SCOA V4 RE-IMPLEMENTATION INTRODUCTION NATIONAL AND PROVINCIAL ROADSHOWS Presenter: SCOA Technical Committee | National Treasury | February - March 2013

SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Embed Size (px)

DESCRIPTION

SCOA V4 RE-IMPLEMENTATION INTRODUCTION. NATIONAL AND PROVINCIAL ROADSHOWS. Presenter: SCOA Technical Committee | National Treasury | February - March 2013. Overview. Objectives set out by the SCOA Technical Committee (i.e. why the change); How these objectives were achieved; - PowerPoint PPT Presentation

Citation preview

Page 1: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

SCOA V4 RE-IMPLEMENTATIONINTRODUCTION

NATIONAL AND PROVINCIAL ROADSHOWS

Presenter: SCOA Technical Committee | National Treasury | February - March 2013

Page 2: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Overview

• Objectives set out by the SCOA Technical Committee

(i.e. why the change);

• How these objectives were achieved;

• Development timeline;

• Summary of the segments;

2

Page 3: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Why the change?

There were a number of user needs that had to be addressed:

– improving the accuracy of allocations across the SCOA segments

thereby eliminating the inconsistent economic classification of

transactions;

– eliminating the duplication of projects in the project segment;

– improving system processing times;

– rationalising the Item segment;

3

1

2

3

4

Page 4: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

How are these objectives achieved?

Improving the accuracy of allocations across the SCOA segments thereby

eliminating the inconsistent economic classification of transactions:

– creation of category links in BAS (i.e. filtering of account views);

– limiting the availability of accounts in BAS to specific departments;

• To build the category links all break down allowed accounts had to be

removed;

4

1

Page 5: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

How are these objectives achieved (cont.)?

Eliminating the duplication of projects in the project segment :

– allow flexibility in creation of projects especially where one project

has a number of sub-projects cutting across different economic

classifications;

• To do this

– all lower levels (e.g. infrastructure & non-infrastructure) had to be

removed;

– an eighth segment was created to carry the detail on infrastructure

and the economic classification indicator Infrastructure Segment;

5

2

Page 6: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

How are these objectives achieved (cont.)?

Improving system processing times :

– deletion of inactive entities (suppliers) and user IDs;

– implementation of new databases for departments;

– updating of departmental parameters and registers;

– cleanup of old debt/suspense accounts;

• To do this requires BAS reimplementation;

6

3

Page 7: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

How are these objectives achieved (cont.)?

Rationalising the item list:

– deletion of unused items (including leger items);

– regrouping of similar items;

– renaming of items;

– aligning to changes in accounting policy and reporting requirements

(e.g. finance leases and inventory);

– creation of items requested by sector departments

(e.g. R&D items, grouping of health facilities, DOD assets);

7

4

Page 8: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Development timeline

• Research and design of proposals by the SCOA Technical Committee

(until end July 2012);

• SCOA Workshop with key stakeholders hosted by NT to discuss

proposals in August 2012;

• Presented inventory / consumable proposals at Asset Management

Workshop hosted by NT in September 2012;

• Final draft SCOA presented at BAS user forum in November 2012;

• Awareness sessions with National and Provincial Departments in

February 2013;

• Go live 1 April 2013;

8

Page 9: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Development timeline

• Research and design of proposals by the SCOA Technical Committee

(until end July 2012);

• SCOA Workshop with key stakeholders hosted by NT to discuss

proposals in August 2012;

• Presented inventory / consumable proposals at Asset Management

Workshop hosted by NT in September 2012;

• Final draft SCOA presented at BAS user forum in November 2012;

• Awareness sessions with National and Provincial Departments in

February 2013;

• Go live 1 April 2013;

9

Page 10: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Development timeline (Cont.)

• Available documentation

– Project summary report with supporting annexures;

– SCOA in excel with item definitions, illustration of category links, and

limitations placed on accounts (i.e. departmental access);

– Updated classification circulars – inventory & consumables, leases;

– Worked examples;

10

Page 11: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

11

•The purpose of infrastructure segment is to identify whether or not a spending item relates to infrastructure and to show the type of infrastructure it relates to.Infrastructure segment

•The purpose of this segment is to record receipt and payment transactions as well as transactions in assets and liabilities. Item segment

•The purpose of this segment is to identify asset classes to which a transaction is allocated when the purpose relates to an asset or the use of an asset. Asset segment

•The purpose of this segment is to identify whether or not a payment is part of a project.Project segment

•The purpose of this segment is to identify the source of funding from which payments are effected, and the nature of receipts.Fund segment

•The purpose of this segment is to identify the programme/activity against which any given transaction should be recorded. The segment reflects a department’s programme and sub-programme structure in as much detail as is required both for reporting and management purposes.

Objective segment

•The purpose of this segment is to identify the cost centre of any given transaction. As the location of cost centres varies across departments, depending on their organisational structure, this segment is not standardised and the departments maintains the segment.

Responsibility segment

•The purpose of this segment is to identify which region benefits from government spending. Regional Identifier segment

Standard Chart of Accounts

Page 12: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

12

Tran

sact

ion

Infrastructure segment

Item segment

Asset segment

Project segment

Fund segment

Objective Segment

Responsibility segment

Regional segment

Order of capturing

The economic classification

Page 13: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Questions?

13

Page 14: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

SCOA V4 RE-IMPLEMENTATIONNATIONAL AND

PROVINCIAL INFORMATION SESSIONS

Presenter: SCOA Technical Committee | National Treasury | February - March 2013

Page 15: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Segment DiscussionHighlights of the changes to

the different segments

15

Page 16: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

NEW INFRASTRUCTURE SEGMENT

16

Page 17: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Infrastructure Segment

• Main segment for identifying the economic classification

• Centrally controlled and standardised for all departments and aligned to

the economic classification

• Improved recording of Own Account and Outsourced transactions – one

to one link

• New category for lease transactions

• Category links into the system now centrally controlled

“Refer to Annexure C for detailed structure”

17

Page 18: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Infrastructure segment…

• Distinguish between expenditure vs. non-expenditure• Expenditure is divided into Infrastructure and Non-Infrastructure

– Infrastructure• Economic classification same as the old “Projects Infrastructure”:

Existing Infrastructure;Maintenance and repairs (Current)Upgrades and Additions (Capital)Refurbishment and Rehabilitation (Capital)

New Infrastructure (Capital) Infrastructure Transfer (Current/Capital)

• Introduced Payments for financial assets for Concessional loans relating to Infrastructure

• Created a Lease category for Finance or Operating leases

“Refer to Annexure C for detailed structure”

18

Page 19: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Infrastructure segment…– Non-Infrastructure

• Includes expenditure categories previously under “Projects non-infrastructure and Stand-alone”

Non-Infrastructure currentNon-infrastructure / stand-alone currentMaintenance and repairs current

Non-infrastructure capitalNon-Infrastructure / stand-alone capitalNon-Infra: Upgrades and AdditionsNon-Infra: Refurbishment and Rehabilitation

Non-Infra: TransfersNon-Infra: Payments for Financial AssetsNon-Infra: Internal ChargesNon-Infra: Cara ExpenditureNon-Infra: Leases

19

Page 20: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Infrastructure segment

• Non Expenditure This category is to be used for non expenditure transactions

General Account Receipts Assets and Liabilities

NB. Changed the term Revenue to Receipts

20

Page 21: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Category links in the system

• Built using the Infrastructure an the Item segment in the systemThe purpose of the infrastructure category type is to provide the link between the posting level items in the Infrastructure segment and those in the Item segment of the chart. The infrastructure category type in the financial system ensures that the correct items in the Item segment is linked to the correct posting level projects in the Infrastructure segment, so ensuring correct classification and the elimination of inconsistencies. This link is pre-set in the systems environment, and when a infrastructure category type is identified a set of posting level items are provided in the Item segment that is linked to such category.

“Refer to Annexure D for detailed structure”

21

Page 22: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Old category links

22

Page 23: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

ITEMSEGMENT

23

Page 24: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Item segment

• Compensation of Employees:New item to be created to under salaries & wages for learnership/internship

• Goods and ServicesThe changes range from the shifting of items between non-posting levels, the removal of unused items, the renaming or redefining of items to the creation of additional items.

“Refer to Annexure B for detailed structure”

24

Page 25: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Item segment…

• Prefix OWN to replace PRJ for own account transactionsOutsourced  A project is “outsourced” when the department appoints a third party to execute the activity in its entirety; then the total value of the amount payable to that outside contractor must be recorded as Outsourced. 

Own Account A project is accounted for as “Own account’ when the Department purchases all the necessary inputs and uses its own resources (e.g. staff and equipment) to plan, implement, and execute the activity. Inputs into the project may include the appointment of professional services such as engineers, architects, project managers, etc. as well as smaller portions of the project that is outsourced, for example the construction of a laboratory outsourced to a private company forming part of a bigger school building project being implemented by the department from own account.

25

Page 26: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Item segment…• Audit Costs

The item AUDIT COST EXT: REGULARITY has been added at level 5 under the item AUDIT COST: EXTERNAL. This item has been created to monitor the total cost related to regulatory audits.

26

Old Segment Detail No

New Segment Detail No

AUDIT COST:EXTERNAL 3340 AUDIT COST:EXTERNAL 344AUDIT FEES:EXT CURRENT YEAR 3533 AUDIT COST EXT:REGULARITY 1084

AUDIT FEES:EXT CURRENT YEAR 4456 AUDIT FEES:EXT CURRENT YEAR 2702PRJ AUDIT FEES:EXT CURRENT YEAR 4457 AUDIT FEES:EXT CURRENT YEAR 3620

AUDIT FEES:EXT DISBURSEMENTS 3534 OWN:AUDIT FEES:EXT CURRENT YEAR 3621AUDIT FEES:EXT DISBURSEMENTS 4458 AUDIT FEES:EXT DISBURSEMENTS 2703PRJ AUDIT FEES:EXT DISBURSEMENTS 4459 AUDIT FEES:EXT DISBURSEMENTS 3622

AUDIT FEES:EXT PREVIOUS YEAR 3535 OWN:AUDIT FEES:EXT DISBURSEMENTS 3623AUDIT FEES:EXT PREVIOUS YEAR 4460 AUDIT FEES:EXT PREVIOUS YEAR 2704PRJ AUDIT FEES:EXT PREVIOUS YEAR 4461 AUDIT FEES:EXT PREVIOUS YEAR 3624

OWN:AUDIT FEES:EXT PREVIOUS YEAR 3625

Old Item Lowest Level New Item Lowest Level

Page 27: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Goods and Services

• External Computer ServicesThe item EXT COMP SER: SYSTEM DEVELOP was exclusively for National Treasury for payments related to systems development and is now open for use by all departments.

• Consultant and professional serviceNew items were added for science and technologies activities expenditure.

New items were added for outsourced maintenance and repairs to be restricted to departments undertaking infrastructure project (i.e. DPW, Health, Transport).

27

Page 28: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Item segment…

28

CONS/PROF:BUSINESS&ADVISORY SERV

C/P:BUS&ADV SER:FIN MANAGEMENTOUTS:C/P:BUS&ADV SER:FIN MANGMNT

C/P:BUS&ADV SER:PRJ MANAGEMENTOUTS:C/P:BUS&ADV SER:PRJ MANGMNT

C/P:BUS&ADV SER:RESEARCH&ADVISOROUTS:C/P:BUS&ADV SER:RESE&ADVISR

C/P:BUS&ADV SER:VALUEROUTS:C/P:BUS&ADV SER:VALUER

CONS/PROF:INFRASTRUCTRE&PLANNING

CONS/PROF:ENGINEERING

CONS/PROF:ENGIN CIVILOUTS:CONS/PROF:ENGIN CIVIL

CONS/PROF:ENGIN ELECTRICALOUTS:CONS/PROF:ENGIN ELECTRICAL

CONS/PROF:ENGIN MECHANICALOUTS:CONS/PROF:ENGIN MECHANICAL

CONS/PROF:ENGIN STRUCTURALOUTS:CONS/PROF:ENGIN STRUCTURAL

C/P:INFR&PLN SER:ARCHITECTURALOUTS:C/P:INFR&PLN SER:ARCHITCTRL

C/P:INF&PLN SER:LND&QTY SURVEYOROUT:C/P:INF&PLN SER:LND&QTY SURV

C/P:INFR&PLN SER:TOWN PLANNEROUTS:C/P:INFR&PLN SER:TWN PLANNR

Page 29: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Goods and Services…

• Contractors:Mnt&Rep,Imp Oth Infr AssItem has been expanded to provide for one on one link relating to maintenance, upgrades or refurbishments with the infrastructure segment (Own Account / Outsourced).

29

Old Segment Detail No

New Segment Detail No

CONTR:MNT&REP,IMPRV OTH INFR ASS 3643 CONTR:MNT&REP OTH INFR ASS 1037OUTS CONTRCTRS:MNT&REP O/INF AS 4667 OUTS CONTRCTRS:MNT&REP O/INF AS 2578PROJ CONTRCTRS:M&T,IMP OT INF A 4668 OWN: CONTRCTRS:MNT&REP OT INF A 2579

CONTR:UPG&ADD OTH INFR ASS 1038OWN CONTRCTRS:UPG&ADD OT INF A 2592

CONTR:REF&REH OTH INFR ASS 1039OWN CONTRCTRS:REFB&REHB OT INF A 2553

Old Item Lowest Level New Item Lowest Level

Page 30: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Goods and Services…

Fleet ServicesThe items relating to the management and operation of fleet have been grouped together under FLEET SERVICES (F/SER). This will ensure that the full cost related to the management of the departmental fleet is recorded together.

30

Old Segment Detail No

New Segment Detail No

TRAVEL AND SUBSISTENCE 3334 FLEET SERVICES 988T&S DOM WITHOUT OP:GG VHCL 3899 F/SER: KILOMETERS 2469

T&S DOM WITHOUT OP:GG VHCL 5146 F/SER: KILOMETERS 3498PRJ T&S DOM WITHOUT OP:GG VHCL 5147 OWN: F/SER: KILOMETERS 3499

T&S DOM WITH OP:GG VHICL 3906 F/SER: KILOMETERS 2469T&S DOM WITH OP:GG VHICL 5158 F/SER: KILOMETERS 3498PRJ T&S DOM WITH OP:GG VHICL 5159 OWN: F/SER: KILOMETERS 3499

INVENTORY OTHER CONSUMABLES 3328INV OTH CONS:LICENCE PLATES 3813 F/SER: LICENCE PLATES 2473

INV OTH CONS:LICENCE PLATES 5011 F/SERS:LICENCE PLATES 3490PRJ INV OTH CONS:LICENCE PLATES 5012 OWN:F/SERS:LICENCE PLATES 3491

OPERATING PAYMENTS 3336O/P:CAR VALET & WASHING SERV 3957 F/SER:CAR VALET & WASHING SERV 2481

O/P:CAR VALET & WASHING SERV 5208 F/SER:CAR VALET & WASHING SERV 3474PRJ O/P:CAR VALET & WASHING SERV 5209 OWN:F/SER:CAR VALT & WASHNG SERV 3475

Old Item Lowest Level New Item Lowest Level

Page 31: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Goods and Services…

• Property Payments: Contract maintenance, improvementsItem has been expanded to provide for one on one link relating to maintenance, upgrades or refurbishments with the infrastructure segment (Own Account / Outsourced).

31

Old Segment Detail No

New Segment Detail No

P/P:CONTRCTD MAINT, IMPROVE PROP 3872 CONTR:MNT&REP NON INFR ASS 1028OUTS P/P:CONTRACTD MAINT 5106 OUTS CONTRCTRS:MNT&REP N-INF ASS 1028PRJ P/P:CONTRCTD MNT, IMPROVE 5107 OWN: CONTRCTRS:MNT&REP N-INF ASS 2551

CONTR:UPG&ADD NON INFR ASS 4236OWN CONTRCTRS:UPG&ADD N-INF A 1029

CONTR:REF&REH NON INFR ASS 2552OWN:CONTRCTRS:REFB&REHB N-INF A 1030

Old Item Lowest Level New Item Lowest Level

Page 32: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Goods and Services…

• Travel and SubsistenceThe naming “WITH/WITHOUT OPERATOR” under TRAVEL AND SUBSISTENCE has been removed, thus there is now one item for each classification. T&S DOM WITHOUT OP: KM ALL (OWN TR) subsistence.

32

Old Segment Detail No

New Segment Detail No

T&S:DOM:TRANPORT W/OUT OPERATOR 3895 T&S:DOM:TRANSPORT 2173T&S DOM WITHOUT OP:CAR RENTAL 3896 T&S DOM:CAR RENTAL 3405

T&S DOM WITHOUT OP:CAR RENT 5140 T&S DOM :CAR RENT 3997PRJ T&S DOM WITHOUT OP:CAR RENT 5141 OWN:T&S DOM:CAR RENT 3998

T&S DOM WITHOUT OP:KM ALL(OWN TR 3897 T&S DOM WITHOUT OP:KM ALL(OWN TR 3406T&S DOM WITHOUT OP:KM AL(O-T 5142 T&S DOM WITHOUT OP:KM AL(O-T 3999PRJ T&S DOM WITHOUT OP:KM AL(O-T 5143 OWN T&S DOM WITHOUT OP:KM AL(O-T 4000

T&S DOM WITHOUT OP: KM ALL(SMS>) 3898 T&S DOM:KM ALLOWANCE SMS 3407T&S DOM WITHOUT OP:KM/A(SMS> 5144 T&S DOM:KM ALLOWANCE SMS 4001PRJ T&S DOM WITHOUT OP:KM/A(SMS> 5145 OWN:T&S DOM:KM ALLOWANCE SMS 4002

T&S DOM WITHOUT OP:GG VHCL 3899T&S DOM WITHOUT OP:GG VHCL 5146PRJ T&S DOM WITHOUT OP:GG VHCL 5147

Old Item Lowest Level New Item Lowest Level

Page 33: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

33

Interest…

Lease transactions

Operating lease item still under goods and services;

Finance lease items created per category of asset under purchase / construction of capital assets;

Interest on Finance lease not recorded separately

Classification of lease transaction to be explained in detail in the Lease Circular.

Page 34: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Payments for Financial Assets

• The categories for PAY FIN ASS:WATER TRAD ACC, TRADING ENTITY:DEPRECIATION and TRAD ENT:LOSS ON SALE OF CAP ASS were removed as these were originally created for recording accruals transactions for trading entities, however, these items have not been used in the recent past. Similar items under Revenue were also removed.

34

Page 35: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Transfers and Subsidies

• The creation of an item for payment towards bursaries related to research and development BURSARIES (R&D) was created on request from the Department of Science and Technology. It was created to cater for postgraduate students (all masters and PhDs excluding coursework degrees) and organised lifelong training for scientists and engineers or the equivalent for those intending to exercise an STA’s

35

Page 36: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

Payments or Construction of Capital Assets

• Changes to the Capital assets category include:– The item SMA Parachutes and Aircraft Launch/Landing/Ground Handling Equipment

has been moved from SMA to Machinery and Equipment.– The item Normal Aircraft has been changed to Military Aircraft– An item for SPECIALISED MILITARY TRAILERS has been created, which includes

trailers specifically designed for the military.– An item for MILITARY COMMUNICATION EQUIPMENT has been created, which

caters for specialised communication equipment for military use.

36

Page 37: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

ASSETSEGMENT

37

Page 38: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

38

• Asset Segment Changes:

• Previously duplicated assets removed i.e. Clinic & Community Health Centre

• Lease assets has been removed, transactions can be identified in the Item and Infrastructure segment.

NB. Department to use “Tangible Capital Asset” to create posting level for lease assets. It is important for the posting level to unique from the normal capital asset. Example when creating a posting level:

TANGIBLE CAPITAL ASSETS BUILD & OTHER FIXED STRUCTURES NON-RESIDENTIAL BUILDINGS OFFICE BUILDINGS

LEASE:40 CHURCH SQUARE40 CHURCH SQUARE

• Laboratories and Mortuaries moved from Non-residential to Health assets

• Prefabricated and Portable Buildings duplicated

Health: Prefabricated and Portable Buildings School: Prefabricated and Portable Buildings

Asset Segment

Page 39: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

PROJECTSEGMENT

39

Page 40: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

40

• Project Segment Changes:

• Infrastructure reporting moved to the Infrastructure segment

• Project Segment changed to only identify Projects within the Department

• Economic Classification removed from the Project Segment

• New project category for Scientific and Technological Activities

• Departments to provide for lower level details (Breakdown allowed)

Project Segment

Page 41: SCOA V4 RE-IMPLEMENTATION INTRODUCTION

FUNDOBJECTIVE

RESPONSIBILITYREGIONAL IDENTIFIER

SEGMENTSNo changes made to the segments

41