Upload
casey-smith
View
214
Download
0
Tags:
Embed Size (px)
DESCRIPTION
a few examples of my undergraduate and professional work
Citation preview
table of contents
A New Face in Montgomery5th Year Thesis
Meditation and Bath House4th Year
Pencil Drawing
Dudley Hall RenovationSNA
Lowder Building RenovationSNA
1
2
3
sec
tio
n o
ne
//
un
de
rgra
du
ate
se
cti
on
tw
o /
/ p
rofe
ssio
na
l / p
ers
on
al
meditation and bath house // 4th year
Individual Meditation Room
Site Diagram Concept Study
Individual Bath
Meditation and Bath House4th Year
meditation and bath house // 4th year
South Elevation
South Section
Path From Pool to Meditation Room
meditation and bath house // 4th year
Detailed North Section
Detailed West Section
Model East Elevation
dudley hall renovation // sna
Main Entrance SignageSection Model at Curtain Wall System
Dudley Hall RenovationSNA
2
STACYNORMANARCHITECTSLLC
FOOTING WALL DETAILScale: 3/4" = 1'-0"
GROUND FLOOR
1'-8
"4"
8"
6" 2'6"
1'-0
"3'-2"(VARIES)
1'-8
" LA
P M
IN
4"
1/2" JOINT FILLERWITH JOINT SEALER
SUB-LEVEL FLOOR
8" CONCRETE BLOCKBEARING WALL
#4 AT 4'-0"2-#5 CONTINUOUS
12" CONCRETE BLOCK BEARING WALL
#8 DOWELS AT 16"
1'-8
"LA
P M
IN
#8 AT 16" VERTICAL EACH FACEFILL CELLS OF BLOCK WITH CONCRETE TO FOUNDATION
5X3X1/4 ANDGLE CONTINUOUS WITH 3/4" DIAMETER 8" BOLTS AT 2'-0"
#3 AT 16" VERTICAL
NEW 4" BLOCK
MORTAR NET
STACYNORMANARCHITECTSLLCJULY 8, 2010
BRICK ANGLE DETAILScale: 3" = 1'-0"
8" M
IN
SHELF ANGLE TO BE S.S. 6"X6"X1/2"
1" RIGID INSULATION
1" AIR SPACE
2" BACK DAM, 24 GA. S.S. FLASHING
MORTAR NET
SEALANT - DOW 795 OR EQUAL
TERM BAR - SEAL FASTEN AT 16" O.C. - LAP W/ TROWEL GRADE DAMPPROOFING
DAMPPROOFING
3/4"
- 1"
2"
CELL VENT WEEPS AT 24" O.C.
2 5/8"
Design Development Details
lowder building renovation // sna
The Dudley Hall renovation rethought
the existing glazing and main entrance, while
replacing the existing brick facade. To bring
more natural light into the studios the existing
punched openings were replaced with a
curtain wall and louver system. Shown at right
is an idea of denoting the main entrance with
a metal mesh signage.
METAL FLASHING
SEALANT AND BACKER ROD
RIGID INSULATION
LIQUID APPLIED WATER BARRIER
1 5/8" AIR SPACE
NEW BRICK
CONCRETE BLOCK
RIGID INSULATIONSTONE AND STUCCO DRAINBY MORTAR NET
BRICK
MULLION
SEALANTBACKER ROD
LIQUID APPLIED WATER BARRIER
Design Development Details
SNA3
The Lowder Building renovation
rethought the existing glazing and
replacement of the existing brick facade. This
was my fi rst project to use Revit Architecture,
which was used to create the shown
rendering. This view shows the front North
facing facade.
Auburn University
College of Architecture, Design, and Construction
Bachelor of Architecture
Snead State Community College
Academic Scholarship / Dean’s List
Auburn University_Rural Studio
Michelle’s House
featured in American Public Media’s
“Speaking of Faith: an Architecture of Decency”
Stacy Norman Architects, LLC_Intern Architect
schematics - construction documents
institutional / commercial / residential
Auburn, AL
David P. King Architect_Intern Architect
schematics - construction documents
medical / commercial / residential
Ocala, FL
English Language Institute in China_English Teacher
Summer camp for high school aged students
Hong Kong, China
AIAS South Quad Conference_Director
semiannual event hosted at Rural Studio
20 student volunteers and 60 participants
AIAS member
Trustee Scholarship
CSI Scholarship
Auburn Circle
Published photography
Hand Drafting / Sketching / Rendering / Model Building Vectorworks / Auto CAD / Revit / SketchUp / PodiumPhotoshop / Illustrator / InDesignRHINOceros / GrasshopperCarpentry / Electrical Wiring / Plumbing
[ References available upon request ]
2005 - 2009
2004 - 2005
Spring 2006
June 2009 - Sept 2011
Summer 2008
Summer 2007
Spring 2007
2005 - 2009
2005 - 2007
Spring 2007
Fall 2007
Profi cient
Knowledgeable
Casey Danielle Smith
ed
uca
tio
n
exp
eri
en
cea
cti
vit
ies/
ho
no
rssk
ills
3113 Woodley Terrace Montgomery, Alabama 36106
[email protected] // 256. 572. 8671