INCOME VS. TOPOGRAPHIC LOCATION- HIGHEST AND LOWEST 20% source: World Bank Data Finder, http://databank.worldbank.org 3% 50% SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS 183 6 INFORMAL CITY FORMAL CITY CARACAS POPULATION 54% 46% .1% SAN RAFAEL-UNIDO PROJECT AREA INFORMAL CITY FORMAL CITY CARACAS SAN RAFAEL-UNIDO INFORMAL CITY FORMAL CITY SITE GEOGRAPHIC RISK source: “Upgrading San Rafael Unido: Integral Urban Project” p. 3 and http://wapi.isu.edu 60% existing slope 30% maximum acceptable CURRENT WATER SUPPLY source: “Upgrading San Rafael Unido: Integral Urban Project” p.12 7 days/wk 4 1 2 3 POPULATION BREAKDOWN BUSINESSES SERVICED BY BARRIO DWELLERS BUSINESSES SERVICED BY FORMAL CITY INHABITANTS SITE TRAFFIC source: http://www.tradingeconomics.com/venezuela/labor-force-total-wb-data.html 2.7 million dwellers 1.1 million workers 1 SQUARE ACRE 1 SQUARE ACRE

SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

INCOME VS. TOPOGRAPHIC LOCATION- HIGHEST AND LOWEST 20% source: World Bank Data Finder, http://databank.worldbank.org

3% 50%

SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS

183 6

INFORMAL CITY FORMAL CITY

CARACAS POPULATION

54%

46%

.1%

SAN RAFAEL-UNIDO PROJECT AREA

INFORMAL CITY FORMAL CITY

CARACAS

SAN RAFAEL-UNIDO

INFORMAL CITY FORMAL CITY

SITE GEOGRAPHIC RISK source: “Upgrading San Rafael Unido: Integral Urban Project” p. 3 and http://wapi.isu.edu

60% existing slope

30% maximum acceptable

CURRENT WATER SUPPLY source: “Upgrading San Rafael Unido: Integral Urban Project” p.12

7 days/wk41 2 3

POPULATION BREAKDOWN

BUSINESSES SERVICED BY BARRIO DWELLERS BUSINESSES SERVICED BY FORMAL CITY INHABITANTSSITE TRAFFIC source: http://www.tradingeconomics.com/venezuela/labor-force-total-wb-data.html

2.7 million dwellers

1.1 million workers

1 S

QU

AR

E A

CR

E

1 S

QU

AR

E A

CR

E

Page 2: SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

30 NEW STAIRWAYS2775 METERS OF INCREASED ACCESS

3 NEW ROADS 1505 METERS OF CIRCULATION

30 NEW PUBLIC SPACES EMBEDDED WITHIN STAIR NETWORK

5 PUBLIC BUILDINGS 7,000 SQ METERS NEW COMMUNITY SPACE

GEOLOGICAL RISK AREA: 8 HECTARES

29% SITE VULNERABLEMITIGATION OF MOST SUSCEPTIBLE AREAS

41 HOMES TO BE MOVED

CONDITIONS AND SOLUTIONS

Page 3: SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

STAIR NETWORK

BOUNDARY ROADS

PUBLIC SPACE

PUBLIC BUILDINGS

LOCAL INTERVENTIONS

STAIR NETWORK - SITE CONTEXT STAIR NETWORK - UTILITY ACCESS

SEWAGE

POTABLE WATER

ELECTRICALDRAINAGE

Page 4: SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

CONNECTION

IDENTITY

Page 5: SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS4ormat-asset.s3.amazonaws.com/vfs/48421/public... · 30 new stairways 2775 meters of increased access 3 new roads 1505 meters of circulation

PROCESS OF COMMUNICATION

CONAVI: GOVERNMENT BACKED ORGANIZATION FORMED TO PROVIDE COORDINATION, FUNDING, AND ETHICAL CONTINUITY FOR THE PROJECT WORLD BANK: PROVIDED 40% OF FUNDING FOR THE $150 MILLION PROJECT

PROYECTOS ARQUI 5: RESPONSIBLE FOR DE-SIGNING UPGRADES TO THE SAN RAFAEL AND UNIDO NEIGHBORHOODS OF THE LA VEGA BAR-RIO. THROUGH A WELL-DEVELOPED COMMUNI-CATION PROCESS, THEY DEVELOPED A PLAN THAT ADDRESSED THE COMMUNITY’S CONCERNS BY FOCUSING ON ACCESS NETWORKS RATHER THAN OPEN SPACES

SAN RAFAEL AND UNIDO NEIGHBORHOODS: WORKED CLOSELY WITH THE ARCHITECTS AND HAD A SIGNIFICANT EFFECT ON THE PLAN THAT RESULTED. THE PROJECT REQUIRED AND ACHIEVED 75% WRITTEN APPROVAL BY THE COMMUNITY BECAUSE IT ADDRESSED SPECIFIC CONCERNS ABOUT OPEN SPACE AND ACCESS TO UTILITIES

FUNDACOMUN: GOVERNMENT BACKED ORGANI-ZATION FORMED TO HANDLE SOCIAL ISSUES AND NEGOTIATE LEGAL ISSUES WITH ALL PARTIES IN-VOLVEDCAMBEA: GOVERNMENT ORGANIZATION THAT PROVIDED INFORMATION ABOUT THE PROJECT TO THE COMMUNITYSURVEYORS, CONTRACTORS, WATER AND ELEC-TRIC SERVICE COMPANIES: PROVIDED TECHNI-CAL SUPPORT IN REALIZING THE PHYSICAL AS-PECTS OF THE PROJECT

TECHNICIANS / NEGOTIATORS

COMMUNITY

ARCHITECTS

PROMOTERS / FUNDERS

PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS PROPOSED PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS BUILT