3
SBWR Test Loop LabVIEW Control Station, 2002

SBWR Test Loop Slide Show

Embed Size (px)

Citation preview

Page 1: SBWR Test Loop Slide Show

SBWR Test Loop LabVIEW Control Station, 2002

Page 2: SBWR Test Loop Slide Show

SBWR Chimney in front of LabVIEW Control Station

Enclosed in 6 inch Pyrex Glass tube to allow viewing

of the boiling process,

surrounded by Plexiglas safety

enclosure.

Page 3: SBWR Test Loop Slide Show

Electrically heated rod bundle on the

floor below the chimney and

LabVIEW Control Station on the Second Floor.