Page 1: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Programme of Activities (PoA) for Sustainable Renewable Energy Power Generation in Papua New 

Guinea (PNG) – Journey So Far

Darshak MehtaTechnical Support FacilityCarbon Market ProgramAsian Development Bankdmehta@cmp‐adb.org

18 July  2012

Page 2: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

The project

• ADB was processing Project 41504: Town Electrification Investment Program

• It included TA‐7113 PNG: Preparing the Town Electrification Project

• Loan‐2714/2713 PNG: Town Electrification Investment Program, Tranche 1

• Early identification of CDM opportunity before loan was approved 

ADB Loan Project Elements

The investment program will improve power supply in provincial urban centres  through replacement of diesel power generation with sustainable renewable energy power generation. The investment program will include: 

(i) construction of about six run‐of‐river hydropower plants to supply provincial centres, 

(ii) construction of transmission systems to connect provincial centres, and

(iii) capacity building within the power utility and communities. Project preparatory technical assistance (TA) was used in project preparation.

Page 3: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

• Population  7.06 million• Urban population 12.5%

• Area  462,840 km2• GDP / Capita USD 1300• Proportion of land area covered by forest 58.1%• Population living on less than US$1.25 per day 35.8%

CDM Related• Number of registered CDM projects  5 (as on 09 July 2012)• PoA under validation 4 (as on 09 July 2012)• CDM projects under validation 12 (as on 09 July 2012)

• Population  7.06 million• Urban population 12.5%

• Area  462,840 km2• GDP / Capita USD 1300• Proportion of land area covered by forest 58.1%• Population living on less than US$1.25 per day 35.8%

CDM Related• Number of registered CDM projects  5 (as on 09 July 2012)• PoA under validation 4 (as on 09 July 2012)• CDM projects under validation 12 (as on 09 July 2012)

Papua New Guinea

Electricity Scenario in PNG

• Grid‐connected power is largely restricted to the main urban areas

• Less than 10% of the population has access to electricity• Relatively low percentage of urban residents are connected• Distributed power is rarely available outside the provincial 

urban centres• The supply of power to business and industry in the 

provincial urban centres is unreliable• Many large businesses in the provinces self‐generate using 

diesel generators, at high cost• Lack of access to affordable, reliable power is limiting 

economic growth

Page 4: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

The Thought Process• Need for electrification • Low carbon growth possible due to existence of natural resources like Solar, hydro, geothermal, wind, wave / tidal, biomass projects

• New projects may include – user generated, – grid connected and – mini grid projects

• Developers may be government, private companies or individuals

• Similar situations are likely to exist in many more countries in the pacific / world

The Thought Process (contd.)

• PoA is ideal for a long term multiple projects scenario

• Number of individual methodologies need to be used to suite each plausible scenario (no electricity (AMS I A) / mini grid (AMS I F) / Grid connected (AMS I D))

• Type I methodologies are good for the hydro projects, and are applicable for other RE technologies as well

• AMS I F or AMS I D are not suitable for greenfield RE generation situation where baseline has no power

• There is a need to have approval from CDM EB on multiple methodology application in PoA

Page 5: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

UNFCCC Submissions SSC_537*• Permission for use of multiple methodologies in a single 

PoA –AMS I F and AMS I D together• By end of crediting period ‐ grid may expand further and 

join to a national grid• Projects like biogas where combination of type I and 

type III methodologies ‐ was not permitted at that time• Request to SSC WG submitted and it acknowledged this 

limitation and considered further work on this aspect while making standard for multiple methodologies

• SSC WG reminded that there has to be consistency of circumstances throughout the crediting period – further flexibility in rules was necessary 

*http://cdm.unfccc.int/methodologies/SSCmethodologies/clarifications/41087

UNFCCC Submission SSC_547*• AMS I F and AMS I D are not suitable for renewable 

electrification in non electrified areas which was case in most of PNG (90 per cent not electrified)

• AMS I A was found to be necessary to be included in PoA in addition to AMS I F and AMS I D 

• There was a clause in AMS I F which made it necessary to discard the  fossil fuel based original electricity generation devise to be destroyed

• Under SSC_547 ADB requested removal of this clause on account of– Inconsistency within the methodology for PoA and Non PoA projects– Usefulness of the equipment in other non electrified areas– Back up generation device to renewable energy

*http://cdm.unfccc.int/methodologies/SSCmethodologies/clarifications/63945

Page 6: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

UNFCCC Submission SSC_547 (Cont.)

• SSC WG accepted use of AMS I F, AMS I D and AMS I A in same PoA

• SSC WG removed clause of discarding replaced fossil fuel generating equipment from type I methodologies AMS I A, AMS I B, AMS I C, AMS I D and AMS I F in PoAs

Additionality Approach

This is in addition to automatic additionality for projects of less than 15 MW projects– Offshore wind– Solar Photovoltaic, solar thermal – Tidal / Wave energy– Check Agenda of EB 68 for  proposed amendment to this list

Page 7: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

A small beginning…..

To reach….

and their combinations……

Page 8: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Combination of RE technologies / Situations covered under PNG PoA

EB 65..Annex 3*

23. If the boundary of the PoA is amended post‐registration to expand the geographic coverage or to include one or more additional host Parties, the CME shall update the eligibility criteria to reflect the consequent changes…….

*  STANDARD FOR DEMONSTRATION OF ADDITIONALITY, DEVELOPMENT 

OF ELIGIBILITY CRITERIA AND APPLICATION OF MULTIPLE METHODOLOGIES FOR PROGRAMME OF ACTIVITIES http://cdm.unfccc.int/Reference/Standards/meth/meth_stan04.pdf

Page 9: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Extension………to Pacific

Extension to……… Asia

Page 10: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Extension to………LDC of the World

PoAs – Building Partnerships

Banglades China India Mongolia Nepal Pakistan  PhilippinesSrilanka Thailand Viet Nam

Air Methane Oxidation

Biogas

Biomass Heat

Biomass Electricity

Building EE

CFL

Coal Mine Methane

Composting

Energy Efficient Chillier

Green Brick

High Voltage Distribution System

Hydrauluic Ram

ICS

Improved water mills

Small Hydro

Solar PV

Solar Water Heating

Street Lighting

Landfill gas

LED

Vapour Absorption Referigeration

Page 11: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Newer Developments in CDM 

• New methodologies 

– AMS‐I.L.: Electrification of rural communities using renewable energy

– AMS‐III.AW.: Electrification of rural communities by grid extension

– AMS‐III.BB: Electrification of communities through grid extension or construction of new mini‐grids

– Concept of suppressed demand 

Suppressed Demand

Suppressed demand concept has considered in new methodologies and emission factors are 

– 6.8 tCO2e / MWh for first 0.0550 MWh

– 1.3 tCO2e / MWh for 0.055 to 0.250 MWh

– 1.0 tCO2e / MWh for 0.250 to 0.500 MWh

For all values above project having greater than 0.5 MWh, a default value of 1.00 will be used. 

Thus, project design and presentation can help in optimizing the CDM benefits

Page 12: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

Way Forward and Lesson Learnt • Asia alone has 675 million people without electricity. 

Highest electrification requirement is in Myanmar, East Timor, Bangladesh, India, Cambodia, Lao PDR, Solomon Islands…

• Expansion project boundaries in case of advanced PoAs –LED, water purification, biogas and other RE technologies 

• Newer methodologies may give better emission reduction • Blending of existing rules can help in simplification of the 

CDM process • Appropriate logical explanations of difficulties in CDM 

projects may be resolved by CDM EB by presentations

Support and guidance provided by..

Jiwan Acharya, Anthony Maxwell, VinayDeodhar, Susan Supa, Damien Sonny, Birgit Haberl, Kate Hughes, Alma Canarejo, Anna Cinco

……..

Srikanth Subbarao

Page 13: Session 3 Darshak Mehta - archive.iges.or.jp · 7/18/2012  · Asian Development Bank dmehta@cmp‐adb.org 18 July 2012. The project • ADB was processing Project 41504: Town

And the journey begins…………

From Divune…….