Version 1.0 Updated: 08/26/2008

SAP Material Master Maintenance

LOG-MD-002Aug 27, 2008

SAP Material Master SAP Material Master MaintenanceMaintenance

LOGLOG--MDMD--002002Aug 27, 2008Aug 27, 2008

LaGovLaGov

Page 2: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 2Friday, November 07, 2008 2

Agenda

Logistics, Ground Rules & Introduction

Workshop Objectives

Project Overview/Timeline

Business Process Review– SAP terms glossary – Process improvement opportunities– SAP concepts & functionality – Leading practices – Enterprise readiness challenges

Action Items

Questions

Page 3: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 3Friday, November 07, 2008 3

Before we get started ...

Logistics

Page 4: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 4Friday, November 07, 2008 4

Ground Rules

Has everybody signed in?

Everybody participates – blueprint is not a spectator sport

Focus is key – please turn off cell phones and close laptops

Challenge existing processes and mindsets

Offer suggestions and ideas

Think Enterprise

Ask questions at any time

One person at a time please

Creativity, cooperation, and compromise

Page 5: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 5Friday, November 07, 2008 5

Introductions

Roles:• Process Analyst and Functional Consultant (Team IBM):

Leads and facilitates the discussions; drives design decisions

• Documenter (State Employee): Takes detailed notes to support the formal meeting minutes (to be sent by the Process Analyst to all participants for review and feedback)

• Team Members (LaGov): Provides additional support for process discussions; addresses key integration touch points

• Subject Matter Experts: Advises team members on the detailed business processes and participates in the decisions required to design the future state business processes

Around the Room Introductions:

1. Name 2. Position3. Agency

Page 6: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 6Friday, November 07, 2008 6

Blueprint Objectives

1. Review and discuss the current or As-Is Business Processes:• Which helps to drive out the business requirementsbusiness requirements• As well as the integration pointsintegration points with other

processes2. Define Master Data:

• Address key integration points• Support organizational requirements• Consistent and appropriate use of data fields

3. Define Future or To-Be Business Processes based on:• Best Practices inherent in SAP• Intellectual capital from other SAP implementations• State business requirements

Page 7: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 7Friday, November 07, 2008 7

Blueprint Objectives (continued)

4. Identify Development Requirements:• Forms• Reports• Interfaces• Conversions• Enhancements• Workflow

5. Understand and communicate any Organizational Impact / Enterprise Readiness Challenges

6. Gather system Security Authorizations and State- wide Training Requirements

Page 8: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 8Friday, November 07, 2008 8

Today’s Workshop Objectives

Review State of Louisiana As-Is process for Material Record (Stock item no.) maintenance

Glossary

Overview of SAP Material Master Maintenance To-Be Processes:– Creation – Change general (central), local– Block– Flag for deletion

Next Steps

Page 9: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 9

Project Phases

Five Key Phases

• Strategy & Approach Defined• Project Team Training

• Business Process Definition• Development Requirements

• Development & Unit Testing• Integration Testing• End-User Training Materials

• User Acceptance• Technical Testing• End-User Training• Conversion

• Go-Live Support• Performance Tuning

Proj

ect

Prep

arat

ion

Bus

ines

s B

luep

rint

Rea

lizat

ion

Go

Live

an

d Su

ppor

t

Fina

l Pr

epar

atio

n

Page 10: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 10

Functionality Tentative Implementation Date

Budget Prep October 2009

DOTD February 2010

Core Modules All Agencies July 2010

Additional Modules January 2011

Tentative Project Timeline

Tentative implementation dates are planned as follows:

Project Start-Up

May – June 2008 July 2008 August – Dec 2008 January 2009

Blueprint

Phased deployment will be

confirmed/updated before completion

of Blueprint activities!

Page 11: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 11Friday, November 07, 2008 11

Blueprint Schedule - Tentative

Please refer to the handout for upcoming Blueprint sessions.

Page 12: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 12

Finance LeadsBeverly Hodges – Finance LeadDrew Thigpen – Finance LeadMary Ramsrud – Consulting Lead

Logistics LeadsBelinda Rogers – Logistics LeadJack Ladhur – Logistics LeadBrad Denham – Consulting Lead

Linear Assets LeadsMark Suarez – Agile Assets LeadCharles Pilson – Consulting Lead

Procurement

Contracting

Facilities Maintenance

Fleet Maintenance

Mobile Solutions

Materials / InventoryWarehousing

Project Organization - Functional Teams

Belinda RogersKaren PierceSterrie ElliottAdam LaTourSudhir Deshmukh

Page 13: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 13Friday, November 07, 2008 13

As-Is OverviewAs-Is Overview

Page 14: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 14Friday, November 07, 2008 14

As-Is Discussion of Material record maintenance for DOTD and DPS

Create new material record

Change existing material record data

Delete/Inactivate existing material record

Page 15: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 1515

DOTD “As-Is” Create or Change Material

Page 16: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 16

DOTD “As-Is” Deletion Process for Material

Material Deletion process for DOTD

Pro

cure

men

t Man

ager

Pro

cure

men

t Spe

cial

ist

US

ER

Delete material Required

Approve Deletion Request

Material deletion notification

Delete material /

Stock number

from PIMS

Delete material in Web App

STOPRequest Valid

Is the material in Inventory

No

Stop

Communicate with requestor with denial of

deletion

Mark item for future deletion (i.e. when stock goes

to zero)

Notify user of deletionYes

No

Print & File material deletion

documentation

Yes

Page 17: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 17

DOTD Initial Request Form

Page 18: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 18

DOTD Material Specification Example

Department of Transportation and Development’s specifications for stock items in PIMS.

Stock Number MS Spec. No 195-00124-16-9600 Dated 2/17/2003

LOUISIANADEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

SPECIFICATIONSDRY BAGGED CONCRETE MIX

DESCRIPTION: This specification covers dry bagged concrete to be used for minor concrete repairs, installing sign posts, installing fence posts, installing guard rail posts, etc.

MATERIALS:Aggregate: Aggregate shall be dried, screened sand and pea gravel.Cement: Cement shall be Type 1 Portland CementBlended Product: The above materials shall be blended according to the manufacturers’ directions. The blended product shall have a minimum proportion of 12:20:48 (12 pounds cement: 20 pounds pea gravel: 48 pounds sand). When tested, test specimens Shall be molded and cured in accordance with DOTD TR-226 and tested in accordance with DOTD TR-230, the minimum average compressive strength shall be 3,000 psi.

PACKAGING: The mixture shall be packaged in 80 pound bags. The bags shall be a minimum of double-layer Kraft paper suitable of containing the concrete mix under normal handling conditions. The bags shall be shipped on polyethylene-covered pallets containing 40 bags per pallet.

SAMPLING: Sampling shall be in accordance with the Department’s Materials Sampling Manual.

Page 19: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 19

DPS “As-Is” Create or Change MaterialCreate/Change Material Master Process for DPS

War

ehou

se M

anag

erE

nd U

ser

Identified new item for inventory

Review information in e-

mail E-mail received from End User

Inquiry/Analysis performed to

determine an add or change of

equipment

Generate request via e-mail to add item to inventory

Validate data for inventory to determine if

feasible to add stock

Add Stock?

Notified via e-mail that item will not

be added to inventory

No

End

Add Inventory to Material Master

Book

Yes

Information should contain: description of item;

estimated quantity for 1 year; Brand/Model #

No

Write Specification

Yes

Change Material Master

Information?

No

Receive request to change

information regarding MM from

bid or contract

Reviews information received for

changes

Edit the description to

match bid/state contract in Material

Master book

Yes

Create / Change Material Required

Page 20: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 20

DPS “As-Is” Inactivation Process for Material

Page 21: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 21

DPS Initial Material Request Form

The DPS “Printing Request” form allows an individual to submit a request for a specific form by Form No., Form Name, Quantity, Size, etc.

Page 22: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 22Friday, November 07, 2008 22

SAP ConceptsSAP Concepts

Page 23: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 23

SAP Glossary

Attribute – A property or value that describes and defines an object or an entity in detail (blonde hair, blue eyes, 5’2” tall, 120 lbs…are all attributes of a human)

Client – A grouping or combination of legal, organizational, business and/or administrative units with a common purpose; a self-contained unit in an SAP system with separate master records and its own set of tables (“The State of Louisiana”)

Company Code – This level represents an independent accounting unit within a client. Each company code has its own balance sheet and its own profit and loss statement. Example : a subsidiary company, member of a corporate group (“The State”)

ECC – Enterprise Central Component (the core SAP system where financials and most logistics transactions are processed

Blocking Material – Making material master record inactive

Flagging for deletion – A label that identifies a data record to be deleted from the database

Purchasing Organization – An organizational unit in Logistics, subdividing an enterprise according to the requirements of Purchasing

MMRM - Material Master Record Maintainers

Page 24: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 24

StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

“Going In” Logistics StructureCompanyCode 0001

(State of LA)

CompanyCode 0001

(State of LA)

PlantC003(DOTD

Sec 45)

PlantC003(DOTD

Sec 45)

PlantA001

(DOA)

PlantA001

(DOA)

PlantB002

(DPS Mgmt& FIN)

PlantB002

(DPS Mgmt& FIN)

StorageLocation

A001

StorageLocation

A001

Department Level

StorageLocation

A002

StorageLocation

A002

StorageLocation

A003

StorageLocation

A003

Agency Level

StorageLocation

B001

StorageLocation

B001

StorageLocation

B002

StorageLocation

B002

StorageLocation

C001

StorageLocation

C001

StorageLocation

C002

StorageLocation

C002

StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

StorageLocation

B003

StorageLocation

B003StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

StorageLocation

A003

StorageLocation

C003

StorageLocation

C003

Guiding Principle: If a given organization maintains inventory AND it wants to track the financial costs of that inventory at a given level, then that organizational level = SAP Plant

Note: Physical inventory taking (conducting an inventory and cycle counting) takes place at the Storage Location level!

Note: Physical inventory taking (conducting an inventory and cycle counting) takes place at the Storage Location level!

Page 25: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 25Friday, November 07, 2008 25

Going-In Position Going-In Position

Page 26: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 26

“To–Be” Create or Extend Material Request Process Flow

Page 27: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 27Friday, November 07, 2008 27

Material Master Record Creation

This process is used to create Material Master Records.

The creation of material master records is limited to a small group of people who are referred to as the Material Master Record Maintainers (MMRM).

Page 28: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 28

Material Master Creation (Continued)

1. The requester identifies the need for a material master record to be created.

2. The requester completes standard forms to provide the required information to create new material master and forwards the request to Material Master Record Maintainers. (MMRM)

3. MMRM checks if the record for that material already exists in the system or not. If it exists but is not extended to the organization (Plant/Purchasing Org) of the requester, MMRM will proceed to extend the master record to that organization.

Page 29: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 29

Material Master Creation (Continued)

4. MMRM checks that the material master record does not exist, then MMRM will create the record using the data provided by the requester.

5. MMRM will put block on the newly created master record and will notify the requester to verify the data.

6. Requester will verify the data and make any necessary corrections. After the data entry is verified, the requester will notify MMRM.

7. MMRM will remove the block on the master record and will send a general SAP mail to the requestor.

Page 30: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 30

“To–Be” Change Material Request Process Flow

Page 31: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 31Friday, November 07, 2008 31

Material Master Record Change

This process is used to Change Material Master Records.

The changing of material master records is limited to a small group of people who are referred to as the Material Master Record Maintainers (MMRM).

Page 32: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 32

Material Master Record Change (Continued)

1. The requester identifies the need to change the material master record. If the change is not global and applicable only to the local organization of the requester, changes will be done by the requesting agency.

2. If the requester identifies the need to change the basic material master data view, the requester will send the change request with the data to MMRM.

3. MMRM will send the requested changes by email to all the agencies using the material for their review.

4. If none of the agencies has any comment, MMRM will make the changes in SAP and will notify the requester and all the agencies of the change. If any agencies defers, MMRM will reject the requested change and will send an email to the requester in that effect.

Page 33: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 33

“To–Be” Delete Material Request Process Flow

Page 34: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 34

Material Master Deletion

1. The requester identifies a material master record that will not be used by the agency in the future and sends a request for deletion to MMRM.

2. MMRM will send the request to all the agencies to approve deletion request.

3. If all the agencies agree, MMRM will flag the material for deletion in SAP, providing none of the agencies are using that material.

4. Otherwise it will be blocked only for those agencies that have decided not to use this material in the future.

Page 35: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 35

Material Master Maintenance Processes Summary

Material Master creation/extension will be performed centrally by MMRM using transaction code MM01.

Material changes will be performed de-centrally by the requesting agencies using transaction MM02.

Basic data view changes and unblocking will be performed by MMRM using transaction code MM02.

Material flagging for deletion will be performed centrally by MMRM using transaction code MM06.

Material blocking/unblocking will be performed centrally by MMRM on Basic data 1 view – field “x-plant matl status”.

Page 36: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 36

Sample Material Request Form

Page 37: SAP Material Master Maintenance - Louisiana Presentation.pdfOverview of SAP Material Master Maintenance ... Cement shall be Type 1 Portland Cement. ... changes in SAP and will notify

Friday, November 07, 2008 37Friday, November 07, 2008 37

Questions?

??

??

?

?

??

?

??

??

?

?

??

?

??

??

?

?

??

?

??

??

?

?

??

?

?

??

??

? ??

??

??

??

??

?

?

?

?

??

? ?

?

??

??

?

??

??

?

??

??

??

?

?

??

??

?

?

??

??

?

?

??

?

??

?

??

??

???

?

??

?

?

??

?

??

??

?

?

??

?

??

??

?

?

??

?

??

???

??

??

?