3,200KW, 4 Pole, Slip Ring Type, 4 sets, TURNKEY Project, Jul 20092,950KW, 4 Pole, Slip Ring Type, 2 sets, TURNKEY Project, Jul 2009

16MOTOR Supply

Page 19: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

MECHANICAL & INSTRUMENTS Supply

17

Page 20: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

18MECHANICAL & INSTRUMENTS Supply

SPECIFICATION Q'TY

  Boiler, Air Heater, Heat Exchanger  Gas/Oil Fired Boiler, Shell & Tube/Plate Type Heat Exchanger    ‐ Water to Water, Water to Air, Air to Air, Air to Water

  Storage Tank   Above/Under Ground Round Tank, Spherical Tank for Cryogenic Gas, High Pressure Tank

  Fan, Blower & Compressor

  Fan (Turbine, Axial Type , etc.)  Blower  Compressor (Hermetic, Semi‐Hermetic, Reciprocating, Centrifugal, Screw Type, etc.)    ‐ Oil Free Type, Non‐oil Free Type

  Pump  Vertical / Horizontal Type, Single/Multi Stage Pump, Gear Pump, Screw Pump, Mono‐Pump,  Diaphragm Pump, Plunger Pump, Centrifugal pump, etc.

  Valves  Manual/Automatic Control Valve (Electrical, Pneumatic, Hydraulic, etc.), Motorized Valve,  Gate Valve, Globe Valve, Ball Valve, Check Valve, Plug Valve, Butterfly Valve, etc.

  Material

  Pipe/Tube & Fitting, Plate, Angle, Bar, etc.    ‐ Complying  with International Standards (API, ASTM, ASME, DIN, BS, JIS, etc.)    ‐ Carbon Steel, Alloy Steel, Stainless Steel, Aluminum, Brass, Bronze, Copper    ‐ Hastelloy, Inconel, Monel, Titanium, PTFE, PE, PP, etc.

  HVAC& Plumbing   Boiler, Water  Heater, AHU, FCU & Plumbing Fixtures

  Fire protection  Water Sprinkler System, AFFF System, Deluge System, Fire Extinguisher, Fire Detecting System,  Fire Prevention System

  Instrument & Control  Electric, Electronic, Hydraulic, Pneumatic, Electro‐Pneumatic Control Systems    ‐ Pressure, Temperature, Transmitter & Switch, Level Gauge, Flow Meter, etc.    ‐ DCS, PLC, SCADA and other  necessary control systems for plant requirement

  Miscellaneous  Bearing, Coupling, Packing, Gasket, Mechanical Seal, Carbon Brush, Battery,  other necessary spare parts for Mechanical & Electrical Equipments

Page 21: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserCapacity

High Pressure Feed Water Heater Korean MakerAl‐Khobar, KSA SA516‐70 + SA556‐C2 Tube – ID1,300 x 10,935L 26.2 Tons, 1set, Feb 2009

19 MECHANICAL & INSTRUMENTS Supply

Page 22: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End User

Blowers with MotorsKorean MakerShoaiba , KSA, 2009

20MECHANICAL & INSTRUMENTS Supply

Page 23: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserType, Size & Material

Pumps (Storm Water, Centrifugal Submersible Pumps, etc.)Various MakersVarious  End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

21 MECHANICAL & INSTRUMENTS Supply

Page 24: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserType, Size & Material

Pumps (Storm Water, Centrifugal Submersible Pumps, etc.)Various MakersVarious  End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

22MECHANICAL & INSTRUMENTS Supply

Page 25: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserType, Size & Material

Pumps (Storm Water, Centrifugal Submersible Pumps, etc.)Various MakersVarious  End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

23 MECHANICAL & INSTRUMENTS Supply

Page 26: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

24MECHANICAL & INSTRUMENTS Supply

ItemMaker

End UserType, Size & Material

Expansion JointsKorean MakerVarious  End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

Page 27: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserType,  Size & Material

Valves (Ball, Gate, Globe, Check, Butterfly, Diaphragm, Needle Valves, etc)Various MakersVarious End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

25 MECHANICAL & INSTRUMENTS Supply

Page 28: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

26MECHANICAL & INSTRUMENTS Supply

ItemMaker

End UserType,  Size & Material

Valves (Ball, Gate, Globe, Check, Butterfly, Diaphragm, Needle Valves, etc)Various MakersVarious End UsersAll Kinds – Comply with Int’l Standards (API, ASTM, ASME, DIN, BS, JIS, NACE, etc)

Page 29: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End User

Boiler & Heat Exchanger Seamless TubesKorean MakerAl Tawellah A1, Abu‐Dhabi, UAE, 2012

27 MECHANICAL & INSTRUMENTS Supply

Page 30: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End User

Supply & Fabrication of Boiler Tubes & PipesKorean MakerShoaibah & Jeddah, KSA, 2007 & 2008

28MECHANICAL & INSTRUMENTS Supply

Page 31: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemMaker

End UserMaterialDensity

Wire DiameterQuantity

DemisterKorean Maker'D' Station, Jebel Ali, DEWA in UAE (Aug  2008)SUS 316L144 Kg/M30.28 mm590 pieces

29 MECHANICAL & INSTRUMENTS Supply

Page 32: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

ItemType

Spare PartsAll Kinds of Mechanical & Electrical Products

30MECHANICAL & INSTRUMENTS Supply

Page 33: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

TURBOAIR COMPRESSOR 

31

Page 34: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

HHI TURBO AIR COMPRESSOR

MAJOR FEATURES HTC Series Application Range• Easy access to all major components• State‐of‐the‐art backward lean type impellers.• Low mechanical loss• Wide operation range• Compact & Simple design.• User friendly operation & interface.• Optimized ventilation system of sound enclosure (Option)

Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. L W H L W H

HTC600 3,000 5,550 1,766 3,237 4,200 2,120 2,095 165 83 82 6,950

HTC900 5,000 8,500 2,943 5,003 4,550 2,120 2,240 179 83 88 8,700

HTC1500 7,500 14,000 4,414 8,240 5,256 2,286 2,485 207 90 98 12,100

HTC2500 13,500 23,500 7,946 13,832 6,000 2,340 2,550 236 92 100 14,500

Weight(withoutMotor)

Nominal  Capacity Discharge Pressure Motor Power

kW HPPsiaG.barG.CFM㎥/hr mm inch

Dimension

Model

361 2,9340.5 25.0 7.3 362.6 269 2,188

※ Sewoong Plant is an Authorized Supplier of Hyundai Heavy Industry Turbo Air Compressors. 32

Page 35: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

HYDRAULIC SYSTEM

33

Page 36: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

BUSINESS PARTNERS

1. Fully capable of designing, producing and maintaining Hydraulic Power Units / Systems. 2. Provide services for improving and remodeling existing Hydraulic Units / Systems. 

• Hydraulic Manifold Block, Valve Stand, and Pump Station• Design & Production for Accumulator Stand & Tank Unit• Hydraulic Valve Test Bench M/C• Hydraulic Motor Test Bench M/C• Hydraulic Pump Test Bench M/C• Proportional Valve & Servo Valve Handy Tester• Design & Production for Testers, Mechanism & etc

MAIN BUSINESS MAIN ITEMS

• Rexroth, Yuken, Nachi, Eaton, Moog, Kawasaki, etc.

◆ TESTERMain Control Valve Test Bench

• Specifications

‐ Test Pressure : Max. 350 kg/㎠‐ Flow Rate          : Max. 300 lpm‐ Operating Fluid  : Mineral Oil ISO VG46‐ Electric             : 75Kw*6p*φ3

(Y‐△ START)

• Specifications

‐ Test Pressure : Max. 350 kgf/㎠‐ Flow Rate      : Max. 91 lpm‐ Filtration       : 10 micron abs‐ Test Temp . : 40°C ± 5°C‐ HYD’ Fluid     : mineral oil ISO VG46‐ Electric Power    : 75Kw*6P*φ3* 380V AC

◆ HYDRAULIC SYSTEMServo Test Bench Hydraulics power unit

◆ ENGINEERINGOverhaul & Trial‐Run at Hyundai‐Steel Co.

34HYDRAULIC System

Page 37: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

SEWOONG PLANT CO., LTD

Address

TelFaxE‐mailWeb

: #1001 ~ 1004, Seoul Forest Kolon Digital Tower, 25, Seongsuillo 4‐gil, Seongdong‐gu, Seoul, Korea (PO: 133‐827): +82.2.467.2141: +82.2.467.2170: [email protected]: www.swplant.com

35 CONTACTS

Page 38: SEWOONG PLANT CO., LTD. - shipserv.comSEWOONG... · High Voltage Transformer Turnkey Project 2008 Established Joint Venture with Local Partner in K.S.A. 2005 Established Partnership

www.swplant.com