28
Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material

Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Seventh General Assembly of the ILRSApril 25, 2002Nice, France

Presentation Material

Page 2: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Network Reports

Page 3: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

ILR

S G

ener

al A

ssem

bly

WL

RS:

-

fully

ope

rati

onal

(SL

R)

sinc

e Ja

nuar

y 20

02

- im

prov

emen

ts:

- E

vent

Tim

er (

Fre

nch

Dev

elop

men

t(D

assa

uld)

)

-

Im

prov

emen

t in

Cal

ibra

tion

-

exte

nsio

n to

low

orb

itin

g sa

telli

tes

(Cha

mp,

..)

- s

econ

d re

ceiv

ing

tele

scop

e w

ith

dete

ctor

- i

nteg

rati

on o

f th

e re

sp. c

alib

rati

on f

eatu

res

TIG

O-S

LR

- s

ince

Jan

uary

in C

once

pcio

n

-

sin

ce m

id o

f A

pril

oper

atio

nal

- f

irst

pas

ses

have

bee

n tr

acke

d

MT

LR

S

-

sti

ll id

le

-

wai

ting

for

dec

isio

ns t

o m

ove

on w

ith

the

coop

erat

ion

wit

h

the

Uru

mqi

Ast

rono

mic

al o

bser

vato

ry

Page 4: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

ILR

S G

ener

al A

ssem

bly

EU

RO

LA

S: S

tatio

n re

port

s

•FT

LR

S•

Wet

tzel

l•

Gra

z–

Ran

ge g

ate

gene

rato

r w

ith <

0.5

ns

reso

lutio

n–

Des

igne

d fo

r m

ulti-

kHz

Las

er s

yste

ms

•Z

imm

erw

ald

–V

ery

prel

imin

ary

test

s w

ith in

frar

ed r

angi

ng(8

46 n

m)

–H

amam

atsu

PM

–B

ette

r re

turn

rat

e, le

ss d

ay li

ght n

oise

, slig

htly

high

er s

ingl

e-sh

ot R

MS

•M

ater

a

Page 5: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Fre

nch

Fre

nch

Tra

nspo

rtab

le L

aser

Sta

tion

in

Tra

nspo

rtab

le L

aser

Sta

tion

in o

pera

tion

oper

atio

n

Jaso

n1 c

alib

rati

on c

ampa

ign

nsta

llati

on o

n ja

nuar

y 15

th 2

002

in C

orsi

caat

Aja

ccio

ason

1 ca

libra

tion

pas

s ev

ery

ten

days

Mor

e th

an 6

00 p

asse

s in

thr

ee m

onth

s

E

nd o

f th

is c

ampa

ign

July

200

2

Col

ocat

ion

phas

e at

Gra

sse

obse

rvat

ory

Thr

ee s

tati

ons

(Fix

ed S

LR

, LL

R a

nd F

TL

RS)

Sept

embe

r 20

01 -

>D

ecem

ber

2001

Res

ults

:-6

0 si

mul

tane

ous

pass

es o

n L

ageo

s w

ith

thre

e st

atio

ns-m

ore

than

120

LE

OS

sate

llite

s w

ith

two

stat

ions

-> F

tlrs

qua

lific

atio

n

Page 6: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:
Page 7: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

FTL

RS

FTL

RS

at

at A

jacc

io (

Aja

ccio

(C

orsi

caC

orsi

ca))

Aja

ccio

-cam

pagn

e d

Aja

ccio

-cam

pagn

e d

’é

’é t

alon

nage

Jas

on1

janv

ier/

juin

200

2ta

lonn

age

Jaso

n1 ja

nvie

r/ju

in 2

002

Page 8: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

7th

ILR

S G

ener

al A

ssem

bly

Nic

e, F

ran

ce,

25

Ap

ril 2

00

2

G. B

ianc

o

AS

I/CG

S, M

ater

a, It

aly

Sta

tus

rep

ort

Page 9: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

MLR

O s

tatu

s re

port

Sys

tem

is p

rodu

cing

goo

d qu

ality

dat

a

2-co

lor

PM

T c

onfig

urat

ion

oper

atio

nal

2-co

lor

stre

ak c

amer

a co

nfig

urat

ion

oper

atio

nal (

seve

ral p

asse

s tr

acke

d)

LLR

con

figur

atio

n op

erat

iona

l (M

oon

trac

ked)

Rea

dy to

go

into

fina

l acc

epta

nce

at a

nytim

e no

w

Page 10: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

In c

ase

you

mis

sed

th

is,

we

’re

her

e…

Page 11: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

LA

GE

OS

II d

ow

n-

LA

GE

OS

II d

ow

n- s

pin

nin

g

spin

nin

g r

ate

rate

1998

.519

9919

99.5

2000

2000

.520

0120

01.5

2002

2002

.51015202530354045505560

Obs

erve

d LA

GE

OS

-2 d

own-

spin

ning

rat

e (e

xpon

entia

l fit)

Yea

r

Rotation Period (s)po

st-f

it R

MS

88.

5 m

s

Dow

n-sp

inni

ng r

ate:

fa

ctor

of 2

eve

ry 1

.5 y

ears

fa

ctor

of 1

0 ev

ery

4.9

year

s

Per

iod

(s)

= 1

1.1

* e

(Yea

r-19

98.7

9)/ 2

.1

Page 12: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

WPLTN ReportILRS Seventh General Assembly

Nice, FranceApril 25, 2002

ABSTRACTS:

Australian Network

The Australian stations Stromlo (7849) and Yarragadee (7090) are performing well. Stromloroutinely operates autonomously and unattended for 80 hours every week, without problems.

The LIDAR system at Yarragadee is to be upgraded slightly to provide enhanced data toatmospheric physicists. The definitive report on the local ties at Stromlo, Yarragadee,Orroral, Hobart and Tidbinbilla has been published.

AUSLIG has been re-organised within the Australian Government administration, and is nowcalled the National Mapping Division of Geoscience Australia. SLR funding faces anuncertain future in Australia.

Chinese Network

The performance of the Chinese stations has not been changed since last Laser Workshop.But many problems have happened recently. The Beijing station has laser problem, theWuhan station has the problem with the new dome, the Kunming station has problem withtheir detectors. Each station is making effort to solve the problems.

The SLR system for Argentina is still under construction. It will be finished by the fall of thisyear, but not including the installation in San Juan, Argentina.

Japanese Network

The KSP(CRL) station at Miura was dismantled in January 2001 and the telescope wasmoved to the University of Kagoshima. Observation from other KSP stations are suspended,pending allocation of funds under the next budget.

JHD has submitted to CDDIS outstanding data obtained in by HTLRS during the 1990’soccupation of a remote island in Japan.

Simosato station has been in trouble with mount motors [now replaced], while LEOproductivity increased by increased efforts in satellite acquisition with lower minimumelevation angle and working shift optimisation.

NASDA new SLR station of GUTS project is under development in a southern island nearlaunching site, and is now in CDR phase.

Russian Network

Komsomolsk [1868] will stop operation from June 2002 to the end of 2002, for modernization(telescope, tracking system, laser, distance measurement system). Maidanak [1863] will beoperational in mid 2002. Maidanak [1864] and Mendeleevo [1870] are operational.

REFLECTOR and METEO were launched.

The new SLR station near Moscow is seeking permission for the publication of its stationcoordinates.

Page 13: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Saudi Arabia

SALRO has re-started observation and to send data to CDDIS in January 2001 withconsiderably high volume of passes from low satellites to high satellites including GPS.Effort to bring the station to a fully operational status continues.

SALRO symposium [to be held on 23-24 September 2001] was deferred indefinitely due tothe events of September 11, 2001.

Page 14: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

DETAILED NATIONAL REPORTS

1. Russia

1868, Komsomolsk:

It is planned to stop the station operation from June, 2002 till the end of 2002, formodernization (telescope, tracking system, laser, distance measurement system).

1863, Maidanak

The tracking system is under upgrading. Possibly the station will be operational in April,2002.

1864, Maidanak, and 1870, Mendeleevo

Operational

SLR station near the Moscow

The station makes regular ranging measurements, but we still have no permission for thestation’s participation in the ILRS; we continue our efforts to obtain such a permission.

The MCC-M is regularly making estimations of the station’s ranging precision (see below inAttachment 1).

Besides this, IPIE is currently conducting several experiments in space, to solve some SLRproblems.

Spherical retroreflector on board of the METEOR-3M(1) satellite

Most of the passive SLR satellites have been launched during the years when the SLR stationequipment provided an accuracy of several centimeters. But now, with the new equipmentproviding an accuracy of several millimeters, the systematic target errors caused by theretroreflector design and their distribution over the satellite surface are limiting the distancemeasurement precision.

On board of the METEOR-3M(1) satellite, a novel-type retroreflector is installed, having anunique design based on the spherical Luneberg lens principle. It has a spherical symmetry,and a constant CoM correction value with an accuracy of about ±0.02 mm. In contrary tocurrently used cube corner prism retroreflectors, this retroreflector has a practically zero targeterror.

Starting from December, 2001, a joint experiment is conducted by GSFC and IPIE on laserranging of the “Optical Luneberg Lens” on board of the METEOR-3M(1)spacecraft. TwoAmerican SLR stations (Greenbelt and Monument Peak) and one Russian station nearMoscow are taking part in the experiment. The limited number of stations participating in theexperiment was caused by fear that laser light may cause interference during operation of theSAGE instrument installed by NASA on board of the METEOR-3M(1) spacecraft. Currentlyall the limitations have been lifted, and we are asking the ILRS for support of the METEOR-3M(1) mission with the spherical retroreflector on board.

From the measurement results obtained by the three SLR stations above (10 passes) it can beseen that the return signal strength is in accordance with the predicted values. Thus it ispossible to initiate, during the ILRS meeting, a discussion on a future launching of anautonomous spherical satellite-retroreflector, and on a search for sponsors for such alaunching A satellite 22 cm in diameter (mass of about 15 kg) could be a good target with a

Page 15: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

sufficient cross-section and a near-zero target error. The cost of such a satellite, with anaccount for the separation device and the launching, will be about 600,000 USD. Thelaunching of such a satellite will not only serve for development of investigations in crustaldynamics, but will also stimulate further developments of more precise SLR equipment.

REFLECTOR microsatellite

December 10, 2001, as a piggyback load on the METEOR-3M(1) spacecraft, theREFLECTOR microsatellite has been put into orbit.

The REFLECTOR microsatellite is a passive test object comprising several groups ofretroreflectors placed into specified points of the object. It is intended for investigations ofresolving power of large-size ground-based telescopes with laser illumination of the target,used to obtain images of “space debris”, as well as for determination of spatial attitude ofspacecraft by precise ranging with use of multistop time interval counters.

IPIE asked ILRS for support of the REFLECTOR mission, and the CB of ILRS respondedpositively. The first SLR observations of the REFLECTOR satellite were made by theYarragadee station. Currently we are using the FR data available from NASA stations, as wellas FR data kindly provided by the Herstmonceau station team, to investigate the satelliteorientation status and to determine its oscillation damping parameters.

Page 16: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

2. China

The fixed stations at Changchun, Shanghai, Beijing and Kunming have been routinelyoperational. The window of the dome at Wuhan station was broken and had been rebuilt lastyear, and the station will start observation soon.

The system stability including both short term and long term stability for all stations has beenpaid more attention. Some data from these stations were still edited in the analysis reportspublished by the UTX/CSR due to the large range bias.

These stations would like to ask for assistance from the Network and Engineering WorkingGroup and the Analysis Working Group to identify and eliminate system biases.

The Shanghai station has had a fixed bias –40 mm for some years and –80 mm since July2001 in the UTX/CSR reports. In order to identify the biases, K.Hamal and I.Prochazka ofthe Czech Technical University brought a portable Pico Event Timer and the independent dataacquisition and processing software package to Shanghai and carried out the calibrationcomparative experiment during August 16-22, 2001 [Results attached].

The joint team has measured 3 short distance targets and found the differences of the systemdelays from these targets only 2-3 mm. The P-PET calibration package was operated inparallel to the existing SLR system and has tracked 16 passes satellites. The comparison ofranging accuracy, time bias and range bias for each pass are listed in the following table. Therange biases were derived from the point to point comparison with the full-rate data obtainedby two systems.

No obvious biases were detected in the experiment. The conclusion we reach is thatadditional support from the Working Groups will be required to identify the system biases.

The mobile system TROS was moved to Urumqi, the biggest city in the northwest border andhad tracked 44 passes of Lageos from April 23 to June 5, 2001. Afterwards, the TROS wasmoved to Lhasa, Tibet in June 2001, and left in January 2002. It had obtained 102 passes fromLageos and 129 passes from other satellites.

Page 17: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Chinese-Czech Joint Project, Satellite Laser Ranging

Summary of Satellite Laser Ranging

August 16-22, 2001

Satellite P-PET rms

(mm)

SLR rms

(mm)

Time bias

(us)

Range bias

(ns)

Starlette 7.5 12.7 0.1 0.02

Beacon-C 9.3 13.8 0.1 0.00

Ajisai 10.9 15.9 0.1 0.00

Lageos 2 10.5 17.3 0.1 -0.01

Starlette 9.0 15.1 0.1 0.03

Lageos 1 8.5 14.2 0.1 0.01

Beacon C 19.2 19.7 0.1 0.02

Topex 22.4 35 0.1 0.00

Topex 4.9 10.8 0.1 0.00

Lageos 1 7.0 13.5 0.1 0.00

Stella 6.1 12.4 0.1 0.00

Beacon C 10.0 16.1 0.1 0.00

Starlette 8.4 12.9 0.1 0.01

Westpac -- 16.6 0.1 0.03

Lageos 2 8.5 16.1 0.1 0.00

ERS-2 4.0 10.5 0.1 0.01

mean 0.1 0.01

Page 18: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

3. Australia

3.1 Station performance

Both Australian stations continue to perform to a high standard, as indicated by the graphbe low, ex t rac ted f rom the recen t ILRS per fo rmance repor t(ilrs.gsfc.nasa.gov/perf_2002q1.html).

3.2 SLR Analysis

Geoscience Australia continues analysis as part of the ILRS Working Group pilot project. A1994-2002 solution for EOP was submitted to IERS for EOP in the frame of ITRF2000.

3-day arc solutions for range and time bias continue to be provided on a regular basis and areavailable from www.auslig.gov.au/geodesy/sgc/product.htm.

3.3 Local Tie Surveys

Geoscience Australia has conducted a number of high accuracy local surveys at Stromlo andYarragadee to connect the SLR invariant point (IVP) to the GPS, Glonass and Dorisequipment at these sites. The results of these surveys were submitted to IERS for inclusion inITRF2000.

Yarragadee was surveyed in August 1998 and again in May 2001 and the difference in thecomputed position of the IVP was of the order of 3 mm. A full description of these projectscan be found in the Technical Reports (www.auslig.gov.au/geodesy/techrpts/pdf/techrep3.pdf& www.auslig.gov.au/geodesy/techrpts/pdf/techrep4.pdf).

Stromlo was surveyed in June 1999 and again in early 2002. Results of the first survey can befound in the Technical Report (www.auslig.gov.au/geodesy/techrpts/pdf/techrep3.pdf) andthey compare very well (mm level) with the preliminary results of the latest survey, which areyet to be finalised.

Page 19: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

3.4 Administrative Arrangements for Stromlo & Yarragadee

In late 2001 the Australian Surveying & Land Information Group (AUSLIG) was mergedwith the Australian Geological Survey Organisation (AGSO) to form Geoscience Australia. InDecember 2001, Dr John Luck retired from Geoscience Australia, although maintains anactive interest in SLR. His experience and knowledge will not be readily replaced - at themoment he continues to provide assistance on a part time basis.

The contracts for the two Australian SLR stations continue to be managed by GeoscienceAustralia and its Space Geodesy Analysis Centre continues as an ILRS Associate AnalysisCentre.

Contract arrangements for the Stromlo SLR station continue for at least another 18 months.The existing contract for the Yarragadee station finishes on 30 June 2002; although there isprovision for an extension of the current contract, funding is a critical issue and is still subjectto negotiation.

Page 20: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

STA

TU

S O

F N

ASA

NE

TW

OR

K

•M

OB

LA

S-4

& 7

: N

omin

al O

pera

tions

.

•M

OB

LA

S-5

(Aus

tral

ia):

Nom

inal

Ope

ratio

ns.

Perf

orm

som

e si

ngle

ope

rato

r tr

acki

ng w

hich

incr

ease

d da

tavo

lum

e.

•M

OB

LA

S-6

(Sou

th A

fric

a):

Nom

inal

Ope

ratio

ns.

Als

ope

rfor

m s

ome

sing

le o

pera

tor

trac

king

.

•M

OB

LA

S-8

(Tah

iti):

Tra

inin

g/T

rack

ing

Stat

us.

In th

epr

oces

s of

trai

ning

the

two

new

cre

w m

embe

rs.

Page 21: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

STA

TU

S O

F N

ASA

NE

TW

OR

K (

Con

t.)

•T

LR

S-3

(Are

quip

a):

Nom

inal

Ope

ratio

ns.

•H

OL

LA

S (H

awai

i):

Eng

inee

ring

Sta

tus.

In

the

proc

ess

of c

ompl

etin

g th

e te

lesc

ope

cont

rol s

yste

m u

pgra

de.

•M

LR

S (T

exas

): N

omin

al O

pera

tions

.

Page 22: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Luna

r La

ser

Ran

ging

•R

outin

e LL

R o

bser

vatio

ns c

ontin

ue a

t OC

A a

nd M

LRS

•N

ew s

tatio

n at

Mat

era,

Ital

y is

und

ergo

ing

LLR

"sh

ake-

dow

n"

•LL

R-r

elat

ed a

ctiv

ity a

t Apa

che

Poi

nt, N

M is

qui

te e

ncou

ragi

ng

•S

igni

fican

t new

wor

k on

the

luna

r in

terio

r us

ing

LLR

dat

a•

Tw

o LL

R-r

elat

ed p

aper

s at

Lun

ar a

nd P

lane

tary

Sci

ence

XX

XIII

(20

02)

•Lu

nar

Love

Num

bers

and

the

Dee

p Lu

nar

Inte

rior

(Jim

Will

iam

s, D

ale

Bog

gs, T

om R

atcl

iff a

nd J

ean

Dic

key

at J

PL

•T

he "

Cor

e" o

f the

Moo

n: Ir

on o

r T

itani

um R

ich?

(M

ark

Wie

czor

ek a

ndM

aria

Zub

er a

t MIT

)

•G

ener

al r

elat

ivity

, gra

vita

tiona

l the

ory,

sol

ar s

yste

m d

ynam

ics

wor

k co

ntin

ues

•C

oord

inat

ed T

rans

pond

er/L

LR/S

LR "

pred

icts

" un

der

activ

e de

velo

pmen

t

Page 23: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Apa

che

Poi

nt U

pdat

e

•T

rip to

MLR

S in

Mar

ch.

Goo

d in

form

atio

n ex

chan

ge.

•La

ser

orde

red.

Opt

imis

tical

ly lo

okin

g fo

rwar

d to

sen

ding

firs

t pho

tons

sky

war

dbe

fore

the

clos

e of

this

yea

r.

•P

rese

ntly

con

cent

ratin

g m

ost i

nten

tly o

n de

tect

or a

nd ti

min

g el

ectr

onic

s.

•T

rip to

MLR

S r

einf

orce

d th

eir

belie

f tha

t tha

t a 3

.5-m

tele

scop

e an

d 1

arcs

ecim

age

qual

ity, w

ill p

rodu

ce a

hig

h ph

oton

-rat

e re

gim

e, a

ble

to a

chie

vem

illim

eter

pre

cisi

on in

a m

atte

r of

min

utes

.

•Q

uotin

g T

om M

urph

y: "

Exc

iting

tim

es, a

nd I

can'

t wai

t to

get i

t all

goin

g".

Page 24: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Data Center Report

Carey Noll
Page 25: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

CDDISEDC

ILRS Global Data Center Report/EDC

W. Seemüller

ILRS General Assembly, Nice, 25. April 2002

DGFIDGFI I L R Snternational aser anging ervice

Page 26: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

I L R Snternational aser anging ervice

ILRS Global Data Center Report / EDC

Wolfgang Seemüller

Check of successful hourly normal point data delivery

between HTSI/CDDIS and EDC, and vice versa

Backup procedures for ILRS prediction exploder are

implemented at EDC

Backup procedures for IRVs of HTSI are implemented at EDC

Backup procedures for daily and subdaily IRVs, andTime Bias Functions of NERC are implemented at EDC

Backup procedures for IRVs of CHAMP and GRACEof D-PAF/GFZ are implemented at EDC

Hourly update of all onp files and summary files

ILRS General Assembly, Nice, April 25, 2002 EGS General Assembly, April 2002

DGFIDGFI

Page 27: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

Structure of directory pub/laser (EDC ftp server)

ILRS General Assembly, Nice, 25. April 2002

pub / laser / qldata /

envisatgraceagraceb

.

.satname

.

.

predictions / DPAF_PRED

timebiasnpdatafrdataeccentricitiescalibrationsoccupationscoordinatesproductssolutionsstation / sch, sci, logmessages / slrmail, slreportreportssoftwareformatscddisdpafhtsiancillary

hourlyhourly_globalhourly_htsi

RGO_PREDCHAMP_PREDMCC_PREDNASDA_PREDGRACE_PREDESOC_PRED

summariessalrostromlo

DGFIDGFII L R Snternational aser anging ervice

Page 28: Seventh General Assembly of the ILRS April 25, 2002 Nice, France Presentation Material · 2002-05-21 · WPLTN Report ILRS Seventh General Assembly Nice, France April 25, 2002 ABSTRACTS:

SLR

mai

ls a

nd S

LRep

orts

per

mon

th s

ince

Nov

. 199

5

0102030405060708090

0102030405060708090

Sta

tus:

Ap

r.1,

200

2

SLRmail925

SLReport1663

NOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC

1996

1997

1998

1999

2000

2001

2002