Upload
evita
View
31
Download
3
Tags:
Embed Size (px)
DESCRIPTION
The renovation of the street lighting systems in Navarre. XIII European Symposium for the Protection of the Night Sky. www.navarra.es. September 2013. Índice. 1. Legal framework 2. Effects of lighting systems 3. Actions by the Administration of Navarre. 1. Legal framework. - PowerPoint PPT Presentation
Citation preview
September 2013
www.navarra.es
The renovation of The renovation of the street lighting the street lighting
systems in Navarresystems in Navarre
XIII European Symposium for the Protection of the Night Sky
1. Legal framework
2. Effects of lighting systems
3. Actions by the Administration of Navarre
Índice
• Royal Decree 1890/2008, of November 14th, approving the Regulations of energy efficiency in public ligthing systems and its complementary technical instructions EA-01 a EA-07.
• Royal Decree 842/2002, of August 2nd, approving the Regulations for low voltage electric systems.
1. Legal framework
• Navarre Law 10/2005, of November 9th, regulating lighting systems por night environment protection.
• Navarre Decree 199/2007, of September 17th, approving regulations in accordance to Navarre Law 10/2005.
Public lighting = lighting of public areas and ways with the objective of providing adequate visibility for normal activities.
Cizur Mayor. A-12 high speed way Pamplona-Estella-Logroño. www.celfosc.org
1. Legal framework
2. Effects of lighting systems
EFFECTS OF LIGHTING SYSTEMS
EFFECTS ON THE
ECONOMY
EFFECTOS ON THE
ENVIRONMENT
2. Effects of lighting on the environment
Light pollution
CO2 emissions
Energy consumption in Administration and public services in Navarre 1991-2011 (TOE)
2. Effects of lighting on the economy
ADMIN. AND PUBLIC SERVICES
COAL
PETROL PRODUCTS
NATURAL GAS
ELECTRICITY
BIOMASS
SOLAR THERMAL
Energy expense in Navarra in 2009, 2010 y 2011 (thousands of euros)
2. Effects of lighting on the economy
2. Effects of lighting on the economy
(save energy)
2. Effects of lighting on the economy
2. Effects of lighting on the economy
Promenade close to the train station. Before the crisis, both rows of lights were on. As a result of the crisis, only one row is used.
Promenade close to the Pamplona road ring. Before the crisis, all lights were on. As a result of the crisis,
only one out of two are used.
Regional Ministry of Local Administration:
Objective: Promote and develop actions in Municipalities by means of triennial plans.
Subsidized actions: not only public lighting but also other public services related to water, waste management, etc.
Criteria: state of the current lighting system and economic return of the action.
3. Actions by the Administration of Navarre
Regional Ministry of Environment:Objective: Promote and develop actions in
Municipalities members of the Network of local sustainable Municipalities
Subsidized actions: public lighting, RES installation, Municipal buildings refurbishment, rural paths...
Criteria : Type of action, budget, documentations submitted and other criteria.
3. Actions by the Administration of Navarre
Regional Ministry of Industry:Objective: Promote renovation of public lighting
systems by the Municipalities with energy efficiency criteria.
Subsidized actionsEnergy audits of existing lighting systemsRenovation of existing lighting systems with energy
efficiency criteriaCriteria:
There has been an evolution from 2006 to 2012
3. Actions by the Administration of Navarre
Regional Ministry of Industry:Criteria:2006-2008: No previous energy audit needed. No specific
technology required.2009: No previous energy audit needed. Renovation by
changing to LED required.2010: No previous energy audit needed. Renovation by
changing to LED required or lighting flux regulation systems required.
Staff from the Regional Ministry of Industry meets “Cel fosc” and starts a collaboration period with this association and some independent consultants in lighting systems. All of them work for free, just looking for a better job.
2011: Previous energy audit compulsory. Renovation must follow energy audit recommendations. In addition, the existing installation must be 20 year-old, renovated installation must have “A” energy efficiency label and minimum light pollution.
3. Actions by the Administration of Navarre
Regional Ministry of Industry:Other actions:
2012: Study of LED installations in Navarre.Special action for very small municipalities (less
than 200 inhabitants)The Regional Ministry pays an independent
lighting audit for 173 small municipalities in order they can later take measures to improve an save energy.
2012: Handbook on efficient management of public lighting systems.
3. Actions by the Administration of Navarre
Public subsidy(euros)
Investment (euros)
Savings(MWh/año) Number of subsidies
2006 88.953,00 340.738,01 400,00 9 (2 auditorias y 7 inv.)
2007 89.311,40 140.317,49 453,0013 (6 auditorias y 7
inv.)
2008 402.374,33 1.727.489,94 5.304,0031 (3 auditorias y 28
inv.)
2009 368.865,26 1.281.240,87 601,0018 (5 auditorias y 13
inv.)
2010 448.823,61 1.433.726,71 1.137,0042 (9 auditorias y 33
inversiones)
2011 510.625,13 983.270,78 1.003,00
42 (32 auditorias y 14 inv. EELL> 200;
173 auditorias (180.000€) en
EELL< 200)
Summary of subsidies given by the Regional Ministry of Industry
3. Actions by the Administration of Navarre
Thank you for your attentionThank you for your attention
www.navarra.eswww.navarra.es