33
Drawing Design Copyright 2018 FUJITSU GENERAL LIMITED 1 Drawing Design Drawing Design screen (Drawing base) Select “Drawing Design”

Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Drawing Design

Copyright 2018 FUJITSU GENERAL LIMITED1

Drawing Design

Drawing Design screen (Drawing base)

Select “Drawing Design”

Page 2: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout

Copyright 2018 FUJITSU GENERAL LIMITED2

Drawing Design

Layout screen (Disposition)

Select “Layout”

Page 3: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

DisplayRefer to “Display”

Tool menu

Copyright 2018 FUJITSU GENERAL LIMITED3

Drawing DesignFile

: Go to menu screen

Help

: Display Manual

Preference

: Refer to “Preference“

Page 4: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Preference

Copyright 2018 FUJITSU GENERAL LIMITED4

Drawing Design

FloorSets the initial value of the floor

GridUse : Grid usage settingWidth : Set the width of the grid

New project picture settingNew project import picture setting

Picture size setting : Set capture size of picturePicture orientation : Set the orientation of picturePicture resolution setting : Set picture resolution

Fine : Capture with resolution equivalent to 300 dpiNormal : Capture with resolution equivalent to 200dpiBasic : Capture with resolution equivalent to 96dpi* Picture resolution setting is no change,

when picture resolution or less

Page 5: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

RefrigerantDisplay list of wiring terminal

Optional partsDisplay list of Pipe and Branch and RB Unit Models

RefrigerantDisplay list of refrigerant equipment

Display

Copyright 2018 FUJITSU GENERAL LIMITED5

Drawing Design

Display category screenDisplay category screenThe selected screen is overlaid and displayed

NavigationDisplay Navigation screen

Page 6: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Delete unitDelete the selected unit

Layout-Disposition(1/2)

Copyright 2018 FUJITSU GENERAL LIMITED6

Drawing DesignFunction switching(refer to function)Disposition : Refrigerant arrangementPiping : Piping settingWiring(Transmission): Wiring settingWiring(Power) : Power supply setting

Model Info Displays unit information

Refrigerant listRefrigerants selected by Design simulator is displayed

Select refrigerantDetails of the refrigerant selected in the Refrigerant list are displayed

VRF network systemMulti and Sprit not connected to VRF network system is displayed in "Others"

Page 7: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout-Disposition(2/2)

Copyright 2018 FUJITSU GENERAL LIMITED7

Drawing Design

ClearRefer to “Clear”

CheckRefer to “Check”

ScaleRefer to “Scale setting”

Quit operationQuit current operation

Page 8: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Clear

Copyright 2018 FUJITSU GENERAL LIMITED8

Drawing Design

1)Press Clear button2)Check the All or Selected refrigerant3)Check the device or unit to be deleted4)Press Clear

Page 9: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Scale setting

Copyright 2018 FUJITSU GENERAL LIMITED9

Drawing Design

1)Select ScaleNot selected scale

Selected scale

2)Left-click at starting point3)Left-click at end point4)Input the scale5)Press Tab key6)Press Set

*If stop drawing ,Press the Esc button

1)

2) 3)

How to scale setting

4)

6)

Page 10: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Disposition

Copyright 2018 FUJITSU GENERAL LIMITED10

Drawing DesignHow to arrangement units

1)Select VRF Network System

2)Select refrigerant3)Select Unit4)Drag & Drop On Work area

Unplaced is orange, and already arranged is light blue

1)

2)

3)

4)

Page 11: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Disposition(Outdoor)

Copyright 2018 FUJITSU GENERAL LIMITED11

Drawing DesignHow to arrangement units(Combination)

1)2)

1)Select refrigerant

2) Drag & Drop on work areaWhen master or Slave units are Drag & Drop on work area ,master and slave unit only arrange

1)Select refrigerant

2) Drag & Drop on work areaWhen Refrigerant are Drag & Drop on work area ,master and slave units are arrange

1) 2)

How to arrangement units(Single unit)

Page 12: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Disposition(Indoor , RB Unit , Other)

Copyright 2018 FUJITSU GENERAL LIMITED12

Drawing DesignHow to arrangement units

1)Select refrigerant

2)Drag & Drop on work areaWhen RB unit are Drag & Drop on work area , RB unit and indoor unit arrange

1)2)

1)

1)Select refrigerant

2) Drag & Drop on work area

2)

Page 13: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Rotation1)Right-click at Menu and Select Rotation2)Unit to Rotate 90 degrees to the right

Right-click menu(1/5)

Copyright 2018 FUJITSU GENERAL LIMITED13

Drawing designMove(1/2)1)Right-click at Menu and Select Move2)Drag to end point3)Left-click at end point

Resize(Outdoor,Indoor)1)Right-click at Menu and Select Resize2)Mouse cursor on any of the four corners of the Unit3)Drag the mouse to the size to change4) Left-click at Work area

1) 2) 3)

Move(2/2)1)Left-click Unit2)Drag to end point3)Left-click at end point

1) 2) 3)

1) 2) 3) 4)

1) 2)

Page 14: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Right-click menu(1/2)

Copyright 2018 FUJITSU GENERAL LIMITED14

Drawing designDelete1)Right-click at Menu and Select Delete2)Confirmation dialog is displayed 2-1)Click OK to delete the unit2-2)Click Cancel to cancel the deletion

1) 2-1) 2-2)

Page 15: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Reference : Right click menu(Move)

Copyright 2018 FUJITSU GENERAL LIMITED15

Drawing DesignHow to Move

*If stop Move ,Press the Esc Key or Quit operation

1)Select Move2)Drag to end point3)Left-click at end point

1)2) 3)

Page 16: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout-Piping(1/2)

Copyright 2018 FUJITSU GENERAL LIMITED16

Drawing design

Display setting Model Info: Show unit’s information

CheckRefer to “Check”

Pipe lineDraw pipe : Refer to “Draw Pipe-Auto” , “Draw

Pipe -Manual”Delete pipe : Delete the selected pipe

ClearRefer to “Clear”

ScaleRefer to “Scale setting“

DS PipingShow DS piping screen

Quit operationQuit current operation

Function switching(refer to function)Disposition : Refrigerant arrangementPiping : Piping settingWiring(Transmission): Wiring settingWiring(Power) : Power supply setting

Page 17: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout-Piping(2/2)

Copyright 2018 FUJITSU GENERAL LIMITED17

Drawing design

Refrigerant listRefer to “Draw Pipe -Auto”,”Draw Pipe -Manual”

Tool boxBranch For 2Pipes, Branch For 3PipesHeader 2-6Pipe,2-8Pipe,3-6Pipe,3-8Pipe PS EPS, Pressure sensor kit :Refer to “Draw Pipe -Auto”,”Draw Pipe -Manual”*PS : Pipe SpaceEPS : Electric Pipe Space

Zoom to: Zoom up: Zoom down: Select zoom: Full picture display

RedrawRedraw: Draw the displayed picture again

Page 18: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Pipe -Auto

Copyright 2018 FUJITSU GENERAL LIMITED18

Drawing designHow to draw a pipe automatically

1)Select refrigerant

2)Select a part3)Left-Click on work area for part disposition4)Press Draw Pipe Not selected Draw Pipe Selected Draw Pipe

5)Left-Click on the unit6)Double-Click on the another unitThe case of 2-6Multi split, when drawing a pipe, wiring(transmission) line is drawn automatically

1)

2)

3)

4)

5),6)

6)5)

6)

Page 19: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Pipe -Manual

Copyright 2018 FUJITSU GENERAL LIMITED19

Drawing designHow to draw a pipe manually

1)Select refrigerant

2)Select parts3)Left-Click on work area4)Press Draw Pipe Not selected Draw Pipe Selected Draw Pipe

5)Left-Click on the unit6)Left-Click on the work area7)Double-Click on the another unitThe case of 2-6Multi split, when drawing a pipe, wiring(transimission) line is drawn automatically

1)

2)

3)

4)

5)-7)

5) 6) 7)

Page 20: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Change Pipe length

Copyright 2018 FUJITSU GENERAL LIMITED20

Drawing designHow to change pipe length

1)Double-Click on start point or

end point of pipe line

2)Input length, press Set

1)8.7m 8.7m 6.0m

2)

1),2)

Page 21: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Check(1/2)

Copyright 2018 FUJITSU GENERAL LIMITED21

Drawing design

1)Press Check

2)Press Report

Each check items and results are shown.Check items are depending on the type of refrigerant

1)

3)

2)

Page 22: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Check(2/2)

Copyright 2018 FUJITSU GENERAL LIMITED22

Drawing design

Show all unit’s modelsAfter showing check reports, all unit’s models and pipe sizes are shown as symbol

*"Display -Optional parts“ in tool menu shows all symbols detail

Page 23: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout-Wiring(Transmission) (1/2)

Copyright 2018 FUJITSU GENERAL LIMITED23

Drawing Design

DS WiringOpen “DS Wiring display”

CheckRefer to “Check”

ClearRefer to “ Clear“

Quit operationQuit current operation is terminated.

Wire lineDraw wire : Refer to “Draw Transmission Wire-Auto”

& “Draw Transmission Wire-Manual”Refer to “Draw Master-Slave Outdoor units Wire-Auto” & “Draw Master-Slave Outdoor units Wire-Manual”

Delete wire : Delete the selected pipe

Display setting Model Info: Show unit’s information

ScaleRefer to “Scale setting“

Page 24: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Layout-Wiring(Transmission) (2/2)

Copyright 2018 FUJITSU GENERAL LIMITED24

Drawing design

Refrigerant listRefer to “Transmission wire-Auto”,” Draw Transmission wire- Manual”

Tool boxPS,EPS:Refer to “PS,EPS”*PS : Pipe SpaceEPS : Electric Pipe Space

Zoom to: Zoom up: Zoom down: Select zoom: Full picture display

RedrawRedraw: Draw the displayed picture again

Page 25: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Controller List

Copyright 2018 FUJITSU GENERAL LIMITED25

Drawing DesignHow to Controller object – Drag and Drop

1)2)

1)Select Controller.

2)Drag and drop for part disposition.

Page 26: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Transmission wire-Auto

Copyright 2018 FUJITSU GENERAL LIMITED26

Drawing Design

2) 3)

1) Press “Draw Transmission wire.”

Not selected Line

Selected Line

2) Left-Click on the unit Terminal

3)Left-double Click at Outdoor unit Terminal.

The case of 2-6Multi split, when drawing wirings,

Piping line is drawn automatically

1)

Show all unit Terminal

*“Display – Explanatory notes“ in tool menu shows all terminal detail

Page 27: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Transmission wire- Manual

Copyright 2018 FUJITSU GENERAL LIMITED27

Drawing Design

1)

2) 2)

1)Press “Draw Transmission wire.”

Not selected Line

Selected Line

2)Left-Click at Outdoor unit Terminal

Left-click at second point

Repeat

3) Left-double Click at Terminal end pointThe case of 2-6Multi split, when drawing wirings,

Piping line is drawn automatically

2) 3)

Page 28: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Master-Slave Outdoor units Wire-Auto

Copyright 2018 FUJITSU GENERAL LIMITED28

Drawing Design

1) Press “Draw Master-Slave Outdoor units Wire.”

Not selected Line

Selected Line

2)Left-Click at Master Outdoor unit Terminal.

Left-click at second point

Repeat

3) Left-double Click at Slave Outdoor unit Terminal.

1)

2) 2) 2) 3)

Master SlaveMaster Slave

Page 29: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw Master-Slave Outdoor units Wire-Manual

Copyright 2018 FUJITSU GENERAL LIMITED29

Drawing Design

1) Press “Draw Master-Slave Outdoor units Wire.”

Not selected Line

Selected Line

2)Left-Click at Master Outdoor unit Terminal.

Left-click at second point

Repeat

3) Left-double Click at Slave Outdoor unit Terminal.It is possible to connect different refrigerant systems in the same way

Master Slave

1)

2) 3)

Page 30: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Draw different refrigerant circuit Wire-Manual

Copyright 2018 FUJITSU GENERAL LIMITED30

Drawing Design

1) Press “Draw Master-Slave Outdoor units Wire.”

Not selected Line

Selected Line

2)Left-Click at Outdoor unit Terminal.

Left-click at second point

Repeat

3) Left-double Click at Slave Outdoor unit Terminal.

1)

2) 3)2) 2)

Page 31: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

1)Press PS,EPS.Not selected PS,EPS

Selected Line PS,EPS

2)Left-Click on work area for part disposition.

3) Press Draw Transmission Wire

Not selected Line

Selected Line

4)Left-Click on the unit

5) Left-click at second point

Repeat

6) Left-double Click at Terminal end point.

PS:Pipe Space

EPS:Electric Pipe Space

PS,EPS

Copyright 2018 FUJITSU GENERAL LIMITED31

Drawing DesignHow to Wiring PS,EPS

1)

2)

3)

4) 5) 6)

Page 32: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

Change wire length

Copyright 2018 FUJITSU GENERAL LIMITED32

Drawing designHow to change wire length

1)Double-Click on start point or

end point of pipe line

2)Input length, press Set

Page 33: Drawing Design - Fujitsu...1)Select VRF Network System 2)Select refrigerant 3)Select Unit 4)Drag & Drop On Work area

RC Group

Copyright 2018 FUJITSU GENERAL LIMITED33

Drawing design

When creating RC Group , terminals are displayed under the indoor unit.

RC Group Terminal name:Series + Outdoor Index + RC Gr. No

Series :V:VRF, F:8RoomMulti, M:2-6Multi split, S:Single split

Outdoor Index: 1-100RC Gr. No : 1-64

Single RC terminal is not displayed.