I. Title of the Project Lagaslas ng Ilog na Iga II. Location Brgy. Pansol, Padre Garcia, Batangas III. Duration/Time of Implementation IV. Type of Community Extension Services Environmental/Ecological Program 1. Waste Management 2. Environmental Management V. Department Involved/College Involved A. Faculty 1. Mr. Reynante Lindog B. Students 1. Hiedi Perez 2. Jazminne Pena 3. Micah Angela Espina 4. Irejane Pamis 5. Jezreel Janry Garcia 6. Carl Lois Borja 7. Jeremiah Ocampo 8. Dahlia Brinosa 9. Mary Rose Ramos 10. Abante, Liezel 11.Aranez, Edward 12.Arano,Leslie Dyan 13.Bilaro, Cristine Republic of the Philippines Batangas State University National Service Training Program Batangas City

sample proposal

  • Upload
    ciarely

  • View
    83

  • Download
    0

Embed Size (px)

DESCRIPTION

made by CWTS- General Engineering Students

Citation preview

Page 1: sample proposal

I. Title of the ProjectLagaslas ng Ilog na Iga

II. LocationBrgy. Pansol, Padre Garcia, Batangas

III. Duration/Time of Implementation

IV. Type of Community Extension ServicesEnvironmental/Ecological Program

1. Waste Management2. Environmental Management

V. Department Involved/College InvolvedA. Faculty

1. Mr. Reynante LindogB. Students

1. Hiedi Perez2. Jazminne Pena3. Micah Angela Espina4. Irejane Pamis5. Jezreel Janry Garcia6. Carl Lois Borja7. Jeremiah Ocampo8. Dahlia Brinosa9. Mary Rose Ramos10. Abante, Liezel11.Aranez, Edward12.Arano,Leslie Dyan13.Bilaro, Cristine14.Carreon, Don Vincent15.De Castro, Mark16.Festijo, Shiela17.Garcia, Glady18.Gupit, Mylene

Republic of the PhilippinesBatangas State UniversityNational Service Training

ProgramBatangas City

Project Proposal

Page 2: sample proposal

19.Lanuzo, Von Eric20.Latade, Arlyn21.Laylo, Giesel22.Magbujos, Charmine23.Manaois, Jomar24.Matibag, Mark Edison25.Mendoza, Syrene Michelle26.Valdez, Maria Inez

VI. Project Leader and CoordinatorsContact Number

Mr. Reynante Lindog Jezreel Janry Garcia 09199454597Carl Lois Borja 09489332041Jeremiah Ocampo 09195533757

VII. Cooperating Agencies/PartnersA. Batangas State University-Rosario CampusB. Association of General Engineering StudentsC. Pansol, Padre Garcia, Batangas Barangay Office

VIII. BeneficiariesCommunity

IX. Total Cost of the Project Broom stick (15 pcs.) -php300 Garbage bag -php200 Fare -php6000 Dust pan -php300 Merienda -php3200

Total cost -php10000

X. Rationale of the ProjectBrgy. Pansol, Padre Garcia, Batangas’ river was once used as a source for potable

drinking water. However, due to certain changes such as the inhabitation of the community’s residents and improper waste disposal, the said river is now polluted and requires immediate action if wanted to be preserved.

XI. Objectives

Page 3: sample proposal

A. To clean the riverbed and its surroundingsB. To inform the residents about proper waste disposalC. To help the students and the residents realize the importance of maintaining the

environment’s cleanliness

XII. Description of the Project, Strategies and Methods/Plan of Action

Brgy. Pansol, Padre Garcia, Batangas’ river was once used as a source for potable drinking water. However, due to certain changes such as the inhabitation of the community’s residents and improper waste disposal, the said river is now polluted and requires immediate action if wanted to be preserved.

The project will be done using the following methods:

a. We will initiate a group discussion with the key informants of the community such as public officials and the localities. We are going to talk about what would we are going to do to make the project possible.

b. A survey or visiting to the place is the next thing we are going to do.XIII. Financial Plan/Proposed Expenditures/Fund Raising ActivitiesXIV. Functional Relationships with the Collaborating Agencies/Duties/Responsibilities of

Agencies InvolvedXV. Monitoring and Evaluation MechanicsXVI. Plans for Ensuring the Sustainability of the Project1. A lot of time and effort for preparation of project.2. Cooperation of members.3. Well management of goals and purposes of desired project.4. Proper monitoring and evaluation of the project.5. Keeps a systematic approach regarding the decision-making for every project matters.6. Break the job into tasks.7. Have an emotional connection to the project.8. Shared leadership.9. Create an atmosphere of growth.10. Have a wide visibility.

Prepared by:

Hiedi PerezJezreel Janry GarciaMicah Angela EspinaIrejane PamisMary Rose Ramos

Page 4: sample proposal

Dahlia BrinosaCarl Lois BorjaJeremiah OcampoJazminne PenaAbante, LiezelAranez, EdwardArano,Leslie DyanBilaro, CristineCarreon, Don VincentDe Castro, MarkFestijo, ShielaGarcia, GladyGupit, MyleneLanuzo, Von EricLatade, ArlynLaylo, GieselMagbujos, CharmineManaois, JomarMatibag, Mark EdisonMendoza, Syrene MichelleValdez, Maria Inez