49
September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Embed Size (px)

Citation preview

Page 1: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

September 2015

C3RS User Group

Linda Connell, NASA ASRS & C3RS Program Director

Leslie E. Savoye, NASA C3RS Project Manager (BAH)

Page 2: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Program Overview

Page 3: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Booz AllenProgram ManagerTravis Trotter

IT Manager

Business AnalystElisa Marfise

Expert Analysts

IT Developers

Database Administrator

ASRS Project Manager

Report ProcessingAdministrator

BusinessManager

Technical Editor

Research Coordinator

Graphics Webmaster

IT Sys Admin

Organization and Roles

Ernest Montgomery

NASA ASRSProgram DirectorLinda Connell

Legend

C3RS Dedicated Staff

ASRS Dedicated Staff

Shared Resources

NASA Funded

Administrative Professional

Gary Hopson

Frank Simmer

Larry Valenzin

Ben Burns

Keith May

Report ProcessingAdministrator Yeraldin Sierra

C3RSProject ManagerLeslie Savoye

Michael Ballard

Page 4: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Programmatic Growth

REPORTING VOLUME

Volume is increasing rapidly and new carriers will also increase intake numbers

IT ENHANCEMENTS

Enhancements, such as specific report forms for

crafts and PRT web portal, Analyst

Workbench, and database development

EXPANSION

More rail carriers and crafts are on the horizon with advocacy from highest levels of FRA and industry.

Additional products such as newsletter, special studies, and alerts

Page 5: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

2010

2011

2012

2013

2014

2015

Interagency Agreement Signed Carrier 3

Carrier 1

Carrier 4

Carrier 5

Rail Carrier Timeline

Carrier 6Carrier 7

Carrier 2

Page 6: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

NASA’s C3RS Role Defined

Intergovernmental Partnership• Interagency Agreement between FRA and NASA

– Utilize NASA’s knowledge and experience To maximize the underlying trust of people working in rail industry to

report safety events Confidentiality, and ultimately anonymity, will result in improved

reporting Provide external and independent reporting avenue

Public/Private Partnership• IMOU between FRA and Carriers

– NASA shall act as owner of the data reported by employees– NASA shall protect the confidentiality of this information through

its own governance– NASA will de-identify data so that employee’s identity, any third

party reference, can no longer be determined through direct or indirect means.

Page 7: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Governing Documents and Data Protections

Page 8: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

What is Confidential Data Protection?

• Promises of “confidentiality” are taken seriously in reporting systems

• Protections need to manage access through two potential paths:– Freedom of Information Act (FOIA)– Legal Discovery/Subpoena

Page 9: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Personally Identified Information (PII) Not Available for

Release Under Penalty of Law

• Privacy Act (PA), 5 USC 552a• NASA Human Experimental and Research Data and

System of Records (NASA 10HERD and SORN)• As required by law, NASA must respond to the

Freedom of Information Act (FOIA), 5 USC 552, - UNLESS the data falls within one or more of nine exemptions. 

Exemption 6, the privacy exemption, would cover the data on individuals.

- Other exemptions can be considered in relation to each specific request

Federal Government and NASA Confidentiality Statutes

No Breach of Confidentiality has occurred in39 year history of ASRS and over 1.2M reports

Page 10: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

(i)(1) Criminal penalties Any officer or employee of an agency, who by virtue of his employment or official position, has possession of, or access to, agency records which contain individually identifiable information the disclosure of which is prohibited by this section or by rules or regulations established thereunder, and who knowing that disclosure of the specific material is so prohibited, willfully discloses the material in any manner to any person or agency not entitled to receive it, shall be guilty of a misdemeanor and fined . . . .

THE PRIVACY ACT OF 19745 U.S.C. § 552a

Page 11: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

De-identification Occurs Rapidly to Protect Data

• All reports read and reviewed by rail expert analyst(s).

• Reports de-identified for direct and indirect information

related to person who submitted report

• Reports de-identified concerning third-party references

(e.g. company, names, numbers etc.)

• De-identified reports are captured in on-site, restricted

database

• De-identified reports are shared with company PRT’s

following telephone callback by C3RS Analyst or time limit

for return phone call expires

De-Identification Protections

Page 12: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Physical Protections

• NASA ASRS and C3RS office is located in a secure, coded-access facility

• All electronic reports are encrypted and received through secure IT process

• All paper reports stored in locked file cabinets with strict access procedures enforced

• Original reports are not retained after safety information has been captured

• All staff work under signed Non-Disclosure Agreements

Page 13: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Aviation Safety Reporting System 13Aviation Safety Reporting System

13

KoreaKAIRS (2000)

United StatesASRS (1976)

United KingdomCHIRP (1982)

CanadaCASRP (1985)SECURITAS (1995)

AustraliaCAIR (1988)REPCON (2007)

RussiaVASRP

BrazilRCSV (1997)

JapanASI-NET (1999)

TaiwanTACARE (2000)

SingaporeSINCAIR (2004)

FranceREC (2000)REX (2011)

ChinaSCASS (2004)

New ZealandICARUS

South AfricaCAHRS (2013)

GermanyEUCARE

ASRS Model Applied to International Aviation Community

International Confidential Aviation Safety Systems (ICASS)

SpainSNS/SRS (2007)

Page 14: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Processing

Page 15: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

• Since the Go Live Date of February 1,

2011 the total number of NASA C3RS

reports received is:

Report Intake

2097*

*As of August 31, 2015

Page 16: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Year over Year Volume Comparison

*Report Intake for 2015 thru August 31, 2015.

Page 17: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

NASA C3RS Report Process

Page 18: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

How to Submit a Report –NASA C3RS Website

http://c3rs.arc.nasa.gov

Page 19: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

How to Submit a Report –NASA C3RS Website

EngineeringMechanicalTransportation

Page 20: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

How to Submit a Report to NASA

1. Submit report form on C3RS website (secure transmission)

or

2. Fill out form on C3RS website, print and mail to NASA

or

3. Locate form at designated carrier locations, Fill out and mail Paper Form (postage free)

EngineeringMechanicalTransportation

Page 21: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

NASA C3RS ERS

As of August 31, 2015

78% of reports have been received through Electronic Report Submission (ERS)

In August 2015, 93% of reports were ERS

http://c3rs.arc.nasa.gov

Page 22: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Processing

Page 23: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Process - Multiple Reports

Single Reporters Multiple Reporters

89% 11%

Page 24: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Process Monitoring

Page 25: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Process - Callbacks

Callback Success Rate

87%

Page 26: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Report Processing Timeline

Screening Initial Screening and Secondary Screening by 2 Expert Analysts within 3 Working Days from Date of Receipt

Return ID Strips 30 – 90 Working Days from Date of Receipt

Accident / Criminal Reports

Provided to NASA Director

Transfer to PRT Portal

No later than 90 Calendar Days from Date of Receipt

Page 27: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Data Overview

Page 28: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Craft

* Categories are mutually exclusive from 1,475 incidents . Data thru August 31, 2015.

Engineering

Mechanical

Transportation

0 200 400 600 800 1000 1200 1400 1600 1800

6

28

1672

n = 1,706 reports*

Page 29: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Hostler - InsideOn Board Service

TrackmanCDL Vehicle Operator

Hostler - OutsideLaborer

ObserverMachinistForemanCarman

Pipe FitterManager

ElectricianYardmaster

Assistant EngineerOther

BrakemanTrainee

DispatcherAssistant Conductor

ConductorEngineer

0 100 200 300 400 500 600 700 800 900

1111223333491111111622

3783

168573

779

Incident Reporter Distribution

*Reports available in 1,475 records. Data thru August 31, 2015. Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than reporter function.

n = 1,706*

Page 30: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Reporter Location

*Reports available in 1,475 records. Data thru August 31, 2015..Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than reporter location.

Vehicle

On Track Equipment

Other Track

On / Under / Between Motive Power

On / Under / Between Rolling Equipment

Main Track

Shop

Office / Crew Facility

Yard

Yard Control Center

Other

Locomotive - Walkway / Steps

Dispatch Center

Station Platform

Train Car - Vestibule

Train Car - Car

Adjacent To Track / On Ground

Locomotive - Cab

0 100 200 300 400 500 600 700 800 900 1000

1

1

2

3

4

6

12

15

34

41

60

67

76

108

145

256

261

858

n = 1,706*

Page 31: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Other Track

Non - Controlled Siding

Controlled Siding

Road Crossing

Shop

Repair Facility

Adjacent To Track

Other

Passenger Station

Main Track

Yard

0 100 200 300 400 500 600 700

1

1

3

3

7

7

8

26

244

639

650

Train Location

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than train location. Data thru August 31, 2015.

n=1.475 incidents*

Page 32: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Missed Station Stop

Near Collision

Maintenance / Repair Action

Equipment Derailment

Regained Train Control

Equipment Problem Dissipated / Resolved

Requested Additional Authority

Cancelled / Delayed

Initiated Emergency Brakes

Overcame Equipment Problem

Unknown

Run Through Switch

Other

Requested Assistance / Clarification

Slowing Of Train / Equipment

Damage To Equipment / Facility

No Action Taken

Stopped Train / Equipment

Returned To Compliance

0 50 100 150 200 250 300 350 400

20

32

34

36

37

39

43

53

54

55

96

113

111

148

202

207

234

308

369

Event Outcome

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than one event outcome/result. Data thru August 31, 2015.

n=1475 incidents*

Page 33: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Contributing Factors

n=1475 incidents*

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than one anomaly. Data thru August 31, 2015.

Page 34: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Human Factors

Physiological - Other

Physical Limitation

Troubleshooting

Fatigue

Human - Machine Interface

Workload

Time Pressure

Training / Qualification

Confusion

Distraction

Communication Breakdown

Situational Awareness

0 200 400 600 800 1000 1200 1400

11

13

39

60

65

153

200

270

329

441

771

1281

n=1402*

*Reporter Human Factor counts are for all persons in a report record. Data thru August 31, 2015. Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than reporter human factor.

Page 35: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Procedural Deviation

Operating Cab / Car Event

Track Authority Violation

Track And Structures Problem

Signal Events

Braking Event

On Track Protection Deviation

Mechanical Problem

Speed Deviation

Encounter

0 500 1000 1500 2000 2500

1956

27

110

118

121

161

162

177

594

736

Top 10 Event Counts

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than one anomaly. Data thru August 31, 2015.

n=1475 incidents*

Page 36: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Equipment Based Speed Restriction

Maximum Authorized Speed

At Or Above 10MPH Deviation

Temporary Speed Restriction

0 50 100 150 200 250

29

134

202

229

Speed Deviation Counts

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than one anomaly. Data thru August 31, 2015.

n=594*

Page 37: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

C3RS Initial Analysis - Over Speed

Page 38: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Procedural Deviation

Operating Cab / Car Event

Track Authority Violation

Track And Structures Problem

Signal Events

Braking Event

On Track Protection Deviation

Mechanical Problem

Speed Deviation

Encounter

0 500 1000 1500 2000 2500

1956

27

110

118

121

161

162

177

594

736

Top 10 Event Counts

*Categories are not mutually exclusive. Therefore, a single incident may be coded by C3RS analysts as involving more than one anomaly. Data thru August 31, 2015.

n=1475*

Page 39: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Filename/RPS Number

Key data fields have been selected for the data analysis

• There are over 400 fields of data collected with each over speed report• The analysis is focused on specific fields based on our understanding of

strong factorsDATA GROUPS• Time of Day• Environment (14 types)• Train track authority (dispatcher, etc.)• Communications (radio, signals, etc.)• Operating Rules (GCOR, NORAC, etc.)• Track configuration (single, multiple)• Train Rules / Train Type• Train Speed Restrictions (5 types)• Train Activity• Person Location / Organization / Shift / Craft / Function

/ Qualification / Certification / Experience• Safety Briefings• Human Factors (13 types)• Events Anomaly (43 types)• Events Detector (13 types)• Passengers involved (Yes/No)• Event Results (40 types)• Contributing Factors (21 types with multi-values)• Primary Problem (21 types)

• Time of Day• Environment (14 types)• Person - Shift Duration• Person - Years of Experience (Total and In Craft)• Train Speed Restrictions (5 types)• Events Anomaly (43 types w/ 4 Speed Deviations)• Human Factors (13 types)• Event Results (40 types)• Events Detector (13 types)

Page 40: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Speed Deviations

Independent OccurrencesSpeed Deviation: At Or Above

10MPH DeviationSpeed Deviation: Equipment

Based Speed RestrictionSpeed Deviation: Maximum

Authorized SpeedSpeed Deviation: Temporary

Speed Restriction

159 27 109 16054% 9% 37% 54%

Overall OccurrencesType Speed Deviation: At Or Above

10MPH DeviationSpeed Deviation: Equipment

Based Speed RestrictionSpeed Deviation: Maximum

Authorized SpeedSpeed Deviation: Temporary

Speed Restriction Count %

2 Combo Yes Yes 92 31%Single Yes 63 21%Single Yes 61 21%

2 Combo Yes Yes 37 13%2 Combo Yes Yes 12 4%

Single Yes 11 4%Single Yes 9 3%

3 Combo Yes Yes Yes 4 1%3 Combo Yes Yes Yes 3 1%2 Combo Yes Yes 2 1%2 Combo Yes Yes 2 1%2 Combo Yes Yes 0 0%3 Combo Yes Yes Yes 0 0%3 Combo Yes Yes Yes 0 0%4 Combo Yes Yes Yes Yes 0 0%

Total 296 100%

Page 41: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Speed Deviation – Time of Day

n=296

Independent Occurrences Time of Day Count % 0001-0600 0601-1200 1201-1800 1801-2400 Unknown

Speed Deviation: At Or Above 10MPH Deviation 159 54% 16 50 38 48 7

Speed Deviation: Equipment Based Speed Restriction 27 9% 3 8 5 11 0

Speed Deviation: Maximum Authorized Speed 109 37% 11 34 33 28 3

Speed Deviation: Temporary Speed Restriction 160 54% 10 63 44 33 10

40 155 120 120 20

9% 34% 26% 26% 4%

Page 42: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Speed – Weather Conditions

Weather Condition

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230Distinct count of ACN (Speed Deviation Spreadsheet)

Clear

Rain

Fog

Other

Null

Snow

Ice

Wind

Haze / Smoke

Thunderstorm / Lightning

Extreme Temperature

Occurence of Weather

Distinct count of ACN (Speed Deviation Spreadsheet) for each Weather Condition.

A strong majority (~65%) of incidents occurred under clear weather conditions

n=296

Page 43: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Speed – Human Factors

The top 4 Human Factors make up 77% of all reported contributing Human Factors (more than 1 may apply to each incident)

Human Factor Detail

0 20 40 60 80 100 120 140 160 180 200 220 240 260Distinct count of ACN (Speed Deviation Spreadsheet)

Situational Awareness

Distraction

Communication Breakdown

Confusion

Training / Qualification

Workload

Time Pressure

Fatigue

Troubleshooting

Human - Machine Interface

Null

Physiological - Other

Physical Limitation

Other / Unknown

Occurence of Human Factors

Distinct count of ACN (Speed Deviation Spreadsheet) for each Human Factor Detail.

n=296

Page 44: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

PRT Interaction

Page 45: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

PRT/NASA Synergy

• Data Access Through Portal– Continuous Coordination

• Telecons– Proposal for Scheduled Check-ins on

Quarterly Basis with Each PRT

• Feedback– Integration of PRT Feedback in Report

Processing

Page 46: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Future Developments

• Newsletter– First Draft Issue Under Review and Naming

• Search Request of Database– Initially Direct Request to C3RS Office– Planning for Password Protected Search

Capabilities

• Alert Messages and Scheduled Telecons– TBD

• Special Studies & Data Analyses

Page 47: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

DRAFT Newsletter

Page 48: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Potential Newsletter Names

• Track Bulletin• Highball• The Line Up• Clear Block• First Out• Lantern• Signal• Timetable• Milepost

• Job Briefing• Train Orders• Synergy Daily• Journal• Points• All-Points Bulletin• Hot Journal• Inside the Rail• From the Cab

Page 49: September 2015 C 3 RS User Group Linda Connell, NASA ASRS & C 3 RS Program Director Leslie E. Savoye, NASA C 3 RS Project Manager (BAH)

Questions?

Linda Connell, NASA

ASRS/C3RS Program Director

(408) 541-2827

[email protected]

Leslie Savoye, Booz Allen Hamilton

C3RS Project Manager

(408) 541-2829

[email protected]

Travis Trotter, Booz Allen Hamilton

ASRS/C3RS Program Manager

(408) 541- 2815

[email protected]