Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
INCOME VS. TOPOGRAPHIC LOCATION- HIGHEST AND LOWEST 20% source: World Bank Data Finder, http://databank.worldbank.org
3% 50%
SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS
183 6
INFORMAL CITY FORMAL CITY
CARACAS POPULATION
54%
46%
.1%
SAN RAFAEL-UNIDO PROJECT AREA
INFORMAL CITY FORMAL CITY
CARACAS
SAN RAFAEL-UNIDO
INFORMAL CITY FORMAL CITY
SITE GEOGRAPHIC RISK source: “Upgrading San Rafael Unido: Integral Urban Project” p. 3 and http://wapi.isu.edu
60% existing slope
30% maximum acceptable
CURRENT WATER SUPPLY source: “Upgrading San Rafael Unido: Integral Urban Project” p.12
7 days/wk41 2 3
POPULATION BREAKDOWN
BUSINESSES SERVICED BY BARRIO DWELLERS BUSINESSES SERVICED BY FORMAL CITY INHABITANTSSITE TRAFFIC source: http://www.tradingeconomics.com/venezuela/labor-force-total-wb-data.html
2.7 million dwellers
1.1 million workers
1 S
QU
AR
E A
CR
E
1 S
QU
AR
E A
CR
E
30 NEW STAIRWAYS2775 METERS OF INCREASED ACCESS
3 NEW ROADS 1505 METERS OF CIRCULATION
30 NEW PUBLIC SPACES EMBEDDED WITHIN STAIR NETWORK
5 PUBLIC BUILDINGS 7,000 SQ METERS NEW COMMUNITY SPACE
GEOLOGICAL RISK AREA: 8 HECTARES
29% SITE VULNERABLEMITIGATION OF MOST SUSCEPTIBLE AREAS
41 HOMES TO BE MOVED
CONDITIONS AND SOLUTIONS
STAIR NETWORK
BOUNDARY ROADS
PUBLIC SPACE
PUBLIC BUILDINGS
LOCAL INTERVENTIONS
STAIR NETWORK - SITE CONTEXT STAIR NETWORK - UTILITY ACCESS
SEWAGE
POTABLE WATER
ELECTRICALDRAINAGE
CONNECTION
IDENTITY
PROCESS OF COMMUNICATION
CONAVI: GOVERNMENT BACKED ORGANIZATION FORMED TO PROVIDE COORDINATION, FUNDING, AND ETHICAL CONTINUITY FOR THE PROJECT WORLD BANK: PROVIDED 40% OF FUNDING FOR THE $150 MILLION PROJECT
PROYECTOS ARQUI 5: RESPONSIBLE FOR DE-SIGNING UPGRADES TO THE SAN RAFAEL AND UNIDO NEIGHBORHOODS OF THE LA VEGA BAR-RIO. THROUGH A WELL-DEVELOPED COMMUNI-CATION PROCESS, THEY DEVELOPED A PLAN THAT ADDRESSED THE COMMUNITY’S CONCERNS BY FOCUSING ON ACCESS NETWORKS RATHER THAN OPEN SPACES
SAN RAFAEL AND UNIDO NEIGHBORHOODS: WORKED CLOSELY WITH THE ARCHITECTS AND HAD A SIGNIFICANT EFFECT ON THE PLAN THAT RESULTED. THE PROJECT REQUIRED AND ACHIEVED 75% WRITTEN APPROVAL BY THE COMMUNITY BECAUSE IT ADDRESSED SPECIFIC CONCERNS ABOUT OPEN SPACE AND ACCESS TO UTILITIES
FUNDACOMUN: GOVERNMENT BACKED ORGANI-ZATION FORMED TO HANDLE SOCIAL ISSUES AND NEGOTIATE LEGAL ISSUES WITH ALL PARTIES IN-VOLVEDCAMBEA: GOVERNMENT ORGANIZATION THAT PROVIDED INFORMATION ABOUT THE PROJECT TO THE COMMUNITYSURVEYORS, CONTRACTORS, WATER AND ELEC-TRIC SERVICE COMPANIES: PROVIDED TECHNI-CAL SUPPORT IN REALIZING THE PHYSICAL AS-PECTS OF THE PROJECT
TECHNICIANS / NEGOTIATORS
COMMUNITY
ARCHITECTS
PROMOTERS / FUNDERS
PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS PROPOSED PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS BUILT